Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
A
11/27/2007
S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
FP 1 $42,736.21 $42,736.21 $42,736.21 $42,736.21 $0.00 $0.00CPM SCHEDULING0110.002
LS 1 $210,178.08 $210,178.08 $300,000.00 $300,000.00 $89,821.92 $89,821.92FIELD OFFICE - TRAILER0130.100
LS 1 $183,908.55 $183,908.55 $75,000.00 $75,000.00 ($108,908.55) ($108,908.55)MAINTENANCE FACILITY0130.174
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00ROADWAY MAINTENANCE0130.300
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00TRAFFIC OFFICERS SERVICES0130.430
AL 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $0.00 $0.00LICENSED SITE PROFESSIONALSERVICES
0160.091
LS 1 $13,554.15 $13,554.15 $176,691.03 $176,691.03 $163,136.88 $163,136.88CLEARING OF SITE0210.000
LS 1 $643,796.35 $643,796.35 $1,242,800.00 $1,242,800.00 $599,003.65 $599,003.65DEMOLITION AND SITEPREPARATION
0210.150
SF 5,000 $5.84 $29,200.00 $1.00 $5,000.00 ($4.84) ($24,200.00)PATCHING AND REPAIRING0211.003
Page 1 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
A
11/27/2007
S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
LS 1 $1,148,821.95 $1,148,821.95 $1,500,000.00 $1,500,000.00 $351,178.05 $351,178.05CONTROLLED DEMOLITION0211.005
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00SITE UTILITIES0211.491
LS 1 $92,238.34 $92,238.34 $75,000.00 $75,000.00 ($17,238.34) ($17,238.34)REMOVE LEAD PAINT0212.153
AL 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $0.00 $0.00ASBESTOS REMOVAL0212.174
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00RODENT CONTROL0213.201
TN 4,545 $79.52 $361,418.40 $42.00 $190,890.00 ($37.52) ($170,528.40)DISPOSE OF CONTAMINATED SOILAT IN-STATE LINED LANDFILL
0221.345
TN 1,694 $133.57 $226,267.58 $0.01 $16.94 ($133.56) ($226,250.64)DISPOSE OF CONTAMINATED SOILIN-STATE RECYCLING FACILITY
0221.347
TN 114 $322.28 $36,739.92 $0.01 $1.14 ($322.27) ($36,738.78)CONTAMINATED SOIL DISPOSAL ATNON-RCRA OUT-OF-STATE LANDFILL
0221.349
CY 3,500 $56.11 $196,385.00 $60.00 $210,000.00 $3.89 $13,615.00UNCLASSIFIED EXCAVATION0222.003
Page 2 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
A
11/27/2007
S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
CY 440 $15.17 $6,674.80 $5.00 $2,200.00 ($10.17) ($4,474.80)TRENCH EXCAVATION - CLASS B0222.151
TN 228 $269.20 $61,377.60 $0.01 $2.28 ($269.19) ($61,375.32)DISPOSE OF RCRA HAZARDOUSWASTE
0222.365
SF 1,000 $33.63 $33,630.00 $0.01 $10.00 ($33.62) ($33,620.00)SUPPORT OF EXCAVATION0222.416
CY 100 $28.05 $2,805.00 $50.00 $5,000.00 $21.95 $2,195.00TEST PITS0222.442
GL 10,000 $0.72 $7,200.00 $0.01 $100.00 ($0.71) ($7,100.00)DISPOSE OF CONTAMINATEDGROUNDWATER
0222.460
CY 300 $23.64 $7,092.00 $0.01 $3.00 ($23.63) ($7,089.00)ORDINARY BORROW0222.501
CY 763 $27.00 $20,601.00 $70.00 $53,410.00 $43.00 $32,809.00GRAVEL BORROW0222.504
EA 3 $347.27 $1,041.81 $400.00 $1,200.00 $52.73 $158.19FRAMES AND GRATES OR COVERSREMOVE AND RESET
0222.542
TN 323 $53.15 $17,167.45 $100.00 $32,300.00 $46.85 $15,132.55CRUSHED STONE FORDRAIN REVET
0222.603
Page 3 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
A
11/27/2007
S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
TN 120 $31.67 $3,800.40 $150.00 $18,000.00 $118.33 $14,199.60STONE BALLAST0222.614
TN 179 $57.31 $10,258.49 $40.00 $7,160.00 ($17.31) ($3,098.49)DENSE GRADED CRUSHED STONE0222.619
TN 188 $17.00 $3,196.00 $85.00 $15,980.00 $68.00 $12,784.00CRUSHED STONE - BACKFILL0222.629
SY 2,462 $6.76 $16,643.12 $2.25 $5,539.50 ($4.51) ($11,103.62)FILTER FABRIC0227.007
LB 17,100 $2.74 $46,854.00 $0.01 $171.00 ($2.73) ($46,683.00)CALCIUM CHLORIDE FORDUST CONTROL
0227.100
EA 6 $565.99 $3,395.94 $500.00 $3,000.00 ($65.99) ($395.94)BOLLARDS0234.195
CY 848 $1,843.87 $1,563,601.76 $1,500.00 $1,272,000.00 ($343.87) ($291,601.76)CAISSONS0235.102
LF 715 $17.40 $12,441.00 $50.00 $35,750.00 $32.60 $23,309.0012" CORRUGATED POLYETHYLENEPIPE
0251.093
LF 20 $35.67 $713.40 $95.00 $1,900.00 $59.33 $1,186.608" PVC PIPE0251.591
Page 4 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
A
11/27/2007
S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
LF 20 $123.85 $2,477.00 $100.00 $2,000.00 ($23.85) ($477.00)6" CAST-IRON PIPE0251.640
LF 100 $282.66 $28,266.00 $30.00 $3,000.00 ($252.66) ($25,266.00)8" CAST IRON PIPE - CLASS 500251.708
LF 188 $50.87 $9,563.56 $75.00 $14,100.00 $24.13 $4,536.448" DUCTILE IRON PIPE0251.770
LF 84 $74.36 $6,246.24 $50.00 $4,200.00 ($24.36) ($2,046.24)TRENCH DRAIN0253.948
EA 2 $39,280.17 $78,560.34 $50,000.00 $100,000.00 $10,719.83 $21,439.66OIL/WATER SEPARATOR0255.070
EA 2 $406.77 $813.54 $500.00 $1,000.00 $93.23 $186.46CLEANOUTS0255.129
TN 24 $259.35 $6,224.40 $192.50 $4,620.00 ($66.85) ($1,604.40)BITUMINOUS CONCRETE BERM0261.140
SY 250 $23.49 $5,872.50 $96.50 $24,125.00 $73.01 $18,252.50REPAIR EXISTING BITUMINOUSCONCRETE PAVEMENT
0261.146
TN 148 $93.06 $13,772.88 $85.00 $12,580.00 ($8.06) ($1,192.88)CLASS I, BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 BINDERCOURSE
0261.197
Page 5 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
A
11/27/2007
S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
TN 148 $101.52 $15,024.96 $85.00 $12,580.00 ($16.52) ($2,444.96)CLASS I, BITUMINOUS CONCRETEPAVEMENT TYPE I-1,TOP COURSE
0261.200
TN 332 $61.42 $20,391.44 $85.00 $28,220.00 $23.58 $7,828.56CLASS I BITUMINOUS CONCRETEPAVEMENT TYPE I-1BASE COURSE
0261.201
CY 61 $1,194.27 $72,850.47 $120.00 $7,320.00 ($1,074.27) ($65,530.47)CONCRETE SIDEWALKS0263.160
LF 390 $38.32 $14,944.80 $33.00 $12,870.00 ($5.32) ($2,074.80)72" CHAIN LINK FENCE0271.700
SY 2,118 $1.12 $2,372.16 $1.85 $3,918.30 $0.73 $1,546.14SEEDING0282.150
LF 310 $5.31 $1,646.10 $6.00 $1,860.00 $0.69 $213.90BALES OF HAYFOR EROSION CONTROL
0282.211
LF 310 $5.73 $1,776.30 $5.00 $1,550.00 ($0.73) ($226.30)SILT FENCE FOR EROSION CONTROL0282.220
CY 100 $28.46 $2,846.00 $35.00 $3,500.00 $6.54 $654.00TOPSOIL0282.256
LS 1 $38,532.35 $38,532.35 $16,200.00 $16,200.00 ($22,332.35) ($22,332.35)PLANTING0284.145
Page 6 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
A
11/27/2007
S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
EA 3 $86,506.15 $259,518.45 $8,000.00 $24,000.00 ($78,506.15) ($235,518.45)RUBBER GRADE CROSSING0290.022
LF 395 $525.17 $207,442.15 $225.00 $88,875.00 ($300.17) ($118,567.15)RAILROAD TRACK CONSTRUCTION0290.100
LF 180 $51.79 $9,322.20 $22.50 $4,050.00 ($29.29) ($5,272.20)RESURFACING AND ALIGNMENT0290.108
LF 395 $51.79 $20,457.05 $25.00 $9,875.00 ($26.79) ($10,582.05)SURFACE AND ALIGN TRACK0290.260
LF 1,181 $57.71 $68,155.51 $100.00 $118,100.00 $42.29 $49,944.49DISMANTLE AND REMOVE TRACK0290.904
EA 1 $125,183.00 $125,183.00 $99,776.00 $99,776.00 ($25,407.00) ($25,407.00)SPECIAL TRACKWORK -200' RADIUS TURNOUTFURNISH AND INSTALL
0291.269
LF 69 $504.44 $34,806.36 $166.00 $11,454.00 ($338.44) ($23,352.36)RESTRAINING RAIL0291.400
EA 4 $504.44 $2,017.76 $675.00 $2,700.00 $170.56 $682.24INSULATED JOINTS0291.800
LF 395 $340.37 $134,446.15 $245.00 $96,775.00 ($95.37) ($37,671.15)TRACK IN CONCRETE FLOOR0292.010
Page 7 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
A
11/27/2007
S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
LF 430 $504.44 $216,909.20 $169.00 $72,670.00 ($335.44) ($144,239.20)PIT TRACK0292.020
CY 100 $139.59 $13,959.00 $121.00 $12,100.00 ($18.59) ($1,859.00)CAST-IN-PLACE PIPE ENCASEMENT0329.908
CY 1,339 $1,496.73 $2,004,121.47 $1,000.00 $1,339,000.00 ($496.73) ($665,121.47)4000 PSI CONCRETE0330.057
LS 1 $302,979.67 $302,979.67 $180,000.00 $180,000.00 ($122,979.67) ($122,979.67)PRECAST CONCRETE PANELS0341.000
SY 280 $46.20 $12,936.00 $15.00 $4,200.00 ($31.20) ($8,736.00)CLEAN AND RESTORE CONCRETE0370.100
LS 1 $385,080.43 $385,080.43 $145,000.00 $145,000.00 ($240,080.43) ($240,080.43)UNIT MASONRY0420.000
SF 468 $50.03 $23,414.04 $25.00 $11,700.00 ($25.03) ($11,714.04)MASONRY RESTORATION0420.102
SF 5,000 $2.40 $12,000.00 $1.00 $5,000.00 ($1.40) ($7,000.00)MASONRY ACID CLEANING,AS REQUIRED
0420.122
LS 1 $667,897.56 $667,897.56 $700,000.00 $700,000.00 $32,102.44 $32,102.44STRUCTURAL METAL0510.000
Page 8 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
A
11/27/2007
S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
LS 1 $373,581.61 $373,581.61 $317,030.00 $317,030.00 ($56,551.61) ($56,551.61)METAL DECKING0530.000
LS 1 $423,446.86 $423,446.86 $220,030.00 $220,030.00 ($203,416.86) ($203,416.86)MISCELLANEOUS METALS0550.000
SY 859 $76.69 $65,876.71 $15.40 $13,228.60 ($61.29) ($52,648.11)WATERPROOFING0710.050
SY 56 $208.03 $11,649.68 $29.00 $1,624.00 ($179.03) ($10,025.68)CEMENTITIOUS WATERPROOFING0718.004
LS 1 $1,200,000.00 $1,200,000.00 $1,148,290.00 $1,148,290.00 ($51,710.00) ($51,710.00)BUILT-UP BITUMINOUS ROOFING- CARHOUSE
0751.010
LS 1 $105,475.83 $105,475.83 $12,000.00 $12,000.00 ($93,475.83) ($93,475.83)CAULKING AND SEALANTS- R.T. SHOP
0790.001
LS 1 $15,597.79 $15,597.79 $5,000.00 $5,000.00 ($10,597.79) ($10,597.79)ELASTOMERIC EXPANSION JOINT0790.101
EA 4 $1,121.33 $4,485.32 $500.00 $2,000.00 ($621.33) ($2,485.32)METAL DOORS AND FRAMES0810.002
EA 14 $7,894.04 $110,516.56 $1,775.00 $24,850.00 ($6,119.04) ($85,666.56)HOLLOW METAL DOORS ANDFRAMES
0811.002
Page 9 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
A
11/27/2007
S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
LS 1 $8,526.26 $8,526.26 $6,380.00 $6,380.00 ($2,146.26) ($2,146.26)COILING DOORS AND GRILLES0833.000
LS 1 $22,090.03 $22,090.03 $45,000.00 $45,000.00 $22,909.97 $22,909.97OVERHEAD DOORS0836.000
LS 1 $4,780.18 $4,780.18 $5,500.00 $5,500.00 $719.82 $719.82GYPSUM DRYWALL0925.000
LS 1 $2,633.71 $2,633.71 $2,500.00 $2,500.00 ($133.71) ($133.71)TILE WORK0930.000
LS 1 $11,188.02 $11,188.02 $7,000.00 $7,000.00 ($4,188.02) ($4,188.02)ACOUSTICAL PANELS0950.005
LS 1 $15,056.79 $15,056.79 $7,500.00 $7,500.00 ($7,556.79) ($7,556.79)RESILIENT FLOOR AND BASE0964.990
LS 1 $45,102.61 $45,102.61 $32,000.00 $32,000.00 ($13,102.61) ($13,102.61)PAINTING0990.000
EA 4 $95.75 $383.00 $250.00 $1,000.00 $154.25 $617.00FIRE EXTINGUISHERS1025.100
LF 440 $2.35 $1,034.00 $2.75 $1,210.00 $0.40 $176.004" REFLECTORIZED WHITE LINE1040.700
Page 10 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
A
11/27/2007
S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
LS 1 $19,461.89 $19,461.89 $13,000.00 $13,000.00 ($6,461.89) ($6,461.89)SIGNAGE1042.012
LS 1 $14,021.54 $14,021.54 $15,500.00 $15,500.00 $1,478.46 $1,478.46LOCKERS AND BENCHES1050.151
LS 1 $75,351.74 $75,351.74 $15,000.00 $15,000.00 ($60,351.74) ($60,351.74)MESH PARTITIONS1053.000
LS 1 $4,269.56 $4,269.56 $1,500.00 $1,500.00 ($2,769.56) ($2,769.56)TOILET ACCESSORIES1080.000
LS 1 $72,444.60 $72,444.60 $150,000.00 $150,000.00 $77,555.40 $77,555.40MECHANICAL DEMOLITION1500.440
LS 1 $457,535.55 $457,535.55 $410,000.00 $410,000.00 ($47,535.55) ($47,535.55)MECHANICAL WORK1500.500
LS 1 $305,259.34 $305,259.34 $331,000.00 $331,000.00 $25,740.66 $25,740.66PLUMBING1501.000
LS 1 $151,937.35 $151,937.35 $130,000.00 $130,000.00 ($21,937.35) ($21,937.35)FIRE PROTECTION1502.000
LB 300 $14.23 $4,269.00 $3.00 $900.00 ($11.23) ($3,369.00)ACTIVATED CARBON1597.422
Page 11 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
A
11/27/2007
S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
DY 60 $213.48 $12,808.80 $50.00 $3,000.00 ($163.48) ($9,808.80)GROUNDWATER TREATMENTSYSTEM OPERATION
1597.525
LS 1 $1,524,304.16 $1,524,304.16 $800,000.00 $800,000.00 ($724,304.16) ($724,304.16)ELECTRICAL WORK1600.500
LS 1 $22,308.27 $22,308.27 $10,000.00 $10,000.00 ($12,308.27) ($12,308.27)ELECTRICAL SNOW MELTINGSYSTEM
1683.000
LS 1 $983,596.90 $983,596.90 $715,000.00 $715,000.00 ($268,596.90) ($268,596.90)TRACTION POWER WORK1696.113
$12,997,822.00 ($2,997,737.00)$15,995,559.00Total Estimate Contract Base Bid:
Page 12 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
A
11/27/2007
S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
Alternate #A01 Line Items
LS 1 $397,957.35 $397,957.35 $254,000.00 $254,000.00 ($143,957.35) ($143,957.35)ALTERNATE NO. 10001.100
$254,000.00 ($143,957.35)$397,957.35Subtotal Alternate # A01:
Page 13 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
A
11/27/2007
S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
Alternate #A02 Line Items
LS 1 $503,232.63 $503,232.63 $337,560.00 $337,560.00 ($165,672.63) ($165,672.63)ALTERNATE NO. 20001.200
$337,560.00 ($165,672.63)$503,232.63Subtotal Alternate # A02:
Page 14 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
A
11/27/2007
S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
Alternate #A03 Line Items
LS 1 $43,014.90 $43,014.90 $101,200.00 $101,200.00 $58,185.10 $58,185.10ALTERNATE NO. 30001.300
$101,200.00 $58,185.10$43,014.90Subtotal Alternate # A03:
$13,690,582.00 ($3,249,181.88)$16,939,763.88Contract Total - Base Bid and Alternates:
Page 15 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
B
11/27/2007
McCOURT CONSTRUCTION CO., INC.
