Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office of the General Manager (Hydel) Operation, WAPDA, 186 - WAPDA House, Lahore. No. GMHO/CEH Dated: 4-8-05-2019 o9 p Rpistrar NEPRA 1„,, PRA Tower, Attaturk Avenue (East), G-5/1, Islamabad. Subject: License Proposed Modification (LPM) in the Existing Generation License of WAPDA Hydroelectric (Changes in the Total Capacity Values of Two (2) Hydropower Projects) Ref: NEPRA's Letter No. NEPRA/ADG (Lic)/LAG-23/3060 dated 21. 02. 2019. It is apprised that the Modification-IV to the Generation License No. GL (Hydel) / 105 / 2004 dated: 03.11.2004 was issued by NEPRA vide its letter No. NEPRA/R/LAG-23/325-30 dated: January 09, 2015 in which two (2) upcoming hydel power stations namely Golen Gol and Keyal Khwar Hydropower Projects were included with their total generation capacity values of 106 MW and 122 MW respectively. On behalf of WAPDA Hydroelectric, this office now intends to file an application for License Proposed Modification (LPM), as directed by NEPRA vide its above referred letter, for the revision/ change in total generation capacity values of Golen Gol Hydropower Project from 106 MW to 108 MW and for Keyal Khwar Hydropower Project from 122 MW to 128 MW. S.No Name of the Project Generation Capacity as per Modification-IV Revised Generation Capacity Difference 1 Golen Gol Hydel Project 106 MW 108 MW 2 MW 2 Keyal Khwar Hydel Project 122 MW 128 MW 6 MW Total Difference 8 MW This revision / change shall result in enhancement of capacity of WAPDA Hydroelectric from 17359.96 MW, as recorded in Modification-IV, to 17367.96 MW. This License Proposed Modification (LPM) is accompanied with necessary attachments as required under NEPRA Licensing (Application and Modification Procedure) Regulations 1999. Authorization letter / Power of Attorney to file the application for Modification-V in the Generation License is also attached. A cross cheque No. 00004653 dated 18-04-2019 amounting to Rs.153,920/- (Habib Bank of Pakistan, Napier Road , Lahore) as License Modification fee is being enclosed for further processing of the case, please. Enr DA / As Above P-cr l 4 2 1 PAh c °1'‘ General Manager (Hyde) Operation r15 41C4 % <-Tee-La ) 1S- oS kl — DKCr,stJ UIT) _LA CE) tr) I''^ Cif t~ — ( 1-Qc.,\ Member (Power) WAPDA, WAPDA House, Lahore. ,-"`(--), General Manager Finance (Power) WAPDA, WAPDA House, Lahore. Copy to:

Transcript of Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power...

Page 1: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

Pakistan Water and Power Development Authority

Telephones: 042-99202288 & 99202211/2186.

Fax No. 042-99202159.

Office of the General Manager (Hydel) Operation, WAPDA,

186 - WAPDA House, Lahore.

No. GMHO/CEH Dated: 4-8-05-2019 o9

pRpistrar NEPRA 1„,, PRA Tower, Attaturk Avenue (East),

G-5/1, Islamabad.

Subject: License Proposed Modification (LPM) in the Existing Generation License of WAPDA Hydroelectric (Changes in the Total Capacity Values of Two (2) Hydropower Projects)

Ref: NEPRA's Letter No. NEPRA/ADG (Lic)/LAG-23/3060 dated 21. 02. 2019.

It is apprised that the Modification-IV to the Generation License No. GL (Hydel) / 105 / 2004 dated: 03.11.2004 was issued by NEPRA vide its letter No. NEPRA/R/LAG-23/325-30 dated: January 09, 2015 in which two (2) upcoming hydel power stations namely Golen Gol and Keyal Khwar Hydropower Projects were included with their total generation capacity values of 106 MW and 122 MW respectively.

On behalf of WAPDA Hydroelectric, this office now intends to file an application for License Proposed Modification (LPM), as directed by NEPRA vide its above referred letter, for the revision/ change in total generation capacity values of Golen Gol Hydropower Project from 106 MW to 108 MW and for Keyal Khwar Hydropower Project from 122 MW to 128 MW.

S.No Name of the Project Generation

Capacity as per Modification-IV

Revised Generation

Capacity Difference

1 Golen Gol Hydel Project 106 MW 108 MW 2 MW 2 Keyal Khwar Hydel Project 122 MW 128 MW 6 MW

Total Difference 8 MW

This revision / change shall result in enhancement of capacity of WAPDA Hydroelectric from 17359.96 MW, as recorded in Modification-IV, to 17367.96 MW.

