What is a Packer?

• A packer is a tool used to form an annular seal between two concentric strings of pipe or between the pipe and the wall of the open hole.

• A packer is usually set just above the producing zone to isolate the producing interval from the casing annulus or from producing zones elsewhere in the wellbore.

• Separates fluid types (or ownership), protects against pressures and corrosion.

8/25/2015 2

George E. King Engineering GEKEngineering.com

Page 3: Packers and Liner Hangers

Why are packers used?

• Tubing and packer used to isolate zone of interest - can be removed for repair.

• Packers act as downhole valve for press control.

• Packer can be a temporary plug to seal off the zone while work is done up the hole.

• Subsurface safety valves used with packers for downhole shut-in.

• Focus flow

• Isolate between zones

8/25/2015 3 George E. King Engineering

GEKEngineering.com

Page 4: Packers and Liner Hangers

Lock Ring and Mandrel

Slips

Cone

Seal

Inner Mandrel

Packer Cutaway Drawing

Ability to effectively set a packer depends on having a clean, non corroded set point and reaching the set point without fouling the slips or failing other components.

As the packer sets, the inner mandrel moves up, driving the cone underneath the slips, pushing them into the casing wall. The sealing element is compressed & extruded to the casing wall.

8/25/2015 4 George E. King Engineering

GEKEngineering.com

Page 5: Packers and Liner Hangers

Packers and Liner Hangers Mechanical isolation methods

Two examples:

1. An external casing packer (ECP) set to seal the annulus between the surface or protection string and the inner, production string

2. A conventional packer set near the end of the tubing, that isolates the inner annulus from the tubing.

8/25/2015 5 George E. King Engineering

GEKEngineering.com

Page 6: Packers and Liner Hangers

Packer Considerations

• Force on an area

Remember, it’s a force balance. Area down =

casing ID - tube OD

Area up =

tube x-section +

casing ID - tube OD

8/25/2015 6 George E. King Engineering

GEKEngineering.com

Page 7: Packers and Liner Hangers

Packer Types & Selection

Hydraulic Set

Wireline Set

Retrievable Permanent

Production Packers

Sealbore

Hydraulic

Multiport

Mechanical

Hydraulic Set

Wireline Set

Differential Set

Hydrostatic Set

Double Grip

Single Grip

ESP

RMC

Dual

Single

Hyd. Slips

Mech. Slips

Schlumberger 8/25/2015 7 George E. King Engineering

GEKEngineering.com

Page 8: Packers and Liner Hangers

Specific Packer Examples

• Packer Examples

– Retrievables

– Seal bores

– Inflatables

– Wash Tools

8/25/2015 8 George E. King Engineering

GEKEngineering.com

Page 9: Packers and Liner Hangers

Retrievable Packers

• Expected to be retrieved

• More prone to leaks

• Need an equalizing port

• Release mechanism must be possible with well design

8/25/2015 9 George E. King Engineering

GEKEngineering.com

Page 10: Packers and Liner Hangers

Retrievable Packers

• Compact

• Simple J slot control for set and release

• Shear ring secondary release

• Right-hand safety joint emergency release

• Rocker type slips

• Can be set shallow

Tension Set - Economical packer used in

production, injection, zone isolation applications

Weatherford 8/25/2015 10

George E. King Engineering GEKEngineering.com

Page 11: Packers and Liner Hangers

Retrievable Production Packers

• Rotation set and release

• Can be set with tension or compression

• Tubing can be landed in tension, compression or neutral

• Models rated up to 10,000 psi

• Pressure equalization needed prior to upper slip release

• Secondary shear release required

Mechanical - Used in production, injection,

fracturing, zone isolation and remedial applicatuions

Weatherford 8/25/2015 11

George E. King Engineering GEKEngineering.com

Page 12: Packers and Liner Hangers

Retrievable Production Packers

• Compression set

• RH rotation required to set, (LH option usually available)

• Available with or without Hydraulic hold down buttons for differential pressure from below

• By-pass needed for equalization of pressure, and for running and retrieval without surging/swabbing the well.

