Page 1: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1
Page 2: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1

PROPRIETARY DOCUMENT This document contains proprietary information which is the exclusive property of

CENTRAL DENVER IRONWORKS. It is loaned for the express purpose described in the transmittal. Neither the document nor the information therein is to be copied, used or transferred without express written permission from

CENTRAL DENVER IRONWORKS INC. © 2006 CENTRAL DENVER IRONWORKS INC.

# DATE REVISION NAME

WO#STRUCTURE:MODEL#:LOCATION:CUSTOMER:NOTE:

DRAWN BY:DESCRIPTION:

CHECKER:SHEET:

1494CUSTOM SHADE STRUCTURE

BRADLEY ELEMENTARY SCHOOLDENVER PUBLIC SCHOOLS

GENERAL NOTESSWM

GN1T.D.

Parts ListMASSNOTESLENGTHDESCRIPTIONMATTEMPSHIPQTYREV369.693 COLUMN ASSEMBLY SHIP MARKA12 68.2366DETAIL1'-6"PL 3/4x18A361p1 2 296.7905 10'-4 7/16"PIPE 8" STD.A53/B1m1 2 3.496DETAIL0'-8"PL 1/4x8A361p2 2 429.3194 COLUMN ASSEMBLY SHIP MARKA22 356.4169 12'-5 7/16"PIPE 8" STD.A53/B2m1 2 68.2366DETAIL1'-6"PL 3/4x18A361p1 2 3.496DETAIL0'-8"PL 1/4x8A361p2 2 5210.7953 ROOF ASSEMBLY SHIP MARKA31 3.496DETAIL0'-8"PL 1/4x8A361p2 4 734.5975 25'-8"PIPE 8" STD.A53/B3m1 1 610.5745 21'-4"PIPE 8" STD.A53/B3m2 1 329.244DETAIL / ROLLED17'-8 3/4"PIPE 6" STD.A53/B3m3 4 329.244 0'-3"PIPE 3" STD.A53/B3m4 4 .312DETAIL0'-3 5/8"PL 3/16x1 5/8A363p1 10 1.5382DETAIL0'-6"PL 3/16x6A363p2 8 1570.2194DETAIL25'-8"3/16" PERF PLATEx13'-2 3/16"A363p3 1 176.5677 25'-8"TS 4x2x3/16A500/B3t1 1 169.1193 24'-7"TS 4x2x3/16A500/B3t2 1 161.6695 23'-6"TS 4x2x3/16A500/B3t3 1 154.2123 22'-5"TS 4x2x3/16A500/B3t4 1 146.7576 21'-4"TS 4x2x3/16A500/B3t5 1

BRADLEY ELEMENTARY SCHOOLSHADE STRUCTURE

GENERAL NOTES: 1. STRUCTURAL STEEL SHALL BE DESIGNED, DETAILED, FABRICATED, AND ERECTED IN ACCORDANCE WITH THE AISC MANUAL OF STEEL CONSTRUCTION, 9TH EDITION AND AISC CODEOF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES.2. STEEL SHALL CONFORM TO ASTM A500 GRADE B FOR STRUCTURAL TUBING AND ASTM A53 GRADE B FOR PIPE. ALL OTHER STEEL SHALL BE ASTM A36 U.N.O.3. ALL BOLTS SHALL BE 3/4" A325 U.N.O.4. ALL BOLTED CONNECTIONS SHALL BE "SNUG TIGHT". (Snug tightis defined as the "fullest effort of a worker with an ordinary spud wrench": re AISC Handbook #SBH-1, pg. 56). UPSET THREADS AFTER TIGHTENING.5. ANCHOR BOLT TOLERANCES SHALL BE PER AISC CODE OF STANDARD PRACTICE SECTION 7.5.6. ALL SHOP WELDS SHALL BE E71T-1 FCAW OR E7018 PER AWS D1.1-LATEST EDITION.7. ALL FIELD WELDS (IF REQUIRED) SHALL BE E7018 OR NR-211-MP PER AWS D1.1-LATEST EDITION. TOUCH UP PAINT AFTER WELDING.8. PRIME PAINT SHALL BE 1 S/C DEVOE CATHA-COAT 302H, DFT 2.0-2.5 MILS. PER SSPC SP6 FOR COLUMNS OR POSTS, SSPC SP7 FOR DECK, AND SSPC SP2 FOR ALL ELSE.9. FINISH PAINT SHALL BE 1 S/C DEVOE DEVTHANE ALIPHATIC URETHANE SEMI-GLOSS ENAMEL #378 OR EQUAL, DFT 2.0-3.0 MILS.10. ROOF TO BE SHOP ASSEMBLED.

