PART 18 – EMERGENCY ACQUISITIONS

Subpart 18.1—Available Acquisition Flexibilities

Subpart 18.2—Emergency Acquisition Flexibilities

Page 2: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.000 Scope of part.

(a) This part identifies acquisition flexibilities that are available for emergency acquisitions. These flexibilities are specific techniques or procedures that may be used to streamline the standard acquisition process. This part includes— (1) Generally available flexibilities; and (2) Emergency acquisition flexibilities that are available only under prescribed circumstances. (b) The acquisition flexibilities in this part are not exempt from the requirements and limitations set forth in FAR Part 3, Improper Business Practices and Personal Conflicts of Interest. (c) Additional flexibilities may be authorized in an executive agency supplement to the FAR.

“Executive agency” means an executive department, a military department, or any independent establishment within the meaning of 5 U.S.C. 101, 102, and 104(1), respectively, and any wholly owned Government corporation within the meaning of 31 U.S.C. 9101. [2.101]

Page 3: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.001 Definition.

“Emergency acquisition flexibilities”, as used in this part, means flexibilities provided with respect to any acquisition of supplies or services by or for an executive agency that, as determined by the head of an executive agency, may be used—

(a) In support of a contingency operation as defined in 2.101;

(b) To facilitate the defense against or recovery from nuclear, biological, chemical, or radiological attack against the United States; or

(c) When the President issues an emergency declaration, or a major disaster declaration.

Page 4: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

Subpart 18.1—Available Acquisition Flexibilities

18.101 General.

The FAR includes many acquisition flexibilities that are available to the contracting officer when certain conditions are met. These acquisition flexibilities do not require an emergency declaration or designation of contingency operation.

Page 5: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.102 Central contractor registration Contractors are not required to be registered in the Central Contractor

Registration (CCR) database for contracts awarded to support unusual and compelling needs or emergency acquisitions. (See 4.1102). However, contractors are required to register with CCR in order to gain access to the Disaster Response Registry. Contracting officers shall consult the Disaster Response Registry via https://www.acquisition.gov to determine the availability of contractors for debris removal, distribution of supplies, reconstruction, and other disaster or emergency relief activities inside the United States and outlying areas. (See 26.205).

Page 6: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.103 Synopses of proposed contract actions.

Contracting officers need not submit a synopsis notice when there is an unusual and compelling urgency and the Government would be seriously injured if the agency complied with the notice time periods. (See 5.202(a)(2).)

5.202 Exceptions. The contracting officer need not submit the notice required by 5.201 when— (a) The contracting officer determines that— (2) The proposed contract action is made under the conditions described in 6.302-2 (or, for purchases conducted using simplified acquisition procedures, if unusual and compelling urgency precludes competition to the maximum extent practicable) and the Government would be seriously injured if the agency complies with the time periods specified in 5.203;

Page 7: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.104 Unusual and compelling urgencyAgencies may limit the number of sources and full and open competition need not be provided for contracting actions involving urgent requirements. (See 6.302-2.)

6.302-2 Unusual and compelling urgency. (a) Authority. (1) Citations: 10 U.S.C. 2304(c)(2) or 41 U.S.C. 253(c)(2). (2) When the agency’s need for the supplies or services is of such an unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals, full and open competition need not be provided for.

(b) Application. This authority applies in those situations where— (1) An unusual and compelling urgency precludes full and open competition; and (2) Delay in award of a contract would result in serious injury, financial or other, to the Government.

(c) Limitations. (1) Contracts awarded using this authority shall be supported by the written justifications and approvals described in 6.303 and 6.304. These justifications may be made and approved after contract award when preparation and approval prior to award would unreasonably delay the acquisition. (2) This statutory authority requires that agencies shall request offers from as many potential sources as is practicable under the circumstances.

(d) Period of Performance. (1) The total period of performance of a contract awarded using this authority— (i) May not exceed the time necessary— (A) To meet the unusual and compelling requirements of the work to be performed under the contract; and (B) For the agency to enter into another contract for the required goods and services through the use of competitive procedures; and (ii) May not exceed one year unless the head of the agency entering into the contract determines that exceptional circumstances apply. (2) The requirements in paragraph (d)(1) of this section shall apply to any contract in an amount greater than the simplified acquisition threshold. (3) The determination of exceptional circumstances is in addition to the approval of the justification in 6.304. (4) The determination may be made after contract award when making the determination prior to award would unreasonably delay the acquisition

Page 8: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.105 Federal Supply Schedules (FSSs), multi-agency blanket purchase

agreements (BPAs), and multi-agency indefinite delivery contracts.