Mechanical Used in production, stimulation and

testing

Weatherford 8/25/2015 12

George E. King Engineering GEKEngineering.com

Page 13: Packers and Liner Hangers

Retrievable Packers

• Can act as a bridge plug prior to production

• Connect to tubing via On/Off Tool with blanking plug

• Tubing can be landed in tension, compression or neutral

• Slips above and below the elements

• Triple element pack off system

• Pressures to 10,000 psi

• Fluid bypass needed for pressure equalization

• Retrieved on tubing

• Secondary shear release needed

Wireline set - Used in production, injection,

fracturing, zone isolation and remedial applications

where wireline setting is preferred

Weatherford 8/25/2015 13 George E. King Engineering

GEKEngineering.com

Page 14: Packers and Liner Hangers

Seal Bore Packers

• Allow tubing movement; however:

– Too much contraction can pull seals out of PBR

– Seals can “bond” to the seal bore over long time at higher temperatures

– Debris on top of packer can stick assembly

8/25/2015 14 George E. King Engineering

GEKEngineering.com

Page 15: Packers and Liner Hangers

Unprotected seals below the packer may allow seal swelling by gas and fluids, causing seals to roll off if the stinger is pulled out.

8/25/2015 15 George E. King Engineering

GEKEngineering.com

Page 16: Packers and Liner Hangers

8/25/2015 16 George E. King Engineering

GEKEngineering.com

Page 17: Packers and Liner Hangers

Deep Completions

• Most typical is permanent packer with a PBR (arrangement depends on personal preferences, individual well configurations and intended operations).

• Seal assembly length dependent not only on normal operations, but also fracturing, kill and expected workovers.

8/25/2015 17 George E. King Engineering

GEKEngineering.com

Page 18: Packers and Liner Hangers

Seal Bore Packers

• High pressure & temperature ratings available

• Multiple packing elements available

• Short units are desirable for use in tight doglegs (>5o) and high (>8o/100ft) departure angles

• Ability to set on wireline or with a hydraulic setting tool

• Rotationally locked units needed for mill-ability

• Share Seal Assemblies with permanent seal bore packers

• Critical metallurgical and seals (O-rings, etc) should be isolated from wellbore fluids by main elements.

Weatherford 8/25/2015 18 George E. King Engineering

GEKEngineering.com

Page 19: Packers and Liner Hangers

Retrievable Seal Bore Packer

• Hydraulic set version retrievable seal bore packer available for one-trip installations

• Seal assembly is run in place for one trip installation

• Available with large upper seal bore to maximize ID

• Rotationally locked components

One-trip applications

Weatherford

8/25/2015 19

George E. King Engineering GEKEngineering.com

Page 20: Packers and Liner Hangers

Permanent Seal Bore Packers

• Seals run in place for one trip setting

• A metal back-up system can be specified to casing ID to prevent element extrusion

• Elastomer and materials available for hostile environments

Used in one trip production applications

Weatherford

8/25/2015 20

George E. King Engineering GEKEngineering.com

Page 21: Packers and Liner Hangers

Packer Considerations

• Select seals for full range of expected temperatures, pressures, and fluids.

• A back-up system is need around the main seal to prevent seal extrusion at high temps and pressure.

• Examine slip design to help avoid premature setting during movement through viscous fluids, doglegs and rough treatment

8/25/2015 21 George E. King Engineering

GEKEngineering.com

Page 22: Packers and Liner Hangers

Seal Bore Packers

Molded Seals:

• Recommended in medium pressure applications where seal movement out of the seal bore is anticipated.

Nitrile Seal or

Viton Seal

Steel spacer

Seal spacer

End spacer

Nitrile Seal or

Viton Seal

Middle spacer

MOLDED SEAL

SINGLE UNIT

CHEVRON SEAL

SINGLE UNIT

Chevron Seals:

Used for higher pressure and

temperature applications.

Weatherford

8/25/2015 22

George E. King Engineering GEKEngineering.com

Page 23: Packers and Liner Hangers

Seal Bore Packer Accessories

• Tubing Anchor and Locator Assemblies

• Seal Units and Spacer Tubes

• Seal Bore and Mill-Out Extensions

• Packer Couplings and Bottoms

• Pump-out, Screw-out, and Knock-out Bottoms

Weatherford 8/25/2015 23 George E. King Engineering

GEKEngineering.com

Page 24: Packers and Liner Hangers

Inflatable Packers and Plugs

• Reasons to run and inflatable.

– Need to set beneath a restriction.

– Need to set in open hole.

– In non-standard casing.

– Setting in multiple sizes of pipe on same run.

– Where larger run-in and retrieval clearances are needed.

– Large diameter applications.

8/25/2015 24 George E. King Engineering

GEKEngineering.com

Page 25: Packers and Liner Hangers

Inflatable Setting Considerations The inflatable packer offers a way to set a seal in a larger area below a restriction.

The quality of the seal depends on how much the packer must expand over initial diameter, the length of the slide (placement run), the differential pressure it must hold, what fluid is used for inflation and the conditions in the area in which it is set.

