PASCOR GroupPASCOR Group
Industry AdviserIndustry Adviser:: Craig Smit Craig SmitProduct EngineerProduct Engineer
Faculty AdviserFaculty Adviser:: Chien Wern, Ph.D. Chien Wern, Ph.D.
Team MembersTeam Members:: Jeremie Bilisari Jeremie BilisariSteve GreeneSteve Greene
Joe HartleyJoe HartleyRobby HoffRobby HoffMatt SmithMatt Smith
OverviewOverview
BackgroundBackground Mission Statement Mission Statement Project ObjectivesProject Objectives PProject roject DDesign esign SSpecificationspecifications Final Design SelectionFinal Design Selection Performance EvaluationPerformance Evaluation What’s LeftWhat’s Left ConclusionConclusion
Mission StatementMission Statement
The design team will develop a fully The design team will develop a fully automated device to cut and form strips of automated device to cut and form strips of silver. The device is required to produce silver. The device is required to produce strips quickly and accurately while being strips quickly and accurately while being robust and portable. robust and portable.
Project ObjectivesProject Objectives
Design and Build a Functional Prototype Design and Build a Functional Prototype to Replace Current System. to Replace Current System.
Maintain TolerancesMaintain Tolerances
Multiple LengthsMultiple Lengths
QuickQuick
2”, 3”, 5” & 6.5”
R=1/4”
1/4”
Tolerance( +/- 1/16” )
PProject roject DDesign esign SSpecificationspecifications
High Priority CriteriaHigh Priority Criteria-- Safety: Emergency Switch & Safety GuardsSafety: Emergency Switch & Safety Guards
-- Performance: Adjustability, Tolerance & Parts/sec. Performance: Adjustability, Tolerance & Parts/sec.
Medium Priority CriteriaMedium Priority Criteria-- DurableDurable
-- Use of Replaceable Parts Use of Replaceable Parts
-- Cost of Production < $5,000Cost of Production < $5,000
Low Priority CriteriaLow Priority Criteria-- Curvature of StripsCurvature of Strips
Performance EvaluationPerformance Evaluation
Targets Met:Targets Met: - Length Tolerance: 2” pieces within 1/32” (Goal was 1/16”)- Length Tolerance: 2” pieces within 1/32” (Goal was 1/16”)
- Radius Curvature: 1/4” radius achieved- Radius Curvature: 1/4” radius achieved- Length Curvature: Achieved - Length Curvature: Achieved - Multiple Lengths: Programs for all required lengths- Multiple Lengths: Programs for all required lengths- Weight ~ 45 lbf (Goal was < 50 lbf)- Weight ~ 45 lbf (Goal was < 50 lbf)- Cost ~ $2500 (Budget Was $5000)- Cost ~ $2500 (Budget Was $5000)
Targets Not Met:Targets Not Met:- Parts Per Time: 2” piece @ 1.8 sec. - Parts Per Time: 2” piece @ 1.8 sec. 6.5” piece @ 5 sec. 6.5” piece @ 5 sec.
What’s LeftWhat’s Left
Install Emergency Stop SwitchInstall Emergency Stop Switch
Install Photoelectric Sensor Install Photoelectric Sensor
Adjust Final Three Lengths to ToleranceAdjust Final Three Lengths to Tolerance
Encase MachineEncase Machine
Consider Ventilation of Electrical PartsConsider Ventilation of Electrical Parts
Incorporate High Speed Card Incorporate High Speed Card
Special ThanksSpecial Thanks
Mike Flaman @ PCC for Machining HelpMike Flaman @ PCC for Machining Help
Pacific Machinery & Tool Steel for Pacific Machinery & Tool Steel for material donationsmaterial donations
Shawn Dunigan @ ABC Electric for PLC Shawn Dunigan @ ABC Electric for PLC programming assistanceprogramming assistance