This License Proposed Modification (LPM) is accompanied with necessary attachments as required under NEPRA Licensing (Application and Modification Procedure) Regulations 1999. Authorization letter / Power of Attorney to file the application for Modification-V in the Generation License is also attached. A cross cheque No. 00004653 dated 18-04-2019 amounting to Rs.153,920/- (Habib Bank of Pakistan, Napier Road , Lahore) as License Modification fee is being enclosed for further processing of the case, please.

Enr DA / As Above

P-crl 4 21 PAh c°1'‘ General Manager (Hyde) Operation

r1541C4%

— <-Tee-La ) 1S-oS kl — DKCr,stJ UIT)

_LACE) tr) I''^ Cif t~ — (1-■Qc.,\ Member (Power) WAPDA, WAPDA House, Lahore. ,-"`(--), General Manager Finance (Power) WAPDA, WAPDA House, Lahore.

Copy to:

zaki
Rectangle
zaki
Rectangle
zaki
Rectangle
zaki
Rectangle
zaki
Rectangle
Page 2: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

Hvdel Power Station, Keval Khwar PLANT DETAILS

1 Location Right tributary of the River Indus at Keyal Khwar Distt. Kohistan in KHYBER PAKHTUNKHWA.

2 Plant Type Total Capacity No. of Units Storage 128 MW 2

3 v Head Gross Maximum Minimum 737.5 m 721.5 m

4 Technology , Pelton Turbine

5

Tunnel No. Length Diameter Total No. of Tunnel - - At Intake At Penstock

(i) No. of Power Tunnel

1 7.16 km 3.2 m 2.2 m

(ii) No. of IrrigationTunnel

- - - -

6 Peak !Base Load Operation

Base Load operation as per requirement of NPCC

7

Minimum Expected Useful Life of the Generation Facility

50 Years

8 Plant Characteristics

Generator Voltage 11 KV Power Factor 0.85

Frequency 50 Hz Automatic

Generation Control Yes

9

Interconnection Arrangements (CCT details, length of Transmission Line, voltage level details etc.)

CCT Voltage (KV) Length (KM)

Keyal-Duber-I 132 3.00

Keyal-Duber-II 132 3.00

Page 3: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

ION KEYAL HYDROPOWER PROJ

Page 4: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

rot. 304010 0100. ....1 no De Roma DNA. "WM „ •-, : _ •....; I •-,,, i i .1 • oY" Nt ,". •. '

!/- .1 -1,', I 4, r p-, I .: GAR 7 , , f I ( !i's

:--/i .. 7.-. ''''" ---- i At4 I1 1 • 4'4

•1.4., '''' ',N

KIK. 5:7990..r. _ 7=teco..14, ,.. -.! ,.. --''' 1 --..„ , . i 04 ' N., i i:'

I .'--A '' '' P...,) - . -

, r/I -'''': ,4

•':,/ l'

O'' ' .

, [009 RI; NOTES: E I. ALL ELEVAlIONS ARE IN METER MOVE SEA REVEL ' 1- DIA) ACCORDING 70 SURVEY Of PAKISTAN ... "' 1 ALL COORDINATES ARE IN UTLI ,,,CORIONG 70

SURVEY Of PAKISTAN. '

1 CONTOUR INTERVAL IS 10 nl, _ 4. ;DP' 'SAP IS DIGITIZED 'Am SURVEY Dr PARISIAN

SHUTS. 5. rcot TENDER PURPOSES CARRY -

LEGEND:

1- : ....'F.: r S , ' , ' KEYAL DAM SITE '

''' E t

1■211 r - 1 , ' I ‘,....‘,..-i :. tl,,r, S'.--.-• :,- '

....... ;--t •,..... ,

A J, I ... — _

' ' -,.; : "-. I . s -•• • • i.' I ,-. . ,

t - •••• y 144.44 t. - - • -71-::: -

1 - - i ' ....

V> iAL it f "•"..,,.. I4 : - ,

"..V5i'

, -.... t-.., . Ut 1„. - I . --,"...•

, 4

'--i .., 1

- IGH9194‹: ---. ,. L' ... -- "11-I . , ,‘. . Is . 1 1

■ 1

_ t i A 1 " 1

1I';'■ , , •

IIII IMPLONG .4.,....,, 10ETALLaI ROAD 7,,St Mt,— JEEPABLE ROAD — — UNME1ALLED PACCA TRACK

. VIRAL. MOMS 7.r."-- RIVER --------" KIVAR, NALA. SMEAR

4. I .-1"-- ''11-A7,--------1, I 44 ' , ... i I i

na 4R4i , 1, ..... for 6/0011 . ! I0001ta ...., ■ S. 7 --.-.4 .71 1 I :.. ' I , .

