PACS FPU
PACS IHDR 12/13 Nov 2003
FPU Structure, Baffle and Straylight
R. Graue, D. KampfKayser-Threde
PACS FPU
PACS IHDR 12/13 Nov 2003
Primary Structure
Chopper Cover
Photometer housing
Bolometerhousing
Red SpectrometerConnector Panel
Collimator housing
Top Optics housing
Spectrometer housing
FPU foot 1 axis
FPU foot2 axis
Blue SpectrometerConnector Panel
2 K Feed Thru
Alignment Cube
Entrance toFPU
Field Mirror forSpectrometer
4 K Thermal Strap
PACS FPU
PACS IHDR 12/13 Nov 2003
FPU STM
PACS FPU
PACS IHDR 12/13 Nov 2003
Bolometer Integration
PACS FPU
PACS IHDR 12/13 Nov 2003
Straylight Analyses – Top Optic Model
ASAP Model of Top Optics• Derived from optical ZEMAX Model • Black Coated Walls (>0.4 mm)
PACS FPU
PACS IHDR 12/13 Nov 2003
Straylight Analyses – Results and Status
• High straylight suppression
• Neglible straylight impacts in consequent boxes
• Inputs considered for Baffle Design
• Straylight suppression 1e-10 to focal plane
• Modell delivered to ASTRIUM
PACS FPU
PACS IHDR 12/13 Nov 2003
2K - Feed Through
Outside sleeve
Cold finger
D/E: Retainer ring 1/2
F: Muff
G: Ring
• Cryo STM Vibration Tested
• Manufactured and Delivered
PACS FPU
PACS IHDR 12/13 Nov 2003
FPU Suspension Design Status and Material
•Status: •Design: completed•Documentation: Completed
•Material•Fibre: T300•Resin: Ciba Geigy
Araldit LY-3505Hardener XP
3403
PACS FPU
PACS IHDR 12/13 Nov 2003
FPU Suspension Cryo Qualification Test Matrix
Status
• Static load tests: completed
• (Cold) material characterisation: completed
• Cryovibration tests: complete (CRYO STM
FPU)
PACS FPU
PACS IHDR 12/13 Nov 2003
MGSE and CVSE Status
• MGSE design, procurement and
functional test completed
– Vibration test adapter
– Lifting device
– Integration Tools
– FW Test Box
• CVSE design, procurement
(cryostat) and functional test
completedKT Cryostat Test Faciliy for Stability Tests
PACS FPU
PACS IHDR 12/13 Nov 2003
Mass Budget
Measured structural items (KT) 52.7 kg 71.7 %
Estimated mass (KT)* 4kg 5.4 %
Measured Bolometer 7.4 kg 10.0 %
Measured Grating 4 kg 5.4 %
Measured Chopper 0.6 kg 0.8 %
Measured Ge: Ga Detector 4.9 kg 6.7 %
Total 73.6kg 100 %
*IR Black Paint, Internal Harness, Screws Contingency not
needed
PACS FPU
PACS IHDR 12/13 Nov 2003
Performed FPFPU Analyses Program
PhysicalAnalyses
Optical AnalysesThermalAnalyses
MechanismsAnalyses
StructuralAnalyses
TolerancingAnalyses/Budgets
StraylightAnalysis
Strength Analysis
Deformation/DistortionAnalysis
Load Analysis
Ray Tracing ,Spot Spot DiagramQuasi Static
AnalysisFunctionalAnalysis
Natural ModesAnalysis
Mass PropertiesAnalysis
PACS FPU
PACS IHDR 12/13 Nov 2003
PACS Thermal Model
PACS-Thermal Model (Input-Status: May 2003)
- PACS thermal model used as submodel of the H-EPLM reduced thermal model
- PACS submodel consists of 154 thermal nodes
PACS-TMM includes:
- All mechanisms, all harness, radiative environment
- Possibility of transient analysis (cool-down and operational time-line)
PACS FPU
PACS IHDR 12/13 Nov 2003
Thermal Analyses - Status - Completed Tasks
• Thermal Analyses– Quasisteady state and transient thermal analyses – Calibration of thermal model (cooling down curves) after
Cryo STM tests– Analyses of thermal links (2 K) wrt conductivity
• Documentation released
PACS FPU
PACS IHDR 12/13 Nov 2003
PACS Cool-Down Behaviour
0
50
100
150
200
250
300
0 0.5 1 1.5 2 2.5 3 3.5 4
Time [d]
Tem
per
atu
re [
K]
CSL-Measurem.: Base Plate L1-Strap Red Detector Grating Top Optics
Calculation: L12-Housing I/F Red Detector Grating Housing Avg.
