PART A PAY QUANTITIES - ROADWAY IN-ER-002_INDIAN_NATION_BRIDGE_38 41_1… · solid slab sodding...
Transcript of PART A PAY QUANTITIES - ROADWAY IN-ER-002_INDIAN_NATION_BRIDGE_38 41_1… · solid slab sodding...
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
S\IN-
ER-002_S_
GE
NE
RA
L
NO
TES_01.dgn
10/28/2013
3:0
3:5
7 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
10/13
10/13
10/13
BRIDGE REPAIR 38.41
AEJ
WZB
SOT 2
2
ITEM NO. DESCRIPTION NOTES UNIT QUANTITY ITEM NO. DESCRIPTION NOTES UNIT QUANTITY
645(A) PROJECT SITE RENTAL $/PSRD
ITEM NO. DESCRIPTION NOTES UNIT QUANTITY
ITEM NO. DESCRIPTION NOTES UNIT QUANTITY
(14)
PAY ITEM NOTES
PAY QUANTITIES AND
PART A PAY QUANTITIES - ROADWAY
PART A
PART A
PART B PROJECT SITE RENTAL
PAY QUANTITIES - BRIDGE 38.41
PAY QUANTITIES - TRAFFIC
BRIDGE PAY ITEM NOTES
"REMOVAL OF BRIDGE ITEMS".
INCLUDED IN THE LUMP SUM PRICE BID FOR
MATERIAL, LABOR, EQUIPMENT AND INCIDENTALS SHALL BE
GRINDING, DEMOLITION, CONTAINMENT AND REMOVAL OF DEBRIS,
OR AS SHOWN ON THE PLANS INCLUDING SAWING, CUTTING,
ALL COSTS NECESSARY TO COMPLETE THE WORK AS SPECIFIED
LUMP SUM PRICE BID FOR "REMOVAL OF BRIDGE ITEMS".
EQUIPMENT, AND INCIDENTALS SHALL BE INCLUDED IN THE
THE WORK AS DESCRIBED INCLUDING LABOR, MATERIALS,
IN A MANNER APPROVED BY THE ENGINEER. ALL COST FOR DOING
BECOME THE PROPERTY OF THE CONTRACTOR AND DISPOSED OF
STANDARD SPECIFICATIONS. ALL REMOVED MATERIAL SHALL
REMOVAL SHALL BE IN ACCORDANCE WITH SECTION 619 OF THE
ADJACENT BEAM ENDS.
BEAMS THAT WILL REMAIN IN PLACE. USE CAUTION NOT TO DAMAGE
ALLOWED TO MAKE THE REMOVALS WITHIN ONE FOOT OF THE
IN PLACE. NO VEHICLE MOUNTED TOOLS OR EQUIPMENT WILL BE
THE REMOVAL WITHIN ONE FOOT OF THE BEAMS THAT WILL REMAIN
OR HAND OPERATED POWER TOOLS WILL BE ALLOWED TO MAKE
WHEN MAKING REMOVALS OF THE DIAPHRAGMS, ONLY HAND TOOLS
CONTRACTOR TO MAKE THE REMOVALS.
A SEQUENTIAL LIST OF STEPS THAT WILL BE FOLLOWED BY THE
HOW THE EQUIPMENT WILL BE USED TO MAKE THE REMOVALS AND
THAT WILL BE USED TO MAKE THE REMOVALS, A DESCRIPTION OF
ENGINEER. THE PLAN SHALL INCLUDE A LIST OF ALL EQUIPMENT
REMOVALS UNTIL THE PLAN HAS BEEN APPROVED BY THE
EXISTING BRIDGE. THE CONTRACTOR SHALL NOT MAKE ANY
TO THE ENGINEER A PLAN FOR REMOVING EACH ITEM FROM THE
BEFORE MAKING ANY REMOVALS, THE CONTRACTOR SHALL SUBMIT
ENGINEER.
EXPENSE OF THE CONTRACTOR TO THE SATISFACTION OF THE
NEGLIGENCE OF THE CONTRACTOR, SHALL BE REPAIRED AT THE
COMPONENTS OR PORTIONS TO REMAIN IN PLACE, DUE TO THE
DIAPHRAGMS, ROADWAY BELOW, OR OTHER EXISTING BRIDGE
BRIDGE ITEMS. ANY DAMAGE TO THE EXISTING BEAMS,
THE CONTRACTOR SHALL EXERCISE CAUTION WHEN REMOVING THE
SHALL BE ATTACHED TO THE NEW CONCRETE RAIL.
RAILING AND POSTS SHALL BE REMOVED AND STOCKPILED, AND
OF THE NEW BRIDGE DECK AS SHOWN IN THE PLANS. THE ALUMINUM
TRANSVERSE REINFORCING SHALL EXTEND 9" INTO THE CONCRETE
THE DAMAGED BEAM AREA AS SHOWN IN THE PLANS. THE EXISTING
DAMAGED PORTIONS AND A PORTION OF THE BRIDGE DECK OVER
INTERIOR BEAM ALONG WITH THE DIAPHRAGMS ATTACHED TO THE
SOUTH SIDE OF SPAN 3, INCLUDING ONE EXTERIOR AND ONE
REMOVAL AND DISPOSAL OF THE DAMAGED PORTION OF THE
THE PAY ITEM "REMOVAL OF BRIDGE ITEMS" SHALL INCLUDE THE
ITEM NO. DESCRIPTION NOTES UNIT QUANTITY
PART A CONSTRUCTION PAY QUANTITIES
642
641
106
CONSTRUCTION STAKING
MOBILIZATION
QUALITY CONTROL & ACCEPTANCE
LSUM
LSUM
LSUM
1
1
1
REMOVAL OF ASPHALT PAVEMENT
RUMBLE STRIP-METHOD HMA-CON
COLD MILLING PAVEMENT
SUPERPAVE, TYPE S4 (PG 64-22 OK)
SUPERPAVE, TYPE S3 (PG 64-22 OK)
PRIME COAT
TACK COAT
SUBGRADE METHOD B
FERTILIZING (10-20-10)
WATERING
SOLID SLAB SODDING
TYPE A SALVAGED TOPSOIL
UNCLASSIFIED EXCAVATION
SY
LF
SY
TON
TON
GAL
GAL
SY
TON
KGAL
SY
LSUM
CY
2100
1555
692
314
824
735
734
2100
0.22
89
2220
1
1575
PIPE RAILING
REMOVAL OF BRIDGE ITEMS
(PL) REPAIR BRIDGE ITEMS
(SP) CARBON FIBER-REINFORCED POLYMER
REINFORCING STEEL
MECHANICAL SPLICES
CLASS AA CONCRETE
STRUCTURAL STEEL
CONCRETE RAIL
PRESTRESSED CONCRETE BEAMS
ENGINEERED FALSEWORK
619(B)
413(A)
412
411(C)
411(B)
408
407(B)
310(B)
234(A)
230(F)
230(A)
205(A)
202(A)
(1)
(14)
(13)
(11)
(7)
(2)
(6) (9) (10)
(8)
(3) (4) (6)
(5)
(12)
LF
LSUM
EA
SF
LB
EA
CY
LB
LF
LF
LSUM
42.7
1
2
40.9
3690.00
115.00
8.40
360.00
42.7
85
1
622(A)
619(B)
540
524(A)
511(A)
511
509(A)
506(A)
504(D)
503(A)
502(A)
(R-49,50) (SP-5)
(SP-6)
(R-49) (SP-7)
(R-32) (SP-2)
(R-32)
(R-28)
(SP-4)
(R-13)
(R-9)
882(A)
880(K)
880(J)
880(A)
878(C)
877(A)
870(A)
857(A)
856(A)
SD
SD
LSUM
SD
SD
LF
SD
LF
LF
5000.00
(SP) CHANGEABLE MESSAGE SIGN
SURVEILLANCE OF TRAFFIC CONTROL
CONSTRUCTION TRAFFIC CONTROL
ARROW DISPLAY (TYPE C)
MODULAR GLARE SCREEN (TEMPORARY)
DELIVER PORTABLE LONGITUDINAL BARRIER
SANDFILLED IMPACT ATTENUATION MODULE
CONSTRUCTION TRAFFIC STRIPE (PAINT)
TRAFFIC STRIPE (MULTI-POLY) (6" WIDE)
(TC-52,84)(SP-1)
(TC-39,84)
(TC-25,33)(SP-3)
(TC-84)
(TC-84)
(0-11) (TC-1)
(TC-44,52,84)
(O-10) (TC-17,21,61)
(TS-25)
140
35
1
67
1826
2762.5
836
19660
16264
MATCH ORIGINAL BEAM PROFILE.
SILICA FUME ADDITIVE AND IS FIBER REINFORCED. REPAIRED AREA SHOULD
EXPOSED STRANDS AND REPAIR AREAS WITH A PATCHING MORTAR THAT CONTAINS
LOCATIONS SHOWN IN THE PLANS AND AS DETERMINED BY THE ENGINEER. CLEAN
CONSIST OF REMOVING LOOSE AND UNSOUND CONCRETE OF THE DAMAGED AREAS AT
REPAIR BEAMS 3 AND 4, SPAN 3 AS SHOWN ON PLANS. CONCRETE REPAIR SHALL(13)
FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS.
WHO IS CURRENTLY REGISTERED WITH THE OKLAHOMA STATE BOARD OF REGISTRATION
STANDARD SPECIFICATIONS AND DESIGNED AND SEALED BY A PROFESSIONAL ENGINEER
WORK ORDER. THE FALSEWORK SHALL BE IN ACCORDANCE WITH SECTION 502 OF THE
DESIGN TO THE ENGINEER FOR APPROVAL WITHIN ONE WEEK AFTER ISSUANCE OF THE
THE CONTRACTOR SHALL SUBMIT DETAIL DRAWINGS AND CALCULATIONS OF FALSEWORK
REMOVING FALSEWORK.
BEAM AND DECK REPAIRS SHALL BE COMPLETE AND ATTAIN 28-DAY STRENGTH BEFORE
BY THE CONTRACTOR, AT HIS EXPENSE, TO THE SATISFACTION OF THE ENGINEER.
FAILURE OF THE FALSEWORK, SHALL BE REPAIRED TO SERVICEABLE CONDITION
PUBLIC DURING THIS WORK. DAMAGE TO THE STRUCTURE DUE TO ANY SETTLEMENT OR
AND SHALL BE FULLY RESPONSIBLE FOR THE SAFETY OF THE BRIDGE AND TRAVELING
FALSEWORK SUPPORTING THE CANTILEVER SLAB PRIOR TO SAW CUTTING THE DECK,
THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE ADEQUACY OF THE(12)
AND CURED.
BE APPLIED AFTER ALL CONCRETE REPAIRS TO THE DAMAGED BEAM HAVE BEEN MADE
PROVISIONS FOR "FIBER-REINFORCED POLYMER MATERIAL". THE CFRP WRAP SHALL
DAMAGED SECTION OF BEAM 4 AS SPECIFIED IN THE PLANS AND IN THE SPECIAL
LAYERS OF A CARBON FIBER-REINFORCED POLYMER (CFRP) COMPOSITE WRAP TO THE
PAY ITEM "(SP) CARBON FIBER-REINFORCED POLYMER" CONSISTS OF APPLYING TWO (2)(11)
TO PROVIDE FOR DEAD LOAD DEFLECTIONS AND GRADE ADJUSTMENT.