O. ' ■ 1 I 00o . .I, htanneia)e. 4 .... 1 I ' ' ! ( - 1 : -- - '9 : 1 ..-• t_.--1-. •;0■•,, • • F ---F—I '-'-' _ut I. • t•

, I e i . • • I - ; t - • -,' _ r ',' v : sr,

ri , -1N Pit .k,”!

-Ply

'

/

7..s

,

.

*.o1, a...

t - ,..„,,,, 'k ‘ 1 t - • /-.• 4 - ---..... I

‘4,,' :)1 c ) ,••• - ''' ".• l'iP 1: \ ,-.- k •• .....,

I - '''i• e'"*"!it! ,;" ..A. [ , ROE= 7-:N

.

V r I/ 1 q sP.TS'•-t .±.!,

c A

I ' A

....." ,..,..

___-- I Ir.... — , ......... •••• : I ;... j

_ • AR/4.. SIA ,

N . ' .1-----'-'

—p--- , _ ... , . 4-4'/ : - 7 e....,. ; ,7_,••• 7 •• ,

.... — •••--- ? • / •••• ...

-, %, I i.... .

: - . __(..._.7...4._.....,..„..-7...,., r Fa I

,..,:' -A. .

. 1 i C. "•• 1. I ,

\ . ......,..4 ,

‘ - Y,.... \

/ ■ '.....1.. i ......., . , ' ' , 4". : ' i i I

Mkt 1:10.100 -00 0 100 090 LIM Loco 0.40e (r..)

Q.5,40Y4. ,. - 4_44----,_,..■.J4-4.4-4.-- ______ -.4...=_÷ - _ ,..-'" 4. : \ r r ' ',/,,r I POWER HOUSE/ ;:. , 1 ‘, I * ̀A. SWITCHYARD AREA tt- : ..e ..i .,:,',>, --. • , •

' :

et ram mita AUK • P. AAD .4000T—i / ----- - - enini

it if. 1' %."Y.00* \ .., TPA --- ..--- , I , • \

Rev DA 1 in IONOTAPPO ,..4, / . . .4-44 44,0 '-,-;,.. PAY '

# . . 0 A. ,.."... '-0 '....`" 0 1 , \ \ ' -:.'"' i = 4,0 .t, - '''' 4 ,

; n . - —

KEYAL KHWAR HYDROPOWER PROJECT 00,0.0....,..1

MOM O., 00/0/8/00**0•000

40.1^...W

.40..0■001.000400.

:I"' —...

Z.' " • .., a ,

,. .. I'. * - , ,^A *1.,: s t ,;--- --:-‘ • , : ,..:•-...-------,-

/ I V. "-- s

-/- I :!.. ' ''. c-1"" _

...... 1,

‘ 1 i ..; 'ma .1 r . ',_, 1 I X .t,.. A " 4„„

r:-. -,) Li \-, 'Iv ,...: 1..' 94 . 1 I 1 1 A----■

a , 4 V 4t

AI)

'S.: ro"...."7..........................

-%, ./ ,..,',.1 4 , 4 \ ' ---,----...3 i -4,- ••• ' ... ..{ ) . k '.... I. ,

' 1 7 , :. :

II- CIM.r

kA'..

GENERAL PROJECT INFORMATION , AMP OF PROJECT AREA

ACCESS TO PROJECT sae • nu ' II 1.1 A' ••I's"--1 A-- ,e- -..,,LLI i . , , , 1 , .. ,,. ,1 ., • ..... an, NHAR • KiioN =KAN soma " maw

o,...46*iiv: pan I...war NNW GHANA/ Or A OnwANIN

0.4 01.2VN SARA butAsvA3 OHL ND No*-RoNN2011-R01 30111001 3200:01P '

Page 5: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

5ioa.oso

mama IMED TKRACI Merl. 11111101.ryona

WM 7.11A.

rEttrainfiNisettE tr.. ..immass444.44.2...4.1 Er 131_=.,„......531rtri_no41444.1!_uf.41,_TTL4a

aulliotwilitsassatt istawatativan t tut tits,

3200,000

1.1.10 M21. RM.. alma

Ora

• CI-111A.