Holding ability of the inflatable is always suspect since it does not have conventional slips.

When deflating an inflatable packer, allow time (1 hr?) for relaxation of the elements. The elements never shrink back to initial diameter – allow about 30% increase in diameter for retrieval. 8/25/2015 25

George E. King Engineering GEKEngineering.com

Page 26: Packers and Liner Hangers

Baker

Inflatables rely on expansion of an inner rubber bag that pushes steel cables or slats

against the wall of the pipe or the open hole. The only gripping ability is generated by the

friction of the steel against the pipe or open hole. This is critically dependent on the

inflation pressure and the exterior slat or cable design. For a permanent seal, place

several bailers of cement on top of the inflatable.

8/25/2015 26 George E. King Engineering

GEKEngineering.com

Page 27: Packers and Liner Hangers

• Heavy Duty reinforced casing cups

• Spacing between cups adjustable from 12” to any length by addition of standard tubing pup joints

• Large internal bypass

• Cup wear from casing burrs can be significant and may reduce seal, especially in long zones.

• The number of successful resets depends on casing conditions, pressures, slide length (running), temperature and deviation. Successful resets run from about 5 to over 20.

Used for selective acidizing of perforated

intervals

Perforation Wash Tool

Weatherford

8/25/2015 27

George E. King Engineering GEKEngineering.com

Page 28: Packers and Liner Hangers

Packer Seals Packer Slips

Lawrence Ramnath - Trinidad 8/25/2015 28 George E. King Engineering

GEKEngineering.com

Page 29: Packers and Liner Hangers

A hydraulic set packer. Note the lower slips set by movement of the mandrel and upper slips set by piston action.

8/25/2015 29 George E. King Engineering

GEKEngineering.com

Page 30: Packers and Liner Hangers

Slips – Liner hanger

8/25/2015 30 George E. King Engineering

GEKEngineering.com

Page 31: Packers and Liner Hangers

J-Slot on a liner hanger.

8/25/2015 31 George E. King Engineering

GEKEngineering.com

Page 32: Packers and Liner Hangers

HES Schlumberger

(Camco)

Packer Type

Weatherford Completion Systems

(Bold Items are Preferred Products)

Baker

Halliburton Guiberson Solid head, Tension Set,

Mechanical, Single Grip

PAD-1, PADL-1 AD-1

AL

RB

R-4

Uni-Packer I SA-3

T Series

Compression Set, Mechanical,

Single Grip

PR-3 Single Grip R-3 Single Grip

Model G

R-4

Uni-Packer IV

Uni-Packer II

G-4

SR-2

U-3

CA-3, C Series

Compression Set, Double Grip

Packer

PR-3 R-3 Double Grip MHS

MH-2

Uni-Packer V SR-1

Neutral Set, Double Grip Packer QDG, QDH, Arrowset I-X (&10K), Ultra-

Lok, Double Grip

Lockset, Max

J-Lok, MS

WPL

Perma-Lach

Uni-Packer VI

G-6, G-16

SOT-1

KH

Hydraulic Set Retrievable

HRP, Hydrow-I, PFH FH, FHL, FHS

Hydra-Pak

HS, HS-S

RH

PHL

AHR

Uni-Packer VII

G-77

RHS

Hydro-5

HRP

Dual Hydraulic Set Retrievable Hydrow IIA A-5

T-2

GT

RDH

BHD

Uni-XXVII

RHD

Hydro-10

HSD

Wireline Set Permanent

Arrowdrill B Model D

F-1

AWB

BWB

AWS

G, GT

H, HT

Model S

Wireline Set Permanent Double

Bore

Arrowdrill DB DA, DAB

FA, FAB

AWR G-1, GT-1

H-1, HT-1

Hydraulic Set Permanent

Arrowdrill BH SB-3 MHR PG

PH

Model HS

Hydraulic Set Permanent Double

Bore Arrowdrill DBH SAB-3 MHR PG-1

PH-1

Model HSB

Retrievable Seal Bore Arrow-Pak

Retrieva-D, DB

WS, WSB

SC-1, SC-2

VTL (Versa-Trieve) G-10 M Omegatrieve

Quantum

Hydraulic Set Retrievable Seal

Bore Hydrow-Pak SC-2PAH VHR (Versa-Trieve) RSB

HPHT Hydraulic Set Retrievable Hydrow-Pak HP-1AH, SC-2PAH

HP/HT

HPHT (Versa-Trieve

Retrievable)

