ENERGY SERVICES
Comprehensive O&M of the CCPP includingProcurement of ConsumablesONGC Tripura Power Company Limited (OTPC) is the owner of the Palatana Power Station comprising 2 Units of 363 MW each, COD was in 2013. OTPC tendered the O&M services as well as the supply of consumables for the entire site. SES won the tender process against the former operator and international competition. Responsibilities of SES: O&M of 2 units with 363 MW (GT: 9FA, GE; HRSG and ST: BHEL); Operation includes 24/7 operation of the plant itself and its auxiliaries. Maintenance activities include daily care, annual shutdown, major overhauls and repair measures as well as procurement of consumables; management of spares and LTSAs.
Palatana Combined-Cycle Power Plant, IndiaO&M Management and Staff
Palatana combined-cycle power plant
Project Facts
Installed capacity 2 x 363 MW
Fuel natural gas
Customer ONGC Tripura Power Company Limited Palatana/Tripura/India
SES project execution 01/2016 – ongoing