Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments...

23
Pasadena Updates Pasadena Updates March 2008 - February March 2008 - February 2009 2009 PFS Megacam MMIRS FourSta r Some of the instruments arriving at Magellan in the next year

description

LDSS focus encoder New current-loop LVDT encoder installed July 2008 New current-loop LVDT encoder installed July 2008 New LDSS focus encoder (current LVDT)

Transcript of Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments...

Page 1: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

Pasadena Pasadena UpdatesUpdates

March 2008 - February March 2008 - February 20092009

PFS Megacam

MMIRSFourStar

Some of the instruments arriving at Magellan in the next year

Page 2: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

LDSS focus encoderLDSS focus encoder

Chronic LDSS focus Chronic LDSS focus setting errorssetting errors

Focus signal was Focus signal was noisy, causing focus noisy, causing focus seek errorsseek errors

Original LDSS focus encoder (voltage SLVC)

Marshall, Estrada, Birk, UomotoNavarrette, Merino, Quiroz, Alfaro, Cortes, Jones, Bravo,

Cerda

Page 3: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

LDSS focus encoderLDSS focus encoder New current-loop New current-loop

LVDT encoder LVDT encoder installed July 2008installed July 2008

New LDSS focus encoder (current LVDT)

Page 4: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

LDSS focus encoderLDSS focus encoder Also installed a new Also installed a new

A/D converter with A/D converter with Ethernet inside LDSSEthernet inside LDSS

Commercial A/D converter

Page 5: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

LDSS temperature LDSS temperature sensorsensor

LDSS focus is LDSS focus is sensitive to sensitive to temperaturetemperature

Using the “dome Using the “dome air” temperature air” temperature wasn’t quite wasn’t quite good enoughgood enough

LDSS focus and temperature sensors

Page 6: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

LDSS temperature LDSS temperature sensorsensor

Added AD592 Added AD592 sensor to LDSS sensor to LDSS cameracamera

Jorge Bravo Jorge Bravo maintains focus maintains focus offset dataoffset data

LDSS AD592 temperature sensor

Page 7: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

LDSS temperature LDSS temperature sensorsensor

Page 8: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

F/5 secondaryF/5 secondary Mirror arrived Mirror arrived

LCO September LCO September 20092009

Felipe Sánchez works on the F/5 secondary

Page 9: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

F/5 secondaryF/5 secondary Aluminized at Aluminized at

the Dupont the Dupont chamberchamber

Povilas Palunas inspects the mirror surface

Page 10: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

F/5 secondaryF/5 secondary Installed on the Installed on the

Clay telescopeClay telescope 1 inch too close 1 inch too close

to primaryto primary

On the telescope

Page 11: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

F/5 secondaryF/5 secondary New truss structure New truss structure

delivered to LCOdelivered to LCO Engineering with Engineering with

Minicam in April 2009Minicam in April 2009

On the telescope

Page 12: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

F/5 bafflesF/5 baffles February 2009 Pasadena meeting with SAO February 2009 Pasadena meeting with SAO

engineersengineers Decided to optimize baffles for Megacam as wider Decided to optimize baffles for Megacam as wider

field instruments not scheduledfield instruments not scheduled Mounting scheme discussions suggest a re-build Mounting scheme discussions suggest a re-build

of primary mirror shroudof primary mirror shroud

Page 13: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

F/5 bafflesF/5 baffles

Page 14: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

F/5 bafflesF/5 baffles Smaller Megacam Smaller Megacam

primary baffles can be primary baffles can be inserted from the inserted from the backside of the backside of the primaryprimary

New shroud extends New shroud extends through hole far past through hole far past the primary mirror the primary mirror surface to support surface to support mid-height bafflesmid-height baffles

Page 15: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

CleanroomCleanroom

LCO Cleanroom excavation

Page 16: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

CleanroomCleanroom

LCO Cleanroom excavation

Page 17: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

CleanroomCleanroom

LCO Cleanroom excavation

Page 18: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

Shipping news OCIW ships (exports) equipment to Chile from all

over the world Air shipments 2X / month from Pasadena Chile has recently become a bit more formal on

import papers; check with Earl Harris Instructions at http://shipping.baade-clay.org/ Layoffs at Schenker have made shipping more

difficult; please allow extra lead time

Page 19: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

BibliographyBibliography

Page 20: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

BibliographyBibliography 397 refereed 397 refereed

publications as of publications as of December 31, 2008December 31, 2008

74 added since 74 added since December 31, 2007December 31, 2007

Papers missed in Papers missed in journals not available journals not available to OCIW or without to OCIW or without searchable databasessearchable databases

Page 21: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

Crabtree counts to 2007Crabtree counts to 2007

By permission, Dennis Crabtree

Page 22: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

BibliographyBibliography

IMACS and MIKE swap places in 2008

Page 23: Pasadena Updates March 2008 - February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.

Pasadena staffingPasadena staffing Pasadena staffing newsPasadena staffing news

– Alan Bagish returned part-time Jan 2009Alan Bagish returned part-time Jan 2009– Accounting analyst Gillian Tong is permanent Accounting analyst Gillian Tong is permanent

OCIW employeeOCIW employee– Jorge Estrada received his bachelor’s degreeJorge Estrada received his bachelor’s degree