..............

- ..... ......

tor ma -73-;

M AGANA Ar mum Nmescamm Ho ALM RMYISM,

eas WOW.Alks GAS MOMS.,

<MUM* Iongumn mum. Mom AN gams PboSST RacfaticziaRettma CONMMaIM

• 3102.24-43C0-0245i-A(11 • 310224-4344-02,470-1102 • 3t0224-4344-02471-402 • 310224-4344,-03137-702

ACME

° a io lato " 1.1

eQKE-a.T.ABQLI 1. All. ONENNONS ARE IN NETER NJ IF NOT OTHERWISE SIAM.

antatE Sem ON 143 CRAVING INGI. THE ASSOCIATED DIURNAL OGIENSIONS RIM TO THE SHOTCRETE UNE

3. DESIGN UNE) •• 17€ CLETH ',ROME of THE 51RocTiNE ALL. NAVAHO'S ME IN ICIER MOVE SSA LEM. (m .11 Accapoirc m swear emusrm

4. At COOR0114411:5 ARE II HIV ACCORDING TO MKT OF MONNE Ana Tranro massAce< nts

Page 6: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

*WM g

SEL. C. • LAN

Page 7: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

YEA

LAM Star ;

sP.A.It cat( +0,

Page 8: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

Hvdel Power Station, Golen Gol PLANT DETAILS

1 Location On Golen Gol Nullah, 25 Km from Distt. Chitral in KHYBER PAKHTUNKHWA.

2 Plant Type Total Capacity No. of Units

Run of River 108 MW 03 '

3 Gross Head Maximum Minimum

-- —.' 439.3 m 423.3 m 4 Technology PeIton Tiarbine

5

Tunnel No. Length Diameter Total No. of Tunnel 3 - At Intake At Penstock

(i) No. of Power Tunnel

3 3.81 km 4.1 m 3.2 m

(ii) No. of Irrigation Tunnel

- - - -

6 Peak / Base Load Operation .

Base Load Operation Plant

7

Minimum Expected Useful Life of the Generation Facility

35 Years

8 Plant Characteristics

Generator Voltage 11 KV Power Factor 0.80

Frequency 50 Hz Automatic

Generation Control Yes

9

Interconnection Arrangements (CCT details, length of Transmission Line, voltage level details etc.)

CCT Voltage (KV) Length (KM)

Golen Gol to Timergarah

132 145

Timergarah to Chakdara

132 53

Page 9: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

*

CT AREA

0 ity

1146(7411.

Totaa4 /

LAttoRe

or,

IOW' **aft

cr- -

aatal!...:1731; t*Tri-inri

ARABIAN SEA PROJEQT LOOM SON MAP

Page 10: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

" 9 '.3 3''' 32NZMUDEMZ:12"33E4'

- 1 Et ME [MIME ft 1

1 I 11111 li 1 il ME I 1

1 1

t

g g 4 1 I

g I •

ir P

g

1 _i...._

7 r‘*4•.;„

.

7 '

,

,i

..J

P

.

OF

cown

taL POINTS

j PO

INT O

tSclIP

TIG

N

Page 11: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

000Le

. ....- -.. 4,1 ,

LATERIILINTAKE ' September 20 t3

N

'11111111114,, VAii

. 441471%" ... 1/1,1! it.q.% -111p

ifAnITCPCHAIINIR \ PROPOSED ,. ■

• d*in .:

....\

, EN GOL HYDROPO'NER PROJECT .

0-46. 7

\\

\\\

GEIE1ML LAYOUT PLAN

mono

\‘. ‘.....)

C

13000

1

tl

\v.

l 1

".--.•----..•.

)-ee,eri ''S\''tadji

/

- V ,

P

-4, -.s l, ilitA -..

io. i ....I:

....1. 3.=:,..-.

I W

..,,,■:,

viAT ,r.

1,..ii• o 1 ‘t.'%1910.,dahlk

4,..

-.. 1 FRAM

Page 12: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

OVER HEAD- 132kV TRANS. UNE

OVER ITEM) IrAVIRARTS. ONE

OVER HEAD 334V LRRE

TO TAMROARAN

TO CTITTRAL

FOR LOCAL SUPPLY

Ti k

NOTE5 x

TM 13223/ 22221 ARC STANT AS lamas Valan.24

2 XL 242411222122 OATS, TITQAR 11T ORTOTI, HOD1R6 Ako PROTSCROK

3 OM DOWNS WITSFORMIR kat PROlec 721+2 Fe* 114, woo a

Ct'sttef IC.f. MA! * w eraiet.raC4 ORO egueums

owl- a 11214ivaP TR 33 3V1214222. At swat maw .11' ant* wo mom 3.22212223

FoRtelmar

14.:•7r.t.