FINAL HAUNCH HEIGHTS WILL BE SET AFTER ERECTION OF GIRDERS AND DIAPHRAGMS
WITH A 1" HAUNCH ALONG THE FULL LENGTH OF THE GIRDERS AND CANTILEVER. THE
GIRDERS AND ADDITIONAL THICKNESS AT CANTILEVER. THIS QUANTITY IS CALCULATED
(10) PLAN QUANTITY FOR CLASS AA CONCRETE INCLUDES 0.5 C.Y. FOR HAUNCHES OVER
UNIT PRICE OF CLASS AA CONCRETE.
(9) INCLUDE ALL COSTS OF SAWCUT, JOINT SEALER AND BACKER ROD IN THE CONTRACT
LABOR, EQUIPMENT, AND OTHER INCIDENTALS USED TO INSTALL BEARING ASSEMBLY.
AND DRILLING AND EPOXY GROUTING OF NEW ANCHOR BOLTS. INCLUDE ALL COSTS OF
BEARING PAD. INCLUDES CUTTING, GRINDING, AND PAINTING EXISTING ANCHOR BOLTS,
(8) ENCOMPASSES COST OF BOTTOM BEARING PLATE, ANCHOR BOLTS, AND ELASTOMERIC
AND EPOXY GROUT LAPPED BARS FROM INTERIOR BEAM TO EXISTING DIAPHGRAM.
(7) INCLUDE ALL COSTS OF LABOR, EQUIPMENT, AND OTHER INCIDENTALS TO DRILL
THE CONTRACT UNIT PRICE OF CLASS AA CONCRETE AND CONCRETE RAIL.
AND CONCRETE RAIL. INCLUDE ALL COSTS OF HIGH EARLY STRENGTH CONCRETE IN
(6) ALL CLASS AA CONCRETE SHALL BE HIGH EARLY STRENGTH CONCRETE FOR DECK, CURB
OF PRESTRESSED CONCRETE BEAMS.
(5) INCLUDE ALL COSTS OF WELDING EMBEDDED SOLE PLATE IN THE CONTRACT UNIT PRICE
OF CLASS AA CONCRETE FOR CONCRETE RAIL.
(4) THERE IS AN ESTIMATED 4.0 C.Y. OF CLASS AA CONCRETE FOR CURB AND 1.7 C.Y.
CONCRETE RAIL. QUANTITIES FOR REINFORCEMENT ARE INCLUDED IN REINFORCING STEEL.
RELATING TO THE CURB AND CONCRETE RAIL IN THE CONTRACT UNIT PRICE OF
(3) INCLUDE ALL COSTS OF LABOR, EQUIPMENT, MATERIALS AND ANY OTHER INCIDENTALS
FROM THE EXISTING DECK WITH NEW REINFORCING.
(2) MECHANICAL SPLICE DEVICES SHALL BE USED TO SPLICE REINFORCING EXTENDING
BOLTS, AND ADDITIONAL SHIMS IF REQUIRED.
TO REINSTALL THE ALUMINUM RAIL ON NEW CONCRETE RAIL, INCLUDING NEW ANCHOR
GUARDRAIL AND ITS ATTACHMENT COMPONENTS. PAY ITEM SHALL INCLUDE ALL COSTS
(1) INCLUDE ALL COSTS TO DISASSEMBLE AND STOCKPILE THE EXISTING ALUMINUM
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
S\IN-
ER-002_S_
GE
NE
RA
L
NO
TES_02.d
gn
10/28/2013
3:17:2
2 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
10/13
10/13
10/13
BRIDGE REPAIR 38.41
AEJ
PAY ITEM NOTES
RAH
SOT 3
3
AND GENERAL NOTES
PAY ITEM NOTES
PAY ITEM NOTES CONT.
DIRECTED BY THE ENGINEER.
INLAY SHALL BE COMPLETED PRIOR TO SHIFTING TRAFFIC ONTO SHOULDER AS
THE INDIAN NATION TURNPIKE SOUTHBOUND OUTSIDE SHOULDER. MILL AND
PAY ITEM INCLUDED FOR THE MILL AND INLAY, 4 FEET WIDE, 2 INCHES THICK, OFSP-7
REMOVED AND SHOULDER IS NO LONGER NEEDED FOR TRAFFIC CONTROL.
RUMBLE STRIP WILL NOT BE MILLED INTO THE SHOULDER UNTIL TRAFFIC HAS BEENSP-6
ASPHALT PAVEMENT.
INCLUDES ALL COSTS OF SAWING PAVEMENT AS REQUIRED FOR REMOVAL OFSP-5
CROSSOVER PAVING.
TURNPIKE SOUTHBOUND OUTSIDE SHOULDER AND 630 GALS FOR MEDIAN
QUANTITY SHOWN INCLUDES 104 GALS FOR MILL AND INLAY OF THE INDIAN NATIONSP-4
OF THE BRIDGE IN THE INTERIM.
THE CONTRACTOR SHALL NOT ALLOW TRAFFIC OVER THE DAMAGED PORTION
SPECIAL PORTABLE LONGITUDINAL BARRIER ALONG E 1460 ROAD (LEHNHARD ROAD).
LONGITUDINAL BARRIER ON THE SAME DAY THE CONTRACTOR PLACES HIS OWN
FOR MANHATTAN ROAD AND BRIDGE TO REMOVE THEIR PLASTIC PORTABLE
COORDINATE WITH KERRY HOFF OF MANHATTAN ROAD AND BRIDGE, 918-437-9560,
DEVICES ALONG E 1460 ROAD (LEHNHARD ROAD). THE CONTRACTOR SHALL
BARRIER WITH HIS OWN, AND TAKE TOTAL RESPONSIBILITY FOR THE LONGITUDINAL
CONTRACTOR SHALL REPLACE THE EXISTING PLASTIC PORTABLE LONGITUDINAL
NORTHBOUND LANES. UPON HIS TAKING CHARGE OF THE PROJECT, THE
BEGINNING ON THE BRIDGE REPAIR OVER THE INDIAN NATION TURNPIKE
ROAD) ON SHEET 19 SHALL BE ASSUMED TO BE "IN PLACE" PRIOR TO WORK
ALL TRAFFIC CONTROL SIGNS AND DEVICES SHOWN ALONG E 1460 ROAD (LEHNHARDSP-3
CROSSOVER PAVING.
TURNPIKE SOUTHBOUND OUTSIDE SHOULDER AND 236 TONS FOR MEDIAN
QUANTITY SHOWN INCLUDES 78 TONS FOR MILL AND INLAY OF THE INDIAN NATIONSP-2
TO THE WORK AREA ALONG E 1460 ROAD (LEHNHARD ROAD).
THE WORK AREA ALONG THE INDIAN NATION TURNPIKE AND ON EACH APPROACH
PROJECT. THIS WILL ALLOW FOR THE USE OF ONE (1) SIGN ON EACH APPROACH TO
A TOTAL OF FOUR (4) CHANGEABLE MESSAGE SIGNS SHALL BE PROVIDED FOR THISSP-1
INCH (6") WIDE TRAFFIC STRIPE.
(MULTI-POLYMER) (BLACK) AND WILL BE MEASURED BY THE LINEAR FOOT OF SIX
6,420 L.F. TRAFFIC STRIPE (MULTI-POLYMER) (YELLOW) AND 1,712 L.F. TRAFFIC STRIPE
QUANTITY SHOWN INCLUDES 8,132 L.F. TRAFFIC STRIPE (MULTI-POLYMER) (WHITE),TS-25
PROJECT’S CONSTRUCTION TRAFFIC CONTROL IS MODIFIED DURING CONSTRUCTION.
FOR THIS PROJECT. THESE ESTIMATED SIGN DAY QUANTITIES MAY CHANGE AS THE
TURNPIKE AUTHORITY STANDARDS AND SUGGESTED CONSTRUCTION SEQUENCE
ITEMS IS AN ESTIMATED QUANTITY ONLY, BASED ON THE CURRENT OKLAHOMA
ITEMS. THE AMOUNT OF CALENDAR DAYS USED TO COMPUTE THE SIGN DAY PAY
35 CONSTRUCTION CALENDAR DAYS WERE USED TO COMPUTE THE SIGN DAY PAYTC-84
TO THE SATISFACTION OF THE ENGINEER.
THEIR INSTALLATION, SHALL BE REPAIRED AT THE CONTRACTOR’S EXPENSE AND
MARKERS OR CHANNELIZING DEVICES AND THE BITUMINOUS ADHESIVE USED IN
CONTRACTORS NEGLIGENCE IN THE REMOVAL OF CONSTRUCTION ZONE PAVEMENT
ANY DAMAGE TO A FINISHED OR EXISTING SURFACE RESULTING FROM THETC-61
WORKING CONDITION, PRIOR TO PLACEMENT ON THE PROJECT.
BY THE OKLAHOMA TURNPIKE AUTHORITY, TO ASSURE THAT THEY ARE IN GOOD
BE PLACED ON THIS PROJECT SHALL BE SUBJECT TO INSPECTION AND APPROVAL,
ANY USED CHANGEABLE MESSAGE SIGN OR SAND FILLED IMPACT ATTENUATOR TOTC-52
PALLETS (IF REQUIRED), RELOCATION AND MAINTENANCE.
PRICE BID FOR THIS ITEM SHALL INCLUDE ATTENUATOR MODULES, SAND, WOODENTC-44
SUPERVISOR.
ASSOCIATION (OTEA) AS A TRAFFIC CONTROL TECHNICIAN OR TRAFFIC CONTROL
SERVICES ASSOCIATION (ATSSA) OR THE OKLAHOMA TRAFFIC ENGINEERING
SHALL HOLD A CURRENT CERTIFICATION FROM THE AMERICAN TRAFFIC SAFETY
TRAFFIC LANES OR ANYTIME THE ENGINEER DEEMS IT NECESSARY. THIS PERSON
DEVICES IN POSITION ANYTIME TRAFFIC IS DIRECTED AWAY FROM THE NORMAL
WEEK, AT THE CONSTRUCTION SITE TO MAINTAIN AND KEEP ALL TRAFFIC CONTROL
THE CONTRACTOR SHALL PROVIDE A PERSON, 24 HOURS A DAY, SEVEN DAYS ATC-39
APPROVAL.
THE CERTIFICATION SHALL INCLUDE TEST RESULTS ON MATERIAL SUBMITTED FOR
WITH O.T.A. STANDARD SPECIFICATIONS (CURRENT EDITION) SUBSECTION 106.04.
THE MANUFACTURER SHALL FURNISH A TYPE ’D’ CERTIFICATION IN ACCORDANCE
REVISION).
FLUORESCENT SHEETING SHALL MEET THE REQUIREMENTS OF ASTM D4956 (LATEST
ALL CONSTRUCTION WORK ZONE SIGNS SHALL HAVE FLUORESCENT SHEETING. THETC-33
NON-DAYLIGHT HOURS.
STANDARD DRAWINGS SHALL HAVE THE CORRESPONDING LIGHT ATTACHED DURING
ALL SIGNS AND BARRICADES, WHICH ARE SHOWN WITH TYPE ’A’ LIGHTS IN THE
FOR COMPLETION OF THE PROJECT.
CONSTRUCTION TRAFFIC CONTROL DEVICES AND PAVEMENT MARKINGS REQUIRED
THE INSTALLATION, MAINTENANCE AND SUBSEQUENT REMOVAL OF ALL NECESSARY
STANDARD DRAWINGS. PRICE BID FOR THIS ITEM SHALL BE PAYMENT IN FULL FOR
DEVICES, (CURRENT EDITION), AND COMPLIANT WITH APPLICABLE O.D.O.T.