• Streamlined procedures and a broad range of goods and services may be available under Federal Supply Schedule contracts (see Subpart 8.4), multi-agency BPAs (see 8.405-3(a)(6)), or multi-agency, indefinite-delivery contracts (see 16.505(a)(8)). These contracting methods may offer agency advance planning, pre-negotiated line items, and special terms and conditions that permit rapid response.

• Subpart 8.4—Federal Supply Schedules • (a) Establishment. • (6) Establishment of a multi-agency BPA against a Federal Supply Schedule

contract is permitted if the multi-agency BPA identifies the participating agencies and their estimated requirements at the time the BPA is established.

Page 9: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.106 Acquisitions from Federal Prison Industries, Inc. (FPI).

Purchase from FPI is not mandatory and a waiver is not required if public exigency requires immediate delivery or performance (see 8.605(b)).

8.605 Exceptions. Purchase from FPI is not mandatory and a waiver is not required if— (b) Public exigency requires immediate delivery or performance; --- a state of affairs that makes urgent demands

Page 10: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.107 AbilityOne specification changes.

Contracting officers are not held to the notification required when changes in AbilityOne specifications or descriptions are required to meet emergency needs. (See 8.712(d).)

8.712 Specification changes. (d) When, in order to meet its emergency needs, a contracting activity is unable to give the 90-day notification required in paragraphs (b) and (c) of this section, the contracting activity shall, at the time it places the order or change notice, inform the AbilityOne participating nonprofit agency and the central nonprofit agency in writing of the reasons that it cannot meet the 90-day notification requirement.

Q: What is the AbilityOne Program?A: Providing employment opportunities to more than 40,000 people, the AbilityOne Program is the largest single provider of jobs for people who are blind or have other significant disabilities in the United States. The AbilityOne Program uses the purchasing power of the federal government to buy products and services from participating, community-based nonprofit agencies nationwide dedicated to training and employing individuals with disabilities.

Page 11: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.108 Qualifications requirements.

Agencies may determine not to enforce qualification requirements when an emergency exists. (See 9.206-1.) 9.206-1 General. (a) Agencies may not enforce any QPL, QML, or QBL without first complying with the requirements of 9.202(a). However, qualification requirements themselves, whether or not previously embodied in a in a QPL, QML, or QBL, may be enforced without regard to 9.202(a) if they are in either of the following categories: (1) Any qualification requirement established by statute prior to October 30, 1984, for civilian agencies (not including NASA); or (2) Any qualification requirement established by statute or administrative action prior to October 19, 1984, for DoD or NASA. Qualification requirements established after the above dates must comply with 9.202(a) to be enforceable. (b) Except when the agency head or designee determines that an emergency exists, whenever an agency elects, whether before or after award, not to enforce a qualification requirement which it established, the requirement may not thereafter be enforced unless the agency complies with 9.202(a). (c) If a qualification requirement applies, the contracting officer need consider only those offers identified as meeting the requirement or included on the applicable QPL, QML, or QBL, unless an offeror can satisfactorily demonstrate to the contracting officer that it or its product or its subcontractor or its product can meet the standards established for qualification before the date specified for award. (d) If a product subject to a qualification requirement is to be acquired as a component of an end item, the contracting officer must ensure that all such components and their qualification requirements are properly identified in the solicitation since the product or source must meet the standards specified for qualification before award. (e) In acquisitions subject to qualification requirements, the contracting officer shall take the following steps: (1) Use presolicitation notices in appropriate cases to advise potential suppliers before issuing solicitations involving qualification requirements. The notices shall identify the specification containing the qualification requirement and establish an allowable time period, consistent with delivery requirements, for prospective offerors to demonstrate their abilities to meet the standards specified for qualification. The notice shall be publicized in accordance with 5.204. Whether or not a presolicitation notice is used, the general synopsizing requirements of Subpart 5.2 apply. (2) Distribute solicitations to prospective contractors whether or not they have been identified as meeting applicable qualification requirements. (3) When appropriate, request in accordance with agency procedures that a qualification requirement not be enforced in a particular acquisition and, if granted, so specify in the solicitation (see 9.206-1(b)). (4) Forward requests from potential suppliers for information on a qualification requirement to the agency activity responsible for establishing the requirement

Page 12: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.109 Priorities and allocations.

The Defense Priorities and Allocations System (DPAS) supports approved national defense, emergency preparedness, and energy programs and was established to facilitate rapid industrial mobilization in case of a national emergency. (See Subpart 11.6.)

There are two levels of priority for rated orders established by the DPAS, identified by the rating symbols “DO” and “DX”. All DO rated orders have equal priority with each other and take preference over unrated orders. All DX rated orders have equal priority with each other and take preference over DO rated and unrated orders.

Page 13: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.110 Soliciting from a single source.

