From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Dear Stakeholder
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated
Solar Power (CSP) project and associated infrastructure. The project
development site is located on Portion 4 of the Farm Scuitklip 92 which is located
approximately 45km north-east of Pofadder within the Khai-Ma Local Municipality
in the Northern Cape. The project is referred to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into
the Eskom electricity grid. The project is proposed to be bid into the Department
of Energy’s (DoE) Renewable Energy Independent Power Producers Procurement
(REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act
(Act No 107 of 1998), as read with Government Notices R982 to GN R985; an EIA
process is being undertaken for this proposed project. The National Department
of Environmental Affairs (DEA) is the competent authority. In order to obtain
authorisation, comprehensive, independent environmental studies must be
undertaken in accordance with the EIA Regulations, 2014. The DEA accepted the
Scoping Report and Plan of Study for the project in February 2016. The
application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as
the independent environmental consultant to undertake the required EIA to
identify and assess all the potential environmental impacts associated with the
proposed project, and propose appropriate mitigation and management measures
in an Environmental Management Programme (EMPr). As part of these
environmental studies, Interested and Affected (I&APs) will be actively involved
through the public involvement process.
![Page 2: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/2.jpg)
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah
Environmental and is available for review. The review period is from
4 May 2016 – 3 June 2016. The report can be viewed at the Pofadder Public
Library (New Road, Pofadder). The report can also be downloaded from the
website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written
correspondence in this regard. All comments received will be submitted in the
final EIA Report which will be submitted to the DEA. Comments can be made as
a written submission via fax, post or email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held
during the public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding
the proposed projects (including technical details, project process and timeframes
etc.), to provide a summary of the findings of the Environmental Impact
Assessment Report, to invite comment on the proposed project, and to further
discuss possible issues of specific concern to you which may need to be
addressed.
Please do not hesitate to contact us should you require additional information
and/or clarification regarding the proposed project. Our team welcomes your
participation and looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 3: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/3.jpg)
EIA PROCESS - PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE -
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Assigned to:
Teams: Global Project: Paulputs CSP Tower Facility, NC
From: Gabriele Wood <[email protected]>
To:
Cc:
Bcc: Amanda Bester <[email protected]>, Alistair Silo <[email protected]>, Chris
Fortuin <[email protected]>, Francois van der Heerver <[email protected]>,
Steven Shibambu <[email protected]>, Samantha Ralston <[email protected]>,
Brian Fisher <[email protected]>, Nonhlahla Mkhwanazi
<[email protected]>, Adrian Tiplady <[email protected]>, Jillian Nortje
<[email protected]>, Constant Hoogstad <[email protected]>, Vered Karty
<[email protected]>, Simon Gear <[email protected]>, Peter Cloete
<[email protected]>, Tabbie Roberts <[email protected]>, Leonard Shaw
<[email protected]>, Shaun Cloete <[email protected]>, John Geeringh
<[email protected]>, Jannie Loubser <[email protected]>, Ratha
Andrew Timothy <[email protected]>, Phillip Hine <[email protected]>, Immanuel
Smith <[email protected]>, Jaco Roelefse <[email protected]>, Lizell
Stroh <[email protected]>, Niell van Rensburg <[email protected]>, Jasper
Nieuwoudt <[email protected]>, Skumsa Mancotywa
<[email protected]>, Roger Basson <[email protected]>, Melanie
Miles <[email protected]>, Debbie Hardin <[email protected]>, Jacoline Mans
<[email protected]>, Lukas van Zyl <[email protected]>, Chris Schutte
<[email protected]>, Johan Koegelenberg <[email protected]>, Conrad
Geldenhuys <[email protected]>, Julian Lopez Garrido
<[email protected]>, Henry Raman <[email protected]>, Louis van Heerden
<[email protected]>, Pule Ramaleho Ramaleho Saila
<[email protected]>, Jenetta Sophia Hennig <[email protected]>, Onwabile
Ndzumo <[email protected]>, Thoko Buthelezi <[email protected]>, Mere Kgampe
<[email protected]>, Obakeng Isaacs <[email protected]>, Nozizwe
Makgalemele <[email protected]>, Abe Abrahams <[email protected]>,
Sunday Mabaso <[email protected]>, Karen van Schalkwyk
<[email protected]>, Wonders Dimakatso Viljoen Mothibi
<[email protected]>, Mashudu Marubini <[email protected]>, Charles
Gregory March <[email protected]>, Pheladi Masipa
<[email protected]>, René de Kock <[email protected]>
Subject: EIA PROCESS - PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE -
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Body: Dear Stakeholder
Forward
Projects Organisations Stakeholders Calendar Reports Emails more
Search
© 2012 SugarCRM Inc.