IN ACCORDANCE WITH CHAPTER VI OF THE MANUAL ON UNIFORM TRAFFIC CONTROL
CONSTRUCTION PLANS, AND INSTALLED IN A MANNER APPROVED BY THE ENGINEER,
ALL CONSTRUCTION TRAFFIC CONTROL WILL BE IMPLEMENTED ACCORDING TOTC-25
AND REMOVAL. THIS ITEM SHOULD BE BID ACCORDINGLY.
INCLUDED IN THE COST OF THIS ITEM SHALL BE INSTALLATION, MAINTENANCE,TC-21
(4" WIDE) YELLOW STRIPE.
INCLUDES AN ESTIMATED 6,720 L.F. (PAINT) (4" WIDE) WHITE AND 12,940 L.F. (PAINT)TC-17
PORTABLE LONGITUDINAL BARRIER.
MAINTENANCE OF TRAFFIC WHEN INSTALLING, RELOCATING OR DELIVERING
AND PROVIDE FLAGGERS NECESSARY FOR THE CONTROL, SAFETY, AND
THE CONTRACTOR SHALL FURNISH AND INSTALL SUCH LIGHTS, SIGNS, BARRICADES,TC-1
202.06 UNCLASSIFIED EXCAVATION.
MATERIALS REMOVED SHALL NOT BE MEASURED FOR PAYMENT UNDER SECTIONR-50
MANNER APPROVED BY THE ENGINEER.
TO BECOME THE PROPERTY OF AND BE DISPOSED OF BY THE CONTRACTOR IN AR-49
ESTIMATED AT 112 LBS. PER SQ. YD. PER 1" THICK.R-32
STANDARD SPECIFICATIONS.
THE RESIDUE FROM DISTILLATION PERCENTAGE SHOWN IN SECTION 708.03 OF THE
OPERATIONS WILL BE DETERMINED BY THE CONTRACTOR, AND SHALL CONSIDER
AGGREGATE BASE. THE ACTUAL CUTBACK PRIME COAT REQUIRED FOR PLACEMENT
WHEN APPLIED TO SUBGRADE, AND 0.25 GAL. PER SQ. YD. WHEN APPLIED TO
PRIME COAT SHALL BE APPLIED AT AN ESTIMATED RATE OF 0.35 GAL. PER SQ. YD.R-28
OF SODDING AND/OR SPRIGGING.
ESTIMATED AT 200 POUNDS OF 10-20-10 FERTILIZER PER 1,000 SQ. YDS.R-13
ESTIMATED AT 40 GALLONS PER SQ. YD. OF SODDING AND/OR SPRIGGING.R-9
APPROVED TRAFFIC CONTROL PLAN.
PAYMENT WILL BE BASED ON THE ACTUAL AMOUNT IN ACCORDANCE WITH THE
PLAN QUANTITIES ARE BASED ON THE PLAN SEQUENCE OF CONSTRUCTION. FINALO-11
WILL BE BY THE LINEAR FOOT OF PAINT REGARDLESS OF THE ITEM USED.
MARKINGS AS SHOWN ON THE PLANS AND ON ALL FINISHED SURFACES. PAYMENT
FLEX-TABS AT HIS OPTION. CONTRACTOR SHALL USE FLEX-TABS FOR TEMPORARY
DURING THE VARIOUS STAGES OF CONSTRUCTION. CONTRACTOR MAY USE
THIS ITEM IS TO BE USED AS APPROVED BY THE ENGINEER TO DIRECT TRAFFICO-10
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
S\IN-
ER-002_S_
GE
NE
RA
L
NO
TES_03.d
gn
10/28/2013
2:2
9:3
8 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
10/13
10/13
10/13
BRIDGE REPAIR 38.41
AEJ
RAH
SOT 4
GENERAL NOTES
4
TRAFFIC CONTROL:
REQUIRED FOR THE PROJECT.
WITH THE OKLAHOMA HIGHWAY PATROL TO DETERMINE THE NUMBER OF OFFICERS AND SCHEDULE
REQUESTED AND WILL BE SUBJECT TO THE APPROVAL OF THE ENGINEER. THE OTA WILL COORDINATE
THE WORK SCHEDULE WILL INCLUDE THE DAYS IN WHICH TRAFFIC SURVEILLANCE, POLICE IS
SCHEDULE TO THE OTA ON-SITE REPRESENTATIVE ONE (1) WEEK IN ADVANCE OF THE WORK.
THIS CONTRACT. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING HIS ANTICIPATED WEEKLY
TRAFFIC SURVEILLANCE, POLICE: TRAFFIC SURVEILLANCE, POLICE WILL NOT BE A PART OF
LANE LINES, AT A MINIMUM, SHALL BE ESTABLISHED AT ALL TIMES DURING CONSTRUCTION.(G-52)
ALL WORK PHASES FOR THE CONSTRUCTION OF THE BRIDGES AND ROADWAYS AFFECTED.
TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO BEGINNING CONSTRUCTION DESCRIBING
THE CONTRACTOR SHALL SUBMIT A FINAL TRAFFIC CONTROL AND CONSTRUCTION PHASING PLAN(G-51)
ADEQUATELY PROTECT THESE TRAFFIC HAZARDS WILL RESULT IN A SHUTDOWN NOTICE BEING ISSUED.
THE CONTRACTOR SHALL NOT LEAVE ANY EXPOSED ENDS OF STRUCTURES. FAILURE TO
IS ALREADY IN PLACE. COST TO BE INCLUDED IN OTHER ITEMS OF WORK.
WHEN SAND FILLED IMPACT ATTENUATORS OR GUARDRAIL ARE REMOVED UNLESS BARRIER
TRUCK MOUNTED ATTENUATORS WILL BE USED TO PROTECT AREAS EXPOSED TO TRAFFIC(G-49)
CONTRACTOR SHALL NOT UTILIZE EMERGENCY VEHICLE TURNAROUNDS ON THE TURNPIKE(G-48)
MISCELLANEOUS:
ALL FIELD MEASUREMENTS SHALL PREVAIL ON INSTALLATION AND REMOVAL.(G-61)
WHEN WORK IS BEING PERFORMED BY HIS SUBCONTRACTORS.
THE PRIME CONTRACTOR SHALL BE REPRESENTED ON SITE AT ALL TIMES. HE MUST BE PRESENT(G-60)
PERMITTED ON SUNDAYS.
WORK IS NOT ALLOWED BEFORE SUNRISE NOR AFTER SUNSET. CONSTRUCTION ACTIVITIES ARE NOT(G-58)
FOR ITEMS WHICH ARE CLASSIFIED FOR PAYMENT.
CONSIDERED INCIDENTAL AND THE COST THEREOF SHALL BE INCLUDED IN THE UNIT PRICE BID
ALL WORK AND/OR MATERIALS NOT CLASSIFIED AS A "CONTRACT PAY ITEM" SHALL BE(G-56)
CONTRACTOR SHALL PAY ALL TURNPIKE FEES. TOLL COST SHALL BE INCLUDED IN OTHER ITEMS OF WORK.(G-55)
AT THE PRE-WORK MEETING.
CONTRACTOR SHALL PROVIDE THE ENGINEER A DIGITAL COPY OF THE PHOTOGRAPHS AND VIDEO
COST SHALL BE CONSIDERED AS INCIDENTAL AND NO SEPARATE PAYMENT SHALL BE MADE.
AND VIDEO WITH A DESIGNATED OTA REPRESENTATIVE, BEFORE THE START OF CONSTRUCTION.
CONTRACTOR SHALL DOCUMENT PRE-CONSTRUCTION SITE CONDITIONS BY MEANS OF PHOTOGRAPHS(G-53)
SITE WORK/RIGHT-OF-WAY:
THE ENGINEER. ALL COST TO BE INCLUDED IN OTHER ITEMS OF WORK.
AND PERMANENT RIGHT-OF-WAY FENCING SHALL BE RESTORED OR INSTALLED IN A MANNER APPROVED BY
OF THE PROJECT THAT REQUIRED THIS FENCE IS COMPLETED, THE TEMPORARY FENCE SHALL BE REMOVED,
THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY RIGHT-OF-WAY FENCE AS REQUIRED. WHEN THE PORTION(G-65)
BY THE CONTRACTOR. ALL ACCESS ROADS SHALL BE APPROVED BY THE OTA PRIOR TO CONSTRUCTION.
OTA RETAINS THE RIGHT TO KEEP ANY ROADS FROM THE TURNPIKE TO THE COUNTY ROADS CONSTRUCTED(G-64)
THE GATE WILL BE PERMANENTLY LOCKED.
BE LOCKED OR MANNED AT ALL TIMES. IF THE GATE IS FOUND UNLOCKED OR UNMANNED THREE TIMES,
IF THE CONTRACTOR ELECTS TO OPEN A GATE IN THE RIGHT-OF-WAY FENCE, THE GATE SHALL EITHER(G-63)
SITE MUST BE RESTORED TO ORIGINAL CONDITION IMMEDIATELY FOLLOWING CONSTRUCTION.
CONTRACTOR SHALL BE ALLOWED TO USE OTA RIGHT-OF-WAY AT APPROVED LOCATIONS FOR STORAGE.(G-62)
ROADWAY:
OF DAILY OPERATIONS IS NO MORE THAN 2 INCHES.
WITHIN THE SAME WORKING PERIOD, SUCH THAT THE MAXIMUM ELEVATION DIFFERENTIAL AT THE CLOSE
ALL COLD MILLED SURFACES AND TACK COAT APPLICATIONS SHALL BE OVERLAID WITH HOT MIX ASPHALT(G-66)
SPECIFICATIONS:
DESCRIPTION OF WORK:
VERIFICATION OF EXISTING CONDITIONS:
EXISTING PLANS:
EXCEPT AS MODIFIED BY PLAN NOTES AND SPECIAL PROVISIONS.
TURNPIKE AUTHORITY, 2010 STANDARD SPECIFICATIONS FOR TURNPIKE CONSTRUCTION,
ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE OKLAHOMA
EXPENSE AND TO THE SATISFACTION OF THE ENGINEER.
ROADWAY DUE TO THE CONTRACTOR’S NEGLIGENCE SHALL BE REPAIRED AT THE CONTRACTOR’S
THE EXISTING BRIDGE OR ATTACHMENTS. ANY DAMAGE TO THE EXISTING BRIDGE OR
PRACTICE AND SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO
THE CONTRACTOR SHALL ADOPT METHODS CONSISTENT WITH GOOD CONSTRUCTION
OF THE NATURE OF THE WORK AND CONDITIONS UNDER WHICH IT WILL BE PERFORMED.
PRIOR TO SUBMITTING HIS BID, THE CONTRACTOR SHALL FULLY INFORM HIMSELF
RESPONSIBLE FOR THE ACCURACY THEREOF.
DIMENSIONS NECESSARY TO CONNECT THE NEW MATERIAL AND SHALL BE SOLELY
AND THE ORIGINAL PLANS ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY ALL
THE DIMENSIONS OF THE EXISTING BRIDGE COMPONENTS SHOWN ON THESE PLANS
MAINTENANCE OF TRAFFIC:
GENERAL NOTES
ASK FOR: CONTRACT NO. 314 AND 302
OKLAHOMA CITY, OKLAHOMA 73111
3500 MARTIN LUTHER KING BOULEVARD
OKLAHOMA TURNPIKE AUTHORITY
OR FROM:
FTP://FTP.PIKEPASS.COM/ORIGINAL/20CONSTRUCTION/20CONTRACTS/INDIAN NATION/CONT314:
FOR THE ORIGINAL CONSTRUCTION AND REHABILITATION ARE AVAILABLE ON OTA WEB SITE;
TH1S BRIDGE WAS CONSTRUCTED BY THE OKLAHOMA TURNPIKE AUTHORITY. PLANS
SURVEYING AND CONSTRUCTION STAKING:
UTILITIES:
SUM OF "CONSTRUCTION STAKING".