FP 1 $42,736.21 $42,736.21 $42,736.21 $42,736.21 $0.00 $0.00CPM SCHEDULING0110.002
LS 1 $210,178.08 $210,178.08 $120,000.00 $120,000.00 ($90,178.08) ($90,178.08)FIELD OFFICE - TRAILER0130.100
LS 1 $183,908.55 $183,908.55 $120,000.00 $120,000.00 ($63,908.55) ($63,908.55)MAINTENANCE FACILITY0130.174
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00ROADWAY MAINTENANCE0130.300
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00TRAFFIC OFFICERS SERVICES0130.430
AL 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $0.00 $0.00LICENSED SITE PROFESSIONALSERVICES
0160.091
LS 1 $13,554.15 $13,554.15 $50,000.00 $50,000.00 $36,445.85 $36,445.85CLEARING OF SITE0210.000
LS 1 $643,796.35 $643,796.35 $200,000.00 $200,000.00 ($443,796.35) ($443,796.35)DEMOLITION AND SITEPREPARATION
0210.150
SF 5,000 $5.84 $29,200.00 $1.00 $5,000.00 ($4.84) ($24,200.00)PATCHING AND REPAIRING0211.003
Page 16 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
B
11/27/2007
McCOURT CONSTRUCTION CO., INC.
LS 1 $1,148,821.95 $1,148,821.95 $1,200,000.00 $1,200,000.00 $51,178.05 $51,178.05CONTROLLED DEMOLITION0211.005
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00SITE UTILITIES0211.491
LS 1 $92,238.34 $92,238.34 $10,000.00 $10,000.00 ($82,238.34) ($82,238.34)REMOVE LEAD PAINT0212.153
AL 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $0.00 $0.00ASBESTOS REMOVAL0212.174
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00RODENT CONTROL0213.201
TN 4,545 $79.52 $361,418.40 $35.00 $159,075.00 ($44.52) ($202,343.40)DISPOSE OF CONTAMINATED SOILAT IN-STATE LINED LANDFILL
0221.345
TN 1,694 $133.57 $226,267.58 $45.00 $76,230.00 ($88.57) ($150,037.58)DISPOSE OF CONTAMINATED SOILIN-STATE RECYCLING FACILITY
0221.347
TN 114 $322.28 $36,739.92 $100.00 $11,400.00 ($222.28) ($25,339.92)CONTAMINATED SOIL DISPOSAL ATNON-RCRA OUT-OF-STATE LANDFILL
0221.349
CY 3,500 $56.11 $196,385.00 $81.00 $283,500.00 $24.89 $87,115.00UNCLASSIFIED EXCAVATION0222.003
Page 17 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
B
11/27/2007
McCOURT CONSTRUCTION CO., INC.
CY 440 $15.17 $6,674.80 $27.00 $11,880.00 $11.83 $5,205.20TRENCH EXCAVATION - CLASS B0222.151
TN 228 $269.20 $61,377.60 $220.00 $50,160.00 ($49.20) ($11,217.60)DISPOSE OF RCRA HAZARDOUSWASTE
0222.365
SF 1,000 $33.63 $33,630.00 $20.00 $20,000.00 ($13.63) ($13,630.00)SUPPORT OF EXCAVATION0222.416
CY 100 $28.05 $2,805.00 $180.00 $18,000.00 $151.95 $15,195.00TEST PITS0222.442
GL 10,000 $0.72 $7,200.00 $2.00 $20,000.00 $1.28 $12,800.00DISPOSE OF CONTAMINATEDGROUNDWATER
0222.460
CY 300 $23.64 $7,092.00 $27.00 $8,100.00 $3.36 $1,008.00ORDINARY BORROW0222.501
CY 763 $27.00 $20,601.00 $54.00 $41,202.00 $27.00 $20,601.00GRAVEL BORROW0222.504
EA 3 $347.27 $1,041.81 $500.00 $1,500.00 $152.73 $458.19FRAMES AND GRATES OR COVERSREMOVE AND RESET
0222.542
TN 323 $53.15 $17,167.45 $54.00 $17,442.00 $0.85 $274.55CRUSHED STONE FORDRAIN REVET
0222.603
Page 18 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
B
11/27/2007
McCOURT CONSTRUCTION CO., INC.
TN 120 $31.67 $3,800.40 $54.00 $6,480.00 $22.33 $2,679.60STONE BALLAST0222.614
TN 179 $57.31 $10,258.49 $54.00 $9,666.00 ($3.31) ($592.49)DENSE GRADED CRUSHED STONE0222.619
TN 188 $17.00 $3,196.00 $54.00 $10,152.00 $37.00 $6,956.00CRUSHED STONE - BACKFILL0222.629
SY 2,462 $6.76 $16,643.12 $3.00 $7,386.00 ($3.76) ($9,257.12)FILTER FABRIC0227.007
LB 17,100 $2.74 $46,854.00 $0.20 $3,420.00 ($2.54) ($43,434.00)CALCIUM CHLORIDE FORDUST CONTROL
0227.100
EA 6 $565.99 $3,395.94 $1,000.00 $6,000.00 $434.01 $2,604.06BOLLARDS0234.195
CY 848 $1,843.87 $1,563,601.76 $600.00 $508,800.00 ($1,243.87) ($1,054,801.76)CAISSONS0235.102
LF 715 $17.40 $12,441.00 $40.00 $28,600.00 $22.60 $16,159.0012" CORRUGATED POLYETHYLENEPIPE
0251.093
LF 20 $35.67 $713.40 $60.00 $1,200.00 $24.33 $486.608" PVC PIPE0251.591
Page 19 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
B
11/27/2007
McCOURT CONSTRUCTION CO., INC.
LF 20 $123.85 $2,477.00 $100.00 $2,000.00 ($23.85) ($477.00)6" CAST-IRON PIPE0251.640
LF 100 $282.66 $28,266.00 $120.00 $12,000.00 ($162.66) ($16,266.00)8" CAST IRON PIPE - CLASS 500251.708
LF 188 $50.87 $9,563.56 $120.00 $22,560.00 $69.13 $12,996.448" DUCTILE IRON PIPE0251.770
LF 84 $74.36 $6,246.24 $300.00 $25,200.00 $225.64 $18,953.76TRENCH DRAIN0253.948
EA 2 $39,280.17 $78,560.34 $50,000.00 $100,000.00 $10,719.83 $21,439.66OIL/WATER SEPARATOR0255.070
EA 2 $406.77 $813.54 $800.00 $1,600.00 $393.23 $786.46CLEANOUTS0255.129
TN 24 $259.35 $6,224.40 $100.00 $2,400.00 ($159.35) ($3,824.40)BITUMINOUS CONCRETE BERM0261.140
SY 250 $23.49 $5,872.50 $100.00 $25,000.00 $76.51 $19,127.50REPAIR EXISTING BITUMINOUSCONCRETE PAVEMENT
0261.146
TN 148 $93.06 $13,772.88 $70.00 $10,360.00 ($23.06) ($3,412.88)CLASS I, BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 BINDERCOURSE
0261.197
Page 20 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
B
11/27/2007
McCOURT CONSTRUCTION CO., INC.
TN 148 $101.52 $15,024.96 $70.00 $10,360.00 ($31.52) ($4,664.96)CLASS I, BITUMINOUS CONCRETEPAVEMENT TYPE I-1,TOP COURSE
0261.200
TN 332 $61.42 $20,391.44 $70.00 $23,240.00 $8.58 $2,848.56CLASS I BITUMINOUS CONCRETEPAVEMENT TYPE I-1BASE COURSE
0261.201
CY 61 $1,194.27 $72,850.47 $200.00 $12,200.00 ($994.27) ($60,650.47)CONCRETE SIDEWALKS0263.160
LF 390 $38.32 $14,944.80 $35.00 $13,650.00 ($3.32) ($1,294.80)72" CHAIN LINK FENCE0271.700
SY 2,118 $1.12 $2,372.16 $1.00 $2,118.00 ($0.12) ($254.16)SEEDING0282.150
LF 310 $5.31 $1,646.10 $10.00 $3,100.00 $4.69 $1,453.90BALES OF HAYFOR EROSION CONTROL
0282.211
LF 310 $5.73 $1,776.30 $3.00 $930.00 ($2.73) ($846.30)SILT FENCE FOR EROSION CONTROL0282.220
CY 100 $28.46 $2,846.00 $27.00 $2,700.00 ($1.46) ($146.00)TOPSOIL0282.256
LS 1 $38,532.35 $38,532.35 $12,000.00 $12,000.00 ($26,532.35) ($26,532.35)PLANTING0284.145
Page 21 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
B
11/27/2007
McCOURT CONSTRUCTION CO., INC.
EA 3 $86,506.15 $259,518.45 $50,000.00 $150,000.00 ($36,506.15) ($109,518.45)RUBBER GRADE CROSSING0290.022
LF 395 $525.17 $207,442.15 $250.00 $98,750.00 ($275.17) ($108,692.15)RAILROAD TRACK CONSTRUCTION0290.100
LF 180 $51.79 $9,322.20 $50.00 $9,000.00 ($1.79) ($322.20)RESURFACING AND ALIGNMENT0290.108
LF 395 $51.79 $20,457.05 $50.00 $19,750.00 ($1.79) ($707.05)SURFACE AND ALIGN TRACK0290.260
LF 1,181 $57.71 $68,155.51 $50.00 $59,050.00 ($7.71) ($9,105.51)DISMANTLE AND REMOVE TRACK0290.904
EA 1 $125,183.00 $125,183.00 $100,000.00 $100,000.00 ($25,183.00) ($25,183.00)SPECIAL TRACKWORK -200' RADIUS TURNOUTFURNISH AND INSTALL
0291.269
LF 69 $504.44 $34,806.36 $100.00 $6,900.00 ($404.44) ($27,906.36)RESTRAINING RAIL0291.400
EA 4 $504.44 $2,017.76 $1,000.00 $4,000.00 $495.56 $1,982.24INSULATED JOINTS0291.800
LF 395 $340.37 $134,446.15 $250.00 $98,750.00 ($90.37) ($35,696.15)TRACK IN CONCRETE FLOOR0292.010
Page 22 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
B
11/27/2007
McCOURT CONSTRUCTION CO., INC.
LF 430 $504.44 $216,909.20 $250.00 $107,500.00 ($254.44) ($109,409.20)PIT TRACK0292.020
CY 100 $139.59 $13,959.00 $200.00 $20,000.00 $60.41 $6,041.00CAST-IN-PLACE PIPE ENCASEMENT0329.908
CY 1,339 $1,496.73 $2,004,121.47 $1,200.00 $1,606,800.00 ($296.73) ($397,321.47)4000 PSI CONCRETE0330.057
LS 1 $302,979.67 $302,979.67 $400,000.00 $400,000.00 $97,020.33 $97,020.33PRECAST CONCRETE PANELS0341.000
SY 280 $46.20 $12,936.00 $10.00 $2,800.00 ($36.20) ($10,136.00)CLEAN AND RESTORE CONCRETE0370.100
LS 1 $385,080.43 $385,080.43 $200,000.00 $200,000.00 ($185,080.43) ($185,080.43)UNIT MASONRY0420.000
SF 468 $50.03 $23,414.04 $24.00 $11,232.00 ($26.03) ($12,182.04)MASONRY RESTORATION0420.102
SF 5,000 $2.40 $12,000.00 $1.00 $5,000.00 ($1.40) ($7,000.00)MASONRY ACID CLEANING,AS REQUIRED
0420.122
LS 1 $667,897.56 $667,897.56 $1,700,000.00 $1,700,000.00 $1,032,102.44 $1,032,102.44STRUCTURAL METAL0510.000
Page 23 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
B
11/27/2007
McCOURT CONSTRUCTION CO., INC.
LS 1 $373,581.61 $373,581.61 $480,000.00 $480,000.00 $106,418.39 $106,418.39METAL DECKING0530.000
LS 1 $423,446.86 $423,446.86 $430,000.00 $430,000.00 $6,553.14 $6,553.14MISCELLANEOUS METALS0550.000
SY 859 $76.69 $65,876.71 $30.00 $25,770.00 ($46.69) ($40,106.71)WATERPROOFING0710.050
SY 56 $208.03 $11,649.68 $130.00 $7,280.00 ($78.03) ($4,369.68)CEMENTITIOUS WATERPROOFING0718.004
LS 1 $1,200,000.00 $1,200,000.00 $2,000,000.00 $2,000,000.00 $800,000.00 $800,000.00BUILT-UP BITUMINOUS ROOFING- CARHOUSE
0751.010
LS 1 $105,475.83 $105,475.83 $10,000.00 $10,000.00 ($95,475.83) ($95,475.83)CAULKING AND SEALANTS- R.T. SHOP
0790.001
LS 1 $15,597.79 $15,597.79 $10,000.00 $10,000.00 ($5,597.79) ($5,597.79)ELASTOMERIC EXPANSION JOINT0790.101
EA 4 $1,121.33 $4,485.32 $500.00 $2,000.00 ($621.33) ($2,485.32)METAL DOORS AND FRAMES0810.002
EA 14 $7,894.04 $110,516.56 $2,500.00 $35,000.00 ($5,394.04) ($75,516.56)HOLLOW METAL DOORS ANDFRAMES
0811.002
Page 24 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
B
11/27/2007
McCOURT CONSTRUCTION CO., INC.
LS 1 $8,526.26 $8,526.26 $5,000.00 $5,000.00 ($3,526.26) ($3,526.26)COILING DOORS AND GRILLES0833.000
LS 1 $22,090.03 $22,090.03 $80,000.00 $80,000.00 $57,909.97 $57,909.97OVERHEAD DOORS0836.000
LS 1 $4,780.18 $4,780.18 $20,000.00 $20,000.00 $15,219.82 $15,219.82GYPSUM DRYWALL0925.000
LS 1 $2,633.71 $2,633.71 $6,000.00 $6,000.00 $3,366.29 $3,366.29TILE WORK0930.000
LS 1 $11,188.02 $11,188.02 $10,000.00 $10,000.00 ($1,188.02) ($1,188.02)ACOUSTICAL PANELS0950.005
LS 1 $15,056.79 $15,056.79 $10,000.00 $10,000.00 ($5,056.79) ($5,056.79)RESILIENT FLOOR AND BASE0964.990
LS 1 $45,102.61 $45,102.61 $70,000.00 $70,000.00 $24,897.39 $24,897.39PAINTING0990.000
EA 4 $95.75 $383.00 $200.00 $800.00 $104.25 $417.00FIRE EXTINGUISHERS1025.100
LF 440 $2.35 $1,034.00 $2.00 $880.00 ($0.35) ($154.00)4" REFLECTORIZED WHITE LINE1040.700
Page 25 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
B
11/27/2007
McCOURT CONSTRUCTION CO., INC.
LS 1 $19,461.89 $19,461.89 $30,000.00 $30,000.00 $10,538.11 $10,538.11SIGNAGE1042.012
LS 1 $14,021.54 $14,021.54 $15,000.00 $15,000.00 $978.46 $978.46LOCKERS AND BENCHES1050.151
LS 1 $75,351.74 $75,351.74 $10,000.00 $10,000.00 ($65,351.74) ($65,351.74)MESH PARTITIONS1053.000
LS 1 $4,269.56 $4,269.56 $1,000.00 $1,000.00 ($3,269.56) ($3,269.56)TOILET ACCESSORIES1080.000
LS 1 $72,444.60 $72,444.60 $100,000.00 $100,000.00 $27,555.40 $27,555.40MECHANICAL DEMOLITION1500.440
LS 1 $457,535.55 $457,535.55 $800,000.00 $800,000.00 $342,464.45 $342,464.45MECHANICAL WORK1500.500
LS 1 $305,259.34 $305,259.34 $800,000.00 $800,000.00 $494,740.66 $494,740.66PLUMBING1501.000
LS 1 $151,937.35 $151,937.35 $200,000.00 $200,000.00 $48,062.65 $48,062.65FIRE PROTECTION1502.000
LB 300 $14.23 $4,269.00 $5.00 $1,500.00 ($9.23) ($2,769.00)ACTIVATED CARBON1597.422
Page 26 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
B
11/27/2007
McCOURT CONSTRUCTION CO., INC.
