SAP ECC 6.0 Business Blueprint for GGPL Controlling Module
Hewlett-Packard - confidential -
Page 3 of 86
Ver. No. Ver. Date Revised By Description Filename
-
SAP ECC 6.0 Business Blueprint for GGPL Controlling Module
Hewlett-Packard - confidential -
Page 4 of 86
CONTENTS
1 Executive Summary.............................................................................................................................6 1.1 Background ..............................................................................................................................6 1.2 Enterprise Resource Planning (ERP) Project Objectives.........................................................................7 1.3 Overview of Blueprint Phase .........................................................................................................7
2 CO Module Introduction .....................................................................................................................9 2.1 Introduction ...............................................................................................................................9 2.2 CO Value Flows in SAP...............................................................................................................9
3 CO Module Integration with Other Modules..........................................................................................11
4 CO Organization Structure ................................................................................................................13
5 CO Master Data .............................................................................................................................14 5.1 Controlling Area.......................................................................................................................14 5.2 Cost Center Standard Hierarchy..................................................................................................14 5.3 Cost Elements ..........................................................................................................................14 5.4 Profit Center Standard Hierarchy .................................................................................................15 5.5 Internal Orders.........................................................................................................................15
6 Business Process Mapping to SAP ECC 6.0 ..........................................................................................16 6.1 Cost Element Accounting............................................................................................................16 6.2 Cost Center Maintenance ..........................................................................................................20 6.3 Activity Type Maintenance .........................................................................................................21 6.4 Statistical Key Figure Maintenance...............................................................................................22 6.5 Cost Allocation ........................................................................................................................23 6.6 Internal Orders.........................................................................................................................26 6.7 Product Cost Controlling ............................................................................................................28
6.7.1Ingredients of Product Cost ...................................................................................................28 6.7.2Creating, Marking and Releasing of Standard Cost Estimate ......................................................28 6.7.3Repetitive Manufacturing Process - Bottles. ...............................................................................29 6.7.4Discrete Manufacturing process - Semifinished Products..............................................................30 6.7.5Period End Closing for both Repetitive Manufacturing and Discrete Manufacturing Processes ............30
6.8 Profit Center Accounting ............................................................................................................32 6.9 Profitability Analysis ..................................................................................................................35
7 Mapping Of As-Is Processes in Blueprint Document .................................................................................38
8 Reports ..........................................................................................................................................40
9 Identified GAPS..............................................................................................................................43
10 Annexure A: Summary Of Requirements ................................................................................................44
11 Annexure B: US and UK Business Process .............................................................................................53 11.1 Background ............................................................................................................................53
-
SAP ECC 6.0 Business Blueprint for GGPL Controlling Module
Hewlett-Packard - confidential -
Page 5 of 86
11.2 CO Module Introduction ............................................................................................................54 11.2.1Introduction......................................................................................................................54 11.2.2CO Value Flows in SAP .....................................................................................................54 11.2.3CO Module Integration with Other Modules..........................................................................56
11.3 CO Organization Structure.........................................................................................................58 11.4 CO Master Data......................................................................................................................59
11.4.1Cost Center Standard Hierarchy..........................................................................................59 11.4.2Cost Elements...................................................................................................................59 11.4.3Profit Center Standard Hierarchy..........................................................................................59 11.4.4Internal Orders .................................................................................................................60
11.5 Business Process Mapping to R/3 ...............................................................................................61 11.5.1Cost Element Accounting....................................................................................................61 11.5.2Cost Center Maintenance...................................................................................................65 11.5.3Activity Type Maintenance..................................................................................................66 11.5.4Statistical Key Figure Maintenance.......................................................................................67 11.5.5Cost Allocation.................................................................................................................68 11.5.6Internal Orders .................................................................................................................71 11.5.7Product Cost Controlling.....................................................................................................73 11.5.8Profit Center Accounting.....................................................................................................77 11.5.9Profitability Analysis ...........................................................................................................80
11.6 Reports...................................................................................................................................83 11.7 GAPS ....................................................................................................................................86
-
SAP ECC 6.0 Business Blueprint for GGPL Controlling Module
Hewlett-Packard - confidential -
Page 6 of 86
1 EXECUTIVE SUMMARY
1.1 BACKGROUND Gujarat Glass (P) Limited [GGPL] is a leading manufacturer of glass based products for pharmaceutical and cosmetic industries. The manufacturing facilities are spread out in different parts of the world like India, Sri Lanka, USA & UK.
The scope of implementation is in India & Sri Lanka. The specific solution in the scope of this document comprises of Implementation of SAP ECC 6.0 covering Jambusar, Kosamba (in India) & Ratmalana (in Sri Lanka) plants. Nattandiya plant was not part of the scope originally. GGPL has requested to include the same in scope. W e
have included Nattandiya plant in blueprint document with express understanding that addition efforts required will be suitably addressed via change management.
The GGPL product profile covers
Pharmaceuticals
Cosmetics/Toiletries
Stationery
Liquors
Sand
Polythene sheets
The production capacities at Kosamba Plant are
5 Furnaces and 18 lines
The production capacities at Jambusar Plant are
1 Furnaces and 6 lines
The production capacities at Ceylon glass Plant are
1 Furnaces and 3 lines
The production capacities at Nattandiya Plant are
Two sand processing units & one Polythene sheet machine.
Jambusar plant is the world's largest pharma amber bottles manufacturing plant at a single location. In all, the 7 furnaces of the company with 27 automatic production lines, many of which are electronically controlled state-of-the-art machines, produces 7 million glass bottles and vials every day throughout the year for quality conscious customers in the healthcare and cosmetics industry.