VV.

—4 — 7=71 MMIX-

4,1... ... ,,,_ J ■-••■. ..... "-

. :'..4

Page 13: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

_

Page 14: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

I. Text of Proposed Modification

A. NEPRA granted Generation License No. GL (Hydel)/05/2004 Modification-IV to WAPDA Hydroelectric on January 09, 2015 for following twenty four (24) Hydel Power Stations having total installed capacity of 17359.96 MW;

i. Tarbela 3478 MW ii. Mangla 1C-00 MW iii. War sak 242.96 MW iv. Ghazi'Barotha 1450 MW v. Chashma 184 MW vi. Renala 1.1 MW vii. Chichoki 13.2 MW viii. Nandipur 13.8 MW ix. Shadiwal 13.5 MW x. Rasul 22 MW xi. Dargai 20 MW xii. Chitral 1 MW xiii. Kurram Garhi 4 MW xiv. Gomal Zam 17.40 MW xv. Jinnah 96 MW xvi. Allai Khwar 121 MW xvii. Duber Khwar 130 MW xviii. Khan Khwar 72 MW xix. Tarbela, 4th Extension 1410 MW xx. Keyal Khwar 122 MW

xxi. Golen Gol 106 MW xxii. Jabban 22 MW xxiii. Diamer Basha 4500 MW xxiv. Dasu 4320 MW

Total 17359.96 MW

B. "WAPDA Hydroelectric has requested for further modification in its Generation License (Modification-V) for revision / correction of the installed capacity of two Hydel Power Stations namely Keyal Khwar (Sr. No. xx in the above list) from 122 MW to 128 MW and for Golen Gol (Sr. No. xxi in the above list) from 106 MW to 108 MW and as a result of the requested changes, the total installed capacity of WAPDA Hydroelectric shall increase from 17359.96 MW to 17367.96 MW".

Page 15: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

National Electric Power Regulatory Authority

(NEPRA)

Islamabad Pakistan

GENERATION LICENCE GL (HYDEL)105/2004

In exercise of the Powers conferred upon the National ElectriC Power

Regulatory Authority (NEPRA) under Section-26 of the Regulation of

Generation, Transmission and Distribution of Electric Power Act, 1997 the

Authority hereby modifies the Generation Licence granted to WAPDA (on

November 03, 2004 and expiring on November 02, 2034), to the extent of

changes mentioned as hereunder:

(i). Installed capacity mentioned in the Face Sheet may be read as 17367.96 MW instead of 17359.96 MW;

(ii). Changes in Schedule-I attached as Modified/Revised Schedule-I; and

(iii). Changes in Schedule-II attached as Modified/Revised Schedule-II.

This Modification-V is given under my hand this of

Registrar

Page 16: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

II. The Statement of Reason in Support of Modification in Generation License

• While filing the application for Modification-IV in the Generation License of WAPDA Hydroelectric, the Installed Capacity values of two (2) hydropower projects namely Golen Gol Hydropower Project and Keyal Khwar Hydropower Project were taken as 106 MW and 122 MW respectively from PC-I documents as the electro-mechanical equipment desIgn parameters were yet to be finalized at that time.

• Later on, the design parameters were finalized for Golen Gol Hydropower Project and the installed capacity was computed as 108 MW (36 MW x 3) and this Project has already been commissioned with this nameplate capacity of 108 MW. Therefore NEPRA is requested to modify Generation License of WAPDA Hydroelectric (Mod ification-V) to the extent of recording the total capacity value of Golen Go! Hydropower Project as 108 MW instead of 106 MW.

• With regards to Keyal Khwar Hydropower Project, though the project is yet to be commissioned; however, its design parameters have been finalized and the contracted capacity value is 128 MW instead of 122 MW. Therefore, NEPRA is requested to incorporate the revised total capacity value of Keyal Khwar Hydropower Project as 128 MW, in place of 122 MW as recorded in Modification-IV, through this License Proposed Modification request.