DY 60 $213.48 $12,808.80 $500.00 $30,000.00 $286.52 $17,191.20GROUNDWATER TREATMENTSYSTEM OPERATION
1597.525
LS 1 $1,524,304.16 $1,524,304.16 $900,000.00 $900,000.00 ($624,304.16) ($624,304.16)ELECTRICAL WORK1600.500
LS 1 $22,308.27 $22,308.27 $20,000.00 $20,000.00 ($2,308.27) ($2,308.27)ELECTRICAL SNOW MELTINGSYSTEM
1683.000
LS 1 $983,596.90 $983,596.90 $530,000.00 $530,000.00 ($453,596.90) ($453,596.90)TRACTION POWER WORK1696.113
$14,669,109.21 ($1,326,449.79)$15,995,559.00Total Estimate Contract Base Bid:
Page 27 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
B
11/27/2007
McCOURT CONSTRUCTION CO., INC.
Alternate #A01 Line Items
LS 1 $397,957.35 $397,957.35 $346,000.00 $346,000.00 ($51,957.35) ($51,957.35)ALTERNATE NO. 10001.100
$346,000.00 ($51,957.35)$397,957.35Subtotal Alternate # A01:
Page 28 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
B
11/27/2007
McCOURT CONSTRUCTION CO., INC.
Alternate #A02 Line Items
LS 1 $503,232.63 $503,232.63 $580,000.00 $580,000.00 $76,767.37 $76,767.37ALTERNATE NO. 20001.200
$580,000.00 $76,767.37$503,232.63Subtotal Alternate # A02:
Page 29 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
B
11/27/2007
McCOURT CONSTRUCTION CO., INC.
Alternate #A03 Line Items
LS 1 $43,014.90 $43,014.90 $215,000.00 $215,000.00 $171,985.10 $171,985.10ALTERNATE NO. 30001.300
$215,000.00 $171,985.10$43,014.90Subtotal Alternate # A03:
$15,810,109.21 ($1,129,654.67)$16,939,763.88Contract Total - Base Bid and Alternates:
Page 30 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
C
11/27/2007
W.T. RICH COMPANY, INC.
FP 1 $42,736.21 $42,736.21 $42,736.21 $42,736.21 $0.00 $0.00CPM SCHEDULING0110.002
LS 1 $210,178.08 $210,178.08 $190,685.00 $190,685.00 ($19,493.08) ($19,493.08)FIELD OFFICE - TRAILER0130.100
LS 1 $183,908.55 $183,908.55 $158,651.00 $158,651.00 ($25,257.55) ($25,257.55)MAINTENANCE FACILITY0130.174
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00ROADWAY MAINTENANCE0130.300
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00TRAFFIC OFFICERS SERVICES0130.430
AL 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $0.00 $0.00LICENSED SITE PROFESSIONALSERVICES
0160.091
LS 1 $13,554.15 $13,554.15 $162,000.00 $162,000.00 $148,445.85 $148,445.85CLEARING OF SITE0210.000
LS 1 $643,796.35 $643,796.35 $402,800.00 $402,800.00 ($240,996.35) ($240,996.35)DEMOLITION AND SITEPREPARATION
0210.150
SF 5,000 $5.84 $29,200.00 $17.00 $85,000.00 $11.16 $55,800.00PATCHING AND REPAIRING0211.003
Page 31 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
C
11/27/2007
W.T. RICH COMPANY, INC.
LS 1 $1,148,821.95 $1,148,821.95 $1,345,500.00 $1,345,500.00 $196,678.05 $196,678.05CONTROLLED DEMOLITION0211.005
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00SITE UTILITIES0211.491
LS 1 $92,238.34 $92,238.34 $55,000.00 $55,000.00 ($37,238.34) ($37,238.34)REMOVE LEAD PAINT0212.153
AL 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $0.00 $0.00ASBESTOS REMOVAL0212.174
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00RODENT CONTROL0213.201
TN 4,545 $79.52 $361,418.40 $33.00 $149,985.00 ($46.52) ($211,433.40)DISPOSE OF CONTAMINATED SOILAT IN-STATE LINED LANDFILL
0221.345
TN 1,694 $133.57 $226,267.58 $39.00 $66,066.00 ($94.57) ($160,201.58)DISPOSE OF CONTAMINATED SOILIN-STATE RECYCLING FACILITY
0221.347
TN 114 $322.28 $36,739.92 $94.00 $10,716.00 ($228.28) ($26,023.92)CONTAMINATED SOIL DISPOSAL ATNON-RCRA OUT-OF-STATE LANDFILL
0221.349
CY 3,500 $56.11 $196,385.00 $65.00 $227,500.00 $8.89 $31,115.00UNCLASSIFIED EXCAVATION0222.003
Page 32 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
C
11/27/2007
W.T. RICH COMPANY, INC.
CY 440 $15.17 $6,674.80 $43.00 $18,920.00 $27.83 $12,245.20TRENCH EXCAVATION - CLASS B0222.151
TN 228 $269.20 $61,377.60 $330.00 $75,240.00 $60.80 $13,862.40DISPOSE OF RCRA HAZARDOUSWASTE
0222.365
SF 1,000 $33.63 $33,630.00 $88.00 $88,000.00 $54.37 $54,370.00SUPPORT OF EXCAVATION0222.416
CY 100 $28.05 $2,805.00 $149.00 $14,900.00 $120.95 $12,095.00TEST PITS0222.442
GL 10,000 $0.72 $7,200.00 $1.00 $10,000.00 $0.28 $2,800.00DISPOSE OF CONTAMINATEDGROUNDWATER
0222.460
CY 300 $23.64 $7,092.00 $30.00 $9,000.00 $6.36 $1,908.00ORDINARY BORROW0222.501
CY 763 $27.00 $20,601.00 $42.00 $32,046.00 $15.00 $11,445.00GRAVEL BORROW0222.504
EA 3 $347.27 $1,041.81 $649.00 $1,947.00 $301.73 $905.19FRAMES AND GRATES OR COVERSREMOVE AND RESET
0222.542
TN 323 $53.15 $17,167.45 $27.00 $8,721.00 ($26.15) ($8,446.45)CRUSHED STONE FORDRAIN REVET
0222.603
Page 33 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
C
11/27/2007
W.T. RICH COMPANY, INC.
TN 120 $31.67 $3,800.40 $66.00 $7,920.00 $34.33 $4,119.60STONE BALLAST0222.614
TN 179 $57.31 $10,258.49 $51.00 $9,129.00 ($6.31) ($1,129.49)DENSE GRADED CRUSHED STONE0222.619
TN 188 $17.00 $3,196.00 $20.00 $3,760.00 $3.00 $564.00CRUSHED STONE - BACKFILL0222.629
SY 2,462 $6.76 $16,643.12 $2.00 $4,924.00 ($4.76) ($11,719.12)FILTER FABRIC0227.007
LB 17,100 $2.74 $46,854.00 $1.00 $17,100.00 ($1.74) ($29,754.00)CALCIUM CHLORIDE FORDUST CONTROL
0227.100
EA 6 $565.99 $3,395.94 $880.00 $5,280.00 $314.01 $1,884.06BOLLARDS0234.195
CY 848 $1,843.87 $1,563,601.76 $1,115.00 $945,520.00 ($728.87) ($618,081.76)CAISSONS0235.102
LF 715 $17.40 $12,441.00 $44.00 $31,460.00 $26.60 $19,019.0012" CORRUGATED POLYETHYLENEPIPE
0251.093
LF 20 $35.67 $713.40 $62.00 $1,240.00 $26.33 $526.608" PVC PIPE0251.591
Page 34 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
C
11/27/2007
W.T. RICH COMPANY, INC.
LF 20 $123.85 $2,477.00 $79.00 $1,580.00 ($44.85) ($897.00)6" CAST-IRON PIPE0251.640
LF 100 $282.66 $28,266.00 $121.00 $12,100.00 ($161.66) ($16,166.00)8" CAST IRON PIPE - CLASS 500251.708
LF 188 $50.87 $9,563.56 $106.00 $19,928.00 $55.13 $10,364.448" DUCTILE IRON PIPE0251.770
LF 84 $74.36 $6,246.24 $605.00 $50,820.00 $530.64 $44,573.76TRENCH DRAIN0253.948
EA 2 $39,280.17 $78,560.34 $19,800.00 $39,600.00 ($19,480.17) ($38,960.34)OIL/WATER SEPARATOR0255.070
EA 2 $406.77 $813.54 $396.00 $792.00 ($10.77) ($21.54)CLEANOUTS0255.129
TN 24 $259.35 $6,224.40 $149.00 $3,576.00 ($110.35) ($2,648.40)BITUMINOUS CONCRETE BERM0261.140
SY 250 $23.49 $5,872.50 $47.00 $11,750.00 $23.51 $5,877.50REPAIR EXISTING BITUMINOUSCONCRETE PAVEMENT
0261.146
TN 148 $93.06 $13,772.88 $88.00 $13,024.00 ($5.06) ($748.88)CLASS I, BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 BINDERCOURSE
0261.197
Page 35 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
C
11/27/2007
W.T. RICH COMPANY, INC.
TN 148 $101.52 $15,024.96 $88.00 $13,024.00 ($13.52) ($2,000.96)CLASS I, BITUMINOUS CONCRETEPAVEMENT TYPE I-1,TOP COURSE
0261.200
TN 332 $61.42 $20,391.44 $88.00 $29,216.00 $26.58 $8,824.56CLASS I BITUMINOUS CONCRETEPAVEMENT TYPE I-1BASE COURSE
0261.201
CY 61 $1,194.27 $72,850.47 $587.00 $35,807.00 ($607.27) ($37,043.47)CONCRETE SIDEWALKS0263.160
LF 390 $38.32 $14,944.80 $54.00 $21,060.00 $15.68 $6,115.2072" CHAIN LINK FENCE0271.700
SY 2,118 $1.12 $2,372.16 $2.00 $4,236.00 $0.88 $1,863.84SEEDING0282.150
LF 310 $5.31 $1,646.10 $8.00 $2,480.00 $2.69 $833.90BALES OF HAYFOR EROSION CONTROL
0282.211
LF 310 $5.73 $1,776.30 $10.00 $3,100.00 $4.27 $1,323.70SILT FENCE FOR EROSION CONTROL0282.220
CY 100 $28.46 $2,846.00 $50.00 $5,000.00 $21.54 $2,154.00TOPSOIL0282.256
LS 1 $38,532.35 $38,532.35 $23,100.00 $23,100.00 ($15,432.35) ($15,432.35)PLANTING0284.145
Page 36 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
C
11/27/2007
W.T. RICH COMPANY, INC.
EA 3 $86,506.15 $259,518.45 $44,000.00 $132,000.00 ($42,506.15) ($127,518.45)RUBBER GRADE CROSSING0290.022
LF 395 $525.17 $207,442.15 $374.00 $147,730.00 ($151.17) ($59,712.15)RAILROAD TRACK CONSTRUCTION0290.100
LF 180 $51.79 $9,322.20 $33.00 $5,940.00 ($18.79) ($3,382.20)RESURFACING AND ALIGNMENT0290.108
LF 395 $51.79 $20,457.05 $50.00 $19,750.00 ($1.79) ($707.05)SURFACE AND ALIGN TRACK0290.260
LF 1,181 $57.71 $68,155.51 $55.00 $64,955.00 ($2.71) ($3,200.51)DISMANTLE AND REMOVE TRACK0290.904
EA 1 $125,183.00 $125,183.00 $165,000.00 $165,000.00 $39,817.00 $39,817.00SPECIAL TRACKWORK -200' RADIUS TURNOUTFURNISH AND INSTALL
0291.269
LF 69 $504.44 $34,806.36 $440.00 $30,360.00 ($64.44) ($4,446.36)RESTRAINING RAIL0291.400
EA 4 $504.44 $2,017.76 $2,250.00 $9,000.00 $1,745.56 $6,982.24INSULATED JOINTS0291.800
LF 395 $340.37 $134,446.15 $495.00 $195,525.00 $154.63 $61,078.85TRACK IN CONCRETE FLOOR0292.010
Page 37 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
C
11/27/2007
W.T. RICH COMPANY, INC.
LF 430 $504.44 $216,909.20 $275.00 $118,250.00 ($229.44) ($98,659.20)PIT TRACK0292.020
CY 100 $139.59 $13,959.00 $495.00 $49,500.00 $355.41 $35,541.00CAST-IN-PLACE PIPE ENCASEMENT0329.908
CY 1,339 $1,496.73 $2,004,121.47 $766.00 $1,025,674.00 ($730.73) ($978,447.47)4000 PSI CONCRETE0330.057
LS 1 $302,979.67 $302,979.67 $634,700.00 $634,700.00 $331,720.33 $331,720.33PRECAST CONCRETE PANELS0341.000
SY 280 $46.20 $12,936.00 $33.00 $9,240.00 ($13.20) ($3,696.00)CLEAN AND RESTORE CONCRETE0370.100
LS 1 $385,080.43 $385,080.43 $171,600.00 $171,600.00 ($213,480.43) ($213,480.43)UNIT MASONRY0420.000
SF 468 $50.03 $23,414.04 $29.00 $13,572.00 ($21.03) ($9,842.04)MASONRY RESTORATION0420.102
SF 5,000 $2.40 $12,000.00 $7.00 $35,000.00 $4.60 $23,000.00MASONRY ACID CLEANING,AS REQUIRED
0420.122
LS 1 $667,897.56 $667,897.56 $1,278,366.00 $1,278,366.00 $610,468.44 $610,468.44STRUCTURAL METAL0510.000
Page 38 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
C
11/27/2007
W.T. RICH COMPANY, INC.
LS 1 $373,581.61 $373,581.61 $305,800.00 $305,800.00 ($67,781.61) ($67,781.61)METAL DECKING0530.000
LS 1 $423,446.86 $423,446.86 $408,100.00 $408,100.00 ($15,346.86) ($15,346.86)MISCELLANEOUS METALS0550.000
SY 859 $76.69 $65,876.71 $41.00 $35,219.00 ($35.69) ($30,657.71)WATERPROOFING0710.050
SY 56 $208.03 $11,649.68 $172.00 $9,632.00 ($36.03) ($2,017.68)CEMENTITIOUS WATERPROOFING0718.004
LS 1 $1,200,000.00 $1,200,000.00 $1,254,000.00 $1,254,000.00 $54,000.00 $54,000.00BUILT-UP BITUMINOUS ROOFING- CARHOUSE
0751.010
LS 1 $105,475.83 $105,475.83 $41,358.00 $41,358.00 ($64,117.83) ($64,117.83)CAULKING AND SEALANTS- R.T. SHOP
0790.001
LS 1 $15,597.79 $15,597.79 $20,617.00 $20,617.00 $5,019.21 $5,019.21ELASTOMERIC EXPANSION JOINT0790.101
EA 4 $1,121.33 $4,485.32 $550.00 $2,200.00 ($571.33) ($2,285.32)METAL DOORS AND FRAMES0810.002
EA 14 $7,894.04 $110,516.56 $2,750.00 $38,500.00 ($5,144.04) ($72,016.56)HOLLOW METAL DOORS ANDFRAMES
0811.002
Page 39 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
C
11/27/2007
W.T. RICH COMPANY, INC.