ROOF ASSEMBLY / PERF PLATE COLOR:___________________________________

COLUMN COLOR:____________________________

DEVOE 309 ROWHOUSE

DEVOE 548 BEACH COMBER

FINAL RELEASED FOR CONSTRUCTION 4/3/2008 PAGE 1 / 15

Page 3: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1

DETAIL 1

SECTION A-A

PROPRIETARY DOCUMENT This document contains proprietary information which is the exclusive property of

CENTRAL DENVER IRONWORKS. It is loaned for the express purpose described in the transmittal. Neither the document nor the information therein is to be copied, used or transferred without express written permission from

CENTRAL DENVER IRONWORKS INC. © 2006 CENTRAL DENVER IRONWORKS INC.

# DATE REVISION NAME

WO#STRUCTURE:MODEL#:LOCATION:CUSTOMER:NOTE:

DRAWN BY:DESCRIPTION:

CHECKER:SHEET:

1494CUSTOM SHADE STRUCTURE

BRADLEY ELEMENTARY SCHOOLDENVER PUBLIC SCHOOLS

ANCHOR BOLT PLANSWM

AB1T.D.

1

A A

11'-0

"

20'-4"2'-2" 2'-2"

24'-8"

COLUMN ASSEMBLYSHIP MARK

A2

COLUMN ASSEMBLYSHIP MARK

A2

COLUMN ASSEMBLYSHIP MARK

A1

COLUMN ASSEMBLYSHIP MARK

A1

BRADLEY ELEMENTARY SCHOOLSHADE STRUCTUREANCHOR BOLT PLAN

7"7"1'-2"

7"7"

1'-2

"

PL 3/4x181p1

PIPE 8" STD.2m1

CONCRETE SLAB

1/2" FELT EXPANSION JOINT

ANCHOR BOLT ASSEMBLY(BY OTHERS)

2'-7" BLOCKOUT

POUR FLUSH

AFTER STEEL

ERECTION

1 1/2" NON-SHRINKGROUT

11'-2

9/1

6"

25'- 9/16"

8"

PL 3/4x181p1

PIPE 8" STD.2m1

TOP OF CONCRETE

TOP OFCAISSON

1 1/2" NON-SHRINKGROUT

7" 7"1'-2"

ANCHOR BOLT ASSEMBLY(BY OTHERS)

1/2" FELT EXPANSION JOINT

4" P

RO

JEC

TIO

NM

INIM

UM

FINAL RELEASED FOR CONSTRUCTION 4/3/2008 PAGE 2 / 15

Page 4: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1

DETAIL 1

PROPRIETARY DOCUMENT This document contains proprietary information which is the exclusive property of

CENTRAL DENVER IRONWORKS. It is loaned for the express purpose described in the transmittal. Neither the document nor the information therein is to be copied, used or transferred without express written permission from

CENTRAL DENVER IRONWORKS INC. © 2006 CENTRAL DENVER IRONWORKS INC.

# DATE REVISION NAME

WO#STRUCTURE:MODEL#:LOCATION:CUSTOMER:NOTE:

DRAWN BY:DESCRIPTION:

CHECKER:SHEET:

1494CUSTOM SHADE STRUCTURE

BRADLEY ELEMENTARY SCHOOLDENVER PUBLIC SCHOOLS

ELEVATIONSSWM

E1T.D.

