P1 cl39 bm_dt kpi_acceptance report

22
Cluster benchmark DT report before and after swap 2011 All rights reserved Page 1 of 22 Cluster Benchmark DT Report Before and After swap For GrameenPhone Phase-1 Cluster-39 Huawei Wireless Network Planning Department

Transcript of P1 cl39 bm_dt kpi_acceptance report

Page 1: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before and after swap

2011 All rights reserved Page 1 of 22

Cluster Benchmark DT Report

Before and After swap For GrameenPhone

Phase-1 Cluster-39

Huawei Wireless Network Planning Department

Page 2: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before and after swap

2011 All rights reserved Page 2 of 22

Table of Contents

1. Test information ...................................................................................................................... 3 

2. Purpose of the test ................................................................................................................... 3 

3. Test manner instruction .......................................................................................................... 3 

4. Cluster test result before and after swap .............................................................................. 4 

5. C/I Table before and after swap ............................................................................................ 5 

6. Internal FTP before and after swap ...................................................................................... 6 

6.1  MAXIMUM & MINIMUM SPEED BEFORE AND AFTER SWAP..……………………...…..6 

6.2  SUMMARY OF EVENTS BEFORE AND AFTER SWAP ........................................................... 6 

7.DT Statistic and Plots before and after swap ........................................................................ 8 

7.1 DT ROUTE: .......................................................................................................................... 8 

7.2 MEASURED ROAD BEFORE AND AFTER SWAP: .................................................................... 8 

7.3 RX LEVEL SUB DBM BEFORE AND AFTER SWAP (IDLE MODE) ............................................ 9 

7.4 RX QUAL SUB (LONG CALL) BEFORE AND AFTER SWAP: .................................................. 10 

7.5 THEMATIC MAP FOR MOS BEFORE AND AFTER SWAP: .................................................... 11 

7.6 THEMATIC MAP FOR C/I BEFORE AND AFTER SWAP: ..................................................... 122 

7.7.THEMATIC MAP FOR DATA TEST BEFORE AND AFTER SWAP .......................................... 133 

7.8 EVENTS AND STATISTIC BEFORE AND AFTER SWAP ...................................................... 144 

8. Cluster Audit Report ............................................................................................................. 19 

9. Benchmark cluster DT swap Approval ............................................................................... 22 

Page 3: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before and after swap

2011 All rights reserved Page 3 of 22

1. Test information

Drive test start date (Pre) 16/03/2011 Drive test finish date (Pre) 22/03/2011

Drive test start date (Post) 02/05/2011 Drive test finish date (Post) 05/05/2011

Report date 06/06/2011 Engineer Md. Mahbubul Alam Cluster No. HS2PH1CL039 Total Count of Sites 45 Cluster Scenario Urban & Rural BSC Name CGHBS224

Table 1: Test information

2. Purpose of the test

In order to check the network quality status of the existing network before swap, we have

finished one DT work in Phase-1 Cluster-39 to collect the coverage, CESR & Dropped

Call information, as a reference for the Swap benchmark KPI. The two tests will be done

under the same test equipment’s including PC, test mobile, call manner, test route and so on.

3. Test manner instruction

Test software: TEMS Investigation 10.0.5

Test PC: Lenovo

Test mobile: W995

Extra antenna: External antennas (0 gains) mounted on car roof

Max car speed: 40 km/hr

Avg. Car speed: 30 km/hr

SIM card information: GP SIM card (1st) IMSI: 470010030152429;

GP SIM card (2nd) IMSI: 470010030152427;

GP SIM card (3rd) IMSI: 470010030152421;

GP SIM card (4th) IMSI: 470010030152428;

GP SIM card (5th) IMSI: 470010550393471;

GP SIM card (6th) IMSI: 470010550393463;

Call manner:

MS 1 is for long call

MS 2 is for short call.

MS 3 is for idle mode

MS 4 is for terminating from mobile two (not connected to TEMS).

MS 5 is for MOS (master)

MS 6 is for MOS (slave)

Page 4: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before and after swap

2011 All rights reserved Page 4 of 22

Long call instruction: Call duration = unlimited.

Short call instruction: Call duration = 15s; Call interval: 5s.

Originating number: MS 1 GP SIM card number: 01755502550;

MS 2 GP SIM card number: 01755502548;

MS 5 GP SIM card number: 01755502563;

Terminating number:

Long call terminating number: 444555

Short call terminating number: MS 4 GP SIM card number: 01755502545;

MOS Call terminating number: MS 5 GP SIM card number: 01755502563; (Loop Back)

MS 6 GP SIM card number: 01755502555;

Instruction: All services will be measured under voice call mode and idle mode.

