Pareto Securities’
Transcript of Pareto Securities’
1
Pareto Securities’
23rd Annual Oil & Offshore Conference14-15 September 2016
Chow Yew Yuen
CEO Keppel Offshore & Marine
22
Disclaimer
This release may contain forward-looking statements which are subject to risks and uncertainties that could cause actual results to differ materially from such statements. Such risks and uncertainties include industry and economic conditions, competition, and legal, governmental and regulatory changes. The forward-looking statements reflect the current views of Management on future trends and developments.
33
• Offshore rig design, construction, repairand upgrading
• Ship conversionand repair
• Specialisedshipbuilding
Offshore & Marine
• Property development
Property
• Energy & related infrastructure
• Logistics & data centres
Infrastructure
• Asset management
•Property & infrastructure trusts
•Private funds
• Investments
Investments
Keppel Corporation
Meeting the needs of sustainable urbanisation.
44
Leading designer, builder and repairer of high-performance mobile offshore drilling rigs
Offshore
Trusted industry name for repair, conversion and upgrade for a diverse range of ships
Ship Repair & Conversion
Designer and builder of a wide spectrum of highly specialised ships for global customers
SpecialisedShipbuilding
Design and engineer market-relevant and commercially viable solutions for all frontiers
Technology
Keppel Offshore & Marine
55
Industry Headwinds
Oil and gas prices remain low
Significant reduction in global E&P spending
Overhang of uncontracted newbuilds for rigs
Oversupply of offshore supply vessels
Offshore production projects pushed to the right
Rig delivery deferments and cancellations
66
Order backlog as of end-Aug 2016
includes:
22 newbuild rigs
16 FPSO/FLNG/FSU projects
One pipelay vessel
One ice-class multi-purpose
vessel
One subsea construction
vessel
Three dredgers
Contract wins year-to-date include
four FPSO projects, a pipelay
vessel upgrade and three dredgers.
Keppel’s Order Backlog
Newbuild semis
7%
FPSOs/FLNGs63%
Specialised vessels
2%
Others4%
Newbuild jackups
26%
Net orderbook*
S$4.3b
*As of end-Jun 2016, excludes contracts for six semis with Sete Brasil.
77
Responding with Agility
88
Lowered workforce by about
28% from early 2015.
Reduced overheads by about
20% yoy in 1H 2016.
Restructuring yards with low work
volumes.
Streamlining operations using
data analysis.
Rightsizing to Optimise Operations
99
Improving Efficiency & Productivity
Automated panel line
Asian Hercules IIICAN-DO barge
Robotic fit-up & welding machine
1010
Retaining & Strengthening Capabilities
Improved construction methodologies.
Integrating resources across our
global operations.
Enhancing processes and engineering
capabilities.
Investing prudently in R&D.
Developing and redeploying talent.
1111
Broadening Product & Service Offerings
Acquisition of LETOURNEAU™ business increased Keppel’s rig designs to
more than 26 and added to its aftersales business.
Added designs and construction capabilities for Production units
Solutions for gas value chain
Variety of specialised vessels
Non oil and gas solutions
1212
Aftersales, Aftermarket & Lifecycle Services
Aftersales, aftermarket and lifecycle
maintenance services for:
Jackups/semis/drillships
Specialised vessels
FPSOs/FLNGs/FSRUs
Scope of services:
Sale of spare parts
Engineering services
Repair
Field service
Inspection
1313
Execution Excellence
Delivered four KFELS B Class jackups, a harsh environment land rig,
a semi upgrade, a liftboat, a derrick lay vessel, an anchor handling tug,
and an FPSO project.
Cidade de Caraguatatuba MV27 Derrick lay vessel, DLV 2000KFELS B Class jackups,
CANTARELL I & II
1414
Singapore: Keppel FELS
Global leader in offshore rig design, construction and repair.
113 jackups and 39 semisubmersibles delivered and on order since 2000
by Keppel O&M.