1

2'-2" 20'-4" 2'-2"

24'-8"

11'-0"

10'-4

11/

16"

8'-9

3/8

" 12'-5

11/

16"

11'-1

1 3/

16"

8'-6

13/

16"

10'-4

11/

16"14

'-5 5

/8"

14'-5

5/8

"

TOP OF FINISHED GRADE

R11'-8"

COLUMN ASSEMBLYSHIP MARK

A2

COLUMN ASSEMBLYSHIP MARK

A1

COLUMN ASSEMBLYSHIP MARK

A1

COLUMN ASSEMBLYSHIP MARK

A2

ROOF ASSEMBLYSHIP MARK

A3

BRADLEY ELEMENTARY SCHOOLSHADE STRUCTURE

ELEVATIONS

3/16" PERF PLATE1/2" HOLES - 23% OPEN

8"

TOP OF CAISSON

R10'-9 3/4"

8" S

TD. P

IPE

CO

LUM

NS

2"x4" TUBE STEEL ROOF PURLINS

6" STD. PIPE ROOF TRUSS

8" STD. PIPE ROOF BEAM

8" S

TD. P

IPE

CO

LUM

NS

3/16" PERF PLATE1/2" HOLES - 23% OPEN

FRONT ELEVATIONEND ELEVATION

TOP OF FINISHED GRADE

8"

TOP OF CAISSON

CONCRETE CAISSON(BY OTHERS)

CONCRETE SLAB

CONCRETE SLAB

8" STD. PIPE ROOF BEAM

6" STD. PIPE ROOF TRUSS

TS 4x2x3/163t1

3/16" PERF PLATEx13'-2 3/16"3p3

6"TYP.

PIPE 6" STD.3m3

PERF PLATE DETAILSMATERIAL THICKNESS - 3/16"HOLE SHAPE - ROUNDPERFERATION SIZE - Ø1/2"HOLE CENTER TO CENTER - 1"STAGGERED CENTERS, 60°BAR WIDTH - 1/2"HOLES PSI - 1.2PERCENT OPEN - 23%

1"

1"

1/2"

1/2" (BAR WIDTH)

60°

FINAL RELEASED FOR CONSTRUCTION 4/3/2008 PAGE 3 / 15

Page 5: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1

PROPRIETARY DOCUMENT This document contains proprietary information which is the exclusive property of

CENTRAL DENVER IRONWORKS. It is loaned for the express purpose described in the transmittal. Neither the document nor the information therein is to be copied, used or transferred without express written permission from

CENTRAL DENVER IRONWORKS INC. © 2006 CENTRAL DENVER IRONWORKS INC.

# DATE REVISION NAME

WO#STRUCTURE:MODEL#:LOCATION:CUSTOMER:NOTE:

DRAWN BY:DESCRIPTION:

CHECKER:SHEET:

1494CUSTOM SHADE STRUCTURE

BRADLEY ELEMENTARY SCHOOLDENVER PUBLIC SCHOOLS

ROOF PLANSWM

E2T.D.

BRADLEY ELEMENTARY SCHOOLSHADE STRUCTURE

PLAN VIEW

7'-10 3/16"

2'-3

11/

16"

11'-0

" (C

.L. C

OLU

MN

TO

C.L

. CO

LUM

N)

2'-1

13/

16"

15'-5

1/2

"

8 3/16"24'-8" (C.L. COLUMN TO C.L. COLUMN)8 3/16"26'-2 1/2"

2'-9

1/2

"2'

-9 1

/2"

2'-9

1/2

"2'

-9 1

/2"

11'-2

" (2"

X4"

T.S

. PU

RLI

N S

PAC

ING

)

TS 4x2x3/163t4

TS 4x2x3/163t5

TS 4x2x3/163t3

TS 4x2x3/163t2

TS 4x2x3/163t1

PIPE 6" STD.3m3

PIPE 6" STD.3m3

PIPE 6" STD.

3m3

PIPE 8" STD.3m2

PIPE 8" STD.3m1

101.15°

101.15°101.15°

COLUMN ASSEMBLYSHIP MARK

A2

COLUMN ASSEMBLYSHIP MARK

A2

COLUMN ASSEMBLYSHIP MARK

A2COLUMN ASSEMBLYSHIP MARK

A2

101.15°

7'-10 3/16"

20'-4" (C.L. COLUMN TO C.L. COLUMN)

FINAL RELEASED FOR CONSTRUCTION 4/3/2008 PAGE 4 / 15

Page 6: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1

DETAIL 1

DETAIL 2

DETAIL 3

PROPRIETARY DOCUMENT This document contains proprietary information which is the exclusive property of

CENTRAL DENVER IRONWORKS. It is loaned for the express purpose described in the transmittal. Neither the document nor the information therein is to be copied, used or transferred without express written permission from

CENTRAL DENVER IRONWORKS INC. © 2006 CENTRAL DENVER IRONWORKS INC.