4. Cluster test result before and after swap

KPI Unit Rural

Formula Before After

Retain ability Dropped Call

(No) 24 9

Changed to Dropped calls as per Acceptance proposal from GP

Integrity MOS

(Grand Total) 3.254

3.515 For discussion with Acceptance team

C/I 9~35(%) 94.30% 94.9%

RxQual 0~5 (%) 95.30% 95.30% sample of RxQual from 0 to 5 / sample

of total RxQual Rx level

(street level) -85 dBm 55759

44570 sample of Rx level no less than target

Rx level / sample of total Rx level. Coverage area Probability

% 85.00% 83.00%

E2E call Setup time(e2e Voice)

ms 5360.21 4938.26 MO Call setup time. Channel Request

to Alerting Message E2E Call

Establishment success Rate

CESR (%) 92.87% 92.16%

No. of Call Establish / No. of Call attempts

Table 2: Cluster test final target & statistic standard

Page 5: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before and after swap

2011 All rights reserved Page 5 of 22

5. C/I Table before and after swap

C/I No of samples % <9 7248 5.7

9-12 11354 8.9

13-16 17820 13.9

>16 91703 71.6

Table 3: C/I (From Long Call) before swap

C/I No of samples % <9 5371 5.1

9-12 10251 9.8

13-16 15421 14.7

>16 74038 70.5

Table 4: C/I (From Long Call) after swap

6. Internal FTP before and after swap

Table 5: Internal FTP DL for all location (From Data Test)

Table 6: External FTP DL for all location (From Data Test)

Protocol Used Speed Threshold(kbps) Service Status No of Location out of 10

Before After

Internal FTP

>= 192  Excellent  1  3 

128‐192  Very Good  4  5 

64‐128  Good  5  2 

32‐64  Fair  0  0 

Protocol Used Speed Threshold(kbps) Service Status No of Location out of 10

Before After

External FTP

>= 192  Excellent  1  1 

128‐192  Very Good  7  6 

64‐128  Good  1  3 

32‐64  Fair  1  0 

Page 6: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before and after swap

2011 All rights reserved Page 6 of 22

Table 7: HTTP DL for all location (From Data Test)

6.1 Maximum & Minimum Speed before and after swap

Test Type Before  After 

Max(Kbps)(Avg.)  Area  Max(Kbps)(Avg.)  Area 

Internal 207.17 UKHIA CIRCLE 209.85 KOLATOLI MOR

External 211.21 UKHIA CIRCLE 197.79 KOLATOLI MOR

HTTP 110.05 JHAWTOLA MAIN ROAD 127.88 KOLATOLI MOR

Test Type Before  After 

Min(Kbps)(Avg.)  Area  Min(Kbps)(Avg.)  Area 

Internal 78.39 BARMIZ MARKET 90.02 HOTEL SEA SUN

External 30.1 AIRPORT ROAD 107.23 TEKNUF CIRCLE

HTTP 40.95 AIRPORT ROAD 67.34 HOTEL SEA SUN

Table 8: Internal FTP, External FTP & HTTP speed

Protocol Used Speed Threshold(kbps) Service Status No of Location out of 10

Before After

HTTP

>= 192  Excellent  0  0 

128‐192  Very Good  0  0 

64‐128  Good  9  10 

32‐64  Fair  1  0 

Page 7: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before and after swap

2011 All rights reserved Page 7 of 22

6.2 Summary of Events before and after swap

Table 9: Table of Summary of Events (Internal FTP DL)

Events # [no. of]

Before  After 

RAS Error 0 0

Session Start 50 50

Session Error 8 8

Session End 42 42

PDP Context Activation 50 50

PDP Context Activation Failure 0 0

PDP Context Deactivation 50 50

Routing Area Update 0 0

Routing Area Update Failure 0 0

Page 8: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before and after swap

2011 All rights reserved Page 8 of 22

7. DT Statistic and Plots before and after swap

7.1 DT Route:

Figure 1: Drive route

7.2 Measured Road before and after swap

Figure 2: Measured Road before swap Figure 3: Measured Road after swap

Page 9: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before and after swap

