Patzer Operator+Effectiveness Oct+2010
-
Upload
ivan-radovic -
Category
Documents
-
view
224 -
download
0
Transcript of Patzer Operator+Effectiveness Oct+2010
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
1/17
ABB / PA / Control SystemsNovember 7, 2010 | Slide 1
ABB Control Systems 800xAOperator Effectiveness
Ingo Patzer, Lifecycle Business Development Manager, RMU Middle East, 2010
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
2/17
The Power of IntegrationOperator Effectiveness
What is Operator Effectiveness
System 800xA Extended Automation
The Four Pillars of Operator Effectiveness
Beyond System 800xA
Competitive Summary
ABB / PA / Control SystemsNovember 7, 2010 | Slide 2
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
3/17
What is Operator Effectiveness?Empowering the process operator
Improve process safety and optimize production
Improve abnormal condition handling
Make better decisions
ABB / PA / Control SystemsNovember 7, 2010 | Slide 3
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
4/17
Market TrendsIncreasing Interest in Operator Effectiveness
Centralization, Consolidation, Collaboration
Adoption of standards and attention to human factors
Retiring knowledge base
Health and Safety
ABB / PA / Control SystemsNovember 7, 2010 | Slide 4
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
5/17
Operator EffectivenessIs it worth it?
Estimated that abnormalsituations account for more
than $20 billion USD lost inthe US economy alone.
These abnormal situationsare estimated to the loss of
3-8% of industrial capacity. It is estimated that 20-25%
of this loss can berecovered with the properimplementation of highperformance HMIs.
Source: the High Performance HMI Handbook by BillHollifield, Dana Oliverr, Ian Nimmo, and Eddie Habibi :quoting studies done by ASM Abnormal Situationmanagement
ABB / PA / Control SystemsNovember 7, 2010 | Slide 5
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
6/17
How do you achieve Operator Effectiveness?
Organizational structure,roles and responsibilities
Operator Interface Design
Alarm Management
ConditionMonitoring
Asset Utilization
Workplace design
Procedures /
Workflow
Control Room Design
and Ergonomics
Operator competence, trainingand skills development
KnowledgeManagement
Process andabnormal situation
understanding
Alertness and Fatigue
Safety CriticalCommunications
ABB / PA / Control SystemsNovember 7, 2010 | Slide 7
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
7/17
The Four Pillars of Operator Effectiveness
Integrated Operations
High Performance Design
Attention to Human Factors
Operator Competence
ABB / PA / Control SystemsNovember 7, 2010 | Slide 8
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
8/17
System 800xA Extended AutomationIntegrated Operations
Perfect for centralized,consolidated
operations Seamless data
presentation fromvaried sources
Rationalized, Multi-tierfaceplates
Aspect ObjectTechnology
Multi-SystemIntegration
ABB / PA / Control SystemsNovember 7, 2010 | Slide 9
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
9/17
High Performance DesignAssociations, Groups, Consultants
Various organizations withguidelines and standards
Operator interface design Alarm Management
Situation Awareness
Research and bestpractices
Other topics as well
Consultant organizations that
have their own version Customer usually have their
own based on sameprincipals
ABB / PA / Control SystemsNovember 7, 2010 | Slide 10
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
10/17
High Performance DesignSituation AwarenessWhats better?
39.4 Deg C Is it rising or falling?
Is it about to go into
alarm? What other tags will be
affected by this?
Small trend shows historywhen mouse hovers
Trend indicates if it is aboutto go into alarm or droppingback to a normal condition.
Arrow shows up to point toaffected tag(s)
ABB / PA / Control SystemsNovember 7, 2010 | Slide 11
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
11/17
System 800xA Extended AutomationHigh Performance Design
Hierarchical Displaytowards standards like
ASM and ISA S88
Graphic elements forPID status PVcomparison
Personalized
Workplace to matchoperations strategy
Intuitive navigation forquick display access
during abnormalconditions
Ability to meet standardsbased design
Personalized workplaces Supported customization
Color Definitions,graphic elements,
navigation elements, Intuitive Navigation
Alarm Management
Dynamic alarmhandling based
on plant state
ABB / PA / Control SystemsNovember 7, 2010 | Slide 12
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
12/17
System 800xA Extended AutomationAttention to Human Factors
Includes processes andprocedures with technology
Control room environmentlooked at more closelyduring evolutions
Attention to human factors
makes operators moreeffective.
Reduced stress and fatigue:
Increase operator
performance Improve abnormal
situation handling
Reduce health issues
and turnover of resources
Old style control room
New modern control room
ABB / PA / Control SystemsNovember 7, 2010 | Slide 13
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
13/17
Extended Operator WorkplaceWhere it all comes together
Advanced keyboard for
multi client handlingwith hotkeys
Directional soundsystem and integrateddimmable lighting Motorized, adjustable
monitor positions
Operator desk systemwith adjustabledesk/monitorpositioning
Optional micro-
ventilation
ABB / PA / Control SystemsNovember 7, 2010 | Slide 14
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
14/17
System 800xA Extended Automation SimulationOperator Competency
System 800xA
configuration
ProcessModel
I/O ITS Link
Simulator
Controlroom
Simulator system
Soft
ControllersAC
800M
Plant
Controlroom
Process
AC
800M
AC
800M
AC
800M
AC
800M
Plant system
InstructorStation
Realistic Training and Test Environment ABB / PA / Control SystemsNovember 7, 2010 | Slide 15
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
15/17
Beyond System 800xAthe product
Industry based libraries andsolutions
Expertise built-in Best practice and standards
organizations
Use whats already
been done Consulting Services and
Solutions
FEED studies!!
Research into newtechnologies
Leaders in futurethinking
Custom Graphic elements by Consult IT Solutions Group
CGM Control Room Design
ABB / PA / Control SystemsNovember 7, 2010 | Slide 16
CRC concepts
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
16/17
The Four Pillars of Operator Effectiveness
Integrated Operations
High Performance Design
Attention to Human Factors
Operator Competence
ABB / PA / Control SystemsNovember 7, 2010 | Slide 17
-
8/8/2019 Patzer Operator+Effectiveness Oct+2010
17/17
ABB GroupNovember 7, 2010 | Slide 18