# DATE REVISION NAME

WO#STRUCTURE:MODEL#:LOCATION:CUSTOMER:NOTE:

DRAWN BY:DESCRIPTION:

CHECKER:SHEET:

1494CUSTOM SHADE STRUCTURE

BRADLEY ELEMENTARY SCHOOLDENVER PUBLIC SCHOOLS

WELD DETAILSSWM

W1T.D.

1

2

3PIPE 8" STD.

3m1

PIPE 8" STD.1m1

PL 1/4x81p2

PIPE 3" STD.3m4

PIPE 6" STD.3m3

3/16TYP.3/16

G

045

TYP.

3/16 TYP.

3/16TYP.

ROOF ASSEMBLYSHIP MARK

A3

COLUMN ASSEMBLYSHIP MARK

A1

PL 3/4x181p1

PIPE 8" STD.1m1

1/4TYP.

PIPE 8" STD.3m2

PL 1/4x81p2

TS 4x2x3/163t4

PL 3/16x1 5/83p1

3/16

G

045

TYP.

3/16

G

045

TYP.

PIPE 8" STD.2m1

PIPE 3" STD.3m4

3/16 TYP.

3/16TYP. 3/16" PERF PLATEx13'-2 3/16"3p3

PL 3/16x63p2

3/16

G

045

TYP.

TS 4x2x3/163t1

3/16" PERF PLATEx13'-2 3/16"3p3

BRADLEY ELEMENTARY SCHOOLSHADE STRUCTURE

WELD DETAILS

PIPE 6" STD.3m3

COLUMN ASSEMBLYSHIP MARK

A1

COLUMN ASSEMBLYSHIP MARK

A1

COLUMN ASSEMBLYSHIP MARK

A2

ROOF ASSEMBLYSHIP MARK

A3

1-121-12TYP.

6"

FINAL RELEASED FOR CONSTRUCTION 4/3/2008 PAGE 5 / 15

Page 7: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1

SECTION A-A

PROPRIETARY DOCUMENT This document contains proprietary information which is the exclusive property of

CENTRAL DENVER IRONWORKS. It is loaned for the express purpose described in the transmittal. Neither the document nor the information therein is to be copied, used or transferred without express written permission from

CENTRAL DENVER IRONWORKS INC. © 2006 CENTRAL DENVER IRONWORKS INC.

# DATE REVISION NAME

WO#STRUCTURE:MODEL#:LOCATION:CUSTOMER:NOTE:

DRAWN BY:DESCRIPTION:

CHECKER:SHEET:

1494CUSTOM SHADE STRUCTURE

BRADLEY ELEMENTARY SCHOOLDENVER PUBLIC SCHOOLS

COLUMN ASSEMBLYSWM

1T.D.

Parts List FOR COLUMN ASSEMBLY A1MASSNOTESLENGTHDESCRIPTIONMATTEMPSHIPQTYREV369.693 COLUMN ASSEMBLY SHIP MARKA12 296.7905 10'-4 7/16"PIPE 8" STD.A53/B1m1 2 68.2366DETAIL1'-6"PL 3/4x18A361p1 2 3.496DETAIL0'-8"PL 1/4x8A361p2 2

A A

10'-4

7/1

6"

9"9"

9" 9"

PL 3/4x181p1

PIPE 8" STD.1m1

1/4

10'-5

3/1

6"

3/4"PL 3/4x18

1p1

PIPE 8" STD.1m1

PL 1/4x81p2

3/16

G

045

2~COLUMN ASSEMBLY MK A1

FINAL RELEASED FOR CONSTRUCTION 4/3/2008 PAGE 6 / 15

Page 8: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1

SECTION A-A

PROPRIETARY DOCUMENT This document contains proprietary information which is the exclusive property of

CENTRAL DENVER IRONWORKS. It is loaned for the express purpose described in the transmittal. Neither the document nor the information therein is to be copied, used or transferred without express written permission from

CENTRAL DENVER IRONWORKS INC. © 2006 CENTRAL DENVER IRONWORKS INC.

