    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    1 of 17

    SPESPE

     

    Factory : Office:

    Plot Nos: B-3/3 to B-3/12, 3rd Floor, Mahan Terrace,

    Sachin Udyognagar Sahakari Mandali Limited Adajan Road, Surat - 395009

    Sachin, Surat- 394230, Gujarat, India Gujarat, India

    Ph+Fax: 91 261 2390471 Ph: 91 261 2686085, 3063000E-mail:[email protected]  Fax: 91 261 2681175

    Prepared By pproved By

     _____________________________ __________________________

    (Inspection Engineer) (QC Manager)

  • 8/18/2019 Painting Procedure Approved.

    3/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    2 of 17

    SPESPE

      CONTENTS 

    I.  PURPOSE

    II.  SCOPE

    III.  REFERENCE DOCUMENTS

    IV.  SIGNIFICANCE OF SURFACE PREPARATION

    V.  PAINTING

    VI.  COATING REPAIR PROCEDURE

    VII.  INSPECTION 

    VIII.  SAFETY CAUTIONS 

    IX.  ANNEXURE -1 (PAINTING LOG SHEET) 

  • 8/18/2019 Painting Procedure Approved.

    4/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    3 of 17

    SPESPE

    I PURPOSE

    The purpose of this document is to follow proper procedure to carry out the activities insequence for surface preparation, painting at shop as well as at field and alsotouch/repair painting on damaged portions.

    II SCOPEThis manual covers the standards procedure for blasting and painting of pressurevessel.

    III REFERENCE DOCUMENTS

    1)  Paint manufacturer’s instruction & safety data sheets.2)  CLIENT Specification no:-9294-VW-SG-001 Rev-03.3)  Technical Data Sheets for Paint system / Touch-up Paint system as per Paint

    Manufacturer’s recommendations

    IV SIGNIFICANCE OF SURFACE PREPARATION

    All surfaces to be painted shall be cleaned and prepared before application of andcontoured. Sharp edges shall be rounded, chamfered. Oil, grease, loose, rust and loosemill scale, if present, shall be removed by suitable methods.

    REFERENCES:

    A.  Painting manufacturer’s Date sheetsB.  CLIENT standards.

    SURFACE PREPARATION METHOD

    A. BLAST CLEANING

    I.  Blast cleaning is the ideal surface preparation method for suitable to preparesurface for painting. All the other forms of surface preparation have theirlimitations.

    II.  In blast cleaning an abrasive is directed at high velocity against the surface. Theabrasive material shall be approved by Client before being used. 

    III.  Copper Slag (Abrasive) shall be dry, clean, and free from containments and of atype and size adequate to give required Surface finish.

  • 8/18/2019 Painting Procedure Approved.

    5/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    4 of 17

    SPESPE

    IV.  Compressed air for blasting shall be free from oil and water.

    V.  The surface to be painted shall be cleaned by Copper slag blasting to a degree ofSA 2.5.

    VI.  Blasting operation shall not be carried out on surface that are wet and also whenthe surface temperature of the steel and structural is less than 3°C above the duepoint of surrounding air or when relative humidity of air exceed 85%.

    VII.  Surfaces where abrasive blasting is not accessible, surfaces are to be cleaned byWire brush grinding to obtain the required surface finish.

    V PAINTING: 

    1.  Painting shall be carried out as per approved paint manufactures specifications.2.  Primer shall be applied after completion of blast cleaning within 4 hours.3.  Paint application log shall be maintained.4.  Coatings and Primers shall be received in the original containers bearing the

    manufacturer’s name, brand name, product designation, batch no, shelf life and date ofmanufacture. Corresponding test certificates to be collected.

    5.  All paint materials shall be stored as per manufacturer’s recommendation.6.  All Painting material shell is stored clean, dry and far from work place.7.  All paint shall be stirred thoroughly prior to use. Stirring up will also become necessary

    repeatedly during application to prevent settling of Pigments.8.  Primer shall be applied by brush, roller or spray gun. A smooth uniform film shall beapplied to the surfaces to be coated. At no place, the film shall be less than the specifiedthickness, thick paint or detrimental brush marks are not acceptable.

    9.  Paint shall be applied only to dry, clean, adequately prepared surfaces underfavourable conditions and in accordance with the paint manufacturer’s instructions. 

    7.  To maintain the required dry film thickness for primer consecutive single coat.Consecutive coats will be applied only after the previous coat dried.

    8.  The temperature of the substrate must be a minimum of 3°C above the dew pointduring coating. The substrate temperature shall be a minimum of 5°C and a maximumof 60°C during coating application.

    STEPS IN PAINTING SYSTEM:i) Application of Primer

    The Primer should be applied as per the painting specification

    1.)  Ethyl Silicate Inorganic Zinc Rich of 75 µm as per painting specification no:- 9294-VW-SG-001 Rev-3 Table 1 (Item- Equipment in Ferritic Steel)to be applied after blasting onall Heater panels, Stacks & all supporting structures.

  • 8/18/2019 Painting Procedure Approved.

    6/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    5 of 17

    SPESPE

    2.)  Epoxy Polyamide cured zinc chromate primer (2 x 35 µm) as per paintingspecification no:- 9294-VW-SG-001 Rev-3 Table 1 (Item-Structural Steel) to be applied onother structural Steel like Handrails, Platforms & Ladders.