For purchases not exceeding the simplified acquisition threshold, contracting officers may solicit from one source under certain circumstances. (See 13.106-1(b).)

13.106-1 Soliciting competition. (b) Soliciting from a single source. (1) For purchases not exceeding the simplified acquisition threshold. (i) Contracting officers may solicit from one source if the contracting officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization). (ii) Where a single source is identified to provide a portion of a purchase because that portion of the purchase specifies a particular brand-name item, the documentation in paragraph (b)(1)(i) of this section only applies to the portion of the purchase requiring the brand-name item. The documentation should state it is covering only the portion of the acquisition which is brand-name. (2) For purchases exceeding the simplified acquisition threshold. The requirements at 13.501(a) apply to sole-source (including brand-name) acquisitions of commercial items conducted pursuant to subpart 13.5. (3) See 5.102(a)(6) for the requirement to post the brand-name justification or documentation.

Page 14: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.111 Oral requests for proposals.

Oral requests for proposals are authorized under certain conditions. (See 15.203(f).)

15.203 Requests for proposals. (f) Oral RFPs are authorized when processing a written solicitation would delay the acquisition of supplies or services to the detriment of the Government and a notice is not required under 5.202 (e.g., perishable items and support of contingency operations or other emergency situations). Use of an oral RFP does not relieve the contracting officer from complying with other FAR requirements. (1) The contract files supporting oral solicitations should include— (i) A description of the requirement; (ii) Rationale for use of an oral solicitation; (iii) Sources solicited, including the date, time, name of individuals contacted, and prices offered; and (iv) The solicitation number provided to the prospective offerors. (2) The information furnished to potential offerors under oral solicitations should include appropriate items from paragraph (e) of this section.

Page 15: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.112 Letter contracts.

Letter contracts may be used when contract performance must begin immediately. (See 16.603.) 16.603 Letter contracts. 16.603-1 Description. A letter contract is a written preliminary contractual instrument that authorizes the contractor to begin immediately manufacturing supplies or performing services. 16.603-2 Application. (a) A letter contract may be used when (1) the Government’s interests demand that the contractor be given a binding commitment so that work can start immediately and (2) negotiating a definitive contract is not possible in sufficient time to meet the requirement. However, a letter contract should be as complete and definite as feasible under the circumstances. (b) When a letter contract award is based on price competition, the contracting officer shall include an overall price ceiling in the letter contract. (c) Each letter contract shall, as required by the clause at 52.216-25, Contract Definitization, contain a negotiated definitization schedule including (1) dates for submission of the contractor's price proposal, required certified cost or pricing data and data other than certified cost or pricing data; and, if required, make-or-buy and subcontracting plans, (2) a date for the start of negotiations, and (3) a target date for definitization, which shall be the earliest practicable date for definitization. The schedule will provide for definitization of the contract within 180 days after the date of the letter contract or before completion of 40 percent of the work to be performed, whichever occurs first. However, the contracting officer may, in extreme cases and according to agency procedures, authorize an additional period. If, after exhausting all reasonable efforts, the contracting officer and the contractor cannot negotiate a definitive contract because of failure to reach agreement as to price or fee, the clause at 52.216-25 requires the contractor to proceed with the work and provides that the contracting officer may, with the approval of the head of the contracting activity, determine a reasonable price or fee in accordance with Subpart 15.4 and Part 31, subject to appeal as provided in the Disputes clause. (d) The maximum liability of the Government inserted in the clause at 52.216-24, Limitation of Government Liability, shall be the estimated amount necessary to cover the contractor’s requirements for funds before definitization. However, it shall not exceed 50 percent of the estimated cost of the definitive contract unless approved in advance by the official that authorized the letter contract. (e) The contracting officer shall assign a priority rating to the letter contract if it is appropriate under 11.604. 16.603-3 Limitations.

Page 16: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.113 Interagency acquisitions.

Interagency acquisitions are authorized under certain conditions. (See Subpart 17.5.)

Subpart 17.5—Interagency Acquisitions 17.500 Scope of subpart. (a) This subpart prescribes policies and procedures applicable to all interagency acquisitions under any authority, except as provided for in paragraph (c) of this section. (b) This subpart applies to interagency acquisitions, see 2.101 for definition, when— (1) An agency needing supplies or services obtains them using another agency’s contract; or (2) An agency uses another agency to provide acquisition assistance, such as awarding and administering a contract, a task order, or delivery order. (c) This subpart does not apply to— (1) Interagency reimbursable work performed by Federal employees (other than acquisition assistance), or interagency activities where contracting is incidental to the purpose of the transaction; or (2) Orders of $500,000 or less issued against Federal Supply Schedules.