# DATE REVISION NAME

WO#STRUCTURE:MODEL#:LOCATION:CUSTOMER:NOTE:

DRAWN BY:DESCRIPTION:

CHECKER:SHEET:

1494CUSTOM SHADE STRUCTURE

BRADLEY ELEMENTARY SCHOOLDENVER PUBLIC SCHOOLS

COLUMN ASSEMBLYSWM

2T.D.

A A

Parts List FOR COLUMN ASSEMBLY A2MASSNOTESLENGTHDESCRIPTIONMATTEMPSHIPQTYREV429.3194 COLUMN ASSEMBLY SHIP MARKA22 68.2366DETAIL1'-6"PL 3/4x18A361p1 2 3.496DETAIL0'-8"PL 1/4x8A361p2 2 356.4169 12'-5 7/16"PIPE 8" STD.A53/B2m1 2

12'-5

7/1

6"

9"9"

9" 9"

PL 3/4x181p1

PIPE 8" STD.2m1

1/4

12'-6

3/1

6"

PL 1/4x81p2

PIPE 8" STD.2m1

PL 3/4x181p1

3/4"

3/16

G

045

2~COLUMN ASSEMBLY MK A2

FINAL RELEASED FOR CONSTRUCTION 4/3/2008 PAGE 7 / 15

Page 9: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1

PROPRIETARY DOCUMENT This document contains proprietary information which is the exclusive property of

CENTRAL DENVER IRONWORKS. It is loaned for the express purpose described in the transmittal. Neither the document nor the information therein is to be copied, used or transferred without express written permission from

CENTRAL DENVER IRONWORKS INC. © 2006 CENTRAL DENVER IRONWORKS INC.

# DATE REVISION NAME

WO#STRUCTURE:MODEL#:LOCATION:CUSTOMER:NOTE:

DRAWN BY:DESCRIPTION:

CHECKER:SHEET:

1494CUSTOM SHADE STRUCTURE

BRADLEY ELEMENTARY SCHOOLDENVER PUBLIC SCHOOLS

ROOF ASSEMBLYSWM

3T.D.

1/3a

Parts List FOR ROOF ASSEMBLY A3MASSNOTESLENGTHDESCRIPTIONMATTEMPSHIPQTYREV5210.7953 ROOF ASSEMBLY SHIP MARKA31 3.496DETAIL0'-8"PL 1/4x8A361p2 4 176.5677 25'-8"TS 4x2x3/16A500/B3t1 1 169.1193 24'-7"TS 4x2x3/16A500/B3t2 1 161.6695 23'-6"TS 4x2x3/16A500/B3t3 1 154.2123 22'-5"TS 4x2x3/16A500/B3t4 1 146.7576 21'-4"TS 4x2x3/16A500/B3t5 1 .312DETAIL0'-3 5/8"PL 3/16x1 5/8A363p1 10 1.5382DETAIL0'-6"PL 3/16x6A363p2 8 1570.2194DETAIL25'-8"3/16" PERF

PLATEx13'-2 3/16"A363p3 1

734.5975 25'-8"PIPE 8" STD.A53/B3m1 1 610.5745 21'-4"PIPE 8" STD.A53/B3m2 1 329.244DETAIL / ROLLED17'-8 3/4"PIPE 6" STD.A53/B3m3 2 1.1699 0'-3"PIPE 3" STD.A53/B3m4 1

2/3a

3/3a

4/3a

5/3a

1~ ROOF ASSEMBLY MK A3(PERF PLATE NOT SHOWN - SEE SHEET 3p3)

11'-0"

2'-1

"

11'-0

"

20'-4"

24'-8"

7'-10 3/16"

PIPE 6" STD.3m3

PIPE 6" STD.3m3

PIPE 6" STD.3m3

PIPE 8" STD.3m1

TS 4x2x3/163t1

TS 4x2x3/163t2

TS 4x2x3/163t3

TS 4x2x3/163t4

PIPE 8" STD.3m2

TS 4x2x3/163t5

6"6"

