Pallatana GBCCPP Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch....

9
Pallatana GBCCPP Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12 • Being established by ONGC Tripura Power Company Limited (OTPC) at Pallatana, Tripura 1

Transcript of Pallatana GBCCPP Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch....

Page 1: Pallatana GBCCPP Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12 Being established by ONGC Tripura Power.

Pallatana GBCCPP

• Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11• Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12

• Being established by ONGC Tripura Power Company Limited (OTPC) at Pallatana, Tripura

1

Page 2: Pallatana GBCCPP Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12 Being established by ONGC Tripura Power.

Power Allocation

S. No. Beneficiaries Allocation (MW)

1 Tripura 196

2 Assam 240

3 Arunachal Pradesh 22

4 Nagaland 27

5 Mizoram 22

6 Manipur 42

7 Meghalaya 79

8 IL&FS / OTPC 98

Total 726

* Note: 50% of allocation is assumed to be linked with Unit -1

2

Page 3: Pallatana GBCCPP Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12 Being established by ONGC Tripura Power.

3

Page 4: Pallatana GBCCPP Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12 Being established by ONGC Tripura Power.

Power Evacuation System• Required by December 2011 along with Unit-1 (363.3 MW).A. Group -1

i. Pallatana Switchyard - OTPCii. Pallatana - Silchar T/L – NETCiii. Silchar sub-station – POWERGRID

B. Group -2 i. Pallatana- Surajmani Nagar T/L – POWERGRIDii. Surajmani Nagar sub-station – TSECL

C Group -3i. Silchar – Hailakandi T/L – POWERGRIDii. Hailakandi sub-station – AEGCL

D Group -4i. Silchar- Srikona T/L- POWERGRIDii. Srikona sub-station – AEGCL

E Group - 5i. Silchar- PK Bari T/L – POWERGRIDii. PK Bari sub-station – TSECL

4

Page 5: Pallatana GBCCPP Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12 Being established by ONGC Tripura Power.

Power Evacuation System (Continued) F. Group - 6 i. Silchar- Imphal T/L – POWERGRIDii. Imphal (new)sub-station – POWERGRID

G. Group – 7 – POWERGRID i. Silchar – Melriat T/L ii. Melriat (new)sub-station

H. Group – 8 – POWERGRID i. Passighat- Roing – Tezu- Namsai T/L ii. Roing sub-station iii. Tezu sub-station iv. Namsai sub-station

I. Group- 9 – POWERGRID i. LILO of Kathalguri – Misa T/L at Mariani (new) ii. Mariani (new) – sub-stationiii. Mariani (new) – Mokochung T/Liv. Mokochung sub-stationv. Mokochung (POWERGRID) – Mokochung (Nagaland) T/L

5

Page 6: Pallatana GBCCPP Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12 Being established by ONGC Tripura Power.

Evacuation System with Unit – 1

6

Page 7: Pallatana GBCCPP Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12 Being established by ONGC Tripura Power.

Evacuation System with Unit -1 (Continued)

7

Page 8: Pallatana GBCCPP Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12 Being established by ONGC Tripura Power.

Power Evacuation System (Continued)

• Required by March 2012 along with Unit-2 (363.3 MW).A. Group -1

i. Silchar – Bongaigaon T/L - NETCii. Bongaigaon sub-station – POWERGRID B. Group -2 i. LILO of Silcahr –Bongaigaon line at Byrnihat sub-station – MeECL ii. Byrnihat sub-station – MeECLC. Group -3i. LILO of Silcahr –Bongaigaon line at Azara – AEGCL ii. Azara sub-station – AEGCL

8

Page 9: Pallatana GBCCPP Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12 Being established by ONGC Tripura Power.

Evacuation System with Unit –II

9