Compression Set Service Packer CST, C5, H/D, MSG EA Retrievamatic RTTS

Champ III, IV

HDCH-V Omegamatic

Compression Set Storm Packer CSTH, DLT

Tension Set Service Packer

32A, Fullbore Tension C Fullbore BV Tension Packer R-104

Tubing Set Retrievable Bridge

Plug

QDH w/ EQV, TSU G Lock-Set 3L RBP-VI P-1

Wireline Set Retrievable Bridge

Plugs

WRP, CE, CE2

Permanent Bridge Plugs/Cement

Retainer

PCR, Plugwell, PBP

Mercury N, K-1 EZSV, EZ Drill

EZ Drill SVB

Fas-Drill, HCS

Type A Quik-Drill

Packer Comparisons - from Weatherford

8/25/2015 32 George E. King Engineering

GEKEngineering.com

Page 33: Packers and Liner Hangers

Packer specifics from Baker

8/25/2015 33 George E. King Engineering

GEKEngineering.com

Page 34: Packers and Liner Hangers

Monobore: mixed grades, same weight

Mixed grades and weights

Mixed weights, same grade

Casing Design Options – think about running and setting packers.

Small diameters at the top of the well may prevent entry by some packers.

8/25/2015 34 George E. King Engineering

GEKEngineering.com

Page 35: Packers and Liner Hangers

Production Packers

• Purposes

– Casing protection from fluids or pressures

– Separation of zones

– Subsurface pressure and fluid control

– Artificial lift support equipment

8/25/2015 35 George E. King Engineering

GEKEngineering.com

Page 36: Packers and Liner Hangers

Packer Considerations

• Seal stability

– pressure, temperature, fluid reaction

• Force balance and direction

– slip direction

• resists upward motion, downward or both ways)

• tension, compression, mechanical or hydraulic set

8/25/2015 36 George E. King Engineering

GEKEngineering.com

Page 37: Packers and Liner Hangers

Allowing Tubular Movement

• Usually incorporate a PBR - polished bore receptacle, for a “stinger” or seal assembly to slide through.

• Shoulder out on the PBR - if it can move, it will eventually leak.

• Seals must match operating extremes as well as general conditions.

8/25/2015 37 George E. King Engineering

GEKEngineering.com

Page 38: Packers and Liner Hangers

Seal Bore Packer to Tubing Connections

Seal Bore

Extensions

(SBE)

Polished Bore

Receptacle

(PBR)

Tubing Sealbore

Receptacle

(TSR)

8/25/2015 38 George E. King Engineering

GEKEngineering.com

Page 39: Packers and Liner Hangers

Seal Assembly Locator Types

Locator Anchor Latch

Snap Latch

8/25/2015 39 George E. King Engineering

GEKEngineering.com

Page 40: Packers and Liner Hangers

A “stinger” or seal assembly that is run on the end of tubing and “stings” into the polished bore receptacle (PBR) of the packer.

8/25/2015 40 George E. King Engineering

GEKEngineering.com

Page 41: Packers and Liner Hangers

Stinger Seal Materials

• Single or mixture of elastomers

• seal design variance

• seals usually protect the slips from corrosive fluids.

8/25/2015 41 George E. King Engineering

GEKEngineering.com

Page 42: Packers and Liner Hangers

Tubing Seal Stability

Seal Material oil brine H2S CO2 Butyl Rubber 4 1 1 2 Flurocarbon 1 1 4 2 Nitrile 1 1 4 1 Fluro-silicone 2 1 3 2 1=good, 2=fair, 3=doubtful, 4= unsatisfactory Much larger data base available online.

8/25/2015 42 George E. King Engineering

GEKEngineering.com

Page 43: Packers and Liner Hangers

A-Satisfactory B - Little or no effect C - Swells D - Attacks NR - Not recommended NT - Not tested

NOTE: (1) This information provides general guidelines for the selection of seal materials and is provided for informational purposes only. Seal Specialists with Halliburton Energy Services should be consulted for the actual selection of seals

for use in specific applications. Halliburton Energy Services will not be liable for any damage resulting from the use of this information without consultation with Halliburton Seal Specialists.

(2) Contact Technical Services at Halliburton Energy Services - Dallas for service temperature and pressure.

(3) Back-Up Rings must be used.

(4) There could be a slight variation in both temperature and pressure rating depending on specific equipment and seal designs.