6" 6"25'-8"

21'-4" 1'-8"1'-8"

7'-10 3/16"

2'- 7/16"2'- 1/4"

2'-1

"

101.15°78.8

101.15°

78.85°

2'-9

1/2

"2'

-9 1

/2"

2'-9

1/2

"2'

-9 1

/2"

11'-2

"

TS 4x2x3/163t2

PIPE 6" STD.3m3

TS 4x2x3/163t1

TS 4x2x3/163t3

TS 4x2x3/163t4

TS 4x2x3/163t5

PIPE 8" STD.3m1

PIPE 3" STD.3m4

PIPE 8" STD.3m2

PIPE 3" STD.3m4

PIPE 8" STD.3m1

PIPE 8" STD.3m2

PIPE 6" STD.3m3

PIPE 6" STD.3m3

PIPE 6" STD.3m3

PIPE 6" STD.3m3

15'- 11/16"

TS 4x2x3/163t1

TS 4x2x3/163t2

TS 4x2x3/163t3

TS 4x2x3/163t4

TS 4x2x3/163t5

FINAL RELEASED FOR CONSTRUCTION 4/3/2008 PAGE 8 / 15

Page 10: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1

DETAIL 1/3a

DETAIL 3/3a

DETAIL 2/3a

DETAIL 4/3a

DETAIL 5/3a

PROPRIETARY DOCUMENT This document contains proprietary information which is the exclusive property of

CENTRAL DENVER IRONWORKS. It is loaned for the express purpose described in the transmittal. Neither the document nor the information therein is to be copied, used or transferred without express written permission from

CENTRAL DENVER IRONWORKS INC. © 2006 CENTRAL DENVER IRONWORKS INC.

# DATE REVISION NAME

WO#STRUCTURE:MODEL#:LOCATION:CUSTOMER:NOTE:

DRAWN BY:DESCRIPTION:

CHECKER:SHEET:

1494CUSTOM SHADE STRUCTURE

BRADLEY ELEMENTARY SCHOOLDENVER PUBLIC SCHOOLS

ROOF DETAILSSWM

3aT.D.

3/16TYP.

TS 4x2x3/163t1

PIPE 8" STD.3m1

3/16

G

045

TYP.

PL 1/4x81p2

PIPE 3" STD.3m4

3/16 TYP.

3/16

G

045

TYP.

PL 3/16x63p2

PIPE 6" STD.3m3

3/16

G

045

TYP.

PL 1/4x81p2

PIPE 3" STD.3m4

TS 4x2x3/163t1

PIPE 8" STD.3m1

PIPE 6" STD.3m3

6"

PL 3/16x1 5/83p1

3/16

G

045

TYP.

6"

PIPE 6" STD.3m3

PIPE 3" STD.3m4

PIPE 8" STD.3m2

TS 4x2x3/163t5

PL 1/4x81p2

PL 3/16x1 5/83p1

PL 3/16x1 5/83p1

TS 4x2x3/163t5

PIPE 6" STD.3m3

PIPE 3" STD.3m4

PIPE 8" STD.3m2

2'-9 1/2"TO C.L. OF NEXT

PURLIN

2'-9 1/2" TO C.L. OF

NEXT PURLIN

FINAL RELEASED FOR CONSTRUCTION 4/3/2008 PAGE 9 / 15

Page 11: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1

PROPRIETARY DOCUMENT This document contains proprietary information which is the exclusive property of

CENTRAL DENVER IRONWORKS. It is loaned for the express purpose described in the transmittal. Neither the document nor the information therein is to be copied, used or transferred without express written permission from

CENTRAL DENVER IRONWORKS INC. © 2006 CENTRAL DENVER IRONWORKS INC.

# DATE REVISION NAME

WO#STRUCTURE:MODEL#:LOCATION:CUSTOMER:NOTE:

DRAWN BY:DESCRIPTION:

CHECKER:SHEET:

1494CUSTOM SHADE STRUCTURE

BRADLEY ELEMENTARY SCHOOLDENVER PUBLIC SCHOOLS

PL 3/4x18SWM

1p1T.D.