EIA PROCESS - PAULPUTS CSP PROJECT, NORTHERN CAPE ... http://savannahsa.sugar-crm.co.za/index.php?module=Emails&action...
1 of 4 04/05/2016 17:19
![Page 4: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/4.jpg)
on Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project. Paulputs CSP RF (Pty) Ltd has appointed Savannah
Environmental (Pty) Ltd as the independent environmental consultant to undertake the
required EIA to identify and assess all the potential environmental impacts associated with
the proposed project. An EIA Report for the proposed project has been prepared by
Savannah Environmental and is available for review. Please refer to the attached notification
letter for further details regarding the availability of the EIA Report and Public Meeting.
Please do not hesitate to contact me if you have any queries in this regard.
Kind regards
Mrs Gabriele Wood
Public Participation and Social Consultant
Savannah Environmental (Pty) Ltd
Tel: 27 11 656 3237
Fax: 086 684 0547
Email: [email protected]
www.savannahsa.com
Show Plain Text
Attachments: Paulputs CSP DEIAr Notification 3.05.2016.pdf
Activities
(0 - 0 of 0)
Subject Status ContactDueDate
AssignedUser
Attachments
(1 - 1 of 1)
Subject ContactLastModified
Paulputs CSP DEIAr Notification 3.05.2016.pdf04/05/201617.18
Accounts
edit
© 2012 SugarCRM Inc.
Projects Organisations Stakeholders Calendar Reports Emails more
EIA PROCESS - PAULPUTS CSP PROJECT, NORTHERN CAPE ... http://savannahsa.sugar-crm.co.za/index.php?module=Emails&action...
2 of 4 04/05/2016 17:19
![Page 5: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/5.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Department of Agriculture, Forestry & Fisheries
Delpen Building, Office 270
Cnr Annie Botha & Union Streets
Pretoria
0084
Tel: 012-319-7619
Email: [email protected]
Dear Ms. Mashudu Marubini
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 6: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/6.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 7: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/7.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Department of Agriculture, Forestry & Fisheries
DAFF Directorate: Forestry Management
Louisvale Road
Upington
8800
Tel: 054-338-5909
Email: [email protected]
Dear Ms. Jacoline Mans
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 8: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/8.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 9: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/9.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Department of Agriculture, Forestry & Fisheries
Delpen Building, Office 270
Cnr Annie Botha and Union Street
Pretoria
0084
Tel: 012-319-7634
Email: [email protected]
Dear Ms. Thoko Buthelezi
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 10: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/10.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 11: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/11.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Department of Energy
Perm Building
65 Phakamile Mabija Street
Kimberley
8301
Tel: 053-807-1752
Attention: Director Northern Cape
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Dear Sir/Madam
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 12: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/12.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 13: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/13.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Department of Energy
192 Visagie Street
Pretoria
0002
Tel: 012-406-7650
Email: [email protected]
Dear Mr. Pheladi Masipa
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 14: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/14.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 15: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/15.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Department of Environmental Affairs
Environment House
473 Steve Biko Road
Pretoria
0001
Tel: 012-399-9514
Email: [email protected]
Dear Ms. Skumsa Mancotywa
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 16: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/16.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 17: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/17.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Department of Mineral Resources
Perm Building
65 Phakamile Mabija Street
Kimberley
8300
Tel: 053-807-1700
Email: [email protected]
Dear Mr. Sunday Mabaso
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 18: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/18.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 19: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/19.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Department of Mineral Resources
Hopley Centre, cnr of Van der stel & Van Riebeeck Streets
Springbok
8240
Tel: 027-712-8160
Email: [email protected]
Dear Mr. Jasper Nieuwoudt
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 20: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/20.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 21: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/21.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Department of Water and Sanitation
Louisvale Road
Upington
8800
Tel: 054-338-5800
Email: [email protected]
Dear Mr. Steven Shibambu
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 22: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/22.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 23: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/23.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Eskom Holdings SOC Ltd
Megawatt Park
Maxwell Drive
Sunninghill
2157
Tel: 011-516-7233
Email: [email protected]
Dear Mr. John Geeringh
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 24: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/24.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 25: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/25.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Khai Ma Local Municipality