LABOR, EQUIPMENT AND INCIDENTALS SHALL BE INCLUDED IN THE UNIT PRICE BID PER LUMP
STAKING NECESSARY FOR COMPLETION OF THE PROJECT INCLUDING THE COST OF ALL MATERIAL,
CONSTRUCTING THE NEW DECK SLAB,. ALL COST OF THE SURVEYING AND CONSTRUCTION
HAUNCH CALCULATIONS SHALL BE PROVIDED TO THE ENGINEER FOR APPROVAL BEFORE
ALL SURVEY DATA, PROPOSED ADJUSTMENTS IN FINISH GRADES, BRIDGE FORMING DATA AND
HAUNCH AND FORMING DATA
MEASURING THE TOP OF BEAM ELEVATIONS FOR DETERMINING DECK SLAB4.
AT CENTERLINE AND EDGES OF DECK SLABS AND AT EACH BEAM LINE
MEASURING THE ELEVATIONS ALONG THE EXISTING BRIDGE DECK SLABS3.
ESTABLISHING VERTICAL CONTROL INCLUDING THE SETTING OF BENCHMARKS2.
ROADWAY AND BRIDGE CENTERLINES
ESTABLISHING HORIZONTAL CONTROL INCLUDING THE STAKING OF1.
INCLUDE THE FOLLOWING:
THE SURVEYING AND CONSTRUCTION STAKING REQUIRED FOR COMPLETION OF THE PROJECT MAY
NECESSARY FOR THE COMPLETION OF THE PROJECT AND AS DIRECTED BY THE ENGINEER.
THE CONTRACTOR WILL BE REQUIRED TO CONDUCT ALL SURVEYING AND CONSTRUCTION STAKING
TO THE CONTRACTOR’S NEGLIGENCE SHALL BE BORNE SOLELY BY THE CONTRACTOR.
UTILITY LINE. ANY COSTS OF REPAIR, REPLACEMENT OR LOSS OF SERVICE DUE
THE CONTRACTOR SHALL TAKE CARE TO AVOID DAMAGE TO THE CONDUIT AND
DURING REMOVAL AND REPLACEMENT OF THE DECK, BEAMS, CURB AND RAIL.
THE CONTRACTOR SHALL SUPPORT THE CONDUIT WHICH IS LOCATED ON THE CURB
REMOVAL OF LEAD BASED PLATE:
CONCRETE INTERMEDIATE DIAPHRAGMS:
80% OF THE SPECIFIED COMPRESSIVE STRENGTH.
OF THE ENGINEER. THIS TIME MAY BE SHORTENED IF THE CONCRETE HAS ATTAINED
DIAPHRAGMS HAS BEEN IN PLACE FOR A MINIMUM OF 5 DAYS OR AT THE DISCRETION
OTHER MASSIVE LOADS TO THE BEAMS OR DIAPHRAGMS UNTIL THE CONCRETE IN THE
COMPRESSIVE STRENGTH. DO NOT PLACE THE CONCRETE FOR THE DECK SLAB OR APPLY
THIS TIME MAY BE SHORTENED IF THE CONCRETE HAS ATTAINED 80% OF THE SPECIFIED
BOTTOM FORM FOR A MINIMUM OF 3 DAYS OR AT THE DISCRETION OF THE ENGINEER.
MINIMUM OF 24 HOURS BEFORE REMOVING THE SIDE FORMS. DO NOT REMOVE THE
ONCE THE CONCRETE HAS BEEN PLACED FOR THE INTERMEDIATE DIAPHRAGM, WAIT A
STAY-IN-PLACE FORMS:
THE USE OF STAY-IN-PLACE FORMS WILL NOT BE ALLOWED ON THIS PROJECT.
REPLACING THE SIGN IN OTHER ITEMS OF WORK.
CLEARANCE AS DIRECTED BY THE ENGINEER. INCLUDE ALL COSTS OF REMOVING AND
EXISTING VERTICAL CLEARANCE SIGN IN KIND DISPLAYING THE NEW MINIMUM VERTICAL
MINIMUM VERTICAL CLEARANCE OVER THE INDIAN NATION TURNPIKE AND REPLACE THE
AFTER ALL BEAM REPAIRS ARE COMPLETE, THE CONTRACTOR SHALL MEASURE THE
INDICATED IN THE PLANS.
AND RAILING OVER THE NORTHBOUND LANES OF THE INDIAN NATION TURNPIKE AS
REMOVE AND REPLACE TWO BEAMS, THREE DIAPHRAGMS, A PORTION OF DECK, CURB
SHALL BE RESTRICTED TO ONE LANE OF TRAFFIC DURING REPAIR OPERATIONS.
DAMAGE TO THE INDIAN NATION BRIDGE 38.41 IN PITTSBURG COUNTY. THE BRIDGE
THE WORK TO BE PERFORMED UNDER THIS CONTRACT CONSISTS OF REPAIRING THE
INCLUDED IN THE UNIT PRICE BID PER LUMP SUM OF "REMOVAL OF BRIDGE ITEMS".
ALL COSTS TO REMOVE AND DISPOSE OF THE LEAD PLATE PROPERLY SHALL BE
SECTION 619 OF THE STANDARD SPECIFICATIONS REGARDING "HAZARDOUS MATERIALS".
THE CONTRACTOR SHALL DISPOSE OF THE LEAD PLATES IN ACCORDANCE WITH
BE REMOVED AND REPLACED WITH A 1/8" ELASTOMERIC BEARING PAD.
THE EXISTING BEARINGS CONTAIN A 1/8" LEAD PLATE COMPONENT THAT SHALL
EACH WAY, LOCATED ON THE SOUTHBOUND LANES.
NORTHBOUND AND SOUTHBOUND TRAFFIC WILL BE REDUCED TO ONE LANE
LANES OF TURNPIKE TRAFFIC SHALL BE CLOSED DURING REPAIRS. THE
TO ONE LANE OF TRAFFIC DURING REPAIR OPERATIONS. THE NORTHBOUND
BRIDGE NO. 38.41 E-1460 ROAD (LEHNHARD ROAD) SHALL REMAIN OPEN
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
S\IN-
ER-002_S_
GP
E_01.dgn
10/28/2013
2:2
9:3
9 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
10/13
10/13
10/13
BRIDGE REPAIR 38.41
SCALE: 1" = 10’
PLAN - EXISTING BRIDGE 38.41
RWS
!
BE
AM
S
SPAN 1 SPAN 2 SPAN 3 SPAN 4
ELEVATION
BRIDGE PLAN AND
SAW CUT LINE
KSJ
KSJ 5
5
AA
SHALL REMAIN, SEE TYPICAL SECTION.
CONCRETE DECK. TRANSVERSE REBAR
SAW CUT AND REMOVE EXISTING
FALSEWORK
f’c = 4,000 PSI
Fy = 60,000 PSI
Fy = 50,000 PSI
LOADING
DESIGN
MATERIAL
DESIGN DATA
AASHTO/AWS D1.5 BRIDGE WELDING CODES.
AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 6TH EDITION,2012.
LFD OPERATING RATING HS-20
HL-93
STRUCTURAL STEEL AASHTO M270 (GRADE 50W)
REINFORCING STEEL
CLASS AA
CONCRETE:
BARRIER SEE NOTE 1.
PORTABLE LONGITUDINAL
PARAPET.
BEARING PLATES,DIAPHRAGMS, DECK, CURB, AND
REMOVE AND REPLACE TWO TYPE I P. C. BEAMS,
PORTABLE LONGITUDINAL BARRIERS
STOCKPILED, AND ATTACHED TO NEW CONCRETE RAIL.
ALUMINUM RAILING SHALL BE REMOVED,
CONCRETE RAIL AND ALUMINUM RAILING.
BEARINGS PLATES, DIAPHRAGMS, DECK, CURB,
REMOVE TWO EXISTING TYPE I P. C. BEAMS,
NOTES:
12’-6" APART AT SPAN 3 UNTIL FALSEWORK IS IN PLACE.
1. PLACE PORTABLE LONGITUDINAL BARRIERS APPROXIMATELY
OF NEW ANCHOR BOLTS.
CENTERLINE OF BEARING, AND THE LOCATION AND ORIENTATION
APPROVE THE LENGTH OF BEAM FROM CENTERLINE OF BEARING TO
ASSEMBLIES. THE CONTRACTOR SHALL VERIFY AND THE ENGINEER
LOCATIONS PRIOR TO FABRICATION OF ANY BEAMS OR BEARING
ENGINEER APPROVE, BEAM AND ANCHOR BOLT DIMENSIONS AND
AT EACH BEAM LINE, THE CONTRACTOR SHALL VERIFY AND THE
PORTABLE LONGITUDINAL BARRIERS
5’-
8"
5’-
8"
5’-
8"
8"
9’-
0"
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
S\IN-
ER-002_S_
TY
PIC
AL_S
EC
T_01.dgn
10/28/2013
2:2
9:4
2 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
10/13
10/13
10/13
BRIDGE REPAIR 38.41
AEJ
SCALE: �" = 1’-0"
SECTION A-A
SCALE: �" = 1’-0"
REINFORCING DETAIL
KSJ 6
6
1"
1" C
LR.
6�
" S
LA
B
1�
" C
LR.
DETAILS
SEE SUPERSTRUCTURE
B/S
DIAPHRAGM DETAILS
SEE FRAMING PLAN AND
DIAPHRAGM DETAILS
SEE FRAMING PLAN AND
11’-2" 8"
3’-0"5’-8"5’-8"5’-8"3’-0"
9 - ET1 #5 EQ. SP. (TOP OF SLAB)
16 - EB1 #5@6 (BOT. OF SLAB)
SEE NOTE 2
SEE NOTE 1
SEE NOTE 3
SEE NOTE 4
! BEAM 1
SEE NOTE 5
AND NOTE 6
SEE NOTE 5
REQUIRED
MECHANICAL SPLICES
7�
"
6" DEPTH FOR D1 #6
DRILL AND GROUT
D2 #6
AB1 #6
AT1 #6
BT1 #6
D1 #6
PROFILE GRADE LINE
! BRIDGE AND
2’-6"9’-0"9’-0"2’-6"
F1 #6
F2 #4
DIAPHRAGM
F3 #4 AT
PROFILE GRADE LINE
! BRIDGE AND CS3 #5
DETAIL 1
DETAIL 2
DETAIL 3
! BEAM 2! BEAM 4 ! BEAM 3
9’-0" (CLEAR LANE)
BRIDGE TYPICAL SECTION
@ !
BR
G.
7�
" (T
YP.)
GENERAL NOTES.
UTILITY CONDUIT SEE
1’-6"
AB1 BEND
BEAM ! TO
SEE NOTE 7
�" PER FT.
PORTABLE LONGITUDINAL BARRIER
ENGINEERED FALSEWORK
SUPPORT SLAB WITH
DETAIL 1, SHEET 10.
COLD JOINT. SEE
SAWCUT AND SEAL
7. CROSS SLOPE SHALL MATCH EXISTING SLOPE ON DECK.
TWO FEET BEYOND THE DAMAGED AREA ALONG THE BEAM LENGTH.
CARBON FIBER-REINFORCED POLYMER WRAP AS SHOWN, EXTENDING
AFTER CONCRETE PATCH HAS CURED, PLACE 2 LAYERS OF6.