PACS FPU
PACS IHDR 12/13 Nov 2003
PACS Thermal Analyses - Open Tasks
- Update of the cryostat-TMM (Sept. 2003) not yet included
- Dissipation values of the grating and the calibration sources are no measured values
-Impact of Electrical insulation between spectrometers and cooling-straps not yet defined
- Results of the discussion of the cooling-strap-IFs not yet included
- Contact resistances at the cooling-strap-I/Fs only assumed, but not measured
PACS FPU
PACS IHDR 12/13 Nov 2003
Structural Analyses - Status - Completed Tasks(see H/O wrt. STM warm/cold vibration)
• Structural Analyses– Evaluation of ambient and cold vibration tests – FEM calibration– Load analyses with calibrated model (cryo-vibration test)– Strength analyses for FPU metallic and CFRP components – Cryogenic material properties analyses – CoG, MoI analyses– Displacement, distortion, deformation analyses
• Documentation released
PACS FPU
PACS IHDR 12/13 Nov 2003
FPU Structure Status – External Interfaces
Design envelope frozen
Optical beam stay out frozen
OB envelope frozen
DCNs of Assembly and IF Drawing version 27 to be approved
PACS FPU
PACS IHDR 12/13 Nov 2003
Documents Status
– ICDs• Chopper, FW, Calibration Source, Filters/
Dichroics, Ga:Ga Detector, Grating: approved• Bolometer, Distribution Boards: approved• Cryogenic harness and connectors: approved
– Procurement specifications (structures, mirror, coating, screws/helicoils, Si -lens, emitter for CS , etc.) approved
– AIV and functional/environmental test plan: updated– Filled in verification matrix: latest status
(10.2003)
PACS FPU
PACS IHDR 12/13 Nov 2003
Configuration Control Documents
Document Description Doc.-No. Configuration Control
FPU Interface and Assembly Drawing Version 27 Yes
FPU Design Specification PACS-KT-SP-002 Yes
Ge detector ICD PACS-KT-ID-002 Yes
Bolometer ICD PACS-KT-ID-005 Yes
CS ICD PACS-KT-ID-007 Yes
FW ICD PACS-KT-ID-006 Yes
Distribution Board ICD PACS-KT-ID-004 Yes
PACS FPU
PACS IHDR 12/13 Nov 2003
Approved Engineering Documents
Document Description
FPU Alignment Plan
FPU Thermal Analyses
FPU Structural Analysis
FPU Load Analysis
FPU AIV Plan
FPU Environmental and Functional Test Verification Plan
FW Environmental and Functional Test Verification Plan
PACS FPU
PACS IHDR 12/13 Nov 2003
PA Activities (KT)
• Approved Documents– PMP (Update)– CIDL (Update)– CIL (Issue1)– PA Plan (Update)– MIP/KIP plan (Update)– Inputs to FMECA (Update)
• Approved procurement/manufacturing documentation/drawings
• Configuration Control
PACS FPU
PACS IHDR 12/13 Nov 2003
MIP / KIP List
Inspection FW assembly (CQM/PFM) after functional and environmental testing Calibration source (CQM/PFM) after environmental and functional
testing Coated mirrors (CQM/PFM) FPU after vibration tests (CQM/PFM) Distribution boards and harness after manufacturing and functional
testing (CQM/PFM)
Fit check inspection after manufacturing and coating of aluminium structure (STM/CQM/PFM)
Functional performance verification after FPU alignment (CQM/PFM)
PACS FPU
PACS IHDR 12/13 Nov 2003
MAIV Status of Structural Items -Completed Tasks
• CQM– Mechanical items design and manufacturing drawings