LS 1 $8,526.26 $8,526.26 $9,350.00 $9,350.00 $823.74 $823.74COILING DOORS AND GRILLES0833.000
LS 1 $22,090.03 $22,090.03 $66,000.00 $66,000.00 $43,909.97 $43,909.97OVERHEAD DOORS0836.000
LS 1 $4,780.18 $4,780.18 $16,500.00 $16,500.00 $11,719.82 $11,719.82GYPSUM DRYWALL0925.000
LS 1 $2,633.71 $2,633.71 $5,500.00 $5,500.00 $2,866.29 $2,866.29TILE WORK0930.000
LS 1 $11,188.02 $11,188.02 $2,420.00 $2,420.00 ($8,768.02) ($8,768.02)ACOUSTICAL PANELS0950.005
LS 1 $15,056.79 $15,056.79 $16,500.00 $16,500.00 $1,443.21 $1,443.21RESILIENT FLOOR AND BASE0964.990
LS 1 $45,102.61 $45,102.61 $123,464.00 $123,464.00 $78,361.39 $78,361.39PAINTING0990.000
EA 4 $95.75 $383.00 $330.00 $1,320.00 $234.25 $937.00FIRE EXTINGUISHERS1025.100
LF 440 $2.35 $1,034.00 $3.00 $1,320.00 $0.65 $286.004" REFLECTORIZED WHITE LINE1040.700
Page 40 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
C
11/27/2007
W.T. RICH COMPANY, INC.
LS 1 $19,461.89 $19,461.89 $49,500.00 $49,500.00 $30,038.11 $30,038.11SIGNAGE1042.012
LS 1 $14,021.54 $14,021.54 $20,625.00 $20,625.00 $6,603.46 $6,603.46LOCKERS AND BENCHES1050.151
LS 1 $75,351.74 $75,351.74 $16,907.00 $16,907.00 ($58,444.74) ($58,444.74)MESH PARTITIONS1053.000
LS 1 $4,269.56 $4,269.56 $1,650.00 $1,650.00 ($2,619.56) ($2,619.56)TOILET ACCESSORIES1080.000
LS 1 $72,444.60 $72,444.60 $80,500.00 $80,500.00 $8,055.40 $8,055.40MECHANICAL DEMOLITION1500.440
LS 1 $457,535.55 $457,535.55 $855,000.00 $855,000.00 $397,464.45 $397,464.45MECHANICAL WORK1500.500
LS 1 $305,259.34 $305,259.34 $840,972.00 $840,972.00 $535,712.66 $535,712.66PLUMBING1501.000
LS 1 $151,937.35 $151,937.35 $226,600.00 $226,600.00 $74,662.65 $74,662.65FIRE PROTECTION1502.000
LB 300 $14.23 $4,269.00 $4.00 $1,200.00 ($10.23) ($3,069.00)ACTIVATED CARBON1597.422
Page 41 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
C
11/27/2007
W.T. RICH COMPANY, INC.
DY 60 $213.48 $12,808.80 $660.00 $39,600.00 $446.52 $26,791.20GROUNDWATER TREATMENTSYSTEM OPERATION
1597.525
LS 1 $1,524,304.16 $1,524,304.16 $1,020,800.00 $1,020,800.00 ($503,504.16) ($503,504.16)ELECTRICAL WORK1600.500
LS 1 $22,308.27 $22,308.27 $27,500.00 $27,500.00 $5,191.73 $5,191.73ELECTRICAL SNOW MELTINGSYSTEM
1683.000
LS 1 $983,596.90 $983,596.90 $764,500.00 $764,500.00 ($219,096.90) ($219,096.90)TRACTION POWER WORK1696.113
$14,981,255.21 ($1,014,303.79)$15,995,559.00Total Estimate Contract Base Bid:
Page 42 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
C
11/27/2007
W.T. RICH COMPANY, INC.
Alternate #A01 Line Items
LS 1 $397,957.35 $397,957.35 $353,920.00 $353,920.00 ($44,037.35) ($44,037.35)ALTERNATE NO. 10001.100
$353,920.00 ($44,037.35)$397,957.35Subtotal Alternate # A01:
Page 43 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
C
11/27/2007
W.T. RICH COMPANY, INC.
Alternate #A02 Line Items
LS 1 $503,232.63 $503,232.63 $399,537.60 $399,537.60 ($103,695.03) ($103,695.03)ALTERNATE NO. 20001.200
$399,537.60 ($103,695.03)$503,232.63Subtotal Alternate # A02:
Page 44 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
C
11/27/2007
W.T. RICH COMPANY, INC.
Alternate #A03 Line Items
LS 1 $43,014.90 $43,014.90 $76,160.00 $76,160.00 $33,145.10 $33,145.10ALTERNATE NO. 30001.300
$76,160.00 $33,145.10$43,014.90Subtotal Alternate # A03:
$15,810,872.81 ($1,128,891.07)$16,939,763.88Contract Total - Base Bid and Alternates:
Page 45 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
D
11/27/2007
BARLETTA HEAVY DIVISION, INC.
FP 1 $42,736.21 $42,736.21 $42,736.21 $42,736.21 $0.00 $0.00CPM SCHEDULING0110.002
LS 1 $210,178.08 $210,178.08 $150,000.00 $150,000.00 ($60,178.08) ($60,178.08)FIELD OFFICE - TRAILER0130.100
LS 1 $183,908.55 $183,908.55 $215,000.00 $215,000.00 $31,091.45 $31,091.45MAINTENANCE FACILITY0130.174
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00ROADWAY MAINTENANCE0130.300
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00TRAFFIC OFFICERS SERVICES0130.430
AL 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $0.00 $0.00LICENSED SITE PROFESSIONALSERVICES
0160.091
LS 1 $13,554.15 $13,554.15 $75,000.00 $75,000.00 $61,445.85 $61,445.85CLEARING OF SITE0210.000
LS 1 $643,796.35 $643,796.35 $384,699.79 $384,699.79 ($259,096.56) ($259,096.56)DEMOLITION AND SITEPREPARATION
0210.150
SF 5,000 $5.84 $29,200.00 $3.00 $15,000.00 ($2.84) ($14,200.00)PATCHING AND REPAIRING0211.003
Page 46 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
D
11/27/2007
BARLETTA HEAVY DIVISION, INC.
LS 1 $1,148,821.95 $1,148,821.95 $1,000,000.00 $1,000,000.00 ($148,821.95) ($148,821.95)CONTROLLED DEMOLITION0211.005
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00SITE UTILITIES0211.491
LS 1 $92,238.34 $92,238.34 $50,000.00 $50,000.00 ($42,238.34) ($42,238.34)REMOVE LEAD PAINT0212.153
AL 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $0.00 $0.00ASBESTOS REMOVAL0212.174
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00RODENT CONTROL0213.201
TN 4,545 $79.52 $361,418.40 $40.00 $181,800.00 ($39.52) ($179,618.40)DISPOSE OF CONTAMINATED SOILAT IN-STATE LINED LANDFILL
0221.345
TN 1,694 $133.57 $226,267.58 $65.00 $110,110.00 ($68.57) ($116,157.58)DISPOSE OF CONTAMINATED SOILIN-STATE RECYCLING FACILITY
0221.347
TN 114 $322.28 $36,739.92 $125.00 $14,250.00 ($197.28) ($22,489.92)CONTAMINATED SOIL DISPOSAL ATNON-RCRA OUT-OF-STATE LANDFILL
0221.349
CY 3,500 $56.11 $196,385.00 $30.00 $105,000.00 ($26.11) ($91,385.00)UNCLASSIFIED EXCAVATION0222.003
Page 47 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
D
11/27/2007
BARLETTA HEAVY DIVISION, INC.
CY 440 $15.17 $6,674.80 $25.00 $11,000.00 $9.83 $4,325.20TRENCH EXCAVATION - CLASS B0222.151
TN 228 $269.20 $61,377.60 $265.00 $60,420.00 ($4.20) ($957.60)DISPOSE OF RCRA HAZARDOUSWASTE
0222.365
SF 1,000 $33.63 $33,630.00 $65.00 $65,000.00 $31.37 $31,370.00SUPPORT OF EXCAVATION0222.416
CY 100 $28.05 $2,805.00 $60.00 $6,000.00 $31.95 $3,195.00TEST PITS0222.442
GL 10,000 $0.72 $7,200.00 $1.00 $10,000.00 $0.28 $2,800.00DISPOSE OF CONTAMINATEDGROUNDWATER
0222.460
CY 300 $23.64 $7,092.00 $30.00 $9,000.00 $6.36 $1,908.00ORDINARY BORROW0222.501
CY 763 $27.00 $20,601.00 $40.00 $30,520.00 $13.00 $9,919.00GRAVEL BORROW0222.504
EA 3 $347.27 $1,041.81 $500.00 $1,500.00 $152.73 $458.19FRAMES AND GRATES OR COVERSREMOVE AND RESET
0222.542
TN 323 $53.15 $17,167.45 $50.00 $16,150.00 ($3.15) ($1,017.45)CRUSHED STONE FORDRAIN REVET
0222.603
Page 48 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
D
11/27/2007
BARLETTA HEAVY DIVISION, INC.
TN 120 $31.67 $3,800.40 $45.00 $5,400.00 $13.33 $1,599.60STONE BALLAST0222.614
TN 179 $57.31 $10,258.49 $50.00 $8,950.00 ($7.31) ($1,308.49)DENSE GRADED CRUSHED STONE0222.619
TN 188 $17.00 $3,196.00 $30.00 $5,640.00 $13.00 $2,444.00CRUSHED STONE - BACKFILL0222.629
SY 2,462 $6.76 $16,643.12 $2.50 $6,155.00 ($4.26) ($10,488.12)FILTER FABRIC0227.007
LB 17,100 $2.74 $46,854.00 $1.00 $17,100.00 ($1.74) ($29,754.00)CALCIUM CHLORIDE FORDUST CONTROL
0227.100
EA 6 $565.99 $3,395.94 $1,200.00 $7,200.00 $634.01 $3,804.06BOLLARDS0234.195
CY 848 $1,843.87 $1,563,601.76 $1,200.00 $1,017,600.00 ($643.87) ($546,001.76)CAISSONS0235.102
LF 715 $17.40 $12,441.00 $35.00 $25,025.00 $17.60 $12,584.0012" CORRUGATED POLYETHYLENEPIPE
0251.093
LF 20 $35.67 $713.40 $60.00 $1,200.00 $24.33 $486.608" PVC PIPE0251.591
Page 49 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
D
11/27/2007
BARLETTA HEAVY DIVISION, INC.
LF 20 $123.85 $2,477.00 $60.00 $1,200.00 ($63.85) ($1,277.00)6" CAST-IRON PIPE0251.640
LF 100 $282.66 $28,266.00 $90.00 $9,000.00 ($192.66) ($19,266.00)8" CAST IRON PIPE - CLASS 500251.708
LF 188 $50.87 $9,563.56 $95.00 $17,860.00 $44.13 $8,296.448" DUCTILE IRON PIPE0251.770
LF 84 $74.36 $6,246.24 $350.00 $29,400.00 $275.64 $23,153.76TRENCH DRAIN0253.948
EA 2 $39,280.17 $78,560.34 $40,000.00 $80,000.00 $719.83 $1,439.66OIL/WATER SEPARATOR0255.070
EA 2 $406.77 $813.54 $1,900.00 $3,800.00 $1,493.23 $2,986.46CLEANOUTS0255.129
TN 24 $259.35 $6,224.40 $120.00 $2,880.00 ($139.35) ($3,344.40)BITUMINOUS CONCRETE BERM0261.140
SY 250 $23.49 $5,872.50 $65.00 $16,250.00 $41.51 $10,377.50REPAIR EXISTING BITUMINOUSCONCRETE PAVEMENT
0261.146
TN 148 $93.06 $13,772.88 $75.00 $11,100.00 ($18.06) ($2,672.88)CLASS I, BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 BINDERCOURSE
0261.197
Page 50 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
D
11/27/2007
BARLETTA HEAVY DIVISION, INC.
TN 148 $101.52 $15,024.96 $75.00 $11,100.00 ($26.52) ($3,924.96)CLASS I, BITUMINOUS CONCRETEPAVEMENT TYPE I-1,TOP COURSE
0261.200
TN 332 $61.42 $20,391.44 $75.00 $24,900.00 $13.58 $4,508.56CLASS I BITUMINOUS CONCRETEPAVEMENT TYPE I-1BASE COURSE
0261.201
CY 61 $1,194.27 $72,850.47 $300.00 $18,300.00 ($894.27) ($54,550.47)CONCRETE SIDEWALKS0263.160
LF 390 $38.32 $14,944.80 $50.00 $19,500.00 $11.68 $4,555.2072" CHAIN LINK FENCE0271.700
SY 2,118 $1.12 $2,372.16 $3.00 $6,354.00 $1.88 $3,981.84SEEDING0282.150
LF 310 $5.31 $1,646.10 $6.00 $1,860.00 $0.69 $213.90BALES OF HAYFOR EROSION CONTROL
0282.211
LF 310 $5.73 $1,776.30 $10.00 $3,100.00 $4.27 $1,323.70SILT FENCE FOR EROSION CONTROL0282.220
CY 100 $28.46 $2,846.00 $60.00 $6,000.00 $31.54 $3,154.00TOPSOIL0282.256
LS 1 $38,532.35 $38,532.35 $35,000.00 $35,000.00 ($3,532.35) ($3,532.35)PLANTING0284.145
Page 51 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
D
11/27/2007
BARLETTA HEAVY DIVISION, INC.
EA 3 $86,506.15 $259,518.45 $50,000.00 $150,000.00 ($36,506.15) ($109,518.45)RUBBER GRADE CROSSING0290.022
LF 395 $525.17 $207,442.15 $500.00 $197,500.00 ($25.17) ($9,942.15)RAILROAD TRACK CONSTRUCTION0290.100
LF 180 $51.79 $9,322.20 $60.00 $10,800.00 $8.21 $1,477.80RESURFACING AND ALIGNMENT0290.108
LF 395 $51.79 $20,457.05 $60.00 $23,700.00 $8.21 $3,242.95SURFACE AND ALIGN TRACK0290.260
LF 1,181 $57.71 $68,155.51 $60.00 $70,860.00 $2.29 $2,704.49DISMANTLE AND REMOVE TRACK0290.904
EA 1 $125,183.00 $125,183.00 $165,000.00 $165,000.00 $39,817.00 $39,817.00SPECIAL TRACKWORK -200' RADIUS TURNOUTFURNISH AND INSTALL
0291.269
LF 69 $504.44 $34,806.36 $500.00 $34,500.00 ($4.44) ($306.36)RESTRAINING RAIL0291.400
EA 4 $504.44 $2,017.76 $600.00 $2,400.00 $95.56 $382.24INSULATED JOINTS0291.800
LF 395 $340.37 $134,446.15 $400.00 $158,000.00 $59.63 $23,553.85TRACK IN CONCRETE FLOOR0292.010
Page 52 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
D
11/27/2007
BARLETTA HEAVY DIVISION, INC.
LF 430 $504.44 $216,909.20 $250.00 $107,500.00 ($254.44) ($109,409.20)PIT TRACK0292.020
CY 100 $139.59 $13,959.00 $250.00 $25,000.00 $110.41 $11,041.00CAST-IN-PLACE PIPE ENCASEMENT0329.908
CY 1,339 $1,496.73 $2,004,121.47 $1,125.00 $1,506,375.00 ($371.73) ($497,746.47)4000 PSI CONCRETE0330.057
LS 1 $302,979.67 $302,979.67 $500,000.00 $500,000.00 $197,020.33 $197,020.33PRECAST CONCRETE PANELS0341.000
SY 280 $46.20 $12,936.00 $45.00 $12,600.00 ($1.20) ($336.00)CLEAN AND RESTORE CONCRETE0370.100
LS 1 $385,080.43 $385,080.43 $130,000.00 $130,000.00 ($255,080.43) ($255,080.43)UNIT MASONRY0420.000
SF 468 $50.03 $23,414.04 $50.00 $23,400.00 ($0.03) ($14.04)MASONRY RESTORATION0420.102
SF 5,000 $2.40 $12,000.00 $5.00 $25,000.00 $2.60 $13,000.00MASONRY ACID CLEANING,AS REQUIRED
0420.122
LS 1 $667,897.56 $667,897.56 $1,500,000.00 $1,500,000.00 $832,102.44 $832,102.44STRUCTURAL METAL0510.000
Page 53 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
D
11/27/2007
BARLETTA HEAVY DIVISION, INC.