Page 17: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.114 Contracting with the Small Business Administration (The 8(a) Program).

Contracts may be awarded to the Small Business Administration (SBA) for performance by eligible 8(a) firms on either a sole source or competitive basis. (See Subpart 19.8.)

19.800 General. (a) Section 8(a) of the Small Business Act (15 U.S.C. 637(a)) established a program that authorizes the Small Business Administration (SBA) to enter into all types of contracts with other agencies and let subcontracts for performing those contracts to firms eligible for program participation. The SBA’s subcontractors are referred to as “8(a) contractors.” (b) Contracts may be awarded to the SBA for performance by eligible 8(a) firms on either a sole source or competitive basis. (c) When, acting under the authority of the program, the SBA certifies to an agency that the SBA is competent and responsible to perform a specific contract, the contracting officer is authorized, in the contracting officer’s discretion, to award the contract to the SBA based upon mutually agreeable terms and conditions. (d) The SBA refers to this program as the 8(a) Business Development (BD) Program. (e) The contracting officer shall comply with 19.203 before deciding to offer an acquisition to a small business concern under the 8(a) Program. For acquisitions above the simplified acquisition threshold, the contracting officer shall consider 8(a) set-asides or sole source awards before considering small business set-asides. (f) When SBA has delegated its 8(a) Program contract execution authority to an agency, the contracting officer must refer to its agency supplement or other policy directives for appropriate guidance.

Page 18: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.115 HUBZone sole source awards.

Contracts may be awarded to Historically Underutilized Business Zone (HUBZone) small business concerns on a sole source basis. (See 19.1306.)

19.1306 HUBZone sole source awards. (a) A contracting officer shall consider a contract award to a HUBZone small business concern on a sole source basis (see 6.302-5(b)(5)) before considering a small business set-aside (see 19.203 and subpart 19.5), provided none of the exclusions at 19.1304 apply; and— (1) The contracting officer does not have a reasonable expectation that offers would be received from two or more HUBZone small business concerns; (2) The anticipated price of the contract, including options, will not exceed— (i) $6.5 million for a requirement within the North American Industry Classification System (NAICS) codes for manufacturing; or (ii) $4 million for a requirement within all other NAICS codes; (3) The requirement is not currently being performed by an 8(a) participant under the provisions of Subpart 19.8 or has been accepted as a requirement by SBA under Subpart 19.8; (4) The acquisition is greater than the simplified acquisition threshold (see Part 13); (5) The HUBZone small business concern has been determined to be a responsible contractor with respect to performance; and (6) Award can be made at a fair and reasonable price. (b) The SBA has the right to appeal the contracting officer’s decision not to make a HUBZone sole source award.

HUBZone CertificationThe Historically Underutilized Business Zones (HUBZone) program helps small businesses in urban and rural communities gain preferential access to federal procurement opportunities. These preferences go to small businesses that obtain HUBZone certification in part by employing staff (35%) who live in a HUBZone. The company must also maintain a "principal office" in one of these specially designated areas.

Page 19: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

8.116 Service-disabled Veteran-owned Small Business (SDVOSB) sole source awards.

Contracts may be awarded to Service-disabled Veteran-owned Small Business (SDVOSB) concerns on a sole source basis. (See 19.1406.)

19.1406 Sole source awards to service-disabled veteran-owned small business concerns. (a) A contracting officer shall consider a contract award to a SDVOSB concern on a sole source basis (see 6.302-5(b)(6)), before considering small business set-asides (see 19.203 and subpart 19.5) provided none of the exclusions of 19.1404 apply and— (1) The contracting officer does not have a reasonable expectation that offers would be received from two or more service-disabled veteran-owned small business concerns; (2) The anticipated award price of the contract, including options, will not exceed— (i) $6 million for a requirement within the NAICS codes for manufacturing; or (ii) $3.5 million for a requirement within any other NAICS code; (3) The requirement is not currently being performed by an 8(a) participant under the provisions of Subpart 19.8 or has been accepted as a requirement by SBA under Subpart 19.8; (4) The service-disabled veteran-owned small business concern has been determined to be a responsible contractor with respect to performance; and (5) Award can be made at a fair and reasonable price. (b) The SBA has the right to appeal the contracting officer’s decision not to make a service-disabled veteran-owned small business sole source award.

Page 20: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.117 Awards to economically disadvantaged women-owned small business (EDWOSB) concerns and women-owned small business (WOSB)concerns eligible under the WOSB Program

Contracts may be awarded to EDWOSB concerns and WOSB concerns eligible under the WOSB Program on a competitive basis. (See subpart 19.15.)