1515
Singapore: Keppel FELS
Order backlog of 21 newbuilds, with deliveries into 2020.
Completed eight repair/upgrading projects year-to-date, with another 12 on order.
SSAUTM 5000NG unit, Floatel Triumph Refurbishment of semi, Ocean Apex
1616
Singapore: Keppel Shipyard
Converted/repaired 40% of FPSO/FSO/FSRU vessels worldwide.
Average of 400 vessel conversion/repair/modification/upgrade jobs per year.
Fabricated 30% of turrets for FPSO vessels worldwide.
1717
Singapore: Keppel Shipyard
Order backlog of 13 FPSO/FLNG/FSU jobs.
Golar’s LNG carrier, the HILLI
1818
Singapore: Keppel Shipyard
On track to deliver four FPSO jobs in 2016.
Harsh-environment FPSO, Armada Kraken
1919
Singapore: Keppel Singmarine
Constructed over 400 specialised vessels for global clientele.
Delivered six pipelay vessels, the highest number by a single builder.
Constructed 11 ice-class vessels, the largest builder in the region.
Derrick lay vessal, DLV 2000
2020
Singapore: Keppel Singmarine
Recent key deliveries include three ice-class vessels, a derrick lay vessel
and an anchor handling tug.
On track to complete an ice-class multi-purpose vessel in mid-2017.
Ice-class vessels, Bumi Uray, Bumi Pokachi and Bumi Naryan-Mar
2121
China: Keppel Nantong
Offers effective production support to the Singapore yards.
To support Keppel Singmarine in building three Trailing Suction Hopper
dredgers for Jan De Nul*.
* Construction of the third dredger will start upon receiving notice from Jan De Nul.
2222
US Gulf of Mexico: Keppel AmFELS
Established a strong track record in the construction, refurbishment,
conversion, life extension and repair of a variety of drilling rigs.
Delivered a land rig and a KFELS B Class jackup in 2016.
Harsh environment enhanced mobility land rig
2323
Brazil: BrasFELS
Over 16 years of experience providing solutions for offshore rigs, FPSOs,
specialised vessels and repair and upgrading projects.
Completed six FPSO projects since 2010.
2424
Brazil: BrasFELS
Presently engaged for three FPSO projects, including module fabrication
and integration for MODEC’s FPSO, MV29, and Petrobras’ FPSOs,
P-66 and P-69.
Delivered FPSO, Cidade de Caraguatatuba MV27 in early 2016.
2525
Azerbaijan: Caspian Shipyard & Baku Shipyard
Synergies of our yards in the design and construction of rigs/vessels.
Subsea construction vessel,
KhankendiDSSTM 38M semi
Modules transported 13,000 km
from Singapore to Azerbaijan
2626
Delivered a major upgrade of the semi, Istiglal, as well as a jacket
transportation and launch barge year-to-date.
Purpose-built jacket transportation and launch barge, STB-1Upgrade of semi drilling rig, Istiglal
Azerbaijan: Caspian Shipyard
2727
Opportunities - Production Solutions
2828
Floating Production Market
FPSOs remain the preferred floating production solution. 45% of FPSs on
order are FPSOs, constituting 60% of the global FPS capex.
Niche demand for tension leg platform and semi floating production units.
* Source: Energy Maritime Associates
2929
Production Solutions Suite of deepwater floating production
solutions.
FPSO conversions, tension leg
platforms and semi floating production
units.
Leveraging engineering, procurement,
construction and installation capability
to build superstructures.
Proven FloaTEC designs for extended
tension leg platforms:
Kizomba A
Kizomba B
Magnolia
P61 Papa Terra
Big Foot
ETLP-3 design
3030
Opportunities - LNG
3131
LNG Market
¹ Source: Douglas-Westwood.
² Source: DNV-GL. The numbers exclude LNG carriers and inland waterway
vessels and are as of 23 Oct 2015.
