Pages: From: Company: Phone No: CC · P:\13010.100_Berkeley...
Transcript of Pages: From: Company: Phone No: CC · P:\13010.100_Berkeley...
The Residences At Berkeley Plaza
1 of 4
P:\13010.100_Berkeley Plaza_MVE\1_General\4_Correspondence\Memo & Letter\C3 Storm Water Calculation Summary\Memorandum.doc
SAN FRANCISCO
855 Folsom St, Unit 142
San Francisco, CA 94107
Tel: (415) 837-1336
Fax: (415) 837-1354
OAKLAND
1330 Broadway, Suite 952
Oakland, CA 94612
Tel: (510) 893-1668
Fax: (510) 893-1669
MEMORANDUM
Date: 2/06/2013 Pages:
4
To: Luis Arambula From:
Paul Boumann
Company: MVEI Company: Telamon Engineering Consultants
Inc.
Phone No: (949) 809-3380 Phone No: (415) 837-1336
CC: Mennor Chan
Project: The Residences At Berkeley Plaza
Subject: C3 Storm Water Discharge Calculations
I. Background:
Telamon Engineering Consultants (TECI) calculated the area and volume required to treat storm water
run-off for 80% of the annual runoff from the project site. The calculations were based on the Alameda
County Clean Water Program, “C.3 Storm Water Technical Guidance”. Since the roof areas will be
treated separately from the court yard areas, these two areas were evaluated independently of each other.
II. Evaluation:
The following tables show the Roof area and Court Yard area requirements along with the flow rates and
volumes generated by a 2 year storm (0.2 inches/hour) for the bio-treatment areas of the subject
conceptual designs. The volumes were calculated using Table 5-3, “ Unit Basin Storage Volumes in
Inches for 80 Percent Capture Using 48-hour Drawdowns”. The “Volume Treatment Value” was
calculated using Region 5 San Francisco, with a mean annual precipitation of 21 inches/year and using
22.5 inches/year for the City of Berkeley. See attached Table 5-3 and “Mean Seasonal Isohyets” map in
Appendices. The “Volume Treatment Value” calculated to 0.78 inches for net areas to be treated. See
“Volume Treatment Calculations” in Appendices.
T E L A M O N E N G I N E E R I N G C O N S U L T A N T S I N C
The residences At Berkeley Plaza
2 of 4
P:\13010.100_Berkeley Plaza_MVE\1_General\4_Correspondence\Memo & Letter\C3 Storm Water Calculation Summary\Memorandum.doc
Treatment Areas:
AREA AREA
TREATED
sf
AREA
TREATED
Acres
REQUIRED
TREATEMENT
AREA
Sf
PROPOSED
TREATEMENT
AREA
sf
Roof 24,193 0.56 968
Roof Landscape
Area
2,900
Court Yard 12,822 0.29 513
Flow Through
Planters
1,196
Flow Rates and Volumes:
III. Assumptions:
The following assumptions were made when generating the calculations above:
1. The landscape areas on the roof will be used as bio-treatment areas. See Exhibit “A” in
Appendices.
2. The flow through planters within the court yard area will be used as bio-treatment areas. See
Exhibit “B” in Appendices.
IV. Conclusion:
Based on the above calculations and assumptions, the Conceptual designs for “The Residences At
Berkeley Plaza” should be able to meet the C3 Storm Water Discharge requirements. The Required
Treatment Area for the roof is 968 square feet and Exhibit “A” shows roughly 2,900 square feet of
landscape area that can potentially be used for bio-treatment area. The required Treatment Area for the
court yard is 513 square feet and Exhibit “B” shows roughly 1,196 square feet of flow through planter
area that can potentially be used for bio-treatment area. The average depth, based on volume, for the bio-
treatment areas are reasonable.
AREA TOTAL
AREA
Sf
LANDSCAPE
AREA
sf
NET
AREA
Sf
AREA
Acres
C CA SUM
CA
UNIT
INTENSITY
FLOW
Q
cfs
Vol.
cf
AVG
Depth
Roof 24,193 2,900 21,193 0.49 0.7 0.34
Roof
Landscape
2,900 2,900 0.07 0.1 .007
Total 0.35 0.2 0.07 1,384 0.48+/-
Court
Yard
12,822 1,196 11,626 0.27 0.7 0.19
Flow
Through
1,196 1,196 0.03 0.1 0.003
Total 0.19 0.2 0.04 756 0.63+/-
T E L A M O N E N G I N E E R I N G C O N S U L T A N T S I N C
The residences At Berkeley Plaza
3 of 4
P:\13010.100_Berkeley Plaza_MVE\1_General\4_Correspondence\Memo & Letter\C3 Storm Water Calculation Summary\Memorandum.doc
The above calculations, assumptions and conclusions are based on Conceptual design plans and therefore
the above results may vary as the design plans become more refined during the design process.
T E L A M O N E N G I N E E R I N G C O N S U L T A N T S I N C
The residences At Berkeley Plaza
4 of 4
P:\13010.100_Berkeley Plaza_MVE\1_General\4_Correspondence\Memo & Letter\C3 Storm Water Calculation Summary\Memorandum.doc
REFERENCES
1. Table 5-3
2. Mean Seasonal Isohyets map
3. Exhibit “A”
4. Exhibit “B”
5. Volume Treatment Calculation