19.1500 General. (a) Section 8(m) of the Small Business Act (15 U.S.C. 637(m)) created the Women-Owned Small Business (WOSB) Program. (b) The purpose of the WOSB Program is to ensure women-owned small business concerns have an equal opportunity to participate in Federal contracting and to assist agencies in achieving their women-owned small business participation goals (see 13 part CFR 127). (c) An economically disadvantaged women-owned small business (EDWOSB) concern or WOSB concern eligible under the WOSB Program is a subcategory of “women-owned small business concern” as defined in 2.101.

Page 21: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.118 Overtime approvals.

Overtime approvals may be retroactive if justified by emergency circumstances. (See 22.103-4(i).)

22.103-4 Approvals. (i) Approvals for using overtime shall ordinarily be prospective, but, if justified by emergency circumstances, approvals may be retroactive.

Page 22: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.119 Trade agreements.

The policies and procedures of FAR 25.4 may not apply to acquisitions not awarded under full and open competition (see 25.401(a)(5)).

25.401 Exceptions. (a) This subpart does not apply to— (5) Other acquisitions not using full and open competition, if authorized by Subpart 6.2 or 6.3, when the limitation of competition would preclude use of the procedures of this subpart; or sole source acquisitions justified in accordance with 13.501(a).

Page 23: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.120 Use of patented technology under the North American Free Trade Agreement.

Requirement to obtain authorization prior to use of patented technology may be waived in circumstances of extreme urgency or national emergency. (See 27.204-1.)

27.204-1 Use of patented technology under the North American Free Trade Agreement. (a) The requirements of this section apply to the use of technology covered by a valid patent when the patent holder is from a country that is a party to the North American Free Trade Agreement (NAFTA). (b) Article 1709(10) of NAFTA generally requires a user of technology covered by a valid patent to make a reasonable effort to obtain authorization prior to use of the patented technology. However, NAFTA provides that this requirement for authorization may be waived in situations of national emergency or other circumstances of extreme urgency, or for public noncommercial use. (c) Section 6 of Executive Order 12889, “Implementation of the North American Free Trade Act,” of December 27, 1993, waives the requirement to obtain advance authorization for an invention used or manufactured by or for the Federal Government. However, the patent owner shall be notified in advance whenever the agency or its contractor knows or has reasonable grounds to know, without making a patent search, that an invention described in and covered by a valid U.S. patent is or will be used or manufactured without a license. In cases of national emergency or other circumstances of extreme urgency, this notification need not be made in advance, but shall be made as soon as reasonably practicable. (d) The contracting officer, in consultation with the office having cognizance of patent matters, shall ensure compliance with the notice requirements of NAFTA Article 1709(10) and Executive Order 12889. A contract award should not be suspended pending notification to the patent owner. (e) Section 6(c) of Executive Order 12889 provides that the notice to the patent owner does not constitute an admission of infringement of a valid privately-owned patent. (f) When addressing issues regarding compensation for the use of patented technology, Government personnel should be advised that NAFTA uses the term “adequate remuneration.” Executive Order 12889 equates “remuneration” to “reasonable and entire compensation” as used in 28 U.S.C. 1498, the statute that gives jurisdiction to the U.S. Court of Federal Claims to hear patent and copyright cases involving infringement by the Government. (g) When questions arise regarding the notice requirements or other matters relating to this section, the contracting officer should consult with legal counsel.

Page 24: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.121 Bid guarantees.

The chief of the contracting office may waive the requirement to obtain a bid guarantee for emergency acquisitions when a performance bond or a performance bond and payment bond is required. (See 28.101-1(c).)

28.101-1 Policy on use. (c) The chief of the contracting office may waive the requirement to obtain a bid guarantee when a performance bond or a performance and payment bond is required if it is determined that a bid guarantee is not in the best interest of the Government for a specific acquisition (e.g., overseas construction, emergency acquisitions, sole-source contracts). Class waivers may be authorized by the agency head or designee.

Page 25: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.122 Advance payments. Agencies may authorize advance payments to facilitate the national defense for actions taken under Public Law 85-804 (see Subpart 50.1, Extraordinary Contractual Actions). 50.101-2 Policy. (a) The authority conferred by Pub. L. 85-804 may not— (1) Be used in a manner that encourages carelessness and laxity on the part of persons engaged in the defense effort; or (2) Be relied upon when other adequate legal authority exists within the agency. (b) Actions authorized under Pub. L. 85-804 shall be accomplished as expeditiously as practicable, consistent with the care, restraint, and exercise of sound judgment appropriate to the use of such extraordinary authority. (c) Certain kinds of relief previously available only under Pub. L. 85-804; e.g., rescission or reformation for mutual mistake, are now available under the authority of the Contract Disputes Act of 1978. In accordance with paragraph (a)(2) of this subsection, Part 33 must be followed in preference to Subpart 50.1 for such relief. In case of doubt as to whether Part 33 applies, the contracting officer should seek legal advice.

