    Edition: August 2008 Specification: Part 416 Cast In Place Concrete Piles

    PART 416

    CAST-IN-PLACE CONCRETE PILES

    CONTENTS

    1. General2. ualit! "e#uire$ents%. &aterials4. Pile Construction'. (olerances6. (esting of Piles). *old Points8. "ecords

    1. GENERAL

    (+is Part specifies t+e re#uire$ents for t+e installation of drilled, cast in place, reinforced concrete piles, -+ic+ donot use per$anent casing. It does not coer continuous flig+t auger piles /refer to Part 41).

    (+e Contractor is responsile for:

    /a proiding t+e detailed design of t+e piles to ac+iee t+e specified esign Geotec+nical Strengt+ /-+eret+e detailed design +as not een proided ! t+e Principal,

    / t+e installation of piles t+at ac+iee t+e esign Geotec+nical Strengt+ and design durailit!, and

    /c erif!ing t+at t+e esign Geotec+nical Strengt+ +as een ac+ieed in practice.

    3nless specified ot+er-ise in t+e Contract Specific Requirementor on t+e ra-ings, piles s+all e designedand constructed in accordance -it+ t+e $et+ods specified in AS 21' and AS'100.%.

    ocu$ents referenced in t+is Part are listed elo-:

    AS 21' Piling 5 esign and Installation.

    AS '100.% ridge esign 5 7oundations and Soil Supporting Structures.

    !. "#ALIT$ RE"#IRE%ENTS

    At a $ini$u$, t+e Contractors ualit! Plan s+all include t+e follo-ing docu$ents, procedures and instructions:

    /a t+e concrete $i9 design/s, including test results for $i9 designs, erif!ing t+e ailit! to ac+ieespecified re#uire$ents

    / details of proposed oring e#uip$ent to e used and eidence of its capacit! to carr! out t+e -or;

    /c proposed recording for$s to e used during construction and testing

    /d $et+odolog! to ensure pile location and erticalit! tolerances are $et

    /e $et+odolog! for oring

    /f safet! re#uire$ents to ensure t+at fall protection is in place -+eneer an open e9caation e9ists

    /g -+ere appropriate, t+e t!pe of drilling $ud and t+e $eans of $aintaining +ead leels

    /+ $et+odolog! to $onitor and preent conta$ination ! ingress of loose $aterial, ground -ater or $udduring pile construction

    /i $et+odolog! for placing s+aft concrete

    /

  • 7/22/2019 Part416 Cast in Place Concrete Piles

    2/4

    Edition: August 2008 Specification: Part 416 Cast In Place Concrete Piles

    (. %ATERIALS

    Concrete s+all e in accordance -it+ Part %20 ?Concrete?. "einforce$ent s+all e in accordance -it+ Part %0'?Steel "einforce$ent?. @ongitudinal reinforce$ent s+all e supplied in full lengt+s.

    4. PILE CONSTR#CTION

    4.1 E)ca*ation

    (+e Contractor s+all ensure t+at t+e $et+od of construction preents collapse, ingress of conta$inants and$aterial falling in fro$ t+e surface. If te$porar! steel casing is used for t+is purpose, an! +oles ored prior toplacing t+e casing in position s+all e drilled -it+ a it not $ore t+an 2' $$ larger t+an t+e outside dia$eter oft+e casing.

    Serices or ad>C999 Page 2

  • 7/22/2019 Part416 Cast in Place Concrete Piles

    3/4

    Edition: August 2008 Specification: Part 416 Cast In Place Concrete Piles

    Integrit! testing s+all e carried out on t+e piles in accordance -it+ integrit! test $et+ods specified in AS 21'.Integrit! testing e#uip$ent s+all e capale of c+ec;ing cross=sectional irregularities in piles and identif!ing t+elocation and c+aracteristics of an! significant ano$alies suc+ as oids or conta$inants.

    Acceptance criteria, superision and reporting of integrit! testing s+all e in accordance -it+ t+e re#uire$ents ofAS 21'.

    3nless specified ot+er-ise, integrit! testing s+all e carried out on all piles.

    6.! Loa+ tetin0

    (+e Contractor s+all carr! out d!na$ic testing of piles to confir$ t+at design pile capacit! +as een ac+ieed. Atleast one d!na$ic load test s+all e perfor$ed for eer! %0 piles. Additional d!na$ic load testing s+all also ecarried out on piles in t+e eent t+at pile toe leels ar! ! $ore t+an 2 $etres fro$ t+e test pile. (esting s+all ecarried out ! use of a Pile riing Anal!ser /PA and t+e data otained fro$ eac+ pile s+all e anal!sed usingCAPAP, (BADE or ot+er approed e#uialent soft-are.

    Additional load testing re#uire$ents /including static load tests $a! e specified in t+e Contract SpecificRequirementor on t+e ra-ings.

    (+e test procedure and test reports s+all confor$ -it+ t+e re#uire$ents of AS 21', and t-o copies of a reports+o-ing t+e $easured field para$eters and t+e results of anal!sis to deter$ine pile capacit! s+all e proided tot+e Superintendent.

    (+e $easured ulti$ate capacit! of test piles s+all e e#ual to or greater t+an t+e pile test load specified in t+eContract Specific "e#uire$ents or on t+e ra-ings.

    6.( Tet Reut

    Su$ission of t+e test results s+all constitute a &OL' POINT.

    2. &OL' POINTS

    (+e follo-ing is a su$$ar! of *old Points ide Part 140 ?ualit! S!ste$ "e#uire$ents?, referenced in t+is Part:

    CLA#SERE/.

    &OL' POINTRESPONSE

    TI%E

    2 Su$ission of Procedures 14 -or;ing da!s

    4.1 At t+e co$pletion of e9caation 1 +our

    6.% Su$ission of test results follo-ing t+e installation of a group of piles 6 +ours

    3. RECOR'S

    (+e Contractor s+all proide continuous records for eac+ pile. (+e data recorded s+all include t+e follo-ing:

    /a ia$eter, lengt+, location and t!pe of pile and date of oring

    / Concrete atc+ details, properties and slu$p

    /c All infor$ation regarding ostructions, dela!s and ot+er interruptions to t+e se#uence of -or;

    /d Integrit! testing results and

    /e +ere specified, results of ulti$ate resistance tests.

    P(I >>C999 Page %

  • 7/22/2019 Part416 Cast in Place Concrete Piles

    4/4

    P(I >>C999 Page 4