Halliburton Energy Services General Guidelines For Seals

(1)

PEEK (2), (4) Ryton Fluorel (3)

Aflas (3) Chemraz (3) Viton (3) Neoprene (3)

Nitrile (3) Kalrez (3)

Teflon (3)

Filled Unfilled Unfilled Filled Unfilled Filled Filled Filled Filled Unfilled

350 350 450 350 325 300 275 450 400 325

(177) (177) (232) (177) (163) (149) (135) (232) (204) (163)

Above Below

15,000 10,000 15,000 5000 5000 5000 3000 15,000 15,000 5000

(103) (68.9) (103) (34.4) (34.4) (34.4) (20.7) (103) (103) (34.4)

A A A A A B B NR NR A A A

A A B B A B B C A A A A

A A A A A A A B B A A A

A A A A A A A B C A A A A

A A A C A A A NR NR A A A

A A C B A C C B A A A A

A A A A A A A NR NR A A A

A A NR A A NR NR NR B A A A

A A A A A A A C A B A A

A A NR A A NR NR NR NR NR B B

Diesel A A A NR A A A B B A A A

(2), (4) Compound

Service °F

(°C)

Pressure psi

(MPa )

Environments

H 2 S

CO 2

CH 4 (Methane)

Hydrocarbons

(Sweet Crude)

Xylene

Alcohols

Zinc Bromide

Inhibitors

Salt Water

Steam

(2), (4)

8/25/2015 43 George E. King Engineering

GEKEngineering.com

Page 44: Packers and Liner Hangers

Halliburton Energy Services General Guidelines For V-Packing

(1)

8/25/2015 44 George E. King Engineering

GEKEngineering.com

Page 45: Packers and Liner Hangers

Halliburton Energy Services General Guidelines For V-Packing

(1)

8/25/2015 45 George E. King Engineering

GEKEngineering.com

Page 46: Packers and Liner Hangers

Packer Element Selection Chart

NITRILE ELEMENTS

W/BONDED GARTER SPRINGS

NITRILE ELEMENTS W/TEFLON

AND METAL BACKUPS

AFLAS ELEMENTS

W/STANDARD METAL BACKUPS

AFLAS ELEMENTS W/TEFLON AND

GRAFOIL WIREMESH AND METAL BACKUPS

CHECK WITH YOUR HALLIBURTON

REPRESENTIVE FOR SPECIAL APPLICATIONS TEMP

GREATER THAN 450°F

FLUOREL ELEMENTS

W/BONDED GARTER SPRINGS

AFLAS ELEMENTS W/BONDED GARTER SPRINGS

CHECK WITH YOUR HALLIBURTON

REPRESENTIVE FOR SPECIAL

APPLICATIONS

EPDM ELEMENTS WITH BACKUPS

CHECK WITH YOUR HALLIBURTON

REPRESENTIVE FOR SPECIAL

APPLICATIONS

Y

Y

Y

Y

Y

Y

Y

Y

N

N

N

N

N

N

N

N

START STEAM/THERMAL

APPLICATION W/NO

HYDROCARBON FLUIDS

NITRILE ELEMENTS

W/STANDARD METAL BACKUPS

Y

Y

Y Y

Y

N

N N N

N

Y

PERMANENT

PACKER DESIGN

PACKER IN OIL BASE MUD

OVER 24 HOURS BEFORE

SET?

PACKER

IN BROMIDE

COMPLETION FLUIDS MORE THAN 36

HOURS BEFORE

SET?

TEMP

40°F TO

325°F

TEMP

40°F TO

400°F

TEMP

100°F TO

400°F

TEMP

100°F TO

450°F

RETRIEVABLE

PACKER

DESIGN

TEMP

40°F TO

275°F

TEMP

100°F TO

400°F

TEMP

GREATER THAN 400°F

TEMP

LESS THAN 550°F

TEMP

GREATER THAN 550°F

PACKER

ELEMENTS

EXPOSED TO AMINE

CORROSION

INHIBITORS?

PACKER

EXPOSED TO

BROMIDES?

TEMP

40°F TO

400°F

N

N

(1)

NOTE: (1) This information provides general guidelines for the selection of seal materials and is provided for informational purposes only. Seal

Specialists with Halliburton Energy Services should be consulted for the actual selection of seals for use in specific applications.

Halliburton Energy Services will not be liable for any damage resulting from the use of this information without consultation with Halliburton

Seal Specialists. 8/25/2015 46 George E. King Engineering

GEKEngineering.com

Page 47: Packers and Liner Hangers

Forces and Length Changes

• Temperature:

• Piston Effect:

• Ballooning

• Buckling:

A tubing movement calculator is the best method, but the difficulty is in knowing accurate temperature changes and pressure changes.

8/25/2015 47 George E. King Engineering

GEKEngineering.com

Page 48: Packers and Liner Hangers

Is it Force or Length Change?

