PAL3 TN Installation Purge Gas Tube 1200mm x-axis … Instructions CTC Analytics AG CH-4222 Zwingen...

6
CTC Analytics AG CH-4222 Zwingen Tel +41 (0)61 765 81 00 Email [email protected] Page 1 of 6 Industriestrasse 20 Switzerland Web www.ctc.ch From: TE Date: February 12, 2016 Subject: Parts: Installation Instructions Purge Gas Tube external PAL3 extended x-axis PAL3-Gas-XY-ExtRet; PAL3-Gas-XY-ExtRpl PAL3 TN Installation Purge Gas Tube 1200mm x-axis Outside Installation Instructions for Purge Gas Tube Outside routing PAL3 1200mm x-axis: Overview: Instruments with extended x-axis are equipped with the gas tubing outside routed. At earlier instrument the gas tubing was inside routed. This instruction is for upgrading an instrument with inside routing to outside in the field. The advantage of the outside routing is to prevent a blockage of the arm during movement and easier replacement in the field. The tubing is connected by two quick couplings and fixed to the x- axis by 4 tubing holders. Picture 1: Two connectors of the tube Note: Please see next pages for a detailed installation description. PAL3-Gas-XY-ExtRet: Gas Tube retrofit kit for extended X-length (≥1205mm)

Transcript of PAL3 TN Installation Purge Gas Tube 1200mm x-axis … Instructions CTC Analytics AG CH-4222 Zwingen...

Page 1: PAL3 TN Installation Purge Gas Tube 1200mm x-axis … Instructions CTC Analytics AG CH-4222 Zwingen Tel +41 (0)61 765 81 00 Email support@ctc.ch Page 3 of 6 Industriestrasse 20 Schweiz

CTC Analytics AG CH-4222 Zwingen Tel +41 (0)61 765 81 00 Email [email protected] Page 1 of 6 Industriestrasse 20 Switzerland Web www.ctc.ch

From: TE Date: February 12, 2016 Subject: Parts:

Installation Instructions Purge Gas Tube external PAL3 extended x-axis PAL3-Gas-XY-ExtRet; PAL3-Gas-XY-ExtRpl

PAL3 TN Installation Purge Gas Tube 1200mm x-axis Outside Installation Instructions for Purge Gas Tube Outside routing PAL3 1200mm x-axis: Overview: Instruments with extended x-axis are equipped with the gas tubing outside routed. At earlier instrument the gas tubing was inside routed. This instruction is for upgrading an instrument with inside routing to outside in the field. The advantage of the outside routing is to prevent a blockage of the arm during movement and easier replacement in the field. The tubing is connected by two quick couplings and fixed to the x-axis by 4 tubing holders.

Picture 1: Two connectors of the tube Note: Please see next pages for a detailed installation description. PAL3-Gas-XY-ExtRet: Gas Tube retrofit kit for extended X-length (≥1205mm)

Page 2: PAL3 TN Installation Purge Gas Tube 1200mm x-axis … Instructions CTC Analytics AG CH-4222 Zwingen Tel +41 (0)61 765 81 00 Email support@ctc.ch Page 3 of 6 Industriestrasse 20 Schweiz

CTC Analytics AG CH-4222 Zwingen Tel +41 (0)61 765 81 00 Email [email protected] Page 2 of 6 Industriestrasse 20 Schweiz Web www.ctc.ch

1 x Tube in tube 1 x Y-axis back cover with gas coupling 7 x plastic clamps with screws and washers 1 x blind panel with hole PAL3-Gas-XY-ExtRpl: Gas Tube replacement kit for extended X-length (≥1205mm)

1 x Tube in tube 7 x plastic clamps with screws and washers (spare material in case existing parts are damaged or unavailable)

Page 3: PAL3 TN Installation Purge Gas Tube 1200mm x-axis … Instructions CTC Analytics AG CH-4222 Zwingen Tel +41 (0)61 765 81 00 Email support@ctc.ch Page 3 of 6 Industriestrasse 20 Schweiz

CTC Analytics AG CH-4222 Zwingen Tel +41 (0)61 765 81 00 Email [email protected] Page 3 of 6 Industriestrasse 20 Schweiz Web www.ctc.ch

Installation Instructions Retrofit Kit: For replacement tube installation please refer to picture 1. Remove simply the old tube, replace the new tube as shown on the picture and connect it to the two quick couplings.

1. Step: Remove side cover and the

X-axis tube inside completely

3. Step: Remove the cover from the

carriage to access the purge gas tube and pull it out

5. Step: Connect the purge gas tube

to the connector on the back plate from the kit

2. Step: Remove y-axis back cover

4. Step: Cut purge gas tube flush with

the y-axis-tube

6. Step: Mount the y-axis-cover again

and put two plastic guides to the opposed side of the connector.

Page 4: PAL3 TN Installation Purge Gas Tube 1200mm x-axis … Instructions CTC Analytics AG CH-4222 Zwingen Tel +41 (0)61 765 81 00 Email support@ctc.ch Page 3 of 6 Industriestrasse 20 Schweiz

CTC Analytics AG CH-4222 Zwingen Tel +41 (0)61 765 81 00 Email [email protected] Page 4 of 6 Industriestrasse 20 Switzerland Web www.ctc.ch

Guides with fixation screws

7. Step: Remove Back Cover

8. Step: Turn quick coupling 90° and

install side cover

9. Step: Mount the blind panel with the hole, which comes with the kit. Mount the three clamps on the upper screws like pictured below,

Page 5: PAL3 TN Installation Purge Gas Tube 1200mm x-axis … Instructions CTC Analytics AG CH-4222 Zwingen Tel +41 (0)61 765 81 00 Email support@ctc.ch Page 3 of 6 Industriestrasse 20 Schweiz

CTC Analytics AG CH-4222 Zwingen Tel +41 (0)61 765 81 00 Email [email protected] Page 5 of 6 Industriestrasse 20 Schweiz Web www.ctc.ch

Detail view outer tubing connected to x-axis

Detail view two quick couplings

Page 6: PAL3 TN Installation Purge Gas Tube 1200mm x-axis … Instructions CTC Analytics AG CH-4222 Zwingen Tel +41 (0)61 765 81 00 Email support@ctc.ch Page 3 of 6 Industriestrasse 20 Schweiz

CTC Analytics AG CH-4222 Zwingen Tel +41 (0)61 765 81 00 Email [email protected] Page 6 of 6 Industriestrasse 20 Schweiz Web www.ctc.ch

For the replacement kit: Simply disconnect the old tubing by loosen the plastic guides and put the new tube in. Do not bend the tube while doing so! If there is any question, please contact [email protected]. Best regards

CTC Analytics AG