2011 All rights reserved Page 9 of 22

7.3 Rx Level Sub dBm (Idle Mode) before and after swap

Figure 4: RxLev Sub (dBm) before Swap Figure 5: RxLev Sub (dBm) after Swap

Bar chart 1: RxLev statistic before swap Bar chart 2: RxLev statistic after swap

Page 10: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before and after swap

2011 All rights reserved Page 10 of 22

7.4 RxQual Sub (Long Call) before and after swap

Figure 6: RxQual Sub before Swap Figure 7: RxQual Sub after Swap

Bar chart 3: RxQual Sub statistic before swap Bar chart 4: RxQual Sub statistic after swap

Page 11: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before and after swap

2011 All rights reserved Page 11 of 22

7.5 Thematic MAP for MOS before and after swap

Figure 8: MOS plot before Swap Figure 9: MOS plot after Swap

Bar chart 5: MOS statistic before swap

Page 12: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before swap

2010

All rights reserved Page 12 of 22

Bar chart 6: MOS statistic after swap

7.6 Thematic MAP for C/I (Long call) before and after swap

Figure 10: C/I before Swap Figure 11: C/I after Swap

Page 13: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before swap

2010

All rights reserved Page 13 of 22

Bar chart 7: C/I statistic before swap Bar chart 8: C/I statistic after swap

7.7 Thematic Map for Data Test before and after swap

Figure 12: Location-wise data Speed (kbps) before swap

Figure 13: Location-wise data Speed (kbps) after swap

Page 14: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before swap

2010

All rights reserved Page 14 of 22

7.8 Events and statistic before Swap before and after swap

CLUTTER Name

Status

Dedicated Mode Total no. of Drive test samples

RxQual (Long Call)

Total no. of samples

RxQual = 0~5(Long Call)

Total No. of Call Attempt(Short Call)

Total no. of call Established (Short Call)

Total no. of blocked calls (Short Call)

Total no. of Call Dropped(Long call)

Urban & Rural

Before swap 128238 122250 1978 1837 38 24

After swap 105336 100370 1633 1505 31 9

CLUTTER Name

Status Idle Mode

Required RxLevel Total no. of Rxlev samplesTotal No. of Required Rxlev

samples Urban &

Rural Before swap -85 65672 55759

After swap -85 54041 44570

Table 8: Samples according to events

Bar Chart 9: Distribution graphs of Current MCS DL before swap

Bar Chart 10: Distribution graphs of Current MCS DL after swap

Bar Chart 11: Distribution graphs of Session App. Mean Throughput before swap

Bar Chart 12: Distribution graphs of Session App. Mean Throughput after swap

Page 15: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before swap

2010

All rights reserved Page 15 of 22

Table for MOS Samples:

CLUTTER Name

Status

Mode

Total no. of Drive test samples

Urban & Rural

Before Swap 5076

After swap 4130

Table 9: MOS Samples according to events

Event Before swap After swap

Number Log file List Number Log file List

Handover 611

541

Handover Failure (Long

Call) 50

P1CL39_0317_02 (21).log; P1CL39_0317_02 (35).log;

P1CL39_0317_02 (38).log; P1CL39_0318_03 (76).log;

P1CL39_0318_03(49).log; P1CL39_0319_04 (89).log;

P1CL39_0319_04 (90).log; P1CL39_0319_04 (91).log;

P1CL39_0319_04 (92).log; P1CL39_0319_04 (94).log;

P1CL39_0319_04 (96).log; P1CL39_0319_04 (97).log;

P1CL39_0319_04 (104).log; P1CL39_0320_05 (119).log;

P1CL39_0321_06 (128).log; P1CL39_0321_06 (129).log;

P1CL39_0321_06 (131).log; P1CL39_0321_06 (144).log;

P1CL39_0321_06 (150).log;

13

PH1CL39_0504_03(52).log;

PH1CL39_0504_03 (54).log;

PH1CL39_0531_05 (98).log;

PH1CL39_0531_05 (106).log;

PH1CL39_0531_05 (107).log;

PH1CL39_0531_05 (116).log

Blocked Call (Short Call)

38

P1CL39_0316_01 (8).log; P1CL39_0316_01 (9).log;

P1CL39_0317_02 (21).log; P1CL39_0317_02 (33).log;

P1CL39_0317_02 (35).log; P1CL39_0317_02 (38).log;

P1CL39_0317_02 (48).log; P1CL39_0318_03 (55).log;

P1CL39_0318_03 (57).log; P1CL39_0318_03 (82).log;