• No packer - tube suspended and not touching well bottom - length change

• Tube landed on packer - incr. force with increasing temp, shortening possible with cooling after downward force absorbed.

• Latched tubing - no movement, only forces

• Tube stung through - length changes unless locator is shouldered

• If tube set in tension or compression, effects of temp depends on initial force and DT

8/25/2015 48

George E. King Engineering GEKEngineering.com

Page 49: Packers and Liner Hangers

Temperature, length change

DL = CLDT

Where:

DL = length change

C = expansion coeff. for steel = 6.9x10-6/oF

L = length of tubing

DT = average temp change, oF

8/25/2015 49 George E. King Engineering

GEKEngineering.com

Page 50: Packers and Liner Hangers

Temperature, Force change

• F = 207 DTa As

• Where:

F = temperature induced force

DTa = change in average temp of tubing, oF

As = cross sectional area of tubing

8/25/2015 50 George E. King Engineering

GEKEngineering.com

Page 51: Packers and Liner Hangers

What Temperature is Average?

• If no circulation - assume all tubing is same as injected fluid temperature. (worst case)

• If circulation is allowed, all but top few joints will be unaffected by injected fluid temp. - no temp change. (v. slight effect)

• Injected fluid temp? - source dependent!

• In dual packer - treat each packer as a separate calculation. Bottom string first.

8/25/2015 51 George E. King Engineering

GEKEngineering.com

Page 52: Packers and Liner Hangers

Temperatures in the Well? Circulating or High Rate Injection?

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

30 40 50 60 70 80 90 100 110 120 130

Tubing

Tbg Fluid

Casing 1

Undisturbed

Circulation pump rate = 8-BPM

BHST= 122*F

BHCT= 98*F

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

30 40 50 60 70 80 90 100 110 120 130

Undisturbed

Tbg Fluid

Tubing

Casing 1

Frac job pump rate = 35-BPM

BHST= 125*F

BHTT= 86*F

8/25/2015 52 George E. King Engineering

GEKEngineering.com

Page 53: Packers and Liner Hangers

Problem

• Temperature Effect Only

– Is a 6 ft seal assembly (effective seal length) enough to keep the tubing from unseating when the average temperature falls from 210oF to 100oF during a Frac job? L = 8000 ft.

– Assume locator is shouldered but no downward force is applied.

8/25/2015 53 George E. King Engineering

GEKEngineering.com

Page 54: Packers and Liner Hangers

Problem

• Temperature Effect Only

DL = 6.9 x 10-6 x 8000 x 110

DL = 6.1 ft unseats!

What if 15,000 lb downward force were applied to the tubing before the temperature change?

8/25/2015 54 George E. King Engineering

GEKEngineering.com

Page 55: Packers and Liner Hangers

How much temperature increase is spent lifting the 15,000 lb?

• F = 207 x DT2 x 2.59 in2

DT2 = 15000 / (207 x 2.59) = 28oF

Then: 110 - 28 = 82oF

DL = 6.9 x 10-6 x 8000 x 82 = 4.52 ft

8/25/2015 55 George E. King Engineering

GEKEngineering.com

Page 56: Packers and Liner Hangers

What about those other factors?

• Buckling, Piston, Ballooning - Use a computer program - better yet, use a couple of them (different assumptions).

8/25/2015 56 George E. King Engineering

GEKEngineering.com

Page 57: Packers and Liner Hangers

Temperature Extremes

• The extremes of temperature change (higher than normal) are usually seen in operations involving cyclic thermal processes.

• Lower than normal temperatures may be seen in permafrost, sea floor penetrating and CO2 operations.

8/25/2015 57 George E. King Engineering

GEKEngineering.com

Page 58: Packers and Liner Hangers

Setting the Packer

• Chances of setting packers go up sharply when a casing scraper is run. (Remember the burrs on the perforations?)

• The quantity of debris turned loose from the casing wall is often severe! (Tens of pounds worth!) Watch the formation damage.

8/25/2015 58 George E. King Engineering

GEKEngineering.com

Page 59: Packers and Liner Hangers

Packer Set Point Requirements

• Avoid setting packer in the same joint where previous packers have been set.

• Avoid doglegs, fault locations or high earth stress zones

• Adequate cement and bond required behind pipe at packer set point

• Caliper casing above and through the packer set point

• Clearance between packer and casing at set point is within rated range of packer

• Avoid zones of high corrosion, either internal or external.

