Past Dam Failures with Modes of Failure

Keith Mills, P.E., G.E.

Acting State Engineer

Oregon Water Resources Dept.

2014 NWHA Annual Meeting

Page 2: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Objective – Discuss major dam incidents relevant to the PNW

Four Dams were selected because a) Severe or potential severe consequencesb) Modes of failure applicable to Pacific

Northwest c) Reasonable knowledge of incident cause

Page 3: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Relevant Dam Incidents

Vaiont 1963 Northern ItalyTeton 1976 Eastern IdahoTaum Sauk 2005 MissouriKaloko 2006 Kauai, Hawaii

Page 4: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Lessons Learned

• Comprehending geology - conditions• Design - state of the practice?• Construction practices• Non-engineered alterations• Operations, monitoring and Inspections

Page 5: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Two Historical Failures

• Johnstown (South Fork) 1889• Saint Francis 1928

Page 6: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

South Fork DamType: Embankment (earth and puddle)10 miles SE Johnstown, PAConstructed: 1840 - 1853

Height 72 feet Storage 15,000 acre-ftDate of Failure: May 31, 1889

Lives Lost: 2,209

Page 7: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

South Fork Dam

Page 8: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Saint Francis DamType: Concrete Gravity

Location: 70 miles North Los Angeles

Constructed: 1924 to 1926

Height 205 feet Storage 38,000 acre feet

Date of Failure:

March 12, 1928

Lives Lost: 450+

Page 9: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Saint Francis Dam

Remnants after near instantaneous dam failure

Page 10: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Vaiont Dam Type: Concrete thin arch

Location: 60 miles North of Venice

Constructed: 1958 -1960 Hydroelectric

Height 869 feet Storage 122,000 acre ft

Date of Failure:

October 9, 1963

Lives Lost: 2,500

Page 11: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Vaiont Dam

Before After – landslide dwarfs dam

Page 12: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Vaiont Dam mode of flooding

DAM DID NOT FAIL DESPITE OVERTOPPING BY 200 + FT

Gigantic landslide displaced reservoir

Contributing Factors• Missed existing inactive landslide(s)• Control by changing reservoir levels • Extreme landslide size and speed

(very rare)

Note reservoir level and rate of movement

Page 13: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Vaiont Dam –Lessons Learned

• Comprehend the dam site geology• Unwise to rely on reservoir level to control

landslide movement• Arch dams can be very stable (dam survived) • No timely independent investigation • Italian state - “the price of modernization”

Page 14: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Teton DamType: Zoned Embankment40 miles NE Idaho FallsConstructed: 1972 - 1976Height 305 feet Storage 288, 250 acre feet

Date of Failure: June 5, 1976Lives Lost: 11 (middle of reported range)

Property damage: $400,000,000 -$1,000,000,000

Page 15: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Teton Dam

Picture taken at near maximum breach just past noon, first observation of problems were that morning

Page 16: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Teton Dam Mode of FailurePrimary: Development of rapid piping in right abutment with no defense or filter Contributing Factors • Large open joints and

fissures in next to key trench• Zone 1 (core) material

highly prone to erosion and piping

• Non standard key trench in abutment

• No soil filter in abutment key trenches

• Grout curtain inconsistent

Page 17: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Teton Dam Lessons Learned

• Designers must understand the significance of open fractures and voids

• Key trenches in the abutment can make the situation worse

• A defensive design for all parts of the dam was essential

Abutment Key Trench

Page 18: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Teton Dam Lessons Learned

• Incomplete grouting can be very unsafe• No compacted fill is ever homogenous • Internal erosion can be masked if rock

fractured and open• Piping through erodible fill can develop to

a dam breach very quickly• Cooperating agencies can complete an

outstanding forensic investigation

Page 19: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Taum Sauk DamType: Concrete faced rock-fill with a parapet wall, liner added

90 miles Southwest of Saint Louis, MO

Constructed: 1960-1964

Failure: December 14, 2005

87 feet tall - 4600 acre feet

Lives Lost: 0 (5 serious injuries)

Page 20: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Taum Sauk

Pumped storage reservoir

Inundation in yellow

Flood wave stored in lower reservoir

Camp located in inundation area

Little use in winter

Casualties could have been much higher

Page 21: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Taum Sauk Mode of FailureOverflow eroding rockfill Crest uneven from settlementImproperly placed sensorsUnsafely programmed sensorsNo direct observation

Differential settlement (fines) Irregular foundation materialImproper liner placement

No spillway

Page 22: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Taum Sauk Lessons Learned

• All dams need a spillway• Dams, even rock-fill, settle over time• Concrete faced dams prone to severe

damage if there is settlement• Organizations need to care about safety• Largest FERC fine, at least to that point• Dam failures impact all dam owners

Page 23: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Kaloko DamType: Embankment/hydraulic fill

Location: 10 mi NW Kapaa

Built 1890, Raised 1911

Height 40 feet Storage 1200 acre feet

Failure: March 14, 2006

Lives Lost: 7

Property damage: Still in litigation Complex ownership pattern

Page 24: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Kaloko Dam

Inundation Area after dam breach

Page 25: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Kaloko Dam Mode of Failure

Primary: Spillway filled by new dam owner, then extended overtopping (filled by irrigation ditch)

Contributing Factors:• Crest uneven (2 feet)• Lack of maintenance; • Trees hid erosion• Incorrect inspectors

The breach

Page 26: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Kaloko Dam Lessons Learned1. DO NOT FILL IN THE

SPILLWAY!!!!!!!2. Incorrect hazard ratings

can have serious consequences (Low when it should have been HIGH)

3. A red flag when dam owners and ditch operators do not talk

4. Inspect dams that need to be inspected

5. The dam regulator must inspect & investigate

Where was dam safety?

Page 27: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Key Lessons from the 6 incidents

• Spillways need to handle design inflows• Understand big picture geology

(rock and soil) • Old design flaws are common• As-built is different than as designed• Small dams failures have consequences on

owners of large dams

Page 28: Past Dam Failures with Modes of Failure Keith Mills, P.E., G.E. Acting State Engineer Oregon Water Resources Dept. 2014 NWHA Annual Meeting.

Acknowledgements

• Robert B. Jansen, USBOR Retired, author of Dams and Public Safety

• J. David Rogers, Professor of Geological Engineering, Missouri University of Science and Technology

• Dave Pelty, Durham University • Robert Godbey, Hawaii Special Deputy A.G.