ORIGINAL BEAM PROFILE.
MANUFACTURER’S DIRECTIONS. REPAIRED AREA SHOULD MATCH
5. CLEAN AND PREPARE DAMAGED AREAS ON BEAMS PER
DO NOT DAMAGE ADJACENT SPAN DIAPHRAGM.
HORIZONTAL REINFORCING IN DIAPHRAGM SHALL REMAIN.
REMOVE END PORTION OF DIAPHRAGM AS SHOWN. EXISTING4.
TRANSVERSE REINFORCING IN DECK SHALL REMAIN.
AND REMOVE REMAINING DECK AND BEAM 2. EXISTING
SAWCUT 1" DEEP THROUGH DECK AND AROUND DIAPHRAGM,3.
DIAPHRAGM, CURB, CONCRETE RAIL AND BEAM 1 AS SHOWN.
SAWCUT THROUGH DECK AND REINFORCING AND REMOVE DECK,2.
ON NEW CONCRETE RAIL.
AND ALUMINUM POST CASTINGS. ATTACH THE TUBE AND POSTS
1. REMOVE AND STOCKPILE EXISTING 4" DIA. ALUMINUM TUBE
NOTES:
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
S\IN-
ER-002_S_
DE
CK_
REIN
F_01.dgn
10/28/2013
2:2
9:4
2 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
BEARING PAD. SEE NOTE 2
WITH �" ELASTOMERIC
REPLACE LEAD PLATES
1" X 8" X 1’-11"
EXISTING ANCHOR BOLTS
XXX
10/13
10/13
10/13
BRIDGE REPAIR 38.41
XXX
1-BT3 #6 (BOTTOM)
1-AT3 #6 (TOP)
! BEAMS
EXISTING CURB AND PARAPET
EDGE OF DECK
42’-8"
6�" 6�"
FO
R
REI
NF
OR
CI
NG
SE
E
TY
PI
CA
L
SE
CTI
ON
EXISTING CURB AND PARAPET
! PIER NO. 2 ! PIER NO. 3
EXISTING REINFORCING
5-S1 #4@12
5-S1 #4@12
5-S1 #4@12
SUPERSTRUCTURE DETAILS
RWS
2-F1 #6 (BOT.)
2-F2 #4 (MID)
2-F3 #4 (TOP)
2-F1 #6 (BOT.)
2-F2 #4 (MID)
2-F3 #4 (TOP)
2-F1 #6 (BOT.)
2-F2 #4 (MID)
2-F3 #4 (TOP)
1-BT1 #6 (BOTTOM)
1-AT1 #6 (TOP)
1’-
9"
36-BT1 #6@14 (BOTTOM)
36-AT1 #6@14 (TOP) 7"
5’-
8"
2’-
10"
9’-
0"
1’-
3"
2’-
6"
CURB AND PARAPET NOT SHOWN (SEE TYPICAL SECTION FOR REINFORCING)
42’-8"
REQUIRED
MECHANICAL SPLICES
! BRIDGE 38.41COLD JOINT
43-CS3 #5@12 LAP WITH CS1 #5 AND CS2 #5
7
SCALE: �" = 1’-0"
DECK - REINFORCING PLAN (SPAN 3)
1’-
9"
6’-
4"
BOTTOM PLATE
SEE NOTE 1
35-AB1 #6@14 (BETWEEN AT1 #6)
1-BT1 #6 (BOTTOM)
1-AT1 #6 (TOP)
NOTES:
1-BT2 #6 (BOTTOM)
1-AT2 #6 (TOP)
7"4"
7
SCALE: NONE
EXISTING BEARING DETAILS
WASHER
1’-11"
EMBEDMENT
1’-3"
SCALE: NONE
ANCHOR BOLT DETAIL
STANDARD SPECIFICATIONS
SEE SECTION 724.05 OF THE
1�" DIA. THREADED BOLT
2 - HEX NUTS
2’-
3" 1
1�
"11�
"
2"
2"
2"
2"
(4 REQUIRED)
BOTTOM PLATE 1"X8"X2’-3"
SEE NOTE 4
1�" DIA. HOLES8"
SCALE: NONE
NEW BEARING DETAILS
SEE NOTE 2 FOR ELASTOMERIC BEARING PAD
5°
2’-
9"
9"
SHALL BE ADJUSTED AS DIRECTED BY THE ENGINEER, AT NO ADDITIONAL COST.
IF NECESSARY, THE BEARING PLATE ASSEMBLIES AND ANCHOR BOLT LOCATIONS
ADJUST THE NEW PLAN BEAM LENGTH AS DIRECTED BY THE ENGINEER.
BEAMS OR BEARING ASSEMBLIES. IF NECESSARY, THE BEAM FABRICATOR SHALL
THE CONTRACTOR AND APPROVED BY THE ENGINEER PRIOR TO FABRICATING ANY
6. AT EACH BEAM LINE, THESE ANCHOR BOLT DIMENSIONS SHALL BE VERIFIED BY
HILTI HIT-RE 500 EPOXY.
5. DRILL AND EPOXY GROUT NEW ANCHOR BOLTS INTO CONCRETE PEDESTAL USING
WEATHERING CHARACTERISTICS.
TESTING NOT REQUIRED). NUTS, WASHERS, AND WELDING SHALL HAVE
AASHTO M270 (ASTM A709) GRADE 50W (WEATHERING STEEL, CHARPY V-NOTCH
4. STRUCTURAL STEEL FOR ANCHOR PLATES AND ANCHOR BOLTS SHALL CONFORM TO
AND PAINT WITH EPOXY.
3. CUT EXISTING ANCHOR BOLTS FLUSH WITH CONCRETE. GRIND SMOOTH
2. �" ELASTOMERIC BEARING PAD SHALL BE SAME SIZE AS NEW BOTTOM PLATES.
WILL BE CONSIDERED.
1. ALTERNATE ENCASED SOLE PLATES, PER CURRENT STANDARD DETAILS,
SEE NOTE 1
ANCHOR BAR DETAILS
PLAN AND DIAPHRAGM DETAILS
BACKER ROD (TYP. BOTH ENDS). SEE FRAMING
SEAL JOINT WITH SILICONE SEALER AND
CONSTRUCTION JOINT
11"
10"
11�"11�"
TY
P.
1"
PIER 3, SPAN 4
PIER 2, SPAN 2
PIER 3, SPAN 3
PIER 2, SPAN 3
BOTTOM PLATE ANCHOR BOLT LOCATION
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
S\IN-
ER-002_S_
MIS
C_
DE
T_01.dgn
10/28/2013
2:2
9:4
4 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
10/13
10/13
10/13
BRIDGE REPAIR 38.41
AEJ
WZB
1�"
�"
2"
6" 1’-3" 1’-3"
SUPERSTRUCTURE DETAILS
KSJ
PLAIN COATED REINFORCING
MARK SIZE QTY. FORM LENGTH REMARKS
(ONE REQUIRED)
SUPERSTRUCTURE BAR LIST
8
8
SHALL BE ROUGHENED
CONSTRUCTION JOINTS
3-CH1 #5 EQ. SPA. BOT.
3-CH1 #5 EQ. SPA. TOP
6"6"
GROOVE (2 PLACES)
�" CONTINUOUS DRIP
1’-
11"
10" 6"
10"
8"
10"10"
10"
1’-
4"
2’-0"
2’-1"
10"
1"
CS1 #5 X 6’-0"
CS3 #5 X 5’-2"
SE
E
NO
TE 3
1’-
0"
SCALE: 1�" = 1’-0"
DETAIL 1
1’-
6"
8"
4�"
4�
"
S1 #4 X 5’-1"
2’-9" 1’-1"
4" 4"2’-8"
4"
4"
AB1 #6 X 7’-6"
43-CS2 #5@12
43-CS1 #5@12
2-CH1 #5 F.S.
2-CH1 #5 N.S.
CS3
CS2
CS1
CH1
D2
D1
F3
F2
F1
S1
EB1
ET1
AB1
BT3
AT3
BT2
AT2
BT1
AT1
#5
#5
#5
#5
#6
#6
#4
#4
#6
#4
#5
#5
#6
#6
#6
#6
#6
#6
#6
43
43
43
10
6
6
6
6
6
15
16
9
35
1
1
1
1
36
36
BNT.
BNT.
BNT.
STR.
STR.
STR.
STR.
STR.
STR.
BNT.
STR.
STR.
BNT.
STR.
STR.
STR.
STR.
STR.
STR.
5’-2"
6’-3"
6’-0"
42’-4"
1’-6"
2’-10"
5’-7"
4’-10"
4’-10"
5’-1"
42’-4"
42’-4"
7’-6"
1’-7"
1’-7"
2’-8"
2’-8"
7’-2"
7’-2"
SE
E
NO
TE 3
1’-
3"
SE
E
NO
TE 3
1’-
0�
"
1’-6"
SEE NOTE 3
10" NOTES FOR DETAIL 1:
43-CS3 #5@12
1’-3" LEVEL
CS2 #5 X 6’-3"
SEE NOTE 4
SEE NOTE 4
SEE NOTE 4
SEE NOTE 4
SEE NOTE 4
SEE NOTE 4MECHANICAL SPLICES REQUIRED.4.
MODIFY DIMENSIONS AS REQUIRED.
NEW CURB AND RAIL SHALL ALIGN WITH EXISTING,3.
2. N.S. = NEAR SIDE AND F.S. = FAR SIDE.
PRIOR TO CONSTRUCTION.
1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS
(ALUMINUM ALLOY)
SEE ANCHOR BOLT SETTING DETAIL
PROVIDE NEW �" DIA. ANCHOR BOLTS
PRICE BID FOR PIPE RAILING.
INCLUDE ALL COSTS OF ANCHOR BOLTS AND NEW SHIMS IN THE
REQUIRED UNDER POSTS, ADDING NEW SHIMS AS NECESSARY.
STEEL, AASHTO M270, GRADE 50W. USE EXISTING SHIMS AS
ANCHOR BOLTS, HEX NUTS, AND WASHERS SHALL BE STRUCTURAL
DETERMINE COUNT TO MATCH THE PORTION OF RAILING REMOVED.
HEX NUTS TO ATTACH THE ALUMINUM RAILING. CONTRACTOR SHALL
PROVIDE 3/4" DIA X 9 3/4" LONG ANCHOR BOLTS, WASHERS, AND
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
S\IN-
ER-002_S_
BE
AM
_D
ET_01.dgn
10/28/2013
2:2
9:4
5 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
XXX
10/13
10/13
10/13
BRIDGE REPAIR 38.41
AEJ
RAH
BEAM DETAILS
42’-6" BEAM LENGTH
.1
.2
.3
.4
.5
.6
.7
.8
.9
!
BR
G.
!
BR
G.