LS 1 $373,581.61 $373,581.61 $300,000.00 $300,000.00 ($73,581.61) ($73,581.61)METAL DECKING0530.000
LS 1 $423,446.86 $423,446.86 $500,000.00 $500,000.00 $76,553.14 $76,553.14MISCELLANEOUS METALS0550.000
SY 859 $76.69 $65,876.71 $75.00 $64,425.00 ($1.69) ($1,451.71)WATERPROOFING0710.050
SY 56 $208.03 $11,649.68 $125.00 $7,000.00 ($83.03) ($4,649.68)CEMENTITIOUS WATERPROOFING0718.004
LS 1 $1,200,000.00 $1,200,000.00 $1,500,000.00 $1,500,000.00 $300,000.00 $300,000.00BUILT-UP BITUMINOUS ROOFING- CARHOUSE
0751.010
LS 1 $105,475.83 $105,475.83 $40,000.00 $40,000.00 ($65,475.83) ($65,475.83)CAULKING AND SEALANTS- R.T. SHOP
0790.001
LS 1 $15,597.79 $15,597.79 $20,000.00 $20,000.00 $4,402.21 $4,402.21ELASTOMERIC EXPANSION JOINT0790.101
EA 4 $1,121.33 $4,485.32 $1,000.00 $4,000.00 ($121.33) ($485.32)METAL DOORS AND FRAMES0810.002
EA 14 $7,894.04 $110,516.56 $2,500.00 $35,000.00 ($5,394.04) ($75,516.56)HOLLOW METAL DOORS ANDFRAMES
0811.002
Page 54 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
D
11/27/2007
BARLETTA HEAVY DIVISION, INC.
LS 1 $8,526.26 $8,526.26 $25,000.00 $25,000.00 $16,473.74 $16,473.74COILING DOORS AND GRILLES0833.000
LS 1 $22,090.03 $22,090.03 $75,000.00 $75,000.00 $52,909.97 $52,909.97OVERHEAD DOORS0836.000
LS 1 $4,780.18 $4,780.18 $15,000.00 $15,000.00 $10,219.82 $10,219.82GYPSUM DRYWALL0925.000
LS 1 $2,633.71 $2,633.71 $2,500.00 $2,500.00 ($133.71) ($133.71)TILE WORK0930.000
LS 1 $11,188.02 $11,188.02 $6,500.00 $6,500.00 ($4,688.02) ($4,688.02)ACOUSTICAL PANELS0950.005
LS 1 $15,056.79 $15,056.79 $16,000.00 $16,000.00 $943.21 $943.21RESILIENT FLOOR AND BASE0964.990
LS 1 $45,102.61 $45,102.61 $125,000.00 $125,000.00 $79,897.39 $79,897.39PAINTING0990.000
EA 4 $95.75 $383.00 $250.00 $1,000.00 $154.25 $617.00FIRE EXTINGUISHERS1025.100
LF 440 $2.35 $1,034.00 $2.00 $880.00 ($0.35) ($154.00)4" REFLECTORIZED WHITE LINE1040.700
Page 55 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
D
11/27/2007
BARLETTA HEAVY DIVISION, INC.
LS 1 $19,461.89 $19,461.89 $15,000.00 $15,000.00 ($4,461.89) ($4,461.89)SIGNAGE1042.012
LS 1 $14,021.54 $14,021.54 $20,000.00 $20,000.00 $5,978.46 $5,978.46LOCKERS AND BENCHES1050.151
LS 1 $75,351.74 $75,351.74 $25,000.00 $25,000.00 ($50,351.74) ($50,351.74)MESH PARTITIONS1053.000
LS 1 $4,269.56 $4,269.56 $4,000.00 $4,000.00 ($269.56) ($269.56)TOILET ACCESSORIES1080.000
LS 1 $72,444.60 $72,444.60 $25,000.00 $25,000.00 ($47,444.60) ($47,444.60)MECHANICAL DEMOLITION1500.440
LS 1 $457,535.55 $457,535.55 $1,000,000.00 $1,000,000.00 $542,464.45 $542,464.45MECHANICAL WORK1500.500
LS 1 $305,259.34 $305,259.34 $600,000.00 $600,000.00 $294,740.66 $294,740.66PLUMBING1501.000
LS 1 $151,937.35 $151,937.35 $210,000.00 $210,000.00 $58,062.65 $58,062.65FIRE PROTECTION1502.000
LB 300 $14.23 $4,269.00 $10.00 $3,000.00 ($4.23) ($1,269.00)ACTIVATED CARBON1597.422
Page 56 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
D
11/27/2007
BARLETTA HEAVY DIVISION, INC.
DY 60 $213.48 $12,808.80 $375.00 $22,500.00 $161.52 $9,691.20GROUNDWATER TREATMENTSYSTEM OPERATION
1597.525
LS 1 $1,524,304.16 $1,524,304.16 $1,000,000.00 $1,000,000.00 ($524,304.16) ($524,304.16)ELECTRICAL WORK1600.500
LS 1 $22,308.27 $22,308.27 $50,000.00 $50,000.00 $27,691.73 $27,691.73ELECTRICAL SNOW MELTINGSYSTEM
1683.000
LS 1 $983,596.90 $983,596.90 $750,000.00 $750,000.00 ($233,596.90) ($233,596.90)TRACTION POWER WORK1696.113
$15,149,500.00 ($846,059.00)$15,995,559.00Total Estimate Contract Base Bid:
Page 57 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
D
11/27/2007
BARLETTA HEAVY DIVISION, INC.
Alternate #A01 Line Items
LS 1 $397,957.35 $397,957.35 $320,000.00 $320,000.00 ($77,957.35) ($77,957.35)ALTERNATE NO. 10001.100
$320,000.00 ($77,957.35)$397,957.35Subtotal Alternate # A01:
Page 58 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
D
11/27/2007
BARLETTA HEAVY DIVISION, INC.
Alternate #A02 Line Items
LS 1 $503,232.63 $503,232.63 $630,000.00 $630,000.00 $126,767.37 $126,767.37ALTERNATE NO. 20001.200
$630,000.00 $126,767.37$503,232.63Subtotal Alternate # A02:
Page 59 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
D
11/27/2007
BARLETTA HEAVY DIVISION, INC.
Alternate #A03 Line Items
LS 1 $43,014.90 $43,014.90 $75,000.00 $75,000.00 $31,985.10 $31,985.10ALTERNATE NO. 30001.300
$75,000.00 $31,985.10$43,014.90Subtotal Alternate # A03:
$16,174,500.00 ($765,263.88)$16,939,763.88Contract Total - Base Bid and Alternates:
Page 60 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
E
11/27/2007
J & J CONTRACTORS, INC.
FP 1 $42,736.21 $42,736.21 $42,736.21 $42,736.21 $0.00 $0.00CPM SCHEDULING0110.002
LS 1 $210,178.08 $210,178.08 $30,000.00 $30,000.00 ($180,178.08) ($180,178.08)FIELD OFFICE - TRAILER0130.100
LS 1 $183,908.55 $183,908.55 $2,950,436.00 $2,950,436.00 $2,766,527.45 $2,766,527.45MAINTENANCE FACILITY0130.174
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00ROADWAY MAINTENANCE0130.300
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00TRAFFIC OFFICERS SERVICES0130.430
AL 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $0.00 $0.00LICENSED SITE PROFESSIONALSERVICES
0160.091
LS 1 $13,554.15 $13,554.15 $13,344.00 $13,344.00 ($210.15) ($210.15)CLEARING OF SITE0210.000
LS 1 $643,796.35 $643,796.35 $598,796.00 $598,796.00 ($45,000.35) ($45,000.35)DEMOLITION AND SITEPREPARATION
0210.150
SF 5,000 $5.84 $29,200.00 $3.00 $15,000.00 ($2.84) ($14,200.00)PATCHING AND REPAIRING0211.003
Page 61 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
E
11/27/2007
J & J CONTRACTORS, INC.
LS 1 $1,148,821.95 $1,148,821.95 $1,078,800.00 $1,078,800.00 ($70,021.95) ($70,021.95)CONTROLLED DEMOLITION0211.005
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00SITE UTILITIES0211.491
LS 1 $92,238.34 $92,238.34 $90,812.00 $90,812.00 ($1,426.34) ($1,426.34)REMOVE LEAD PAINT0212.153
AL 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $0.00 $0.00ASBESTOS REMOVAL0212.174
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00RODENT CONTROL0213.201
TN 4,545 $79.52 $361,418.40 $31.00 $140,895.00 ($48.52) ($220,523.40)DISPOSE OF CONTAMINATED SOILAT IN-STATE LINED LANDFILL
0221.345
TN 1,694 $133.57 $226,267.58 $50.00 $84,700.00 ($83.57) ($141,567.58)DISPOSE OF CONTAMINATED SOILIN-STATE RECYCLING FACILITY
0221.347
TN 114 $322.28 $36,739.92 $80.00 $9,120.00 ($242.28) ($27,619.92)CONTAMINATED SOIL DISPOSAL ATNON-RCRA OUT-OF-STATE LANDFILL
0221.349
CY 3,500 $56.11 $196,385.00 $22.50 $78,750.00 ($33.61) ($117,635.00)UNCLASSIFIED EXCAVATION0222.003
Page 62 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
E
11/27/2007
J & J CONTRACTORS, INC.
CY 440 $15.17 $6,674.80 $20.00 $8,800.00 $4.83 $2,125.20TRENCH EXCAVATION - CLASS B0222.151
TN 228 $269.20 $61,377.60 $210.00 $47,880.00 ($59.20) ($13,497.60)DISPOSE OF RCRA HAZARDOUSWASTE
0222.365
SF 1,000 $33.63 $33,630.00 $35.00 $35,000.00 $1.37 $1,370.00SUPPORT OF EXCAVATION0222.416
CY 100 $28.05 $2,805.00 $40.00 $4,000.00 $11.95 $1,195.00TEST PITS0222.442
GL 10,000 $0.72 $7,200.00 $0.90 $9,000.00 $0.18 $1,800.00DISPOSE OF CONTAMINATEDGROUNDWATER
0222.460
CY 300 $23.64 $7,092.00 $30.00 $9,000.00 $6.36 $1,908.00ORDINARY BORROW0222.501
CY 763 $27.00 $20,601.00 $35.00 $26,705.00 $8.00 $6,104.00GRAVEL BORROW0222.504
EA 3 $347.27 $1,041.81 $400.00 $1,200.00 $52.73 $158.19FRAMES AND GRATES OR COVERSREMOVE AND RESET
0222.542
TN 323 $53.15 $17,167.45 $30.00 $9,690.00 ($23.15) ($7,477.45)CRUSHED STONE FORDRAIN REVET
0222.603
Page 63 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
E
11/27/2007
J & J CONTRACTORS, INC.
TN 120 $31.67 $3,800.40 $30.00 $3,600.00 ($1.67) ($200.40)STONE BALLAST0222.614
TN 179 $57.31 $10,258.49 $30.00 $5,370.00 ($27.31) ($4,888.49)DENSE GRADED CRUSHED STONE0222.619
TN 188 $17.00 $3,196.00 $30.00 $5,640.00 $13.00 $2,444.00CRUSHED STONE - BACKFILL0222.629
SY 2,462 $6.76 $16,643.12 $1.00 $2,462.00 ($5.76) ($14,181.12)FILTER FABRIC0227.007
LB 17,100 $2.74 $46,854.00 $0.60 $10,260.00 ($2.14) ($36,594.00)CALCIUM CHLORIDE FORDUST CONTROL
0227.100
EA 6 $565.99 $3,395.94 $600.00 $3,600.00 $34.01 $204.06BOLLARDS0234.195
CY 848 $1,843.87 $1,563,601.76 $662.00 $561,376.00 ($1,181.87) ($1,002,225.76)CAISSONS0235.102
LF 715 $17.40 $12,441.00 $60.00 $42,900.00 $42.60 $30,459.0012" CORRUGATED POLYETHYLENEPIPE
0251.093
LF 20 $35.67 $713.40 $50.00 $1,000.00 $14.33 $286.608" PVC PIPE0251.591
Page 64 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
E
11/27/2007
J & J CONTRACTORS, INC.
LF 20 $123.85 $2,477.00 $50.00 $1,000.00 ($73.85) ($1,477.00)6" CAST-IRON PIPE0251.640
LF 100 $282.66 $28,266.00 $50.00 $5,000.00 ($232.66) ($23,266.00)8" CAST IRON PIPE - CLASS 500251.708
LF 188 $50.87 $9,563.56 $50.00 $9,400.00 ($0.87) ($163.56)8" DUCTILE IRON PIPE0251.770
LF 84 $74.36 $6,246.24 $400.00 $33,600.00 $325.64 $27,353.76TRENCH DRAIN0253.948
EA 2 $39,280.17 $78,560.34 $20,000.00 $40,000.00 ($19,280.17) ($38,560.34)OIL/WATER SEPARATOR0255.070
EA 2 $406.77 $813.54 $1,500.00 $3,000.00 $1,093.23 $2,186.46CLEANOUTS0255.129
TN 24 $259.35 $6,224.40 $120.00 $2,880.00 ($139.35) ($3,344.40)BITUMINOUS CONCRETE BERM0261.140
SY 250 $23.49 $5,872.50 $25.00 $6,250.00 $1.51 $377.50REPAIR EXISTING BITUMINOUSCONCRETE PAVEMENT
0261.146
TN 148 $93.06 $13,772.88 $70.00 $10,360.00 ($23.06) ($3,412.88)CLASS I, BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 BINDERCOURSE
0261.197
Page 65 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
E
11/27/2007
J & J CONTRACTORS, INC.
TN 148 $101.52 $15,024.96 $70.00 $10,360.00 ($31.52) ($4,664.96)CLASS I, BITUMINOUS CONCRETEPAVEMENT TYPE I-1,TOP COURSE
0261.200
TN 332 $61.42 $20,391.44 $80.00 $26,560.00 $18.58 $6,168.56CLASS I BITUMINOUS CONCRETEPAVEMENT TYPE I-1BASE COURSE
0261.201
CY 61 $1,194.27 $72,850.47 $500.00 $30,500.00 ($694.27) ($42,350.47)CONCRETE SIDEWALKS0263.160
LF 390 $38.32 $14,944.80 $50.00 $19,500.00 $11.68 $4,555.2072" CHAIN LINK FENCE0271.700
SY 2,118 $1.12 $2,372.16 $3.00 $6,354.00 $1.88 $3,981.84SEEDING0282.150
LF 310 $5.31 $1,646.10 $8.00 $2,480.00 $2.69 $833.90BALES OF HAYFOR EROSION CONTROL
0282.211
LF 310 $5.73 $1,776.30 $7.00 $2,170.00 $1.27 $393.70SILT FENCE FOR EROSION CONTROL0282.220
CY 100 $28.46 $2,846.00 $25.00 $2,500.00 ($3.46) ($346.00)TOPSOIL0282.256
LS 1 $38,532.35 $38,532.35 $21,000.00 $21,000.00 ($17,532.35) ($17,532.35)PLANTING0284.145
Page 66 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
E
11/27/2007
J & J CONTRACTORS, INC.
EA 3 $86,506.15 $259,518.45 $18,000.00 $54,000.00 ($68,506.15) ($205,518.45)RUBBER GRADE CROSSING0290.022
LF 395 $525.17 $207,442.15 $270.00 $106,650.00 ($255.17) ($100,792.15)RAILROAD TRACK CONSTRUCTION0290.100
LF 180 $51.79 $9,322.20 $120.00 $21,600.00 $68.21 $12,277.80RESURFACING AND ALIGNMENT0290.108
LF 395 $51.79 $20,457.05 $270.00 $106,650.00 $218.21 $86,192.95SURFACE AND ALIGN TRACK0290.260
LF 1,181 $57.71 $68,155.51 $50.00 $59,050.00 ($7.71) ($9,105.51)DISMANTLE AND REMOVE TRACK0290.904
EA 1 $125,183.00 $125,183.00 $103,000.00 $103,000.00 ($22,183.00) ($22,183.00)SPECIAL TRACKWORK -200' RADIUS TURNOUTFURNISH AND INSTALL
0291.269
LF 69 $504.44 $34,806.36 $180.00 $12,420.00 ($324.44) ($22,386.36)RESTRAINING RAIL0291.400
EA 4 $504.44 $2,017.76 $1,800.00 $7,200.00 $1,295.56 $5,182.24INSULATED JOINTS0291.800
LF 395 $340.37 $134,446.15 $270.00 $106,650.00 ($70.37) ($27,796.15)TRACK IN CONCRETE FLOOR0292.010
Page 67 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
E
11/27/2007
J & J CONTRACTORS, INC.
