Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge
-
Upload
viswanathyakkala -
Category
Documents
-
view
232 -
download
3
Transcript of Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge
![Page 1: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/1.jpg)
ABSTRACT FROM
RAMAYAN
Part 3
![Page 2: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/2.jpg)
ABSTRACT FROM RAMAYAN
![Page 3: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/3.jpg)
ABSTRACT FROM RAMAYAN Rama asked Samudra to give way to
Lanka. Samudra expressed his inability and advised him to take help from Nala the son of Viswakarma (Chief Engineer and Chief Architect for Devas) to build a bridge across the sea.
![Page 4: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/4.jpg)
![Page 5: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/5.jpg)
ABSTRACT FROM RAMAYAN
Rama requested Nala to build the bridge.
With the guidance of Nala the Vanaras brought boulders from mountains, Sala trees from forest and made the bridge in five days.
A Distance of 112 Yojanas (180 KM?).
![Page 6: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/6.jpg)
ABSTRACT FROM RAMAYAN
On the first day they laid the bridge a length of 14 Yojanas.
This part is made mainly of mountain rocks.
![Page 7: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/7.jpg)
![Page 8: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/8.jpg)
ABSTRACT FROM RAMAYAN
On the Second day they laid the bridge a length of 20 Yojanas.
This part is made mainly of mountain rocks.
![Page 9: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/9.jpg)
![Page 10: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/10.jpg)
ABSTRACT FROM RAMAYAN
On the Third day they laid the bridge a length of 21 Yojanas.
On this day a part is made of rocks, The rest from Sala trees tied by ropes, anchored by boulders.
![Page 11: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/11.jpg)
ABSTRACT FROM RAMAYANSection of the bridge made of floating Sala trees tied by ropes and anchored by boulders.
Anchored Boulders Dropped To The Sea Bottom
Floating Bridge Made Of Sala Trees Tied By Ropes
Anchoring Ropes
Sea Bottom
Sea
Sky
![Page 12: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/12.jpg)
ABSTRACT FROM RAMAYAN
On the Forth day they laid the bridge a length of 24 Yojanas.
This part is made of Sala trees tied by ropes floating and anchored by boulders.
![Page 13: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/13.jpg)
Aerial View Of Adams Bridge (Floating Bridge With Piers)
![Page 14: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/14.jpg)
ABSTRACT FROM RAMAYAN
Floating Bridge had piers of boulders for stability
![Page 15: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/15.jpg)
ABSTRACT FROM RAMAYAN
On the Fifth and Final day they laid the bridge a length of 33 Yojanas.
On the last day a part is made of Sala trees tied by ropes floating and anchored by boulders.
The rest with rocks.
![Page 16: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/16.jpg)
![Page 17: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/17.jpg)
ABSTRACT FROM RAMAYANOut of 280 KM The first 120 KM was solid rock and soil filled, 30 KM (Shown in NASA Satellite picture) was a floating bridge made of floating Sala trees tied by ropes, anchored by boulders and the balance was solid filling.
Floating Bridge Made Of Sala Trees Tied By Ropes Anchored Boulders Dropped To The Sea Bottom
Sea Bottom
Sky
solid rock and soil filled
solid rock and soil filled
India Sri Lanka
Satellite PictureSolid Bridge
Floating Bridge
Sea
280 KM India to Lanka
30 KM
![Page 18: Part 3 (Ramayanam) Setu Samudram Project Ramavaradhi Adams Bridge](https://reader036.fdocuments.in/reader036/viewer/2022062307/551e65a5497959e4398b48be/html5/thumbnails/18.jpg)
After Effects Of Setubandhan
(Rama Varadhi)
See Part 4 For
in a period of 17,50,000 years