Parts ListMASSNOTESLENGTHDESCRIPTIONMATTEMPSHIPQTYREV68.2366DETAIL1'-6"PL 3/4x18A361p1 4

2" 1'-2" 2"

1'-6"

2"1'

-2"

2"1'

-6"

3/4"

Ø1 1/16 in (1.0625")TYPICAL OF 4

FINAL RELEASED FOR CONSTRUCTION 4/3/2008 PAGE 10 / 15

Page 12: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1

PROPRIETARY DOCUMENT This document contains proprietary information which is the exclusive property of

CENTRAL DENVER IRONWORKS. It is loaned for the express purpose described in the transmittal. Neither the document nor the information therein is to be copied, used or transferred without express written permission from

CENTRAL DENVER IRONWORKS INC. © 2006 CENTRAL DENVER IRONWORKS INC.

# DATE REVISION NAME

WO#STRUCTURE:MODEL#:LOCATION:CUSTOMER:NOTE:

DRAWN BY:DESCRIPTION:

CHECKER:SHEET:

1494CUSTOM SHADE STRUCTURE

BRADLEY ELEMENTARY SCHOOLDENVER PUBLIC SCHOOLS

PL 1/4x8SWM

1p2T.D.

Parts ListMASSNOTESLENGTHDESCRIPTIONMATTEMPSHIPQTYREV3.496DETAIL0'-8"PL 1/4x8A361p2 8

7 15/16"

1/4"

PL 1/4x81p2

BURNOUT FILE: 1494-1p2

FINAL RELEASED FOR CONSTRUCTION 4/3/2008 PAGE 11 / 15

Page 13: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1

PROPRIETARY DOCUMENT This document contains proprietary information which is the exclusive property of

CENTRAL DENVER IRONWORKS. It is loaned for the express purpose described in the transmittal. Neither the document nor the information therein is to be copied, used or transferred without express written permission from

CENTRAL DENVER IRONWORKS INC. © 2006 CENTRAL DENVER IRONWORKS INC.

# DATE REVISION NAME

WO#STRUCTURE:MODEL#:LOCATION:CUSTOMER:NOTE:

DRAWN BY:DESCRIPTION:

CHECKER:SHEET:

1494CUSTOM SHADE STRUCTURE

BRADLEY ELEMENTARY SCHOOLDENVER PUBLIC SCHOOLS

PL 3/16x1 5/8SWM

3p1T.D.

Parts ListMASSNOTESLENGTHDESCRIPTIONMATTEMPSHIPQTYREV.312DETAIL0'-3 5/8"PL 3/16x1 5/8A363p1 10

3 5/

8"

1 5/8"

R3/16"

TYP.

3/16"

PL 3/16x1 5/83p1

BURNOUT FILE: 1494-3p1

FINAL RELEASED FOR CONSTRUCTION 4/3/2008 PAGE 12 / 15

Page 14: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1

PROPRIETARY DOCUMENT This document contains proprietary information which is the exclusive property of

CENTRAL DENVER IRONWORKS. It is loaned for the express purpose described in the transmittal. Neither the document nor the information therein is to be copied, used or transferred without express written permission from

CENTRAL DENVER IRONWORKS INC. © 2006 CENTRAL DENVER IRONWORKS INC.

# DATE REVISION NAME

WO#STRUCTURE:MODEL#:LOCATION:CUSTOMER:NOTE:

DRAWN BY:DESCRIPTION:

CHECKER:SHEET:

1494CUSTOM SHADE STRUCTURE

BRADLEY ELEMENTARY SCHOOLDENVER PUBLIC SCHOOLS

PL 3/16x6SWM

3p2T.D.

Parts ListMASSNOTESLENGTHDESCRIPTIONMATTEMPSHIPQTYREV1.5382DETAIL0'-6"PL 3/16x6A363p2 8

3/16"

Ø6"

BURNOUT FILE: 1494-3p2

FINAL RELEASED FOR CONSTRUCTION 4/3/2008 PAGE 13 / 15

Page 15: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1

DETAIL 1

PROPRIETARY DOCUMENT This document contains proprietary information which is the exclusive property of

CENTRAL DENVER IRONWORKS. It is loaned for the express purpose described in the transmittal. Neither the document nor the information therein is to be copied, used or transferred without express written permission from

CENTRAL DENVER IRONWORKS INC. © 2006 CENTRAL DENVER IRONWORKS INC.