LF 430 $504.44 $216,909.20 $270.00 $116,100.00 ($234.44) ($100,809.20)PIT TRACK0292.020
CY 100 $139.59 $13,959.00 $300.00 $30,000.00 $160.41 $16,041.00CAST-IN-PLACE PIPE ENCASEMENT0329.908
CY 1,339 $1,496.73 $2,004,121.47 $672.00 $899,808.00 ($824.73) ($1,104,313.47)4000 PSI CONCRETE0330.057
LS 1 $302,979.67 $302,979.67 $577,000.00 $577,000.00 $274,020.33 $274,020.33PRECAST CONCRETE PANELS0341.000
SY 280 $46.20 $12,936.00 $50.00 $14,000.00 $3.80 $1,064.00CLEAN AND RESTORE CONCRETE0370.100
LS 1 $385,080.43 $385,080.43 $156,000.00 $156,000.00 ($229,080.43) ($229,080.43)UNIT MASONRY0420.000
SF 468 $50.03 $23,414.04 $26.00 $12,168.00 ($24.03) ($11,246.04)MASONRY RESTORATION0420.102
SF 5,000 $2.40 $12,000.00 $5.50 $27,500.00 $3.10 $15,500.00MASONRY ACID CLEANING,AS REQUIRED
0420.122
LS 1 $667,897.56 $667,897.56 $1,025,000.00 $1,025,000.00 $357,102.44 $357,102.44STRUCTURAL METAL0510.000
Page 68 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
E
11/27/2007
J & J CONTRACTORS, INC.
LS 1 $373,581.61 $373,581.61 $188,000.00 $188,000.00 ($185,581.61) ($185,581.61)METAL DECKING0530.000
LS 1 $423,446.86 $423,446.86 $430,634.00 $430,634.00 $7,187.14 $7,187.14MISCELLANEOUS METALS0550.000
SY 859 $76.69 $65,876.71 $30.00 $25,770.00 ($46.69) ($40,106.71)WATERPROOFING0710.050
SY 56 $208.03 $11,649.68 $40.00 $2,240.00 ($168.03) ($9,409.68)CEMENTITIOUS WATERPROOFING0718.004
LS 1 $1,200,000.00 $1,200,000.00 $1,340,000.00 $1,340,000.00 $140,000.00 $140,000.00BUILT-UP BITUMINOUS ROOFING- CARHOUSE
0751.010
LS 1 $105,475.83 $105,475.83 $20,000.00 $20,000.00 ($85,475.83) ($85,475.83)CAULKING AND SEALANTS- R.T. SHOP
0790.001
LS 1 $15,597.79 $15,597.79 $5,000.00 $5,000.00 ($10,597.79) ($10,597.79)ELASTOMERIC EXPANSION JOINT0790.101
EA 4 $1,121.33 $4,485.32 $1,000.00 $4,000.00 ($121.33) ($485.32)METAL DOORS AND FRAMES0810.002
EA 14 $7,894.04 $110,516.56 $1,000.00 $14,000.00 ($6,894.04) ($96,516.56)HOLLOW METAL DOORS ANDFRAMES
0811.002
Page 69 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
E
11/27/2007
J & J CONTRACTORS, INC.
LS 1 $8,526.26 $8,526.26 $10,000.00 $10,000.00 $1,473.74 $1,473.74COILING DOORS AND GRILLES0833.000
LS 1 $22,090.03 $22,090.03 $56,700.00 $56,700.00 $34,609.97 $34,609.97OVERHEAD DOORS0836.000
LS 1 $4,780.18 $4,780.18 $10,000.00 $10,000.00 $5,219.82 $5,219.82GYPSUM DRYWALL0925.000
LS 1 $2,633.71 $2,633.71 $2,000.00 $2,000.00 ($633.71) ($633.71)TILE WORK0930.000
LS 1 $11,188.02 $11,188.02 $2,200.00 $2,200.00 ($8,988.02) ($8,988.02)ACOUSTICAL PANELS0950.005
LS 1 $15,056.79 $15,056.79 $12,000.00 $12,000.00 ($3,056.79) ($3,056.79)RESILIENT FLOOR AND BASE0964.990
LS 1 $45,102.61 $45,102.61 $44,405.00 $44,405.00 ($697.61) ($697.61)PAINTING0990.000
EA 4 $95.75 $383.00 $200.00 $800.00 $104.25 $417.00FIRE EXTINGUISHERS1025.100
LF 440 $2.35 $1,034.00 $2.00 $880.00 ($0.35) ($154.00)4" REFLECTORIZED WHITE LINE1040.700
Page 70 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
E
11/27/2007
J & J CONTRACTORS, INC.
LS 1 $19,461.89 $19,461.89 $11,000.00 $11,000.00 ($8,461.89) ($8,461.89)SIGNAGE1042.012
LS 1 $14,021.54 $14,021.54 $18,750.00 $18,750.00 $4,728.46 $4,728.46LOCKERS AND BENCHES1050.151
LS 1 $75,351.74 $75,351.74 $28,000.00 $28,000.00 ($47,351.74) ($47,351.74)MESH PARTITIONS1053.000
LS 1 $4,269.56 $4,269.56 $2,000.00 $2,000.00 ($2,269.56) ($2,269.56)TOILET ACCESSORIES1080.000
LS 1 $72,444.60 $72,444.60 $65,324.00 $65,324.00 ($7,120.60) ($7,120.60)MECHANICAL DEMOLITION1500.440
LS 1 $457,535.55 $457,535.55 $750,000.00 $750,000.00 $292,464.45 $292,464.45MECHANICAL WORK1500.500
LS 1 $305,259.34 $305,259.34 $531,000.00 $531,000.00 $225,740.66 $225,740.66PLUMBING1501.000
LS 1 $151,937.35 $151,937.35 $224,000.00 $224,000.00 $72,062.65 $72,062.65FIRE PROTECTION1502.000
LB 300 $14.23 $4,269.00 $2.50 $750.00 ($11.73) ($3,519.00)ACTIVATED CARBON1597.422
Page 71 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
E
11/27/2007
J & J CONTRACTORS, INC.
DY 60 $213.48 $12,808.80 $1,000.00 $60,000.00 $786.52 $47,191.20GROUNDWATER TREATMENTSYSTEM OPERATION
1597.525
LS 1 $1,524,304.16 $1,524,304.16 $1,200,478.00 $1,200,478.00 ($323,826.16) ($323,826.16)ELECTRICAL WORK1600.500
LS 1 $22,308.27 $22,308.27 $10,246.00 $10,246.00 ($12,062.27) ($12,062.27)ELECTRICAL SNOW MELTINGSYSTEM
1683.000
LS 1 $983,596.90 $983,596.90 $922,840.00 $922,840.00 ($60,756.90) ($60,756.90)TRACTION POWER WORK1696.113
$15,681,599.21 ($313,959.79)$15,995,559.00Total Estimate Contract Base Bid:
Page 72 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
E
11/27/2007
J & J CONTRACTORS, INC.
Alternate #A01 Line Items
LS 1 $397,957.35 $397,957.35 $410,000.00 $410,000.00 $12,042.65 $12,042.65ALTERNATE NO. 10001.100
$410,000.00 $12,042.65$397,957.35Subtotal Alternate # A01:
Page 73 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
E
11/27/2007
J & J CONTRACTORS, INC.
Alternate #A02 Line Items
LS 1 $503,232.63 $503,232.63 $450,000.00 $450,000.00 ($53,232.63) ($53,232.63)ALTERNATE NO. 20001.200
$450,000.00 ($53,232.63)$503,232.63Subtotal Alternate # A02:
Page 74 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
E
11/27/2007
J & J CONTRACTORS, INC.
Alternate #A03 Line Items
LS 1 $43,014.90 $43,014.90 $220,000.00 $220,000.00 $176,985.10 $176,985.10ALTERNATE NO. 30001.300
$220,000.00 $176,985.10$43,014.90Subtotal Alternate # A03:
$16,761,599.21 ($178,164.67)$16,939,763.88Contract Total - Base Bid and Alternates:
Page 75 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
F
11/27/2007
WALSH CONSTRUCTION CO. OF ILLINOIS
FP 1 $42,736.21 $42,736.21 $42,736.21 $42,736.21 $0.00 $0.00CPM SCHEDULING0110.002
LS 1 $210,178.08 $210,178.08 $80,000.00 $80,000.00 ($130,178.08) ($130,178.08)FIELD OFFICE - TRAILER0130.100
LS 1 $183,908.55 $183,908.55 $350,000.00 $350,000.00 $166,091.45 $166,091.45MAINTENANCE FACILITY0130.174
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00ROADWAY MAINTENANCE0130.300
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00TRAFFIC OFFICERS SERVICES0130.430
AL 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $0.00 $0.00LICENSED SITE PROFESSIONALSERVICES
0160.091
LS 1 $13,554.15 $13,554.15 $125,000.00 $125,000.00 $111,445.85 $111,445.85CLEARING OF SITE0210.000
LS 1 $643,796.35 $643,796.35 $1,250,000.00 $1,250,000.00 $606,203.65 $606,203.65DEMOLITION AND SITEPREPARATION
0210.150
SF 5,000 $5.84 $29,200.00 $40.00 $200,000.00 $34.16 $170,800.00PATCHING AND REPAIRING0211.003
Page 76 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
F
11/27/2007
WALSH CONSTRUCTION CO. OF ILLINOIS
LS 1 $1,148,821.95 $1,148,821.95 $1,000,000.00 $1,000,000.00 ($148,821.95) ($148,821.95)CONTROLLED DEMOLITION0211.005
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00SITE UTILITIES0211.491
LS 1 $92,238.34 $92,238.34 $50,000.00 $50,000.00 ($42,238.34) ($42,238.34)REMOVE LEAD PAINT0212.153
AL 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $0.00 $0.00ASBESTOS REMOVAL0212.174
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00RODENT CONTROL0213.201
TN 4,545 $79.52 $361,418.40 $25.00 $113,625.00 ($54.52) ($247,793.40)DISPOSE OF CONTAMINATED SOILAT IN-STATE LINED LANDFILL
0221.345
TN 1,694 $133.57 $226,267.58 $50.00 $84,700.00 ($83.57) ($141,567.58)DISPOSE OF CONTAMINATED SOILIN-STATE RECYCLING FACILITY
0221.347
TN 114 $322.28 $36,739.92 $50.00 $5,700.00 ($272.28) ($31,039.92)CONTAMINATED SOIL DISPOSAL ATNON-RCRA OUT-OF-STATE LANDFILL
0221.349
CY 3,500 $56.11 $196,385.00 $45.00 $157,500.00 ($11.11) ($38,885.00)UNCLASSIFIED EXCAVATION0222.003
Page 77 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
F
11/27/2007
WALSH CONSTRUCTION CO. OF ILLINOIS
CY 440 $15.17 $6,674.80 $15.00 $6,600.00 ($0.17) ($74.80)TRENCH EXCAVATION - CLASS B0222.151
TN 228 $269.20 $61,377.60 $210.00 $47,880.00 ($59.20) ($13,497.60)DISPOSE OF RCRA HAZARDOUSWASTE
0222.365
SF 1,000 $33.63 $33,630.00 $30.00 $30,000.00 ($3.63) ($3,630.00)SUPPORT OF EXCAVATION0222.416
CY 100 $28.05 $2,805.00 $100.00 $10,000.00 $71.95 $7,195.00TEST PITS0222.442
GL 10,000 $0.72 $7,200.00 $1.00 $10,000.00 $0.28 $2,800.00DISPOSE OF CONTAMINATEDGROUNDWATER
0222.460
CY 300 $23.64 $7,092.00 $35.00 $10,500.00 $11.36 $3,408.00ORDINARY BORROW0222.501
CY 763 $27.00 $20,601.00 $45.00 $34,335.00 $18.00 $13,734.00GRAVEL BORROW0222.504
EA 3 $347.27 $1,041.81 $250.00 $750.00 ($97.27) ($291.81)FRAMES AND GRATES OR COVERSREMOVE AND RESET
0222.542
TN 323 $53.15 $17,167.45 $30.00 $9,690.00 ($23.15) ($7,477.45)CRUSHED STONE FORDRAIN REVET
0222.603
Page 78 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
F
11/27/2007
WALSH CONSTRUCTION CO. OF ILLINOIS
TN 120 $31.67 $3,800.40 $100.00 $12,000.00 $68.33 $8,199.60STONE BALLAST0222.614
TN 179 $57.31 $10,258.49 $50.00 $8,950.00 ($7.31) ($1,308.49)DENSE GRADED CRUSHED STONE0222.619
TN 188 $17.00 $3,196.00 $40.00 $7,520.00 $23.00 $4,324.00CRUSHED STONE - BACKFILL0222.629
SY 2,462 $6.76 $16,643.12 $2.00 $4,924.00 ($4.76) ($11,719.12)FILTER FABRIC0227.007
LB 17,100 $2.74 $46,854.00 $0.50 $8,550.00 ($2.24) ($38,304.00)CALCIUM CHLORIDE FORDUST CONTROL
0227.100
EA 6 $565.99 $3,395.94 $500.00 $3,000.00 ($65.99) ($395.94)BOLLARDS0234.195
CY 848 $1,843.87 $1,563,601.76 $1,000.00 $848,000.00 ($843.87) ($715,601.76)CAISSONS0235.102
LF 715 $17.40 $12,441.00 $30.00 $21,450.00 $12.60 $9,009.0012" CORRUGATED POLYETHYLENEPIPE
0251.093
LF 20 $35.67 $713.40 $120.00 $2,400.00 $84.33 $1,686.608" PVC PIPE0251.591
Page 79 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
F
11/27/2007
WALSH CONSTRUCTION CO. OF ILLINOIS
LF 20 $123.85 $2,477.00 $95.00 $1,900.00 ($28.85) ($577.00)6" CAST-IRON PIPE0251.640
LF 100 $282.66 $28,266.00 $110.00 $11,000.00 ($172.66) ($17,266.00)8" CAST IRON PIPE - CLASS 500251.708
LF 188 $50.87 $9,563.56 $55.00 $10,340.00 $4.13 $776.448" DUCTILE IRON PIPE0251.770
LF 84 $74.36 $6,246.24 $500.00 $42,000.00 $425.64 $35,753.76TRENCH DRAIN0253.948
EA 2 $39,280.17 $78,560.34 $5,500.00 $11,000.00 ($33,780.17) ($67,560.34)OIL/WATER SEPARATOR0255.070
EA 2 $406.77 $813.54 $100.00 $200.00 ($306.77) ($613.54)CLEANOUTS0255.129
TN 24 $259.35 $6,224.40 $150.00 $3,600.00 ($109.35) ($2,624.40)BITUMINOUS CONCRETE BERM0261.140
SY 250 $23.49 $5,872.50 $120.00 $30,000.00 $96.51 $24,127.50REPAIR EXISTING BITUMINOUSCONCRETE PAVEMENT
0261.146
TN 148 $93.06 $13,772.88 $75.00 $11,100.00 ($18.06) ($2,672.88)CLASS I, BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 BINDERCOURSE
0261.197
Page 80 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
F
11/27/2007
WALSH CONSTRUCTION CO. OF ILLINOIS
TN 148 $101.52 $15,024.96 $80.00 $11,840.00 ($21.52) ($3,184.96)CLASS I, BITUMINOUS CONCRETEPAVEMENT TYPE I-1,TOP COURSE
0261.200
TN 332 $61.42 $20,391.44 $80.00 $26,560.00 $18.58 $6,168.56CLASS I BITUMINOUS CONCRETEPAVEMENT TYPE I-1BASE COURSE
0261.201
CY 61 $1,194.27 $72,850.47 $500.00 $30,500.00 ($694.27) ($42,350.47)CONCRETE SIDEWALKS0263.160
LF 390 $38.32 $14,944.80 $50.00 $19,500.00 $11.68 $4,555.2072" CHAIN LINK FENCE0271.700
SY 2,118 $1.12 $2,372.16 $2.00 $4,236.00 $0.88 $1,863.84SEEDING0282.150
LF 310 $5.31 $1,646.10 $6.00 $1,860.00 $0.69 $213.90BALES OF HAYFOR EROSION CONTROL
0282.211
LF 310 $5.73 $1,776.30 $9.00 $2,790.00 $3.27 $1,013.70SILT FENCE FOR EROSION CONTROL0282.220
CY 100 $28.46 $2,846.00 $40.00 $4,000.00 $11.54 $1,154.00TOPSOIL0282.256
LS 1 $38,532.35 $38,532.35 $10,000.00 $10,000.00 ($28,532.35) ($28,532.35)PLANTING0284.145
Page 81 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
F
11/27/2007
WALSH CONSTRUCTION CO. OF ILLINOIS