41’-0"
END VIEW
1’-0"
1’-4"
2’-
4"
11"3"
5"
4"
5"
PRESTRESSED CONCRETE BEAM NOTES
SCALE: �" = 1’-0"
PLAN - TYPE I INTERIOR BEAM FOR SPAN 3
SCALE: �" = 1’-0"
PLAN - TYPE I EXTERIOR BEAM FOR SPAN 3
SCALE: �" = 1’-0"
ELEVATION - TYPE I BEAM FOR SPAN 3
! BEAM
21’-3"21’-3"
9" 9"! BEARINGEND OF BEAM END OF BEAM! BEARING
END SECTION
! SECTION
BEAM SECTIONS
(12 - 0.6" DIA. STRANDS)
SCALE 1" = 1’-0"
3" 3"
@ 2"=10"
5 SPA.
A AB C C B
@ 2"=10"
5 SPA.3" 3"
2"
1’-
6"
4"
IN PAIRS
Z1 #5
IN PAIRS
Z1 #5
H1 #4H1 #4
2"
2"
4"
S2 #4
2-H1 #4
2" 6" 10" 8"8" 10" 2"6"
8-Z1 #5@3 IN PAIRS = 9"
IN PAIRS = 4’-6"
20-Z1 #5@6
IN PAIRS = 5’-4"
18-Z1 #5@8
IN PAIRS = 8’-0"
18-Z1 @5@12
8-Z1 #5@3 IN PAIRS = 9"
IN PAIRS = 4’-6"
20-Z1 #5@6
IN PAIRS = 5’-4"
18-Z1 #5@8
IN PAIRS = 8’-0"
18-Z1 @5@12
U1 #42-H1 #4
U2 #4 U1 #4
9"
9"
2’-
6"
(TYPE I P.C.B.)
SCALE: �" = 1’-0"
1’-
1"
(SEE BEAM SECTIONS)
12 - 0.6" DIA. STRANDS
2"
1"
1"
1"
1"
1’-
6"
2"
Z1 #5 X 4’-0"
3" 6" 6"
3"6"
" INSERTS4-32
9
9
U2 #4
S2 #4 (BOTTOM OF BEAM)
S1 #4 (TOP OF BEAM)
S2 #4 (BOTTOM OF BEAM)
S1 #4 (TOP OF BEAM)
S2 #4 (BOTTOM OF BEAM)
S1 #4 (TOP OF BEAM)
U1 #4 U2 #42-H1 #4
U2 #4 U1 #4
S2 #4 (BOTTOM OF BEAM)
S1 #4 (TOP OF BEAM)
6"6"
2-U1 #4
5" 5"6"
3" 3"
2-U1 #4
SEE PLAN VIEWS
INSERTS OR HOLES
11�
"3-
U2 #4
8�
"
4�
"2"
4�
"
@4"=8"
2-U1 #4
CLR.
CLR.
S1 #4
CLR.
CLR.
.18"
.09"
.26"
.31"
.32"
.31"
.26"
.18"
.09"
9"
3"
4’-0"
U1
U2
U1 #4 X 8’-9"
U2 #4 X 8’-3"
1
1
10"
1’-2"
2�
"
3�
"
4"
7"
S1
S1
S1
S2
S2
S2
S2 #4 X 2’-11"
S1 #4 X 1’-11"
3"3"6"3"
SPAN 2 SPAN 4
3"3"3"
SPAN 2 SPAN 4
3-
U2 #4
@4
3-
U2 #4
@4
9-S1 #4@6
9-S2 #4@6
9-S1 #4@6
9-S2 #4@6DETAILS
FOR DETAILS, SEE SUPERSTRUCTURE
ANCHOR PLATE AND ANCHOR BAR (TYP.).
21’-3�" SEE NOTE 121’-2�" SEE NOTE 1
21’-3�" SEE NOTE 121’-2�" SEE NOTE 1
(TYP. BOTH ENDS)
ON NORTH SIDE
THREADS EXPOSED
" INSERTS4-32
DIAPHRAGM DOWEL (TYP.)
1" DIA. HOLE FOR
NOTE:
SKEW ANGLE.
TAKE INTO CONSIDERATION THE
SHOWN ON NORTH SIDE OF WEB AND
DOWEL LOCATION DIMENSIONS ARE
(1)(1)
A MINIMUM OF 3" AND A MAXIMUM OF 12".
THE 8" DIMENSION SHOWN MAY BE ADJUSTED TO BETWEEN
SEE NOTES ON SHEET 5. IF ADJUSTMENT IS REQUIRED,
(1) LENGTH OF BEAM MAY REQUIRE ADJUSTMENT.
FABRICATION OF BEAM.
DIAPHRAGM DOWEL AND INSERT LOCATIONS PRIOR TO
FIELD VERIFY LENGTH OF BEAM AND EXISTING
LFD OPERATING RATING - HS20
WITH ULTIMATE TENSILE STRENGTH OF 270 K.S.I.
USE STRAND HAVING A NOMINAL DIAMETER OF 0.6"
THE REQUIRED STRAND TYPE IS LOW-RELAXATION.
STRAND TYPE
PRESTRESS AND 6,000 P.S.I. AT 28 DAYS.
CONCRETE IS 4,500 P.S.I. AT TRANSFER OF
THE REQUIRED COMPRESSIVE STRENGTH OF THE
COMPRESSIVE STRENGTH
DEAD LOAD DEFLECTION DIAGRAM
NOTE:
THE BEAM WEIGHT.
CURB + CONCRETE RAIL. IT DOES NOT INCLUDE
DUE TO DECK SLAB + DIAPHRAGMS + CONCRETE
THE TENTH POINTS ARE THE INITIAL DEFLECTIONS
THE DEAD LOAD DEFLECTION SHOWN ABOVE AT
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
S\IN-
ER-002_S_F
RA
MIN
G_P
LA
N_01.dgn
10/28/2013
2:2
9:4
5 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
10/13
10/13
10/13
BRIDGE REPAIR 38.41
RWS
! BEARING ! BEARING
EXISTING PARAPET AND DECK
AREA OF DECK REMOVAL
END DIAPHRAGM END DIAPHRAGM
INTERMEDIATE DIAPHRAGM TYPE I P.C. BEAMS
! PIER NO. 3! PIER NO. 2
SCALE: NONE
PLAN OF END DIAPHRAGMS AT PIERS
SCALE: �" = 1’-0"
FRAMING PLAN SPAN 3
DIAPHRAGM DETAILS
FRAMING PLAN AND
!
BE
AM
S
KSJ
KSJ
S1 #4
S1 #4
F2 #4
F1 #6F1 #6
F2 #4
F3 #4
F3 #4
SCALE: NONE
DETAIL 2 SCALE: NONE
DETAIL 3
DETAIL 1 SEE STD. LECS-4
SILCONE JOINT SEALER
�" DIA. BACKER ROD
DETAIL 1 SCALE: NONE
2-D1 #6 THRU BEAM
BEAM STIRRUPS
" DIA. THREADED ROD4-32
#4 TIE RODS
AT DIAPHRAGM.
TO BE CAST IN EXTERIOR GIRDERS
INSERT, WELD TO #4 TIE RODS.
@ 6" C/C, OR APPROVED EQUAL,
" MALLEABLE HEX NUTS 3" LONG4-32
DIAPHRAGMS
INTERIOR GIRDERS AT
6" C/C TO BE CAST IN
2-1" DIA. SLEEVES AT
BARS THRU BEAM
2-#6 SPLICED TO
ON ONE END 3"
THREADED
2-D2 #6
SCALE: NONE
TYPICAL SECTION,INTERMEDIATE AND END DIAPHRAGMS
10
10
�"
MI
N.
�"
�"
1�
" +/- �
"
3"
�"
5’-
8"
5’-
8"
5’-
8"
2’-
10"
2’-
10"
21’-3�"21’-2�"
5°0’0"
9" 9"
8"
42’-8" (SPAN 3)
1" 1"
3"
21’-2�" 21’-3�"
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
C\IN-
ER-002_
AD
VSIG
N_1_
01.dgn
10/28/2013
2:2
9:4
7 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
11
11
10/13
10/13
10/13
BRIDGE REPAIR 38.41
LLWSCALE: N.T.S.
SOUTHBOUND ADVANCE SIGNING
RAISED MEDIANRAISED MEDIAN
DO
NO
TP
AS
S
RO
AD
WO
RK
1 M
ILE
SP
EE
DLIM
IT
65
(2)
TY
PE ’A’
LIG
HT
S
(2)
W20-1 (1
MIL
E)
(2)
TY
PE ’A’
LIG
HT
S
(2)
W3-5(6
5)
EXISTING SOUTHBOUND LANES
EXISTING NORTHBOUND LANES
(2)
R4-1F
(2)
CS-18
E
(2)
CS-17
E
(2)
CS-16
E
WZB
SOT
ARROW DISPLAY
DRUM
TRAFFIC FLOW
LEGEND
SIGN
WORK AREA
TYPE III BARRICADE
BARRIER
LONGITUDINAL
PORTABLE
ST
A.
190
+05
1,000’1,000’1,300’1,300’1,100’500’500’500’
(2)
R2-1F(6
5)
(2)
CS-14
F
(2)
CS-13
F
(2)
WIN
G
BA
RRIC
AD
ES
SP
EE
D
LIM
IT
65
DO
NO
TP
ASSRO
AD
WO
RK
1 MIL
E
SP
EE
DLIM
IT
65
(2)
TY
PE ’A’
LIG
HT
S
(2)
W20-1 (1
MIL
E)
(2)
TY
PE ’A’
LIG
HT
S
(2)
W3-5(6
5)
(2)
TY
PE ’A’
LIG
HT
S
(2)
W4-2(L)
(2)
CS-16
E
(2)
CS-17
E
(2)
CS-18
E
(2)
R4-1F
(2)
TY
PE ’A’
LIG
HT
S
(2)
W20-5
L (�
MIL
E)
SCALE: N.T.S.
NORTHBOUND ADVANCE SIGNING
SP
EE
D
LIM
IT
65
(2)
CS-13
F
(2)
CS-14
F
(2)
R2-1F(6
5)
ST
A.
145
+20
1,000’ 1,000’ 1,300’ 1,300’ 1,100’ 500’ 500’ 500’
12
MIL
E
LEFT L
ANE
CLO
SED
12
MIL
E
LE
FT L
AN
E
CL
OS
ED
12
MIL
E
RIG
HT L
AN
E
CL
OS
ED
RAISED MEDIAN
(2)
WIN
G
BA
RRIC
AD
ES
SIG
N-10
(1)
CO
NS
TR
UC
TIO
N
(2)
TY
PE ’A’
LIG
HT
S
(2)
W4-2(R)
SIG
N-11
(1)
CO
NS
TR
UC
TIO
N
(2)
TY
PE ’A’
LIG
HT
S
(2)
W20-5
R (�
MIL
E)
(2)
TY
PE ’A’
LIG
HT
S
(2)
W4-2(L)
SIG
N-10
(1)
CO
NS
TR
UC
TIO
N
(2)
TY
PE ’A’
LIG
HT
S
(2)
W20-5
L (�
MIL
E)
PHASE 1 SIGNING
LOCATION
PHASE 1
RAISED MEDIAN
EXISTING SOUTHBOUND LANES
EXISTING NORTHBOUND LANES
PHASES 2,3 AND 4 SIGNING
PHASES 1-4
ADVANCE SIGNING
SUGGESTED TRAFFIC CONTROL
LOCATION
PHASES 2,3 AND 4
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
C\IN-
ER-002_
CO
NS
TS
EQ_1_
01.dgn
10/28/2013
2:2
9:4
7 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
8’-0" 4’-0"
OUTSIDE SHOULDER
LEAVE IN PLACE
INLAY
MILL AND
12’-0" 15’-0"
RAISED MEDIAN
LANE LINE
EXISTING DASHED WHITE
LANE LINE
EXISTING SOLID YELLOW
KEEP
LEFT
SECTION A-A
PHASE 1
(EVERY OTHER DRUM)
R4-7A(L)
DRUMS @ 100’ C/C
TYPE S4 (PG 64-22 OK)
2" SUPERPAVE,
TACK COAT
12
12
10/13
10/13
10/13
BRIDGE REPAIR 38.41
LLW
SCALE: N.T.S.
SOUTHBOUND TRAFFIC CONTROL
PHASE 1
PHASE 1
OF EXISTING OUTSIDE SHOULDER.
