Panel Test

2
REF.NO-------------- DATE------- TEST REPORT CUSTOMER : ORDER REFERENCE : PRODUCT : PANEL SR. NO------------ DRAWING NO. ---------------- QUANTITY ----- ---- SYPPLY VOLTAGE ………………. CONTROL VOLTAGE ……………… AMPERE ------------ The following routine test and inspection were carried out on the above control panel. GENERAL INSPECTION 1. Verification of bill of material and rating of components --------------------------------- (As per drawing no…………………………………….. 2. Overall &Mounting of dimension of panel ------------------------------- (As per drawing no…………………………………….. 3. Power wiring and control wiring of components --------------------------------- (As per drawing no…………………………………….. 4. Paint finish and overall appearance -------------------------------- (Inside ……………………………outside…………………….. ELECTRICAL OPERATION AND TEST 1. Verification of control transformer ------------------------------------ 2. Verification of proper function of all components ---------------------------------

description

v

Transcript of Panel Test

Page 1: Panel Test

REF.NO-------------- DATE-------

TEST REPORT

CUSTOMER :ORDER REFERENCE :PRODUCT : PANEL SR. NO------------ DRAWING NO. ---------------- QUANTITY ----- ----SYPPLY VOLTAGE ………………. CONTROL VOLTAGE ……………… AMPERE ------------The following routine test and inspection were carried out on the above control panel.

GENERAL INSPECTION

1. Verification of bill of material and rating of components ---------------------------------

(As per drawing no……………………………………..

2. Overall &Mounting of dimension of panel -------------------------------

(As per drawing no……………………………………..

3. Power wiring and control wiring of components ---------------------------------

(As per drawing no……………………………………..

4. Paint finish and overall appearance --------------------------------

(Inside ……………………………outside……………………..

ELECTRICAL OPERATION AND TEST

1. Verification of control transformer ------------------------------------2. Verification of proper function of all components ---------------------------------3. Verification of correct sequence of operation ----------------------------------

DI-ELECTRIC TEST

1. High voltage test conducted at -------KV Voltage for 1 minute seconds

2. Between each pole and earth ---------------------

3. Between the poles when contacts are open ---------------------

INSULATION RESISTANCE TEST

1. Measurement of insulation resistance with 500/1000V DC Megger Mega –ohm

Page 2: Panel Test

2. Between each pole and earth ---------------------

3. Between the poles when contacts are open ---------------------

Client’s Rep………………………….. Tested by ………………Reviewed by ………………….