EA 3 $86,506.15 $259,518.45 $35,000.00 $105,000.00 ($51,506.15) ($154,518.45)RUBBER GRADE CROSSING0290.022
LF 395 $525.17 $207,442.15 $200.00 $79,000.00 ($325.17) ($128,442.15)RAILROAD TRACK CONSTRUCTION0290.100
LF 180 $51.79 $9,322.20 $175.00 $31,500.00 $123.21 $22,177.80RESURFACING AND ALIGNMENT0290.108
LF 395 $51.79 $20,457.05 $75.00 $29,625.00 $23.21 $9,167.95SURFACE AND ALIGN TRACK0290.260
LF 1,181 $57.71 $68,155.51 $30.00 $35,430.00 ($27.71) ($32,725.51)DISMANTLE AND REMOVE TRACK0290.904
EA 1 $125,183.00 $125,183.00 $80,000.00 $80,000.00 ($45,183.00) ($45,183.00)SPECIAL TRACKWORK -200' RADIUS TURNOUTFURNISH AND INSTALL
0291.269
LF 69 $504.44 $34,806.36 $750.00 $51,750.00 $245.56 $16,943.64RESTRAINING RAIL0291.400
EA 4 $504.44 $2,017.76 $3,000.00 $12,000.00 $2,495.56 $9,982.24INSULATED JOINTS0291.800
LF 395 $340.37 $134,446.15 $550.00 $217,250.00 $209.63 $82,803.85TRACK IN CONCRETE FLOOR0292.010
Page 82 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
F
11/27/2007
WALSH CONSTRUCTION CO. OF ILLINOIS
LF 430 $504.44 $216,909.20 $200.00 $86,000.00 ($304.44) ($130,909.20)PIT TRACK0292.020
CY 100 $139.59 $13,959.00 $250.00 $25,000.00 $110.41 $11,041.00CAST-IN-PLACE PIPE ENCASEMENT0329.908
CY 1,339 $1,496.73 $2,004,121.47 $950.00 $1,272,050.00 ($546.73) ($732,071.47)4000 PSI CONCRETE0330.057
LS 1 $302,979.67 $302,979.67 $800,000.00 $800,000.00 $497,020.33 $497,020.33PRECAST CONCRETE PANELS0341.000
SY 280 $46.20 $12,936.00 $80.00 $22,400.00 $33.80 $9,464.00CLEAN AND RESTORE CONCRETE0370.100
LS 1 $385,080.43 $385,080.43 $450,000.00 $450,000.00 $64,919.57 $64,919.57UNIT MASONRY0420.000
SF 468 $50.03 $23,414.04 $50.00 $23,400.00 ($0.03) ($14.04)MASONRY RESTORATION0420.102
SF 5,000 $2.40 $12,000.00 $1.50 $7,500.00 ($0.90) ($4,500.00)MASONRY ACID CLEANING,AS REQUIRED
0420.122
LS 1 $667,897.56 $667,897.56 $1,600,000.00 $1,600,000.00 $932,102.44 $932,102.44STRUCTURAL METAL0510.000
Page 83 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
F
11/27/2007
WALSH CONSTRUCTION CO. OF ILLINOIS
LS 1 $373,581.61 $373,581.61 $400,000.00 $400,000.00 $26,418.39 $26,418.39METAL DECKING0530.000
LS 1 $423,446.86 $423,446.86 $430,000.00 $430,000.00 $6,553.14 $6,553.14MISCELLANEOUS METALS0550.000
SY 859 $76.69 $65,876.71 $36.50 $31,353.50 ($40.19) ($34,523.21)WATERPROOFING0710.050
SY 56 $208.03 $11,649.68 $156.00 $8,736.00 ($52.03) ($2,913.68)CEMENTITIOUS WATERPROOFING0718.004
LS 1 $1,200,000.00 $1,200,000.00 $1,500,000.00 $1,500,000.00 $300,000.00 $300,000.00BUILT-UP BITUMINOUS ROOFING- CARHOUSE
0751.010
LS 1 $105,475.83 $105,475.83 $80,000.00 $80,000.00 ($25,475.83) ($25,475.83)CAULKING AND SEALANTS- R.T. SHOP
0790.001
LS 1 $15,597.79 $15,597.79 $5,000.00 $5,000.00 ($10,597.79) ($10,597.79)ELASTOMERIC EXPANSION JOINT0790.101
EA 4 $1,121.33 $4,485.32 $950.00 $3,800.00 ($171.33) ($685.32)METAL DOORS AND FRAMES0810.002
EA 14 $7,894.04 $110,516.56 $1,200.00 $16,800.00 ($6,694.04) ($93,716.56)HOLLOW METAL DOORS ANDFRAMES
0811.002
Page 84 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
F
11/27/2007
WALSH CONSTRUCTION CO. OF ILLINOIS
LS 1 $8,526.26 $8,526.26 $20,000.00 $20,000.00 $11,473.74 $11,473.74COILING DOORS AND GRILLES0833.000
LS 1 $22,090.03 $22,090.03 $75,000.00 $75,000.00 $52,909.97 $52,909.97OVERHEAD DOORS0836.000
LS 1 $4,780.18 $4,780.18 $20,000.00 $20,000.00 $15,219.82 $15,219.82GYPSUM DRYWALL0925.000
LS 1 $2,633.71 $2,633.71 $3,000.00 $3,000.00 $366.29 $366.29TILE WORK0930.000
LS 1 $11,188.02 $11,188.02 $2,200.00 $2,200.00 ($8,988.02) ($8,988.02)ACOUSTICAL PANELS0950.005
LS 1 $15,056.79 $15,056.79 $4,500.00 $4,500.00 ($10,556.79) ($10,556.79)RESILIENT FLOOR AND BASE0964.990
LS 1 $45,102.61 $45,102.61 $100,000.00 $100,000.00 $54,897.39 $54,897.39PAINTING0990.000
EA 4 $95.75 $383.00 $150.00 $600.00 $54.25 $217.00FIRE EXTINGUISHERS1025.100
LF 440 $2.35 $1,034.00 $2.00 $880.00 ($0.35) ($154.00)4" REFLECTORIZED WHITE LINE1040.700
Page 85 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
F
11/27/2007
WALSH CONSTRUCTION CO. OF ILLINOIS
LS 1 $19,461.89 $19,461.89 $12,000.00 $12,000.00 ($7,461.89) ($7,461.89)SIGNAGE1042.012
LS 1 $14,021.54 $14,021.54 $6,000.00 $6,000.00 ($8,021.54) ($8,021.54)LOCKERS AND BENCHES1050.151
LS 1 $75,351.74 $75,351.74 $25,000.00 $25,000.00 ($50,351.74) ($50,351.74)MESH PARTITIONS1053.000
LS 1 $4,269.56 $4,269.56 $7,500.00 $7,500.00 $3,230.44 $3,230.44TOILET ACCESSORIES1080.000
LS 1 $72,444.60 $72,444.60 $125,000.00 $125,000.00 $52,555.40 $52,555.40MECHANICAL DEMOLITION1500.440
LS 1 $457,535.55 $457,535.55 $500,000.00 $500,000.00 $42,464.45 $42,464.45MECHANICAL WORK1500.500
LS 1 $305,259.34 $305,259.34 $250,000.00 $250,000.00 ($55,259.34) ($55,259.34)PLUMBING1501.000
LS 1 $151,937.35 $151,937.35 $250,000.00 $250,000.00 $98,062.65 $98,062.65FIRE PROTECTION1502.000
LB 300 $14.23 $4,269.00 $2.00 $600.00 ($12.23) ($3,669.00)ACTIVATED CARBON1597.422
Page 86 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
F
11/27/2007
WALSH CONSTRUCTION CO. OF ILLINOIS
DY 60 $213.48 $12,808.80 $500.00 $30,000.00 $286.52 $17,191.20GROUNDWATER TREATMENTSYSTEM OPERATION
1597.525
LS 1 $1,524,304.16 $1,524,304.16 $1,000,000.00 $1,000,000.00 ($524,304.16) ($524,304.16)ELECTRICAL WORK1600.500
LS 1 $22,308.27 $22,308.27 $25,000.00 $25,000.00 $2,691.73 $2,691.73ELECTRICAL SNOW MELTINGSYSTEM
1683.000
LS 1 $983,596.90 $983,596.90 $700,000.00 $700,000.00 ($283,596.90) ($283,596.90)TRACTION POWER WORK1696.113
$15,429,110.71 ($566,448.29)$15,995,559.00Total Estimate Contract Base Bid:
Page 87 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
F
11/27/2007
WALSH CONSTRUCTION CO. OF ILLINOIS
Alternate #A01 Line Items
LS 1 $397,957.35 $397,957.35 $500,000.00 $500,000.00 $102,042.65 $102,042.65ALTERNATE NO. 10001.100
$500,000.00 $102,042.65$397,957.35Subtotal Alternate # A01:
Page 88 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
F
11/27/2007
WALSH CONSTRUCTION CO. OF ILLINOIS
Alternate #A02 Line Items
LS 1 $503,232.63 $503,232.63 $750,000.00 $750,000.00 $246,767.37 $246,767.37ALTERNATE NO. 20001.200
$750,000.00 $246,767.37$503,232.63Subtotal Alternate # A02:
Page 89 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
F
11/27/2007
WALSH CONSTRUCTION CO. OF ILLINOIS
Alternate #A03 Line Items
LS 1 $43,014.90 $43,014.90 $100,000.00 $100,000.00 $56,985.10 $56,985.10ALTERNATE NO. 30001.300
$100,000.00 $56,985.10$43,014.90Subtotal Alternate # A03:
$16,779,110.71 ($160,653.17)$16,939,763.88Contract Total - Base Bid and Alternates:
Page 90 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
G
11/27/2007
J.F. WHITE CONTRACTING CO.
FP 1 $42,736.21 $42,736.21 $42,736.21 $42,736.21 $0.00 $0.00CPM SCHEDULING0110.002
LS 1 $210,178.08 $210,178.08 $50,000.00 $50,000.00 ($160,178.08) ($160,178.08)FIELD OFFICE - TRAILER0130.100
LS 1 $183,908.55 $183,908.55 $240,000.00 $240,000.00 $56,091.45 $56,091.45MAINTENANCE FACILITY0130.174
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00ROADWAY MAINTENANCE0130.300
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00TRAFFIC OFFICERS SERVICES0130.430
AL 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $0.00 $0.00LICENSED SITE PROFESSIONALSERVICES
0160.091
LS 1 $13,554.15 $13,554.15 $200,000.00 $200,000.00 $186,445.85 $186,445.85CLEARING OF SITE0210.000
LS 1 $643,796.35 $643,796.35 $300,000.00 $300,000.00 ($343,796.35) ($343,796.35)DEMOLITION AND SITEPREPARATION
0210.150
SF 5,000 $5.84 $29,200.00 $20.00 $100,000.00 $14.16 $70,800.00PATCHING AND REPAIRING0211.003
Page 91 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
G
11/27/2007
J.F. WHITE CONTRACTING CO.
LS 1 $1,148,821.95 $1,148,821.95 $2,925,000.00 $2,925,000.00 $1,776,178.05 $1,776,178.05CONTROLLED DEMOLITION0211.005
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00SITE UTILITIES0211.491
LS 1 $92,238.34 $92,238.34 $71,000.00 $71,000.00 ($21,238.34) ($21,238.34)REMOVE LEAD PAINT0212.153
AL 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $0.00 $0.00ASBESTOS REMOVAL0212.174
AL 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $0.00 $0.00RODENT CONTROL0213.201
TN 4,545 $79.52 $361,418.40 $30.00 $136,350.00 ($49.52) ($225,068.40)DISPOSE OF CONTAMINATED SOILAT IN-STATE LINED LANDFILL
0221.345
TN 1,694 $133.57 $226,267.58 $50.00 $84,700.00 ($83.57) ($141,567.58)DISPOSE OF CONTAMINATED SOILIN-STATE RECYCLING FACILITY
0221.347
TN 114 $322.28 $36,739.92 $80.00 $9,120.00 ($242.28) ($27,619.92)CONTAMINATED SOIL DISPOSAL ATNON-RCRA OUT-OF-STATE LANDFILL
0221.349
CY 3,500 $56.11 $196,385.00 $70.00 $245,000.00 $13.89 $48,615.00UNCLASSIFIED EXCAVATION0222.003
Page 92 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
G
11/27/2007
J.F. WHITE CONTRACTING CO.
CY 440 $15.17 $6,674.80 $39.00 $17,160.00 $23.83 $10,485.20TRENCH EXCAVATION - CLASS B0222.151
TN 228 $269.20 $61,377.60 $200.00 $45,600.00 ($69.20) ($15,777.60)DISPOSE OF RCRA HAZARDOUSWASTE
0222.365
SF 1,000 $33.63 $33,630.00 $20.00 $20,000.00 ($13.63) ($13,630.00)SUPPORT OF EXCAVATION0222.416
CY 100 $28.05 $2,805.00 $310.00 $31,000.00 $281.95 $28,195.00TEST PITS0222.442
GL 10,000 $0.72 $7,200.00 $3.00 $30,000.00 $2.28 $22,800.00DISPOSE OF CONTAMINATEDGROUNDWATER
0222.460
CY 300 $23.64 $7,092.00 $40.00 $12,000.00 $16.36 $4,908.00ORDINARY BORROW0222.501
CY 763 $27.00 $20,601.00 $50.00 $38,150.00 $23.00 $17,549.00GRAVEL BORROW0222.504
EA 3 $347.27 $1,041.81 $600.00 $1,800.00 $252.73 $758.19FRAMES AND GRATES OR COVERSREMOVE AND RESET
0222.542
TN 323 $53.15 $17,167.45 $38.00 $12,274.00 ($15.15) ($4,893.45)CRUSHED STONE FORDRAIN REVET
0222.603
Page 93 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
G
11/27/2007
J.F. WHITE CONTRACTING CO.
TN 120 $31.67 $3,800.40 $56.00 $6,720.00 $24.33 $2,919.60STONE BALLAST0222.614
TN 179 $57.31 $10,258.49 $40.00 $7,160.00 ($17.31) ($3,098.49)DENSE GRADED CRUSHED STONE0222.619
TN 188 $17.00 $3,196.00 $50.00 $9,400.00 $33.00 $6,204.00CRUSHED STONE - BACKFILL0222.629
SY 2,462 $6.76 $16,643.12 $2.50 $6,155.00 ($4.26) ($10,488.12)FILTER FABRIC0227.007
LB 17,100 $2.74 $46,854.00 $0.50 $8,550.00 ($2.24) ($38,304.00)CALCIUM CHLORIDE FORDUST CONTROL
0227.100
EA 6 $565.99 $3,395.94 $1,100.00 $6,600.00 $534.01 $3,204.06BOLLARDS0234.195
CY 848 $1,843.87 $1,563,601.76 $600.00 $508,800.00 ($1,243.87) ($1,054,801.76)CAISSONS0235.102
LF 715 $17.40 $12,441.00 $105.00 $75,075.00 $87.60 $62,634.0012" CORRUGATED POLYETHYLENEPIPE
0251.093
LF 20 $35.67 $713.40 $780.00 $15,600.00 $744.33 $14,886.608" PVC PIPE0251.591
Page 94 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
G
11/27/2007
J.F. WHITE CONTRACTING CO.
LF 20 $123.85 $2,477.00 $135.00 $2,700.00 $11.15 $223.006" CAST-IRON PIPE0251.640
LF 100 $282.66 $28,266.00 $135.00 $13,500.00 ($147.66) ($14,766.00)8" CAST IRON PIPE - CLASS 500251.708
LF 188 $50.87 $9,563.56 $137.00 $25,756.00 $86.13 $16,192.448" DUCTILE IRON PIPE0251.770
LF 84 $74.36 $6,246.24 $512.00 $43,008.00 $437.64 $36,761.76TRENCH DRAIN0253.948
EA 2 $39,280.17 $78,560.34 $48,250.00 $96,500.00 $8,969.83 $17,939.66OIL/WATER SEPARATOR0255.070
EA 2 $406.77 $813.54 $460.00 $920.00 $53.23 $106.46CLEANOUTS0255.129
TN 24 $259.35 $6,224.40 $200.00 $4,800.00 ($59.35) ($1,424.40)BITUMINOUS CONCRETE BERM0261.140
SY 250 $23.49 $5,872.50 $60.00 $15,000.00 $36.51 $9,127.50REPAIR EXISTING BITUMINOUSCONCRETE PAVEMENT
0261.146
TN 148 $93.06 $13,772.88 $100.00 $14,800.00 $6.94 $1,027.12CLASS I, BITUMINOUS CONCRETEPAVEMENT, TYPE I-1 BINDERCOURSE
0261.197
Page 95 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
G
11/27/2007
J.F. WHITE CONTRACTING CO.