STEP 2 - MILL AND INLAY INSIDE 4’-0"
ON INSIDE SOUTHBOUND LANE.
STEP 1 - PLACE ALL SOUTHBOUND TRAFFIC
PHASE 1
SUGGESTED TRAFFIC CONTROL
WZB
SOT
ARROW DISPLAY
DRUM
TRAFFIC FLOW
LEGEND
SIGN
WORK AREA
TYPE III BARRICADE
BARRIER
LONGITUDINAL
PORTABLE
EN
D
DR
UM
S
ST
A.
156
+20
ST
A.
157
+20
RAISED MEDIAN
EXISTING NORTHBOUND LANES
EXISTING SOUTHBOUND LANES
EN
D
RO
AD W
OR
K(2)
G20-
2A
SP
EE
D
LIM
IT
75
(2)
R2-IF(75)
100’500’500’
DRUMS @ 20’ C/C
DOWNSTREAM TAPER
R4-7A(L) (EVERY OTHER DRUM)
DRUMS @ 100’ C/C
MA
TC
HLI
NE 168
+00
KEEP
LEFTWHITE LANE LINE
EXISTING DASHED
YELLOW EDGE LINE
EXISTING SOLID
4’ OF OUTSIDE SHOULDER
MILL AND INLAY INNER
AA
RAISED MEDIAN
WORK AREA
(LEHNHARD ROAD)
E 1460 ROAD
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
C\IN-
ER-002_
CO
NS
TS
EQ_1_
02.d
gn
10/28/2013
2:2
9:4
8 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
MA
TC
HLI
NE 180
+00
MA
TC
HLI
NE 168
+00
R4-7A(L) (EVERY OTHER DRUM)
DRUMS @ 100’ C/C
KEEP
LEFT
R4-7A(L) (EVERY OTHER DRUM)
DRUMS @ 50’ C/C
KEEP
LEFT
WHITE LANE LINE
EXISTING DASHED
YELLOW EDGE LINE
EXISTING SOLID
4’ OF OUTSIDE SHOULDER
MILL AND INLAY INNER
EXISTING NORTHBOUND LANES
EXISTING SOUTHBOUND LANES
(3) R11-2(LANE)
(6) TYPE ’A’ LIGHTS
(3) TYPE III BARRICADES
ST
A.
172
+75
RAISED MEDIAN RAISED MEDIAN
LANE
CLOSED
830’ TANGENTWORK AREA
13
13
10/13
10/13
10/13
BRIDGE REPAIR 38.41
LLW
PHASE 1
OF EXISTING OUTSIDE SHOULDER.
STEP 2 - MILL AND INLAY INSIDE 4’-0"
ON INSIDE SOUTHBOUND LANE.
STEP 1 - PLACE ALL SOUTHBOUND TRAFFIC
PHASE 1
SUGGESTED TRAFFIC CONTROL
WZB
SOT
ARROW DISPLAY
DRUM
TRAFFIC FLOW
LEGEND
SIGN
WORK AREA
TYPE III BARRICADE
BARRIER
LONGITUDINAL
PORTABLE
MA
TC
HLI
NE 180
+00
W1-8 (EVERY OTHER DRUM)
DRUMS @ 50’ C/C
900’ MERGING TAPER 830’ TANGENT
DRUMS @ 50’ C/C
300’ SHOULDER TAPER
(TYPE ’C’)
ARROW DISPLAY
(3) W1-6
(6) TYPE ’A’ LIGHTS
(3) TYPE III BARRICADES
ST
A.
190
+05
ST
A.
181
+05
PHASE 1
SCALE: N.T.S.
SOUTHBOUND TRAFFIC CONTROL
EXISTING NORTHBOUND LANES
EXISTING SOUTHBOUND LANE
RAISED MEDIAN RAISED MEDIAN
SIGNING
SOUTHBOUND ADVANCE
SEE SHEET 11 FOR
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
C\IN-
ER-002_
CO
NS
TS
EQ_
TY
P.d
gn
10/28/2013
4:5
6:5
4 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
14
14
10/13
10/13
10/13
BRIDGE REPAIR 38.41
LW
LW
B/S
4’-0" 1’-0" 1’-0"2’-0"
NORTH BOUND LANE
12’-0"
4’-0"
SOUTH BOUND LANE
12’-0" 7’-6"7’-6"
8’-0"
PHASE 3 TYPICAL SECTION
NOTES:
TYPICAL SECTION THRU MEDIAN CROSSOVER
PHASE 2
STA. 170+25 - STA. 176+55
STA. 158+70 - STA. 165+00
EXISTING 12" SELECT MATERIALHERE (2)
PRIME TO
HERE (2)
PRIME TO
TYPE S3 (PG 64-22-OK)
3" SUPERPAVE,
TYPE S3 (PG 64-22 OK)
4" SUPERPAVE,
SOIL CEMENT
EXISTING 4"
CONC. PAVEMENT
EXISTING 9" P.C.
! TURNPIKE
CONC. PAVEMENT
EXISTING 9" P.C.
SOIL CEMENT
EXISTING 4"
12’-0" (EXISTING SHOULDER)24’-0" (EXISTING NORTHBOUND LANES)15’-0"24’-0" (EXISTING SOUTHBOUND LANES)12’-0" (EXISTING SHOULDER)
(PHASE 3) REPAIR BRIDGE
SB EXIST. PAVEMENT NB EXIST. PAVEMENT
LIMITS OF 8" SUBGRADE METHOD "B"
! TURNPIKE
TACK COAT
REACTION.
SUBGRADE HAS OCCURRED TO RETAIN MOISTURE FOR PROPER CHEMICAL
2. PRIME COAT IS TO BE APPLIED IMMEDIATELY AFTER STABILIZED
PERMANENTLY REMOVED FROM THE MEDIAN AND CROSSOVERS.
CONSTRUCTED/INSTALLED UNTIL TRAFFIC HAS BEEN
SHALL NOT BERUMBLE STRIP AT THESE LOCATIONS1.
7’-6"7’-6"
15’-0" MEDIAN
TYPE S4 (PG 64-22 OK)
2" SUPERPAVE,
SLOPE
EXISTING
MATCH
SLOPE
EXISTING
MATCH
BARRIER
PORTABLE LONGITUDINAL
BARRIER
PORTABLE LONGITUDINAL
RAISED MEDIAN
EXCAVATION
(PHASE 1)
MILL + INLAY
PHASES 2 AND 3
TYPICAL SECTIONS
SUGGESTED TRAFFIC CONTROL
RUMBLE STRIP (1)
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
C\IN-
ER-002_
CO
NS
TS
EQ_2_01.dgn
10/28/2013
2:2
9:4
9 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
15
15
10/13
10/13
10/13
BRIDGE REPAIR 38.41
LLW
WZB
SOT
ARROW DISPLAY
DRUM
TRAFFIC FLOW
LEGEND
SIGN
WORK AREA
TYPE III BARRICADE
BARRIER
LONGITUDINAL
PORTABLE
MA
TC
HLI
NE 159
+00
MA
TC
HLI
NE 171
+00
MA
TC
HLI
NE 159
+00
RAISED MEDIAN
RAISED MEDIAN RAISED MEDIAN
RAISED MEDIAN
EDGE LINE
4" SOLID YELLOW
NORTHBOUND LANE
EN
D
RO
AD W
OR
K(2)
G20-
2A
SP
EE
D
LIM
IT
75
(2)
R2-IF(75)
100’600’500’
EN
D
DR
UM
S
ST
A.
157
+20
DRUMS @ 20’ C/C
DOWNSTREAM TAPER
ST
A.
158
+20
EXISTING SOUTHBOUND LANES
DRUMS @ 50’ C/C
SHOULDER TAPER
300’
W1-8 (EVERY OTHER DRUM)
DRUMS @ 50’ C/C
900’ MERGING TAPER
ST
A.
145
+20
(TYPE ’C’)
ARROW DISPLAY
(3) W1-6
(6) TYPE ’A’ LIGHTS
(3) TYPE III BARRICADES
KEEP
RIGHT
R4-7A(R) (EVERY OTHER DRUM)
DRUMS @ 50’ C/C
450’ TANGENT
ST
A.
158
+70
ST
A.
154
+20
(2) R11-2(LANE)
(4) TYPE ’A’ LIGHTS
(2) TYPE III BARRICADES
EDGE LINE
4" SOLID YELLOW
WORK AREA
R4-7A(R) (EVERY OTHER DRUM)
DRUMS @ 100’ C/C
KEEP
RIGHT
R4-7A(R) (EVERY OTHER DRUM)
DRUMS @ 100’ C/C
KEEP
RIGHT
WORK AREA
ST
A.
170
+25
ST
A.
165
+00
PHASE 2
STEP 2 - CONSTRUCT MEDIAN CROSSOVER PAVING.
LANE.
TRAFFIC ON THEIR RESPECTIVE OUTSIDE
STEP 1 - PLACE ALL NORTHBOUND AND SOUTHBOUND
PHASE 4
CONSTRUCT RAISED MEDIAN.
STEP 2 - REMOVE MEDIAN CROSSOVER PAVING AND
LANE.
TRAFFIC ON THEIR RESPECTIVE OUTSIDE
STEP 1 - PLACE ALL NORTHBOUND AND SOUTHBOUNDPHASES 2 AND 4
SUGGESTED TRAFFIC CONTROL
SCALE: N.T.S.
TRAFFIC CONTROL
R4-7A(R) (EVERY OTHER DRUM)
DRUMS @ 100’ C/C
KEEP
RIGHT
R4-7A(R) (EVERY OTHER DRUM)
DRUMS @ 100’ C/CKEEP
RIGHT
525’ TANGENT
WORK AREA
LANE
CLOSED
WORK AREA
525’ TANGENT
(LEHNHARD ROAD)
E 1460 ROADEDGE LINE
4" SOLID YELLOW
SIGNING
NORTHBOUND ADVANCE
SEE SHEET 11 FOR
WORK AREA
WORK AREA
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
C\IN-
ER-002_
CO
NS
TS
EQ_2_02.d
gn
10/28/2013
2:2
9:5
0
PM
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
16
16
10/13
10/13
10/13
BRIDGE REPAIR 38.41
LLW
ARROW DISPLAY
DRUM
TRAFFIC FLOW
LEGEND
SIGN
WORK AREA
TYPE III BARRICADE
BARRIER
LONGITUDINAL
PORTABLE
MA
TC
HLI
NE 171
+00
MA
TC
HLI
NE 180
+00
MA
TC
HLI
NE 180
+00
DRUMS @ 20’ C/C
DOWNSTREAM TAPER
100’630’ WORK AREA
R4-7A(R) (EVERY OTHER DRUM)
DRUMS @ 100’ C/C
KEEP
RIGHT
KEEP
RIGHT
R4-7A(R) (EVERY OTHER DRUM)
DRUMS @ 100’ C/C
R4-7A(R) (EVERY OTHER DRUM)
DRUMS @ 50’ C/C
450’ TANGENT
KEEP
RIGHT
450’ TANGENT
ST
A.
176
+55
(2)
R2-1F(7
5)
SP
EE
D
LIM
IT
75E
ND
RO
AD W
OR
K
(2)
G20-
2A
ST
A.
176
+55
EN
D
DR
UM
S
ST
A.