Page 17: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

NT AUTHOR TY Aigiuk I" ER

Fax:04249102722

No. Si'F'D Keyed HPFY g 2 ecf En9In r ration,

W'epda House,

07 204-

ti k

.desited,

t. Due ME enc. Report. 2_ Location 3- Single Line Diagram. 4. Project Layout- 5. Auxiliary Consumption.

HPIG=102114206: 3 dated tithe* regar. rtg, Key&

e Opitern 'quarter as sad iere

ojeOt, for ontMind

1. TO to General Manager (H Sunny VIM, Lahofe.

1

Page 18: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

Generation license Hydel Power *eons

• HOUSE lisig) E

k

Lo ati ti On thei rights Bank ref. River indut at Patton () ztrict Williston, in "Province •

her ithition khawa. MO. No of Units

02

72 .

'Of:Tunnel f

Na of Iri l':I trOii.::Twiritri.

At Penstock 2.2m

this 'Ration Plan Nil

()Oration record for list . fisie Nil rs

Year Energy Produced Running forced Outage Maintenance. Stand by IWKEH Hours Hours Hours Hours

Operation Availability

(34)

Consents

Length of Transmission Line

ouble Cl.rcuit Transmission

Voltage length (KV)_. (KM) 12. 2.780

1 Plant. Characteristic Power Fatter

Unit s 01 4 0.85 U I(s) Unit(s) Frequency = 50 Hz Automatic Control = Computerized Control Syste n (as)

Unit wise expected(latest) Commissioning dates

Dates Unit Nos. 01 ,201

Jult 2018

14- I Train Training facilities are available at Hyde! Training Centre,Mangla for the whole Hyde!. ng and Development

Page 19: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

Golen Gol Hydropower Consultan s JV

GG HC

19th July 2014

GOLEN GOL HYDROPOWER PROJECT

Due Diligence Report

1. Location On left bank of Mastui River, downstream of the Galen Got mouth, near Koghuzi. Chitral, in Province of Khyber Pakhtoon Khwa (KPK).

2. Plant Type Total Capacity No of Units Run of River 108 MW 3

3. Head Gross Net 439.30 m 423.30 m

4. Technology Felton Turbines 5. Tunnel/Shaft No. Length Dia.

Total No. of tunnels 6 At Intake At Penstock No. of power tunnels 3 HT = 3,805.8 m

PS = 396.9 rn PT= 561.2 m

j+ ivlartifold= 76 m)

4.1-4.7 m 3.2 m

3.2-3.7 m 3.1 m

No. of access tunnels 3 AT = 67.5 m AT-HT = 179.0 rn AT-PT = 87.0 m

4.1 m

Surge Chamber 1 Height = 40.6 m Dia. = 162 m 6, Minimum expected useful

life of the generation facility

50 years

7. "Peakingillase operation Operated for base load (no storage capacity for peaking) 8. Plant characteristics Generator Voltage Power factor

11 kV 0.8 Fre_guency = 50 Hz. • Automatic control: SCADA

9. Transmission Lines CCT Voltage Length Galen Gol to Timargara D/C Line

132 kV 145 km

Timergara to Chakdara VC Line

132 kV 53 km

Page 20: Pakistan Water and Power Development Authority · 2020. 2. 25. · Pakistan Water and Power Development Authority Telephones: 042-99202288 & 99202211/2186. Fax No. 042-99202159. Office

Ill. A statement of the impact on the tariff, quality of service and performance by the licensee of its obligations under the license.

• As for quality of service and performance is concerned, WAPDA Hydroelectric is already maintaining highest level of performance and quality of services which can be confirmed from the plant availability factor of existing Hydel Power Stations. The same spirit will be followed in future as well.

• Through this modification, the notional capacity (fixed) charge figure shall be reduced as the total capacity in MWs of WAPDA Hydroelectric shall increase from 17359.96 MW to 17367.96 MW, however the total tariff in Rs/kWh shall remain the same, if computed for the same amount of costs & expenditures considered while computing the tariff on the basis of earlier recorded total capacity value of 17359.96 MW.

• After this modification, WAPDA's desired performance delivery levels shall be stretched and become compatible with industry standards as it shall then become liable to generate and deliver the rated generating capacity in respect of these two power projects (Golen Gol Hydropower Project and Keyal Khwar Hydropower Project) and the cushion of now available 8 MW shall be vanished. Furthermore, the issue of non-conformity with regards to actual capacity values and NEPRA's recognized capacity values, mentioned in the latest modification (Modification-IV) of the Generation License granted to WAPDA, shall also be addressed / settled which currently has been consuming significant efforts and resources of the Licensee unnecessarily.