These advance payments may be made at or after award of sealed bid contracts, as well as negotiated contracts. (See 32.405.) 32.405 Applying Pub. L. 85-804 to advance payments under sealed bid contracts. (a) Actions that designated agencies may take to facilitate the national defense without regard to other provisions of law relating to contracts, as explained in 50.101-1(a), also include making advance payments. These advance payments may be made at or after award of sealed bid contracts, as well as negotiated contracts. (b) Bidders may request advance payments before or after award, even if the invitation for bids does not contain an advance payment provision. However, the contracting officer shall reject any bid requiring that advance payments be provided as a basis for acceptance.

Page 26: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.123 Assignment of claims.

The use of the no-setoff provision may be appropriate to facilitate the national defense in the event of a national emergency or natural disaster. (See 32.803(d).)

32.803 Policies. (a) Any assignment of claims that has been made under the Act to any type of financing institution listed in 32.802(b) may thereafter be further assigned and reassigned to any such institution if the conditions in 32.802(d) and (e) continue to be met. (b) A contract may prohibit the assignment of claims if the agency determines the prohibition to be in the Government’s interest. (c) Under a requirements or indefinite quantity type contract that authorizes ordering and payment by multiple Government activities, amounts due for individual orders for $1,000 or more may be assigned. (d) Any contract of a designated agency (see FAR 32.801), except a contract under which full payment has been made, may include a no-setoff commitment only when a determination of need is made by the head of the agency, in accordance with the Presidential delegation of authority dated October 3, 1995, and after such determination has been published in the Federal Register. The Presidential delegation makes such determinations of need subject to further guidance issued by the Office of Federal Procurement Policy. The following guidance has been provided: Use of the no-setoff provision may be appropriate to facilitate the national defense; in the event of a national emergency or natural disaster; or when the use of the no-setoff provision may facilitate private financing of contract performance. However, in the event an offeror is significantly indebted to the United States, the contracting officer should consider whether the inclusion of the no-setoff commitment in a particular contract is in the best interests of the United States. In such an event, the contracting officer should consult with the Government officer(s) responsible for collecting the debt(s).

Page 27: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.124 Electronic funds transfer.

Electronic funds transfer payments may be waived for acquisitions to support unusual and compelling needs or emergency acquisitions. (See 32.1103(e).)

32.1103 Applicability. The Government shall provide all contract payments through EFT except if— (e) A contract is awarded by a deployed contracting officer in the course of military operations, including, but not limited to, contingency operations as defined in 2.101, or a contract is awarded by any contracting officer in the conduct of emergency operations, such as responses to natural disasters or national or civil emergencies, if— (1) EFT is not known to be possible; or (2) EFT payment would not support the objectives of the operation;

Page 28: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.125 Protest to GAO.

When urgent and compelling circumstances exist, agency protest override procedures allow the head of the contracting activity to determine that the contracting process may continue after GAO has received a protest. (See 33.104(b) and (c).) 33.104 Protests to GAO. (b) Protests before award. (1) When the agency has received notice from the GAO of a protest filed directly with the GAO, a contract may not be awarded unless authorized, in accordance with agency procedures, by the head of the contracting activity, on a nondelegable basis, upon a written finding that— (i) Urgent and compelling circumstances which significantly affect the interest of the United States will not permit awaiting the decision of the GAO; and (ii) Award is likely to occur within 30 days of the written finding. (2) A contract award shall not be authorized until the agency has notified the GAO of the finding in paragraph (b)(1) of this section. (3) When a protest against the making of an award is received and award will be withheld pending disposition of the protest, the contracting officer should inform the offerors whose offers might become eligible for award of the protest. If appropriate, those offerors should be requested, before expiration of the time for acceptance of their offer, to extend the time for acceptance to avoid the need for resolicitation. In the event of failure to obtain such extensions of offers, consideration should be given to proceeding under paragraph (b)(1) of this section. (c) Protests after award. (1) When the agency receives notice of a protest from the GAO within 10 days after contract award or within 5 days after a debriefing date offered to the protester for any debriefing that is required by 15.505 or 15.506, whichever is later, the contracting officer shall immediately suspend performance or terminate the awarded contract, except as provided in paragraphs (c)(2) and (3) of this section. (2) In accordance with agency procedures, the head of the contracting activity may, on a nondelegable basis, authorize contract performance, notwithstanding the protest, upon a written finding that— (i) Contract performance will be in the best interests of the United States; or (ii) Urgent and compelling circumstances that significantly affect the interests of the United States will not permit waiting for the GAO’s decision. (3) Contract performance shall not be authorized until the agency has notified the GAO of the finding in paragraph (c)(2) of this section. (4) When it is decided to suspend performance or terminate the awarded contract, the contracting officer should attempt to negotiate a mutual agreement on a no-cost basis. (5) When the agency receives notice of a protest filed with the GAO after the dates contained in paragraph (c)(1), the contracting officer need not suspend contract performance or terminate the awarded contract unless the contracting officer believes that an award may be invalidated and a delay in receiving the supplies or services is not prejudicial to the Government’s interest.

