Pacific Aviation Directors Workshop March 13 – 15, 2012

14
Pacific Aviation Directors Workshop March 13 – 15, 2012 Hosted by: A B Won Pat International Airport - Guam Federal Aviation Administration DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION YAP INTERNATIONAL AIRPORT PRESENTATION

description

F ederal A viation A dministration. Pacific Aviation Directors Workshop March 13 – 15, 2012 Hosted by: A B Won Pat International Airport - Guam. DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION YAP INTERNATIONAL AIRPORT PRESENTATION. Introduction. - PowerPoint PPT Presentation

Transcript of Pacific Aviation Directors Workshop March 13 – 15, 2012

Page 1: Pacific Aviation Directors Workshop March 13 – 15, 2012

Pacific Aviation Directors WorkshopMarch 13 – 15, 2012

Hosted by: A B Won Pat International Airport - Guam

Federal Aviation Administration

DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION

YAP INTERNATIONAL AIRPORT PRESENTATION

Page 2: Pacific Aviation Directors Workshop March 13 – 15, 2012

Introduction 1. Completed Projects within the Last five (5)

years 2. UPCOMING PROJECT

4. PROPOSED PROJECT

3.ONGOING PROJECT

Page 3: Pacific Aviation Directors Workshop March 13 – 15, 2012

• Runway Shoulders, Turnaround and Seal Coating (June 2009 – November 2011)

Page 4: Pacific Aviation Directors Workshop March 13 – 15, 2012

FRONT VIEW OF THE BLDG. FACING RUNWAY.

• Y.I.A. Aircraft Rescue and Firefighting Facility Project

(April 2008 – February 2010 TURN-OVER CELEBRATION

SOUTHWEST SIDE OF THE BLDG.

SOUTHEAST SIDE OF THE BLDG.

Page 5: Pacific Aviation Directors Workshop March 13 – 15, 2012

APRON WEST SIDE

• Apron Reconstruction Project (February 2008 – December 2009 APRON EAST SIDE

APRON WEST SIDEAPRON EAST SIDE

Page 6: Pacific Aviation Directors Workshop March 13 – 15, 2012

• Rehabilitation, Installation of Perimeter Fencing and Upgrading of

lightings and signs(January 2006 – September 2007)

Page 7: Pacific Aviation Directors Workshop March 13 – 15, 2012

FRONT VIEW OF THE BUILDING FACING VEHICLE PARKING AREA (SOUTHSIDE).

NEW DEPARTURE LOUNGE.

•Y.I.A Terminal Facility Rehabilitation (July 2006 – September 2007).

Page 8: Pacific Aviation Directors Workshop March 13 – 15, 2012

• Departure Lounge RemodelingDeparture Lounge Remodeling

• New HangerNew Hanger

UPCOMING PROJECTS

Page 9: Pacific Aviation Directors Workshop March 13 – 15, 2012

Ongoing Projects

AIRPORT MASTER PLAN

Page 10: Pacific Aviation Directors Workshop March 13 – 15, 2012

• Yap Neighboring Island Airport Projects

Proposed Projects

a. Ulithi Airport

b. Fais Airport

c. Woleai Airport

d. Parking Lot Solar Panel

Installation

e. ARFF Building Solar Panel

Installation

Page 11: Pacific Aviation Directors Workshop March 13 – 15, 2012

1) PERIMETER FENCING AROUND THE RUNWAY.2) 2 (TWO) WIND CONES.3) RUNWAY LIGHTINGS.4) REHABILITATION OF DAMAGED ITEMS AT THE

TERMINAL.5) STRIPING ALONG THE RUNWAY.

ULITHI AIRPORT

Page 12: Pacific Aviation Directors Workshop March 13 – 15, 2012

1) PERIMETER FENCING AROUND THE RUNWAY.2) 2 (TWO) WIND CONES.3) PAVEMENT RESURFACING.4) RUNWAY LIGHTINGS.5) CONSTRUCT NEW AIRPORT TERMINAL.

FAIS AIRPORT

Page 13: Pacific Aviation Directors Workshop March 13 – 15, 2012

1) PERIMETER FENCING AROUND THE RUNWAY.2) 2 (TWO) AIRFIELD WIND CONES.3) PAVEMENT RESURFACING.4) RUNWAY LIGHTINGS.5) CONSTRUCT NEW AIRPORT TERMINAL.

WOLEAI AIRPORT

Page 14: Pacific Aviation Directors Workshop March 13 – 15, 2012

END OF PRESENTATIONEND OF PRESENTATION

“THANK YOU”“KAMMAGAR MAGAR”