• Remove burrs from pipe above packer set point

• Remove debris (dope, mill scale, mud, cement, etc.) on casing wall (fills slip teeth)

• Well pressures are within range of packer at set point

• Pipe alloy compatible with setting slips (hardness of casing relative to packer slips)

• Slip design & contact area acceptable for slip holding

• Weight applied to packer can be transferred to formation

8/25/2015 59

George E. King Engineering GEKEngineering.com

Page 60: Packers and Liner Hangers

Information Required Before Setting Packer or Plug

• Wellbore drawing with all diameters

• Last TD tag – rerun?

• Doglegs and deviations

• Viscosity of fluid in wellbore – Calculate running speed vs. surge/swab.

• Copy of reference logs

• Where have other packers been set (avoid that joint)

• Set point requirements

• How can it be equalized if it has to be pulled?

8/25/2015 60 George E. King Engineering

GEKEngineering.com

Page 61: Packers and Liner Hangers

Job Checks

• Measurements from CCL to a packer reference point.

• Run in hole at about 100 fpm, slowing at ID restrictions.

• Using CCL/GR, log up and correlate depths

• Set packer – look for line weight reduction

• Disconnect and log up a few collars (may be slightly off depth after disconnecting).

8/25/2015 61 George E. King Engineering

GEKEngineering.com

Page 62: Packers and Liner Hangers

Job Checks

• Drop back and gently tag packer with setting tool to confirm depth.

• Log back up a few collars.

8/25/2015 62 George E. King Engineering

GEKEngineering.com

Page 63: Packers and Liner Hangers

Packer Setting Guidelines

• Drift

• Scraping

• Casing Support

8/25/2015 63 George E. King Engineering

GEKEngineering.com

Page 64: Packers and Liner Hangers

Drift the Casing

• Casing ID requirements above the set point

• Casing ID requirements below the set point

• Check the drift to deepest point with drift of diameter and length of packer.

8/25/2015 64 George E. King Engineering

GEKEngineering.com

Page 65: Packers and Liner Hangers

Clean/Scrape The Casing?

• Removal of perforation burrs minimizes elastomer seal damage

• Removal of cement, mud, pipe dope and mill scale minimize debris that can fill the slips.

• Scraping casing can increase packer setting success

• Scraping casing can also produce some severe formation damage if perforations are not protected.

8/25/2015 65 George E. King Engineering

GEKEngineering.com

Page 66: Packers and Liner Hangers

Casing Scraper – Designed to knock off perforation burrs, lips in tubing pins, cement and mud sheaths, scale, etc.

It cleans the pipe before setting a packer or plug.

The debris it turns loose from the pipe may damage the formation unless the pay is protected by a LCM or plug.

8/25/2015 66 George E. King Engineering

GEKEngineering.com

Page 67: Packers and Liner Hangers

8/25/2015 67 George E. King Engineering

GEKEngineering.com

Page 68: Packers and Liner Hangers

Effect of Scraping or Milling Adjacent to Open

Perforations

-60

-50

-40

-30

-20

-10

0

10

20

1 2

% C

ha

ng

e in

PI

Short Term PI Change

Long Term PI Change

Perfs not protected by

LCM prior to scraping

Perfs protected by

LCM

SPE 26042

One very detrimental action was running a scraper prior to packer setting. The scraping and surging drives debris into unprotected perfs.

8/25/2015 68 George E. King Engineering

GEKEngineering.com

Page 69: Packers and Liner Hangers

Typical Completions

• Single and Dual Zone Completion Types

8/25/2015 69 George E. King Engineering

GEKEngineering.com

Page 70: Packers and Liner Hangers

Single Zone Completion (Mechanical Packer)

Retrievable Packer

On-Off Sealing Connector

Packer isolates casing from production

• Provides means of well control

• Protects casing above packer from corrosion

• Anchors tubing string

• Tension Set

• Compression set

• Wireline Set

• Large Variety of

accessories available

Weatherford 8/25/2015 70

George E. King Engineering GEKEngineering.com

Page 71: Packers and Liner Hangers

Single Zone Completion (Hydraulic Set Packer)

• Permits Packer setting without tubing manipulation

–Common in offshore applications where SCSSV control lines prevent tubing rotation

• Allows one-trip installation

• With sliding sleeve, allows packer fluid change-out after wellhead is flanged (sliding sleeve not recommended in every case).

• Requires tubing plugging device to set packer

–Wireline plug - preferred

–Drop Ball Seat – debris problem?