Page 29: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.126 Contractor rent-free use of Government property.

Rental requirements do not apply to items of Government production and research property that are part of a general program approved by the Federal Emergency Management Agency and meet certain criteria. (See 45.301.)

45.301 Use and rental. This subpart prescribes policies and procedures for contractor use and rental of Government property. (a) Government property shall normally be provided on a rent-free basis in performance of the contract under which it is accountable or otherwise authorized. (b) Rental charges, to the extent authorized do not apply to Government property that is left in place or installed on contractor-owned property for mobilization or future Government production purposes; however, rental charges shall apply to that portion of property or its capacity used for non-government commercial purposes or otherwise authorized for use. (c) The contracting officer cognizant of the Government property may authorize the rent-free use of property in the possession of nonprofit organizations when used for research, development, or educational work and— (1) The use of the property is in the national interest; (2) The property will not be used for the direct benefit of a profit-making organization; and (3) The Government receives some direct benefit, such as rights to use the results of the work without charge, from its use. (d) In exchange for consideration as determined by the cognizant contracting officer(s), the contractor may use Government property under fixed-price contracts other than the contract to which it is accountable. When, after contract award, a contractor requests the use of Government property, the contracting officer shall obtain a fair rental or other adequate consideration if use is authorized. (e) The cognizant contracting officer(s) may authorize the use of Government property on a rent-free basis on a cost type Government contract other than the contract to which it is accountable. (f) In exchange for consideration as determined by the cognizant contracting officer, the contractor may use Government property for commercial use. Prior approval of the Head of the Contracting Activity is required where non-Government use is expected to exceed 25 percent of the total use of Government and commercial work performed.

Page 30: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.127 Extraordinary contractual actions.

Subpart 50.1 prescribes policies and procedures for entering into, amending, or modifying contracts in order to facilitate the national defense under the extraordinary emergency authority granted by Public Law 85-804 (50 U.S.C. 1431-1434). This includes—

50.103-2 Types of contract adjustment. (a) Amendments without consideration. (1) When an actual or threatened loss under a defense contract, however caused, will impair the productive ability of a contractor whose continued performance on any defense contract or whose continued operation as a source of supply is found to be essential to the national defense, the contract may be amended without consideration, but only to the extent necessary to avoid such impairment to the contractor’s productive ability. (2) When a contractor suffers a loss (not merely a decrease in anticipated profits) under a defense contract because of Government action, the character of the action will generally determine whether any adjustment in the contract will be made, and its extent. When the Government directs its action primarily at the contractor and acts in its capacity as the other contracting party, the contract may be adjusted in the interest of fairness. Thus, when Government action, while not creating any liability on the Government’s part, increases performance cost and results in a loss to the contractor, fairness may make some adjustment appropriate.

Page 31: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.127 Extraordinary contractual actions.

(b) Correcting or mitigating mistakes in a contract (see 50.103-2(b)); and

50.103-2 Types of contract adjustment. (b) Correcting mistakes. (1) A contract may be amended or modified to correct or mitigate the effect of a mistake. The following are examples of mistakes that may make such action appropriate: (i) A mistake or ambiguity consisting of the failure to express, or express clearly, in a written contract, the agreement as both parties understood it. (ii) A contractor’s mistake so obvious that it was or should have been apparent to the contracting officer. (iii) A mutual mistake as to a material fact. (2) Amending contracts to correct mistakes with the least possible delay normally will facilitate the national defense by expediting the contracting program and assuring contractors that mistakes will be corrected expeditiously and fairly.

Page 32: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.127 Extraordinary contractual actions.

(c) Formalizing informal commitments (See 50.103-2(c)).

50.103-2 Types of contract adjustment. (c) Formalizing informal commitments. Under certain circumstances, informal commitments may be formalized to permit payment to persons who have taken action without a formal contract; for example, when a person, responding to an agency official’s written or oral instructions and relying in good faith upon the official’s apparent authority to issue them, has furnished or arranged to furnish supplies or services to the agency, or to a defense contractor or subcontractor, without formal contractual coverage. Formalizing commitments under such circumstances normally will facilitate the national defense by assuring such persons that they will be treated fairly and paid expeditiously.