TN 148 $101.52 $15,024.96 $100.00 $14,800.00 ($1.52) ($224.96)CLASS I, BITUMINOUS CONCRETEPAVEMENT TYPE I-1,TOP COURSE
0261.200
TN 332 $61.42 $20,391.44 $100.00 $33,200.00 $38.58 $12,808.56CLASS I BITUMINOUS CONCRETEPAVEMENT TYPE I-1BASE COURSE
0261.201
CY 61 $1,194.27 $72,850.47 $450.00 $27,450.00 ($744.27) ($45,400.47)CONCRETE SIDEWALKS0263.160
LF 390 $38.32 $14,944.80 $54.00 $21,060.00 $15.68 $6,115.2072" CHAIN LINK FENCE0271.700
SY 2,118 $1.12 $2,372.16 $1.75 $3,706.50 $0.63 $1,334.34SEEDING0282.150
LF 310 $5.31 $1,646.10 $8.50 $2,635.00 $3.19 $988.90BALES OF HAYFOR EROSION CONTROL
0282.211
LF 310 $5.73 $1,776.30 $6.00 $1,860.00 $0.27 $83.70SILT FENCE FOR EROSION CONTROL0282.220
CY 100 $28.46 $2,846.00 $58.00 $5,800.00 $29.54 $2,954.00TOPSOIL0282.256
LS 1 $38,532.35 $38,532.35 $25,500.00 $25,500.00 ($13,032.35) ($13,032.35)PLANTING0284.145
Page 96 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
G
11/27/2007
J.F. WHITE CONTRACTING CO.
EA 3 $86,506.15 $259,518.45 $65,500.00 $196,500.00 ($21,006.15) ($63,018.45)RUBBER GRADE CROSSING0290.022
LF 395 $525.17 $207,442.15 $350.00 $138,250.00 ($175.17) ($69,192.15)RAILROAD TRACK CONSTRUCTION0290.100
LF 180 $51.79 $9,322.20 $18.00 $3,240.00 ($33.79) ($6,082.20)RESURFACING AND ALIGNMENT0290.108
LF 395 $51.79 $20,457.05 $33.00 $13,035.00 ($18.79) ($7,422.05)SURFACE AND ALIGN TRACK0290.260
LF 1,181 $57.71 $68,155.51 $75.00 $88,575.00 $17.29 $20,419.49DISMANTLE AND REMOVE TRACK0290.904
EA 1 $125,183.00 $125,183.00 $145,000.00 $145,000.00 $19,817.00 $19,817.00SPECIAL TRACKWORK -200' RADIUS TURNOUTFURNISH AND INSTALL
0291.269
LF 69 $504.44 $34,806.36 $230.00 $15,870.00 ($274.44) ($18,936.36)RESTRAINING RAIL0291.400
EA 4 $504.44 $2,017.76 $1,000.00 $4,000.00 $495.56 $1,982.24INSULATED JOINTS0291.800
LF 395 $340.37 $134,446.15 $800.00 $316,000.00 $459.63 $181,553.85TRACK IN CONCRETE FLOOR0292.010
Page 97 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
G
11/27/2007
J.F. WHITE CONTRACTING CO.
LF 430 $504.44 $216,909.20 $210.00 $90,300.00 ($294.44) ($126,609.20)PIT TRACK0292.020
CY 100 $139.59 $13,959.00 $215.00 $21,500.00 $75.41 $7,541.00CAST-IN-PLACE PIPE ENCASEMENT0329.908
CY 1,339 $1,496.73 $2,004,121.47 $950.00 $1,272,050.00 ($546.73) ($732,071.47)4000 PSI CONCRETE0330.057
LS 1 $302,979.67 $302,979.67 $475,000.00 $475,000.00 $172,020.33 $172,020.33PRECAST CONCRETE PANELS0341.000
SY 280 $46.20 $12,936.00 $48.00 $13,440.00 $1.80 $504.00CLEAN AND RESTORE CONCRETE0370.100
LS 1 $385,080.43 $385,080.43 $220,000.00 $220,000.00 ($165,080.43) ($165,080.43)UNIT MASONRY0420.000
SF 468 $50.03 $23,414.04 $50.00 $23,400.00 ($0.03) ($14.04)MASONRY RESTORATION0420.102
SF 5,000 $2.40 $12,000.00 $7.00 $35,000.00 $4.60 $23,000.00MASONRY ACID CLEANING,AS REQUIRED
0420.122
LS 1 $667,897.56 $667,897.56 $950,000.00 $950,000.00 $282,102.44 $282,102.44STRUCTURAL METAL0510.000
Page 98 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
G
11/27/2007
J.F. WHITE CONTRACTING CO.
LS 1 $373,581.61 $373,581.61 $325,000.00 $325,000.00 ($48,581.61) ($48,581.61)METAL DECKING0530.000
LS 1 $423,446.86 $423,446.86 $625,000.00 $625,000.00 $201,553.14 $201,553.14MISCELLANEOUS METALS0550.000
SY 859 $76.69 $65,876.71 $40.00 $34,360.00 ($36.69) ($31,516.71)WATERPROOFING0710.050
SY 56 $208.03 $11,649.68 $160.00 $8,960.00 ($48.03) ($2,689.68)CEMENTITIOUS WATERPROOFING0718.004
LS 1 $1,200,000.00 $1,200,000.00 $1,600,000.00 $1,600,000.00 $400,000.00 $400,000.00BUILT-UP BITUMINOUS ROOFING- CARHOUSE
0751.010
LS 1 $105,475.83 $105,475.83 $42,500.00 $42,500.00 ($62,975.83) ($62,975.83)CAULKING AND SEALANTS- R.T. SHOP
0790.001
LS 1 $15,597.79 $15,597.79 $33,000.00 $33,000.00 $17,402.21 $17,402.21ELASTOMERIC EXPANSION JOINT0790.101
EA 4 $1,121.33 $4,485.32 $2,600.00 $10,400.00 $1,478.67 $5,914.68METAL DOORS AND FRAMES0810.002
EA 14 $7,894.04 $110,516.56 $2,700.00 $37,800.00 ($5,194.04) ($72,716.56)HOLLOW METAL DOORS ANDFRAMES
0811.002
Page 99 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
G
11/27/2007
J.F. WHITE CONTRACTING CO.
LS 1 $8,526.26 $8,526.26 $22,500.00 $22,500.00 $13,973.74 $13,973.74COILING DOORS AND GRILLES0833.000
LS 1 $22,090.03 $22,090.03 $64,000.00 $64,000.00 $41,909.97 $41,909.97OVERHEAD DOORS0836.000
LS 1 $4,780.18 $4,780.18 $23,000.00 $23,000.00 $18,219.82 $18,219.82GYPSUM DRYWALL0925.000
LS 1 $2,633.71 $2,633.71 $5,200.00 $5,200.00 $2,566.29 $2,566.29TILE WORK0930.000
LS 1 $11,188.02 $11,188.02 $14,000.00 $14,000.00 $2,811.98 $2,811.98ACOUSTICAL PANELS0950.005
LS 1 $15,056.79 $15,056.79 $16,500.00 $16,500.00 $1,443.21 $1,443.21RESILIENT FLOOR AND BASE0964.990
LS 1 $45,102.61 $45,102.61 $140,000.00 $140,000.00 $94,897.39 $94,897.39PAINTING0990.000
EA 4 $95.75 $383.00 $300.00 $1,200.00 $204.25 $817.00FIRE EXTINGUISHERS1025.100
LF 440 $2.35 $1,034.00 $2.50 $1,100.00 $0.15 $66.004" REFLECTORIZED WHITE LINE1040.700
Page 100 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
G
11/27/2007
J.F. WHITE CONTRACTING CO.
LS 1 $19,461.89 $19,461.89 $39,000.00 $39,000.00 $19,538.11 $19,538.11SIGNAGE1042.012
LS 1 $14,021.54 $14,021.54 $24,000.00 $24,000.00 $9,978.46 $9,978.46LOCKERS AND BENCHES1050.151
LS 1 $75,351.74 $75,351.74 $32,000.00 $32,000.00 ($43,351.74) ($43,351.74)MESH PARTITIONS1053.000
LS 1 $4,269.56 $4,269.56 $1,500.00 $1,500.00 ($2,769.56) ($2,769.56)TOILET ACCESSORIES1080.000
LS 1 $72,444.60 $72,444.60 $90,000.00 $90,000.00 $17,555.40 $17,555.40MECHANICAL DEMOLITION1500.440
LS 1 $457,535.55 $457,535.55 $625,000.00 $625,000.00 $167,464.45 $167,464.45MECHANICAL WORK1500.500
LS 1 $305,259.34 $305,259.34 $1,100,000.00 $1,100,000.00 $794,740.66 $794,740.66PLUMBING1501.000
LS 1 $151,937.35 $151,937.35 $250,000.00 $250,000.00 $98,062.65 $98,062.65FIRE PROTECTION1502.000
LB 300 $14.23 $4,269.00 $3.00 $900.00 ($11.23) ($3,369.00)ACTIVATED CARBON1597.422
Page 101 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
G
11/27/2007
J.F. WHITE CONTRACTING CO.
DY 60 $213.48 $12,808.80 $100.00 $6,000.00 ($113.48) ($6,808.80)GROUNDWATER TREATMENTSYSTEM OPERATION
1597.525
LS 1 $1,524,304.16 $1,524,304.16 $1,200,000.00 $1,200,000.00 ($324,304.16) ($324,304.16)ELECTRICAL WORK1600.500
LS 1 $22,308.27 $22,308.27 $6,000.00 $6,000.00 ($16,308.27) ($16,308.27)ELECTRICAL SNOW MELTINGSYSTEM
1683.000
LS 1 $983,596.90 $983,596.90 $1,065,000.00 $1,065,000.00 $81,403.10 $81,403.10TRACTION POWER WORK1696.113
$17,174,025.71 $1,178,466.71$15,995,559.00Total Estimate Contract Base Bid:
Page 102 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
G
11/27/2007
J.F. WHITE CONTRACTING CO.
Alternate #A01 Line Items
LS 1 $397,957.35 $397,957.35 $660,000.00 $660,000.00 $262,042.65 $262,042.65ALTERNATE NO. 10001.100
$660,000.00 $262,042.65$397,957.35Subtotal Alternate # A01:
Page 103 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
G
11/27/2007
J.F. WHITE CONTRACTING CO.
Alternate #A02 Line Items
LS 1 $503,232.63 $503,232.63 $650,000.00 $650,000.00 $146,767.37 $146,767.37ALTERNATE NO. 20001.200
$650,000.00 $146,767.37$503,232.63Subtotal Alternate # A02:
Page 104 of 112
Line Item Description Unit Unit Price Total PriceQuantity Total PriceUnit PriceTotal PriceUnit Price
Contract S10CN02
VarianceBidderEngineer
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder:
DMJM+HARRIS, INC(formerly DMJM)
EN Bidder:
Firm Name:
Bid Date:
G
11/27/2007
J.F. WHITE CONTRACTING CO.
Alternate #A03 Line Items
LS 1 $43,014.90 $43,014.90 $400,000.00 $400,000.00 $356,985.10 $356,985.10ALTERNATE NO. 30001.300
$400,000.00 $356,985.10$43,014.90Subtotal Alternate # A03:
$18,884,025.71 $1,944,261.83$16,939,763.88Contract Total - Base Bid and Alternates:
Page 105 of 112
S10CN02
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder: EN Bidder:
Bid Date:
G
11/27/2007
DMJM+HARRIS, INC(formerly DMJM)
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Contract
Firm Name: J.F. WHITE CONTRACTING CO.
Engineer Bidder Variance
Total Type Basic = $15,995,559.00 $17,174,025.71 ($1,178,466.71)
Total Type Alternate group 01 - not in bid total = $397,957.35 $660,000.00 ($262,042.65)
Total Type Alternate group 02 - not in bid total = $503,232.63 $650,000.00 ($146,767.37)
Total Type Alternate group 03 - not in bid total = $43,014.90 $400,000.00 ($356,985.10)
Contract Total - Base Bid and Alternates: $16,939,763.88 $18,884,025.71 ($1,944,261.83)
Page 106 of 112
S10CN02
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder: EN Bidder:
Bid Date:
F
11/27/2007
DMJM+HARRIS, INC(formerly DMJM)
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Contract
Firm Name: WALSH CONSTRUCTION CO. OF ILLINOIS
Engineer Bidder Variance
Total Type Basic = $15,995,559.00 $15,429,110.71 $566,448.29
Total Type Alternate group 01 - not in bid total = $397,957.35 $500,000.00 ($102,042.65)
Total Type Alternate group 02 - not in bid total = $503,232.63 $750,000.00 ($246,767.37)
Total Type Alternate group 03 - not in bid total = $43,014.90 $100,000.00 ($56,985.10)
Contract Total - Base Bid and Alternates: $16,939,763.88 $16,779,110.71 $160,653.17
Page 107 of 112
S10CN02
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder: EN Bidder:
Bid Date:
E
11/27/2007
DMJM+HARRIS, INC(formerly DMJM)
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Contract
Firm Name: J & J CONTRACTORS, INC.
Engineer Bidder Variance
Total Type Basic = $15,995,559.00 $15,681,599.21 $313,959.79
Total Type Alternate group 01 - not in bid total = $397,957.35 $410,000.00 ($12,042.65)
Total Type Alternate group 02 - not in bid total = $503,232.63 $450,000.00 $53,232.63
Total Type Alternate group 03 - not in bid total = $43,014.90 $220,000.00 ($176,985.10)
Contract Total - Base Bid and Alternates: $16,939,763.88 $16,761,599.21 $178,164.67
Page 108 of 112
S10CN02
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder: EN Bidder:
Bid Date:
D
11/27/2007
DMJM+HARRIS, INC(formerly DMJM)
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Contract
Firm Name: BARLETTA HEAVY DIVISION, INC.
Engineer Bidder Variance
Total Type Basic = $15,995,559.00 $15,149,500.00 $846,059.00
Total Type Alternate group 01 - not in bid total = $397,957.35 $320,000.00 $77,957.35
Total Type Alternate group 02 - not in bid total = $503,232.63 $630,000.00 ($126,767.37)
Total Type Alternate group 03 - not in bid total = $43,014.90 $75,000.00 ($31,985.10)
Contract Total - Base Bid and Alternates: $16,939,763.88 $16,174,500.00 $765,263.88
Page 109 of 112
S10CN02
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder: EN Bidder:
Bid Date:
C
11/27/2007
DMJM+HARRIS, INC(formerly DMJM)
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Contract
Firm Name: W.T. RICH COMPANY, INC.
Engineer Bidder Variance
Total Type Basic = $15,995,559.00 $14,981,255.21 $1,014,303.79
Total Type Alternate group 01 - not in bid total = $397,957.35 $353,920.00 $44,037.35
Total Type Alternate group 02 - not in bid total = $503,232.63 $399,537.60 $103,695.03
Total Type Alternate group 03 - not in bid total = $43,014.90 $76,160.00 ($33,145.10)
Contract Total - Base Bid and Alternates: $16,939,763.88 $15,810,872.81 $1,128,891.07
Page 110 of 112
S10CN02
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder: EN Bidder:
Bid Date:
B
11/27/2007
DMJM+HARRIS, INC(formerly DMJM)
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Contract
Firm Name: McCOURT CONSTRUCTION CO., INC.
Engineer Bidder Variance
Total Type Basic = $15,995,559.00 $14,669,109.21 $1,326,449.79
Total Type Alternate group 01 - not in bid total = $397,957.35 $346,000.00 $51,957.35
Total Type Alternate group 02 - not in bid total = $503,232.63 $580,000.00 ($76,767.37)
Total Type Alternate group 03 - not in bid total = $43,014.90 $215,000.00 ($171,985.10)
Contract Total - Base Bid and Alternates: $16,939,763.88 $15,810,109.21 $1,129,654.67
Page 111 of 112
S10CN02
Massachusetts Bay Transportation Authority
Capital Management System
Comparison of Bids
Report ID:
Date/Time:
CMS-BM-003
Firm Name:
Bidder: EN Bidder:
Bid Date:
A
11/27/2007
DMJM+HARRIS, INC(formerly DMJM)
ORIENT HEIGHTS MAINTENANCE FACILITY,READVERTISEMENT -- PHASE II, EAST BOSTON
Contract
Firm Name: S&R CONSTRUCTION CO., INC.,dba S&RCONSTRUCTION ENTERPRISES
Engineer Bidder Variance
Total Type Basic = $15,995,559.00 $12,997,822.00 $2,997,737.00
Total Type Alternate group 01 - not in bid total = $397,957.35 $254,000.00 $143,957.35
Total Type Alternate group 02 - not in bid total = $503,232.63 $337,560.00 $165,672.63
Total Type Alternate group 03 - not in bid total = $43,014.90 $101,200.00 ($58,185.10)
Contract Total - Base Bid and Alternates: $16,939,763.88 $13,690,582.00 $3,249,181.88
Page 112 of 112