Transcript of Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW |...
Paula J. Trigg, County Engineer
Public Works and Transportation Committee
April 2, 2014
OVERVIEW | SOURCE OF PROJECTS2014-2019 PROPOSED HIGHWAY IMPROVEMENT PROGRAM
PRESENTATION SCHEDULE:2014-2019 5-YEAR HIGHWAY IMPROVEMENT PROGRAM
PWTC 2014 Meeting Date Presentation Topic
February 26 • Preview 2014 Construction
April 2 • Overview/Source of Projects
April 30 • Preservation Projects
May 7 • Modernization and Expansion Projects
May 28 • Funding and Revenue
June 4 • Project Listings
June 25 • Draft Program Document
• Presented at Feb 26 PWTC meeting
• Transportation corridors
• Meeting long-term traffic growth demands
PREVIEW: 2014-15 MAJOR PROJECTS
Project continued from 2013
New project (construction in 2014)
Late-2014 project award (construction in 2015)
• 2014-2019 5-year Highway Improvement Program effective 7/1/14, but project additions generally made for years 2015-2019
• Q: Where do ideas for the recommended projects come from to create a list of funded projects for the next 5 years?
• A: from the LCDOT’s comprehensive technical, objective highway asset management tools
POTENTIAL PROJECT SOURCES
WORK TYPES• Bike Path
• Bonds
• Bridges
• Culverts
• Drainage
• Engineering Support
• Enhancements
• Facilities
• Guardrail
• Intersection
• Maintenance
• Paratransit
• Patch
• Patrol 1
• Plan
• Railroad
• Reconstruction
• Resurface
• Resurfacing, Rehabilitation & Restoration (3R)
• Road Districts
• Roadway
• Signals
DEVELOPING THE PROGRAM
SYSTEM PRESERVATION PROJECTS• First Priority
• Keep county highway pavements, bridges bikeways, signals and related items in good condition
• Project set is developed using:
• ARGUS
• NBIS
RECURRING ANNUAL PROJECTS:2019 MAINTENANCE
• Basin Management
• Bike Path Repaving
• Bituminous Markings
• Bituminous Patching
• Bituminous Shoulder Maintenance
• Bond Payments
• CMAP Assessment
• Concrete Markings
• Concrete Patching
• Crack Sealing
• Detention Right of Way
• Guardrail Maintenance
• ITS-PASSAGE Elements
• ITS-PASSAGE Integration
• ITS-PASSAGE Network
• JULIE locates
• Material Inspection
• Microsurfacing
• Miscellaneous Engineering – MT
• Miscellaneous Engineering – ST
• Miscellaneous Maintenance – CB
• Miscellaneous Maintenance – MT
• Non-motorized Travel
• NPDES Phase 2
• Paratransit Dispatch Mobility Operations
• Pavement Management
• Pavement Markers
• Retaining Wall Maintenance
• Road Districts
• Road Enhancements
• Road Maintenance
• 2012 Revised Sales Tax Plan – Engineering and ROW Support
• Signal Coordination
• Signal Equipment
• Signal Maintenance
• Tree Maintenance
SYSTEM MODERNIZATION PROJECTS• Second Priority
• Reduce delays and increase safety by accommodating short-term traffic growth and the needs of non-motorists
• Project set is developed using:
• TCAS
• 2040 Bicycle Priorities
• Non-motorized Policy guidelines
• Inter/Intra County Paratransit Transportation Plan
• Third Priority
• Provide highway capacity to meet long-term traffic growth needs and provide for economic development
• Project set is developed using:
• Consensus Priority List
• Plan for Using the new Collar County Transportation Empowerment Funds
• 2040 Roadway Plan
• Average Daily Traffic data
• 2040 Transit Plan
SYSTEM EXPANSION PROJECTS
LAKE COUNTY’S2040 TRANSPORTATION PLAN• Long range plan to identify
deficiencies and recommend improvements to address future transportation needs
• In development since 2010
• Network modeled from CMAP regional model with local characteristics
• Includes 2040 population and employment projections and corresponding traffic impacts
• Proposed improvements prioritized based on forecasted deficiency, prior study, cost and people-jobs potential
2040 ROADWAY PRIORITIES• Peak period trips estimated
to increase by 36% between 2010 and 2040
• 212 miles of roadway Improvements recommended
• 7 interchange
• 9 intersection
• 65 corridor
• Plan recommends an
additional 300 miles of non-motorized facilities
• Primarily off-street multi-use path for cyclist, pedestrian and other non-motorized use
• Many projects connect to Metra and bus routes for improved viability of non-motorized travel
• Provide essential non-motorized connections to communities, jobs, parks, schools, forest preserves
• Jurisdiction over non-motorized facilities by Lake County DOT, Lake County Forest Preserves, townships, municipalities and institutions
2040 NON-MOTORIZED PRIORITIES
• Variety of transit services are needed to address county needs:
• Demand response
• Fixed route bus
• Commuter rail• Recommendations based on
assessed needs with regard to:
• Connectivity
• Existing facilities and services
• Jurisdictional issues
• Considered previous plan results (CMAP GOTO2040, Lake County 2020 Transportation Priority Plan)
2040 TRANSIT PRIORITIES
PRESENTATION SCHEDULE:2014-2019 5-YEAR HIGHWAY IMPROVEMENT PROGRAM
PWTC 2014 Meeting Date Presentation Topic
February 26 • Preview 2014 Construction
April 2 • Overview/Source of Projects
April 30 • Preservation Projects
May 7 • Modernization and Expansion Projects
May 28 • Funding and Revenue
June 4 • Project Listings
June 25 • Draft Program Document