Page 33: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

18.127 Extraordinary contractual actions

18.202 Defense or recovery from certain attacks.

(a) Micro-purchase threshold. The threshold increases when the head of the agency determines the supplies or services are to be used to facilitate defense against or recovery from nuclear, biological, chemical, or radiological attack. (See 2.101.) (b) Simplified acquisition threshold. The threshold increases when the head of the agency determines the supplies or services are to be used to facilitate defense against or recovery from nuclear, biological, chemical, or radiological attack. (See 2.101.) (c) Commercial items to facilitate defense and recovery. Contracting officers may treat any acquisition of supplies or services as an acquisition of commercial items if the head of the agency determines the acquisition is to be used to facilitate the defense against or recovery from nuclear, biological, chemical, or radiological attack. (See 12.102(f)(1) and 13.500(e).) (d) Test program for certain commercial items. The threshold limits authorized for use of the test program may be increased when it is determined the acquisition is to facilitate defense against or recovery from nuclear, biological, chemical, or radiological attack. (See 13.500(e).)

Page 34: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

Subpart 18.2—Emergency Acquisition Flexibilities

18.201 Contingency operation.

(a) Contingency operation is defined in 2.101.

(b) Micro-purchase threshold. The threshold increases when the head of the agency determines the supplies or services are to be used to support a contingency operation. (See 2.101 and 13.201(g).)

(c) Simplified acquisition threshold. The threshold increases when the head of the agency determines the supplies or services are to be used to support a contingency operation. (See 2.101.)

(d) SF 44, Purchase Order-Invoice-Voucher. The normal threshold for the use of the SF 44 is at or below the micro-purchase threshold. Agencies may, however, establish higher dollar limitations for purchases made to support a contingency operation. (See 13.306.)

(e) Test program for certain commercial items. The threshold limits authorized for use of the test program may be increased for acquisitions to support a contingency operation. (See 13.500(e).)

Page 35: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

Subpart 18.2—Emergency Acquisition Flexibilities

18.202 Defense or recovery from certain attacks.

(a) Micro-purchase threshold. The threshold increases when the head of the agency determines the supplies or services are to be used to facilitate defense against or recovery from nuclear, biological, chemical, or radiological attack. (See 2.101.)

(b) Simplified acquisition threshold. The threshold increases when the head of the agency determines the supplies or services are to be used to facilitate defense against or recovery from nuclear, biological, chemical, or radiological attack. (See 2.101.)

(c) Commercial items to facilitate defense and recovery. Contracting officers may treat any acquisition of supplies or services as an acquisition of commercial items if the head of the agency determines the acquisition is to be used to facilitate the defense against or recovery from nuclear, biological, chemical, or radiological attack. (See 12.102(f)(1) and 13.500(e).)

(d) Test program for certain commercial items. The threshold limits authorized for use of the test program may be increased when it is determined the acquisition is to facilitate defense against or recovery from nuclear, biological, chemical, or radiological attack. (See 13.500(e).)

Page 36: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

Subpart 18.2—Emergency Acquisition Flexibilities

18.203 Emergency declaration or major disaster declaration.

(a) Disaster or emergency assistance activities. Preference will be given to local organizations, firms, and individuals when contracting for major disaster or emergency assistance activities when the President has made a declaration under the Robert T. Stafford Disaster Relief and Emergency Assistance Act. Preference may take the form of local area set-asides or an evaluation preference. (See 6.208 and Subpart 26.2.)

(b) Ocean transportation by U.S. flag vessels. The provisions of the Cargo Preference Act of 1954 may be waived in emergency situations. (See 47.502(c).)

Page 37: PART 18 – EMERGENCY ACQUISITIONS Subpart 18.1—Available Acquisition Flexibilities Subpart 18.2—Emergency Acquisition Flexibilities.

Subpart 18.2—Emergency Acquisition Flexibilities

18.204 Resources.

(a) National Response Framework. The National Response Framework (NRF) is a guide to how the Nation conducts all-hazards response. This key document establishes a comprehensive, national, all-hazards approach to domestic incident response. The Framework identifies the key response principles, roles and structures that organize national response. It describes how communities, States, the Federal Government, the private-sector, and nongovernmental partners apply these principles for a coordinated, effective national response. It also describes special circumstances where the Federal Government exercises a larger role, including incidents where Federal interests are involved and catastrophic incidents where a State would require significant support. The NRF is available at http://www.fema.gov/emergency/nrf/.

(b) OFPP Guidelines. The Office of Federal Procurement Policy (OFPP) “Emergency Acquisitions Guide” is available at http://www.whitehouse.gov/sites/default/files/omb/assets/procurement_guides/emergency_acquisitions_guide.pdf