Global LNG expenditure is expected to total US$284b in 2017-2021,
a 50% growth from the preceding five-year period¹.
0
50
100
150
200
2010 2011 2012 2013 2014 2015 2016 2017 2018
No
. o
f S
hip
s
Development of LNG-fuelled fleet²
Ships in operation Ships on order
LNG demand is driven by:
COP21
Gas-fired power plants
Harbour use
FSRU for municipalities
LNG-fueled ships
3232
Solutions for Gas Value Chain
Gas to LNGOffshore liquefaction
Gas to LNGOnshore liquefaction
LNG as FuelEngine conversion
LNG to GasRe-gasification and storage
LNG to UsersTransportation and bunkering
LNG to PowerBringing power to users
3333
FLNG Solutions
The global FLNG market is
expected to draw US$65b of
investments in 2014-2020*.
35 years of experience and
expertise in conversion and
modularization.
Economical, safe and quick to
market midstream solutions for
small and mid-scale LNG projects.
Awarded three FLNG vessel
conversion jobs from Golar LNG.
Keppel’s FLNG + FSU deployment concepts provide cost
effective solutions for gas export terminals.
*Source: Douglas-Westwood.
3434
PreNEx Liquefaction Technology
Keppel’s proprietary PreNEx (Pre-cooled
Nitrogen Expansion) offers simple, safe and
reliable alternative to other LNG processes.
The land-based PreNEx LNG plant for PT NAT Gas has a
liquefaction capacity of 50 tons/day.
PreNEx can be used for
offshore and onshore
applications.
Collaborating with PT
NAT Gas in developing
PreNEx LNG plant in
Batam, Indonesia.
3535
LNG Bunkering & Distribution
The Keppel-Shell joint venture, FueLNG,
secured the license to supply LNG
bunker in Singapore.
Developing Singapore into a key
LNG bunkering hub in Asia.
Meeting the needs for sustainable
shipping with our growing LNG
solution.
Potential pull-through for LNG-fuelled
newbuilds, repairs and conversions.
Expertise in LNG vessel servicing.
Award winning dual-fuel ASD tug
design.
65T LNG-fueled ASD tug
3636
LNG Transportation & Logistics Solutions
LNG carriers for shallow waters
3,000mᶟ capacity,
non-propelled
8,000mᶟ/10,000mᶟ capacity,
non-propelled
12,000mᶟ capacity,
self-propelled or non-propelled
Storage capacity up to 50,000mᶟ
FSRU barge
3737
Opportunities - Specialised Vessels
3838
Specialised Vessels
Ice-class vessel
Liftboats
Decommissioning/plug & abandonment vessels
Pipelay vessels
Subsea construction vessels
Cable laying vessels
Ice-breakers/Ice-class vessels
Dredgers Liftboat
Artist impression of Trailing Suction Hopper dredgers
3939
Opportunities - Non O&G Solutions
4040
Offshore Wind Support
Offshore wind market continues to grow.
Seven projects in Europe has drawn
€14b investment in 1H 2016.
Keppel offers a full suite of offshore wind
support solutions, including:
Liftboat/self-installing platforms
Offshore substations
Jacket foundations
Floating cranes
Offshore support barges
4141
Single/Dual Fuel Floating Power Barge
Increasing demand for offshore power
in developing countries.
Minimal land usage
Cheaper fuel
High mobility
Quick implementation
Customised business model related
to Power Purchase Agreement
opportunities.
4242
Offshore Desalination
Freshwater shortage driven by
climate change and population
growth.
Global floating desalination market
expected to generate at least
US$1.5-4b every year until 2025*.
Advantages of offshore desalination:
Minimal ecological footprint
Minimal land usage
Quick implementation
High mobility
* Source: Deloitte.
4343
We aim to anchor our position as the
trusted and preferred solutions partner
in the offshore & marine industry by
seizing opportunities to build and grow
our businesses.
44
Thank you
Q&As