completed and released– STM/ CQM metallic items manufactured and IR black coated– Mechanical Fit check/Preintegration of all mechanical items
(on boxes and FPU level)– STM/ CQM CFRP items manufactured and static load tested– Cooling straps manufactured
• PFM– Structural items design and manufacturing drawings
completed and released– CFRP items manufactured and static load tested
PACS FPU
PACS IHDR 12/13 Nov 2003
MAIV Status of Structural Items - OpenTasks
• CQM– Thermal Contact Soldering and Ge:Ga detector attachment (sapphire
embedding) of CQM cooling straps in progress (until end of Nov. 2003)– Development of Ge:Ga Detector electrical isolation (thick layer
coating) under progress (until end of Nov. 2003)• PFM
– Substructures and metallic components manufacturing in progress until April 2004
– Preassembly/fit check until June 2004– Finish and black Coating until July 2004
PACS FPU
PACS IHDR 12/13 Nov 2003
FPFPU Cryo Vibration Qualification Breakdown
FPFPU Qualif ikationKT Units
Filter Wheels(Bolometer andSpectrometer)
DistributionBoards (Blue and Red)
2K Thermal StrapsFPFPU
SuspensionFPFPU
HousingDetector Suspension
Similar to CQM
Qualif ication TestsComplete
Housing Qualif ied
Similar to CQM
Qualif ication TestsComplete
Suspension Qualif ied
Similar to CQM
Qualif ication TestsComplete
Filter WheelsQualif ied
Similar to CQM
Qualif ication TestsComplete
Distribution BoardsQualif ied
CQM
Qualif ication TestsComplete
Hardw are w ill berew orked
Qualif ication inprogress
CalibrationSource
Similar to CQM
Qualif ication TestsComplete
Calibration SourceQualif ied
2K StrapsQualif ied
See dedicated chapters
PACS FPU
PACS IHDR 12/13 Nov 2003
PACS FPU Verification
Similarity• CQM and STM were
manufactured parallel with the same drawingsout of the same lot
Qualification Tests• STM vibration tests
Reduced Functional Test
Functional Test(LHe)
Vibration Test - tbc(LHe)
Ambient VibrationTest (Qualification )
Physical Measurement
Functional Tests
Prel. OpticalPerformance Tests *
CQM
Vibration Test(LHe - tbc)
Vibration Test(ambient)
Physical Measurement
Mass / StructuralDummy
Reduced Functional Test
Functional Test(LHe)
Cold Vibration Test
Ambient VibrationTest (Acceptance)
Physical Measurement
Functional Tests
Prel. OpticalPerformance Tests *
PFM
Reduced Functional Test
Functional Tests(LHe)
Ambient VibrationTest (Acceptance)
Physical Measurement
Functional Tests
Prel. OpticalPerformance Tests *
FS
F PF PU Test Pro g ra m
Tests completedConclusion:
FPFPU Housing is structurally qualified
PACS FPU
PACS IHDR 12/13 Nov 2003
CQM SCHEDULE
• Manufacturing– CQM primary/secondary structures thermal treatment
/manufacturing /IR coating sequentially completed – CQMoptical components delivered– CQM CFRP struts and 2 K feed through material test
program and manufacturing completed
• AIV (Final assembly and alignment) – CQM from 7/03 to 1/04 (tbc)
PACS FPU
PACS IHDR 12/13 Nov 2003
PFM SCHEDULE• Manufacturing
– PFM primary/secondary structures thermal treatment /manufacturing /IR coating to be completed until 6.2004
– PFM optical components delivered– PFM CFRP struts and 2 K feed through material test
program and manufacturing completed
• AIV (Final assembly and alignment) – PFM from 7/04 to 11/04