177
+55
DRUMS @ 50’ C/C
300’ SHOULDER TAPER
W1-8 (EVERY OTHER DRUM)
DRUMS @ 50’ C/C
900’ MERGING TAPER
(2) R11-2(LANE)
(4) TYPE ’A’ LIGHTS
(2) TYPE III BARRICADES
EDGE LINE
4" SOLID YELLOW
EDGE LINE
4" SOLID YELLOW
(3) W1-6
(6) TYPE ’A’ LIGHTS
(3) TYPE III BARRICADES
(TYPE ’C’)
ARROW DISPLAY
RAISED MEDIAN
EXISTING NORTHBOUND LANES
SOUTHBOUND LANE
RAISED MEDIAN RAISED MEDIAN
PHASE 2
STEP 2 - CONSTRUCT MEDIAN CROSSOVER PAVING.
LANE.
TRAFFIC ON THEIR RESPECTIVE OUTSIDE
STEP 1 - PLACE ALL NORTHBOUND AND SOUTHBOUND
WZB
SOT
PHASE 4
CONSTRUCT RAISED MEDIAN.
STEP 2 - REMOVE MEDIAN CROSSOVER PAVING AND
LANE.
TRAFFIC ON THEIR RESPECTIVE OUTSIDE
STEP 1 - PLACE ALL NORTHBOUND AND SOUTHBOUND
SCALE: N.T.S.
TRAFFIC CONTROL
PHASES 2 AND 4
SUGGESTED TRAFFIC CONTROL
RAISED MEDIAN
SOUTHBOUND LANE
NORTHBOUND LANE
SOUTHBOUND LANE
EXISTING NORTHBOUND LANES
SIGNING
SOUTHBOUND ADVANCE
SEE SHEET 11 FOR
LANE
CLOSED
ST
A.
190
+05
500’
500’500’
WORK AREA
ST
A.
181
+05
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
C\IN-
ER-002_
CO
NS
TS
EQ_3_01.dgn
10/28/2013
2:2
9:5
0
PM
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
EXISTING SOUTHBOUND LANES
EXISTING NORTHBOUND LANES
RAISED MEDIAN RAISED MEDIAN
SOUTHBOUND LANE
NORTHBOUND LANE
E 1460
RD (LE
HN
HA
RD
RO
AD)
RAISED MEDIAN RAISED MEDIAN
17
17
10/13
10/13
10/13
BRIDGE REPAIR 38.41
LLW
MA
TC
HLI
NE 156
+00
MA
TC
HLI
NE 156
+00
500’
DRUMS @ 50’ C/C
300’ SHOULDER TAPER
900’ MERGING TAPER
630’ OPENING IN MEDIAN FOR CROSSOVER
LENGTH OF CROSSOVER 630 L.F.
OF CURVE PLUS 100’
GLARE SCREEN TO MIDPOINT
PHASE 3
SUGGESTED TRAFFIC CONTROL
SCALE: N.T.S.
SOUTH CROSSOVER
PHASE 3
W1-8 (EVERY OTHER DRUM)
DRUMS @ 50’ C/C
PAVEMENT MARKINGS
REMOVE ANY CONFLICTING
(TYPE ’C’)
ARROW DISPLAY 4" SOLID YELLOW EDGE LINE
(2)
R2-1F(7
5)
SP
EE
D
LIM
IT
75 EN
D
RO
AD W
OR
K
65
ST
A.
154
+20
ST
A.
157
+20
LANE
CLOSED
PAVEMENT MARKINGS
REMOVE ANY CONFLICTING
(3) W1-6
(6) TYPE ’A’ LIGHTS
(3) TYPE III BARRICADES
LONGITUDINAL BARRIER
225 L.F. PORTABLE
DO NOT
ENTERROAD
CLOSED(2) R5-1
(3) R11-2
(10) TYPE ’A’ LIGHTS
(5) TYPE III BARRICADES
ST
A.
165
+00
R4-7A(R) (EVERY OTHER DRUM)
DRUMS @ 50’ C/C
ST
A.
158
+70
ST
A.
158
+70
WZB
SOT
ARROW DISPLAY
DRUM
TRAFFIC FLOW
LEGEND
SIGN
WORK AREA
TYPE III BARRICADE
BARRIER
LONGITUDINAL
PORTABLE
PHASE 3
REPAIR BRIDGE OVER NORTHBOUND LANES.
(2)
G20-2
A
(3) W1-6
(6) TYPE ’A’ LIGHTS
(3) TYPE III BARRICADES
SIGNING
NORTHBOUND ADVANCE
SEE SHEET 11 FOR
W1-8 (EVERY OTHER DRUM)
DRUMS @ 50’ C/C
4" SOLID YELLOW EDGE LINE
4" SOLID WHITE EDGE LINE ATTENUATOR (19 MODULES)
SAND FILLED
525’ PORTABLE LONGITUDINAL BARRIER
4" SOLID WHITE EDGE LINE
450’
600’
600’
ST
A. 145
+20
DRUMS @ 20’ C/C
DOWNSTREAM TAPER
150’
KEEP
RIGHT
1,787.5’ L.F. PORTABLE LONGITUDINAL BARRIER
450’ TANGENT
(2) R11-2(LANE)
(4) TYPE ’A’ LIGHTS
(2) TYPE III BARRICADES
(1)
TY
PE ’A’
LI
GH
T
(1)
W1-4(L)
(1)
W13-1
PE(6
5)
(2) R11-2 (LANE)
(4) TYPE ’A’ LIGHTS
(2) TYPE III BARRICADES
LANE
CLOSED
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
C\IN-
ER-002_
CO
NS
TS
EQ_3_02.d
gn
10/28/2013
2:2
9:5
1 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
EXISTING SOUTHBOUND LANES
EXISTING NORTHBOUND LANES
RAISED MEDIAN
SOUTHBOUND LANE
NORTHBOUND LANE
E 1460
RD (LE
HN
HA
RD
RO
AD)
RAISED MEDIAN RAISED MEDIANRAISED MEDIAN
18
18
10/13
10/13
10/13
BRIDGE REPAIR 38.41
LLW
MA
TC
HLI
NE 180
+00
MA
TC
HLI
NE 180
+00
PHASE 3
SUGGESTED TRAFFIC CONTROL
WZB
SOT
(TYPE ’C’)
ARROW DISPLAYPAVEMENT MARKINGS
REMOVE ANY CONFLICTING
(3) W1-6
(6) TYPE ’A’ LIGHTS
(3) TYPE III BARRICADES
65
EN
D
RO
AD W
OR
K
(2)
R2-1F(7
5)
LANE
CLOSED
PAVEMENT MARKINGS
REMOVE ANY CONFLICTING
DO NOT
ENTERROAD
CLOSED(2) R5-1
(3) R11-2
(10) TYPE ’A’ LIGHTS
(5) TYPE III BARRICADES
SCALE: N.T.S.
NORTH CROSSOVER
(2)
G20-2
A
500’
4" SOLID YELLOW EDGE LINE
4" SOLID WHITE EDGE LINE
TANGENT
100’
SHIFTING TAPER
150’
ST
A.
181
+05
ST
A.
172
+75
ST
A.
171
+25
ST
A.
170
+25
R4-7A(R) (EVERY OTHER DRUM)
DRUMS @ 50’ C/C
W1-8 (EVERY OTHER DRUM)
DRUMS @ 50’ C/C
EDGE LINE
4" SOLID YELLOW
DRUMS @ 50’ C/CDRUMS @ 50’ C/C
PHASE 3
ARROW DISPLAY
DRUM
TRAFFIC FLOW
LEGEND
SIGN
WORK AREA
TYPE III BARRICADE
BARRIER
LONGITUDINAL
PORTABLE
SIGNING
NORTHBOUND ADVANCE
SEE SHEET 13 FOR
(3) R11-2(LANE)
(6) TYPE ’A’ LIGHTS
(3) TYPE II BARRICADES
R4-7A(L) (EVERY OTHER DRUM)
DRUMS @ 50’ C/C
LENGTH OF CROSSOVER 630 L.F.
4" SOLID WHITE EDGE LINE
ATTENUATOR (19 MODULES)
SAND FILLED
PHASE 3
REPAIR BRIDGE OVER NORTHBOUND LANES.
OF CURVE PLUS 100’
GLARE SCREEN FROM MIDPOINT
500’
EDGE LINE
4" SOLID YELLOW
630’ OPENING IN MEDIAN FOR CROSSOVER
525’ PORTABLE LONGITUDINAL BARRIER
1787.5 L.F. PORTABLE LONGITUDINAL BARRIER
KEEP
RIGHT
DRUMS @ 20’ C/C
DOWNSTREAM TAPER
KEEP
LEFT
ST
A. 190
+05
SP
EE
D
LIM
IT
75
ST
A. 176
+55
100’
830’ TANGENT
500’
900’ MERGING TAPER830’ TANGENT
(1)
TY
PE ’A’
LI
GH
T
(1)
W1-4(R)
(1)
W13-1
PE(6
5)
P:\
ECI\
1650-
TU
L\
CIV\4051111000_
OT
A_In
dia
n_
Natio
n_
Brid
ge
_38.4
1\20_
DES
GN\40_
CA
D\
C\IN-
ER-002_
CO
NS
TS
EQ_
BO_3_01.dgn
10/28/2013
2:2
9:5
2 P
M
DATEBY
SECTION
OF SHEET
REVISIONNO.
PROFILE SCALE
HORIZONTAL
VERTICAL
DRAWN
DESIGNED
PLAN SCALE
CHECKED DATE
CONTRACT NO.
OKLAHOMA TURNPIKE AUTHORITY
TOTAL SHEETSSHEET NO.CONTRACT NUMBERSECTIONSECTION ENGINEER
October 2013
SAIC
SAIC Energy, Environment & Infrastructure, LLC
(918) 492-1600 � saic.com/E
One West Third Street � Suite 100 � Tulsa, Oklahoma
OKLAHOMA TURNPIKE AUTHORITY
19
INDIAN NATION BRIDGE 38.41
IN-ER-002
IN-ER-002
19
19
19
10/13
10/13
10/13
BRIDGE REPAIR 38.41
200’
YIE
LD
YIE
LD
AH
EA
D
RO
AD
ON
E
LA
NE
EN
D
RO
AD W
OR
K
200’
EN
D
RO
AD W
OR
K
AH
EA
D
RO
AD
ON
E
LA
NE
(LEHNHARD ROAD)
E 1460 ROAD
TO
ONC
OMIN
G
TR
AFFIC
BRIDGE 200’
LLW
RWS
SOT
(2) TYPE ’A’ LIGHTS
(1) TYPE III BARRICADE
(1)
G20-2
A
(2) TYPE ’A’ LIGHTS
(1) TYPE III BARRICADE
(1)
TY
PE
A
LI
GH
T
(1)
W20-4
(1)
TY
PE
A
LI
GH
T
(1)
W20-4
(1)
TY
PE
A
LI
GH
T
(1)
W3-2
(1)
G20-2
A
PHASE 3
REPAIR BRIDGE OVER NORTHBOUND LANES.
200’ 200’ 15’ 50’ 30’ 50’30’
INDIAN NATIONS TURNPIKE
@ 10’ C/C
DRUMS
@ 10’ C/C
DRUMS
@ 10’ C/C
DRUMS
@ 10’ C/C
DRUMS
LAY DOWN AREALAY DOWN AREA
BRIDGE REPAIR AREA
PHASE 3 - LEHNHARD ROAD
SUGGESTED TRAFFIC CONTROL
(1)
R1-2
(1)
R1-2a
P
ARROW DISPLAY
DRUM
TRAFFIC FLOW
LEGEND
SIGN
WORK AREA
TYPE III BARRICADE
BARRIER
LONGITUDINAL
PORTABLE
LONGITUDINAL BARRIER
225’ PORTABLE