# DATE REVISION NAME

WO#STRUCTURE:MODEL#:LOCATION:CUSTOMER:NOTE:

DRAWN BY:DESCRIPTION:

CHECKER:SHEET:

1494CUSTOM SHADE STRUCTURE

BRADLEY ELEMENTARY SCHOOLDENVER PUBLIC SCHOOLS

PERF PLATE DETAILSSWM

3p3T.D.

1

Parts ListMASSNOTESLENGTHDESCRIPTIONMATTEMPSHIPQTYREV1570.2194DETAIL25'-8"3/16" PERF PLATEx13'-2 3/16"A363p3 1

3'-10 11/16"

2'-11 3/8"

2'-10 1/16"

3'-5 15/16"

4 3/8"TYPICAL

3/16" PERF PLATEx13'-2 3/16"3p3

PIPE 6" STD.3m3

13'-2 3/16"

PERF PLATE SECTIONS REQUIRED:5 PIECES, 4'-0" x 13'-2 3/16"2 PIECES, 2'-10" x 13'-2 3/16"

2'-10" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 2'-10"

ATTACH END PERF PLATES, THEN SNAPA CHALK LINE AND TORCH CUT. CLEANCUT EDGES. TYPICAL BOTH SIDES.

25'-8"

20'-9 5/8"4 13/16" 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 4 13/16"

PERF PLATE DETAILSMATERIAL THICKNESS - 3/16"HOLE SHAPE - ROUNDPERFERATION SIZE - Ø1/2"HOLE CENTER TO CENTER - 1"STAGGERED CENTERS, 60°BAR WIDTH - 1/2"HOLES PSI - 1.2PERCENT OPEN - 23%

SEE SHEET E1 FORADDITIONAL DETAILS.

SECURELY ATTACH PERF PLATESTO TS 4x2 PURLINS BY USING HOLES

IN PERF PLATE TO PLUG WELD PLATESTO TUBE STEEL. MINIMUM 1 PLUG WELD

PER ONE FOOT OF PURLIN LENGTH (EACH PURLIN).

6"

6"3/16" PERF PLATEx13'-2 3/16"

3p3

FINAL RELEASED FOR CONSTRUCTION 4/3/2008 PAGE 14 / 15

Page 16: Parts List - Learning Landscapes · per sspc sp6 for columns or posts, sspc sp7 for deck, and sspc sp2 for all else. 9. finish paint shall be 1 s/c devoe devthane aliphatic ... ab1

PROPRIETARY DOCUMENT This document contains proprietary information which is the exclusive property of

CENTRAL DENVER IRONWORKS. It is loaned for the express purpose described in the transmittal. Neither the document nor the information therein is to be copied, used or transferred without express written permission from

CENTRAL DENVER IRONWORKS INC. © 2006 CENTRAL DENVER IRONWORKS INC.

# DATE REVISION NAME

WO#STRUCTURE:MODEL#:LOCATION:CUSTOMER:NOTE:

DRAWN BY:DESCRIPTION:

CHECKER:SHEET:

1494CUSTOM SHADE STRUCTURE

BRADLEY ELEMENTARY SCHOOLDENVER PUBLIC SCHOOLS

PIPE 6" STD.SWM

3m3T.D.

Parts ListMASSNOTESLENGTHDESCRIPTIONMATTEMPSHIPQTYREV329.244DETAIL / ROLLED17'-8 3/4"PIPE 6" STD.A53/B3m3 4

1'-8"

2'-0"

1'-3 9/16"

2 '-3 5/8"

2 '-10 3/8"

3'- 9/16"

2'-10 3/8"

2'-3 5/8"

1 '-3 9/16 "

2'-0"

2'-0"

2'-0"

2'-0"

2'-0"

1'-8"

7'-8"

7'-8"

15'-4"

R11'-8 5/8"

R11 '-2"

46.6586°

46.6

586°

16'-1 1/16"

PIPE 6" STD.3m3

17'-8 3/4"

86.6828°