Track needs to stay on the inside of the orange line, representing the Lift Rail. The track needs to run parallel to the wall instead of angling into the wall, per ZGF. ZGF is pleased with this type of track. You are released to manufacture this type of track for the Patient Bathrooms.
-
Upload
spectrum-specialty-builders -
Category
Documents
-
view
212 -
download
0
description
Includes Sellen & ZGF's review of the Mock-up showwer track. This is to be reviewed prior to install.