New Street
Pofadder
8890
Tel: 054-933-1014
Email: [email protected]
Dear Ms. Jillian Nortje
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 26: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/26.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 27: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/27.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Khai Ma Local Municipality
354 Lang Street
Blyvooruitsig
Pofadder
8890
Tel: 054-933-1000
Email: [email protected]
Dear Cllr Henry Raman
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 28: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/28.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 29: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/29.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Khai Ma Local Municipality
New Street
Pofadder
8890
Tel: 054-933-1000
Email: [email protected]
Dear Mr. Roger Basson
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 30: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/30.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 31: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/31.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Khai Ma Local Municipality
New Street
Pofadder
8890
Tel: 054-933-1005
Email: [email protected]
Dear Mr. Obakeng Isaacs
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 32: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/32.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 33: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/33.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Namakwa District Municipality
Van Riebeeck Street
Springbok
8240
Tel: 027-712-8000
Email: [email protected]
Dear Mr. Chris Fortuin
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 34: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/34.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 35: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/35.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Namakwa District Municipality
Van Riebeeck Street
Springbok
8240
Tel: 027-712-8000
Email: [email protected]
Dear Mr. Immanuel Smith
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 36: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/36.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 37: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/37.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Ngwao-Boswa Ya Kapa Bokone (Northern Cape Provincial Heritage Resources Authority)
1 Monridge Office Park
Cnr Kekewich Drive & Memorial Road
Kimberley
8301
Tel: 053-831-2537
Email: [email protected]
Dear Mr. Ratha Andrew Timothy
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 38: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/38.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 39: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/39.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Northern Cape Department of Agriculture, Land Reform & Rural Development
Kimberlite Building
162 George Street
Kimberley
8301
Tel: 053-838-9102
Email: [email protected]
Dear Mr. Wonders Dimakatso Viljoen Mothibi
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 40: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/40.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 41: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/41.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Northern Cape Department of Environment and Nature Conservation
Cnr. Voortrekker and Magasyn Street
Springbok
8240
Tel: 027-718-8800
Email: [email protected]
Dear Ms. Onwabile Ndzumo
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 42: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/42.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 43: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/43.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Northern Cape Department of Environment and Nature Conservation
c/o Voortrekker & Magasyn Street
Springbok
8240
Tel: 027-718-8800
Email: [email protected]
Dear Mr. Peter Cloete
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 44: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/44.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 45: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/45.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Northern Cape Department of Environment and Nature Conservation
1 Airport Road
Springbok
8240
Tel: 027-718-9906
Email: [email protected]
Dear Mr. Conrad Geldenhuys
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 46: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/46.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 47: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/47.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
South African National Roads Agency Limited
1 Havenga Street
Oakdale
Bellville
7530
Tel: 021-957-4600
Email: [email protected]
Dear Ms. René de Kock
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 48: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/48.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 49: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/49.jpg)
From the desk of Gabriele Wood
E-mail: [email protected]_____________________________________
4 May 2016
Square Kilometre Array (SKA): South Africa
SKA Office, 1st Floor
17 Baker Street
Rosebank
2196
Tel: 011-442-2434
Email: [email protected]
Dear Mr. Adrian Tiplady
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
PUBLIC PARTICIPATION PROCESS
PAULPUTS CSP PROJECT, NORTHERN CAPE PROVINCE
(DEA REF. No. 14/12/16/3/3/2/870)
NOTIFICATION OF AVAILABILITY OF EIA REPORT AND PUBLIC MEETING
Paulputs CSP RF (Pty) Ltd proposes the development of a 200MW Concentrated Solar Power
(CSP) project and associated infrastructure. The project development site is located on
Portion 4 of the Farm Scuitklip 92 which is located approximately 45km north-east of
Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred
to as the Paulputs CSP Project.
