Aro Valley Community Centre project number: 1802-980 date drawn: 14.12.18 revision: B AVCC Package 4 Move Hall Back & Refurbish Pavillion Location Notes • Hall building moved North and West diagonally to • Align West edge of hall building with West wall of pavilion. • Kitchen removed from North edge of building and building to abut asphalt outside pavilion. • Possibly expand existing hall footprint to South West / North East - if budget permits. Amenities • Cohesive plan to connect and renovate interior of hall and pavilion to provide amenity. • Exterior work connecting hall with expanded open space and park, if budget permits. Do minimum with office space. Office Pavilion Hall

Transcript of Package 4 Move Hall Back & Refurbish Pavillion...JOHN 048 jerram tocker ARCHITECTS 0001 llt.m.ei]l ....

Page 1: Package 4 Move Hall Back & Refurbish Pavillion...JOHN 048 jerram tocker ARCHITECTS 0001 llt.m.ei]l . Created Date: 2/5/2019 1:02:14 PM ...

Aro Valley Community Centreproject number: 1802-980 date drawn: 14.12.18 revis ion: B

AVCC

Package 4

Move Hall Back & Refurbish PavillionLocation Notes

• Hall building moved North and West diagonally to

• Align West edge of hall building with West wall of pavilion.

• Kitchen removed from North edge of building and building to abut asphalt outside pavilion.

• Possibly expand existing hall footprint to South West / North East - if budget permits.

Amenities

• Cohesive plan to connect and renovate interior of hall and pavilion to provide amenity.

• Exterior work connecting hall with expanded open space and park, if budget permits.

• Do minimum with office space.

Office

Pavilion Hall

Page 2: Package 4 Move Hall Back & Refurbish Pavillion...JOHN 048 jerram tocker ARCHITECTS 0001 llt.m.ei]l . Created Date: 2/5/2019 1:02:14 PM ...

Aro Valley Community Centreproject number: 1802-980 date drawn: 14.12.18 revis ion: B

AVCC

Hall

2.5m

< >

Office

Pavilion

Package 4

Move Hall Back & Refurbish Pavillion