    The painting system for steel surface is designed to give dual action. Corrosioninhibition Barrier protectionii) Significance of Primers 

    This is the corrosion inhibitive coat applied to restrict corrosion at steel surface. Thiscontains various anti-corrosive pigments like Zinc-silicate & Zinc Dust. If this coat isnot applied, the painting system will provide only a barrier, like a plastic sheet. In caseof mechanical damage or rupture in the paint film during its life corrosion will start on& shall creep in to the surface causing peeling off of paint immediately. Besides primerhelps & improve adhesion of second coat as well. Hence for steel surface primer coat isvery important & essential.

    iii). Application of paint:The following precautions are suggested during paint application:a) Shall not apply paint when temperature falls below 10°C.b) Shall not apply paint when humidity is above 85% or during fog, mist or rain.c) Primed Surface shall be over coated after the recoat ability time specified in the

    data sheet of the paint manufactured.d) All the primers and finishes are supplied with brushing consistency. Thinner

    should be added only if the viscosity increases due to temperature change duringapplication. Normally addition of thinner is restricted up to 5-10% by volume incase of brush application. In case of spray application, only recommended thinnershall be used to bring the paints to spraying consistency.

    e) Blast cleaned surfaces shall be coated with primer within maximum 3-4 hours. Ifrelative humidity is over 75% this should be reduced to 1-2 hours for betterperformance.

    f) All the two packed primers and paints should be used up within the pot lifementioned in data sheets.

    g) Application of paint is recommended at ambient temperature. The substrateshould be at ambient temperature.

    h) Epoxy polyamide MIO of 150 µm as per painting specification no:- 9294-VW-SG-001Rev-3  Table 1 (Item- Equipment in Ferritic Steel)to be applied on the primedsurface of heater panels as Intermediate. Aliphatic polyurethane (1x50 µm) as finalcoat to be applied on the Intermediate coat, colour code as per Table 3 RAL no:-7035 for Furnace casing and RAL no:- 9006 for stack & flue duct(In field).

    i)  2 pack  Polyamide cured Epoxy finish of (2 x 35 µm) as per painting specificationno:-  9294-VW-SG-001 Rev-3  Table 2 (Item- Structural Steel)to be applied on theprimed surface of platforms, Ladders & Handrails as final coat, colour code as perTable 3 RAL no:- 1021.

  • 8/18/2019 Painting Procedure Approved.

    7/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    6 of 17

    SPESPE

     j)  For Stack the intermediate and final coat should be silicon acrylic aluminium paintof 25 micron each.

    VI COATING REPAIR PROCEDURE AT SITE FOR ALL SHOP PAINTEDITEMS1)  All shop painted items shall be checked for DFT of coating as per the specifications

    & condition of coating for uniform coverage and damages during transportation.2)  In case of shop applied primer/coating is in acceptable condition the surface shall be

    thoroughly rubbed down/ cleaned by emery paper and remove oil, grease bysolvent and wash the surface with fresh water and dry it with compressed air &proceed with the field painting system.

    3)  The compatibility of shop and field paint coating shall be ascertained as per paintmanufacturer’s painting system.

    4)  Any size and type of paint damage/deterioration shall be repaired/ repainted as perapproved procedure.

    VII INSPECTION: 

    Inspection shall be carried out in stages as per approved Quality Control plan & Section11.3 of painting Specification (no:-9294-VW-SG-001 Rev-03.). Dry film thickness,humidity and final DFT shall be inspected. Profile measurements for blasted surface shallbe carried with surface profile gauge.

    The dry film thickness of coat shall be checked by means of a calibrated Elcometer- dryfilm thickness gauge. Re calibration will be done after expiry of the certificate. Periodicand continuous field checks on workmen shall be made to ensure that the correctprocedure and paint is applied according to the specifications prescribed. Defective workshall be corrected as and when identified.

    A Painting log shall be maintained & format of same shall be as attached Annex1.

    VIII SAFETY PRECAUTIONS:1.PPE shall be used during blasting operation & painting.2.Paint material shall be kept away from hot work areas.

    3.Material Data Sheets shall be made available at all times.4.Required permits shall be obtained during work progress.

    Prepared By pproved By

     _____________________________ __________________________

    (Inspection Engineer) (QC Manager)

    3

  • 8/18/2019 Painting Procedure Approved.

    8/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    7 of 17

    SPESPE

     

  • 8/18/2019 Painting Procedure Approved.

    9/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    8 of 17

    SPESPE

     

  • 8/18/2019 Painting Procedure Approved.

    10/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    9 of 17

    SPESPE

     

  • 8/18/2019 Painting Procedure Approved.

    11/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    10 of 17

    SPESPE

     

  • 8/18/2019 Painting Procedure Approved.

    12/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    11 of 17

    SPESPE

     

  • 8/18/2019 Painting Procedure Approved.

    13/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    12 of 17

    SPESPE

     

  • 8/18/2019 Painting Procedure Approved.

    14/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    13 of 17

    SPESPE

     

  • 8/18/2019 Painting Procedure Approved.

    15/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    14 of 17

    SPESPE

     

  • 8/18/2019 Painting Procedure Approved.

    16/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    15 of 17

    SPESPE

     

  • 8/18/2019 Painting Procedure Approved.

    17/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    16 of 17

    SPESPE

     

  • 8/18/2019 Painting Procedure Approved.

    18/18

    Document No.  SPE-85-PR-SP&P-01

    Rev. No. 3

    Date 21.03.11

    PROCEDURE FOR SURFACEPREPARATION AND

    PAINTINGPage

    17 of 17

    SPESPE