Flow Coupling

Sliding Sleeve

Flow Coupling

Hydrostatic Retrievable Packer

Flow Coupling

Seating Nipple

Spacer Tube

Ball Activated Pressure Sub

Perforated Spacer Tube

No-Go Seating Nipple

Wireline Re-Entry Guide

Weatherford 8/25/2015 71 George E. King Engineering

GEKEngineering.com

Page 72: Packers and Liner Hangers

Single Zone Completion (Seal Bore Packers)

• Dependable

• Low failure frequency

• Generally permit larger flow ID’s

• Available as Permanent or Retrievable

• Production string may be anchored or floating, depending on tubing movement requirements (anchored or shouldered is highly recommended)

• Packer may be plugged, can be used as temporary or permanent bridge plug

• Permanent packers removed by milling operations

• Retrievable Seal Bore Packers are removed in separate trip with retrieval tool – provided seals will release.

Annulus Activated, Block and Kill Valve

Sliding Sleeve

Seal Bore Packer

Mill-Out Extension

Crossover Sub

Flow Coupling

Seating Nipple

Spacer Tube

Flow Coupling

No-Go Seating NipplePerforated Spacer Tube

Crossover Sub

Seating Nipple

Wireline Re-Entry Guide

Weatherford 8/25/2015 72 George E. King Engineering

GEKEngineering.com

Page 73: Packers and Liner Hangers

Single Zone Completion (Seal Bore Packers w/Locator Seal Assy.)

• Locator unit atop Seal Bore Extension allows tubing movement from press and temp changes:

– Frac or Acid Stimulation

– Production extremes and shut-in

• Seals available to match environment: – Temperature Range

– Pressure Conditions

– Fluid Environment

• Works well with tubing conveyed perforating (TCP)

Sliding Sleeve

Flow Coupling

Locator Seal Assembly

Seal Bore Packer

Seal Spacer Tube

Seal Bore Extension

Tubing Seal Nipples

Production Tube

Spacer Tube

Flow Coupling

Seating Nipple

Perforated Spacer Tube

No-Go Seating Nipple

Weatherford 8/25/2015 73 George E. King Engineering

GEKEngineering.com

Page 74: Packers and Liner Hangers

Single Zone Completion (Polished Bore Receptacle (PBR))

• Seal Bore Packer with large upper bore permits maximum flow area.

• PBR above packer accommodates tubing trip/movement

– Shear release locator allows one-trip installation with Hydraulic set packer

– Large ID suitable for Thru-Tubing perforating

Locator Seal Assembly

Retrievable Packer Bore Receptacle

Anchor Tubing Seal Nipple

Hydraulic Set Seal Bore Packer

Mill-Out Extension

Crossover Sub

Shear-Out Ball Seat Sub

Weatherford 8/25/2015 74 George E. King Engineering

GEKEngineering.com

Page 75: Packers and Liner Hangers

Single Zone Completion (Stacked Selective Completion)

• Permanent packers are stacked for multiple zone completion

– Zones are selective flowed or shut-in by sliding sleeves or ported profiles and plugs

– Tubing may be anchored or floating

– Blast joints are placed across production interval to reduce flow-cutting of production lines

• This type of completion design often has severe problems with leaking sleeves and corroded/eroded tubing in the straddled zone.

Flow Coupling

Sliding Sleeve

Seal Bore Packer

Seal Bore Extension

Tubing Seal Nipples

Flow Coupling

Seating Nipple

Blast Joint

Polished Nipple

Flow Coupling

Sliding Sleeve

Seal Bore Packer

Seal Bore Extension

Seal Spacer Tube

Tubing Seal Nipples

Spacer Tube

No-Go Seating Nipple

Production Tube

Weatherford 8/25/2015 75 George E. King Engineering

GEKEngineering.com

Page 76: Packers and Liner Hangers

Single Zone Completion (Standard Dual Completion)

• Permits independent production of each zone

• Flanged-up completion for safety

• Fully retrievable completion (both packers) for remedial access

• Or, the bottom packer may be a permanent packer which serves as a locator for spacing out the completion

Flow Couplings

Seating Nipples

Flow Couplings

Flow Coupling

Flow Coupling

Sliding Sleeve

Short String Seal Nipple

Dual Hydraulic Retrievable Packer

Seating Nipple

Flow CouplingBall Activated Pressure Sub

Ball Activated Pressure Sub

Perforated Spacer Tube

Perforated Spacer Tube

No-Go Seating Nipple

No-Go Seating Nipple

Pinned Collar

Seating Nipple

Blast Joint

Polished Nipple

Sliding Sleeve

Hydraulic Retrievable Packer

Seating Nipple

Wireline Re-Entry Guide

Weatherford 8/25/2015 76