The purpose of the proposed CSP project is to evacuate the generated power into the Eskom
electricity grid. The project is proposed to be bid into the Department of Energy’s (DoE)
Renewable Energy Independent Power Producers Procurement (REIPPP) Programme.
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
In terms of Sections 24 and 24D of the National Environmental Management Act (Act No
107 of 1998), as read with Government Notices R982 to GN R985; an EIA process is being
undertaken for this proposed project. The National Department of Environmental Affairs
(DEA) is the competent authority. In order to obtain authorisation, comprehensive,
independent environmental studies must be undertaken in accordance with the EIA
Regulations, 2014. The DEA accepted the Scoping Report and Plan of Study for the project
in February 2016. The application has been assigned the following reference number:
14/12/16/3/3/2/870.
Paulputs CSP RF (Pty) Ltd has appointed Savannah Environmental (Pty) Ltd as the
independent environmental consultant to undertake the required EIA to identify and assess
all the potential environmental impacts associated with the proposed project, and propose
appropriate mitigation and management measures in an Environmental Management
Programme (EMPr).
![Page 50: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/50.jpg)
As part of these environmental studies, Interested and Affected (I&APs) will be actively
involved through the public involvement process.
AVAILABILITY OF THE EIA REPORT FOR REVIEW
An EIA Report for the proposed project has been prepared by Savannah Environmental and
is available for review. The review period is from 4 May 2016 – 3 June 2016. The report
can be viewed at the Pofadder Public Library (New Road, Pofadder). The report can also be
downloaded from the website www.savannahsa.com/projects.
Please could you kindly submit your formal comments by sending written correspondence in
this regard. All comments received will be submitted in the final EIA Report which will be
submitted to the DEA. Comments can be made as a written submission via fax, post or
email.
PUBLIC MEETING
In order to facilitate comments on the EIA Report, a public meeting will be held during the
public review period as follows:
Date: Thursday 26 May 2016
Time: 17:30
Venue: Pofadder Civic Hall, Bree Street, Pofadder
The aim of the public meeting is to provide you with more information regarding the
proposed projects (including technical details, project process and timeframes etc.), to
provide a summary of the findings of the Environmental Impact Assessment Report, to invite
comment on the proposed project, and to further discuss possible issues of specific concern
to you which may need to be addressed.
Please do not hesitate to contact us should you require additional information and/or
clarification regarding the proposed project. Our team welcomes your participation and
looks forward to your involvement throughout this process.
Kind Regards
MRS GABRIELE WOOD
PUBLIC PARTICIPATION AND SOCIAL CONSULTANT
SAVANNAH ENVIRONMENTAL
![Page 51: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/51.jpg)
![Page 52: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/52.jpg)
![Page 53: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/53.jpg)
![Page 54: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/54.jpg)
![Page 55: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/55.jpg)
![Page 56: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/56.jpg)
![Page 57: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/57.jpg)
![Page 58: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/58.jpg)
![Page 59: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/59.jpg)
![Page 60: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/60.jpg)
![Page 61: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/61.jpg)
![Page 62: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/62.jpg)
![Page 63: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/63.jpg)
![Page 64: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/64.jpg)
![Page 65: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/65.jpg)
![Page 66: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/66.jpg)
![Page 67: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/67.jpg)
![Page 68: Paulputs CSP DEIAr Notification 3.05 · 2018. 1. 20. · , Jannie Loubser](https://reader031.fdocuments.in/reader031/viewer/2022011916/5fe24390a0f24b677b0f70fb/html5/thumbnails/68.jpg)