P1CL39_0318_03 (83).log; P1CL39_0319_04 (89).log;

P1CL39_0319_04 (91).log; P1CL39_0319_04 (92).log;

P1CL39_0319_04 (95).log; P1CL39_0319_04 (102).log;

P1CL39_0319_04 (104).log; P1CL39_0320_05 (119).log;

P1CL39_0320_05 (122).log; P1CL39_0321_06 (129).log;

P1CL39_0321_06 (132).log; P1CL39_0321_06 (141).log;

P1CL39_0321_06 (143).log; P1CL39_0321_06 (144).log;

P1CL39_0321_06 (147).log; P1CL39_0321_06 (148).log;

31

PH1CL39_0503_02(22).log;PH1CL39_0503_02(27).log;

PH1CL39_0504_03(33).log;PH1CL39_0504_03(34).log

PH1CL39_0504_03(35).log;PH1CL39_0504_03(51).log;

PH1CL39_0504_03(52).log;PH1CL39_0504_03(53).log;

PH1CL39_0504_03(55).log;PH1CL39_0504_03(59).log;

PH1CL39_0504_03(64).log;PH1CL39_0505_04(82).log;

PH1CL39_0505_04(85).log;PH1CL39_0531_05(98).log;

PH1CL39_0531_05(99).log;PH1CL39_0531_05(106).log

Call Attempt (Short Call)

1978

1633

Call End (Short Call)

1925

1601

Page 16: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before swap

2010

All rights reserved Page 16 of 22

Table 10: Other events statistics before and after swap

Call Established (Short Call)

1837

1505

Call Setup (Short Call)

1852

1512

Cell reselection (Idle Mode)

727

603

Dropped Call (Long Call)

24

P1CL39_0317_02 (20).log; P1CL39_0317_02 (21).log;

P1CL39_0317_02 (35).log; P1CL39_0317_02 (38).log;

P1CL39_0318_03 (77).log; P1CL39_0318_03 (83).log;

P1CL39_0319_04 (89).log; P1CL39_0319_04 (91).log;

P1CL39_0319_04 (92).log; P1CL39_0319_04 (93).log;

P1CL39_0319_04 (94).log; P1CL39_0321_06 (129).log;

P1CL39_0321_06 (131).log; P1CL39_0321_06 (143).log;

P1CL39_0321_06 (144).log;

9

PH1CL39_0503_02(13).log;PH1CL39_0503_02(22).log;

PH1CL39_0504_03(34).log;PH1CL39_0504_03(52).log;

PH1CL39_0504_03(65).log;PH1CL39_0531_05(92).log

Location Area Update (Idle

Mode) 3

9

Location Area Update Failure

(Idle Mode) 0

0

Handover Intracell (Long call)

52

26

Handover Intracell Failure

(Long call) 1

P1CL39_0318_03 (60).log;

0

Page 17: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before swap

2010

All rights reserved Page 17 of 22

Sl N

o

Loca

tion

Serv

ing

Cel

l

Rx

Qua

l

C/I

No

of T

ime

Slot

Cod

ing

Sche

me

Performance Status

Performance

Evaluation

[Internal

FTP]

Performance Status

[INTERNAL FTP]

Con

nect

ivity

Spee

d(K

bps)

TIM

E

EXTERNAL

FTP HTTP

Browsing

Speed

(kbps)

Speed

(kbps)

1 Point-1 CXKTL2A 0 25.3 4 CS-1;MCS3,5,6,7,8,9 5/5 106.45 5:10 PM Good 142.63 105.65

2 Point-2 CXKLL1B 0 28.8 4 CS-1;MCS1,3,5,6,7,8,9 5/5 143.53 6:15 PM Very Good 149.48 89.29

3 Point-3 CXKTL1C 0 20.6 4 CS-1;MCS1,3,5,6,7,8,9 5/5 146.05 7:20 PM Very Good 147.88 75.29

4 Point-4 CXMRD3A 0 33.1 4 CS-1,2; MCS3,5,6,7,8,9 5/5 115.81 8:25 PM Good 30.1 40.95

5 Point-5 CXUKA1B 0 35 4 CS-1,MCS3,5,6,7,8,9 5/5 207.17 9:30 PM Excellent 211.21 102.05

6 Point-6 CXTEK2C 0 33.9 3 CS-1,MCS3,5,7,8,9 5/5 91.56 4:35 PM Good 116.24 91.84

7 Point-7 CXMRD1C 0 9.66 2 CS-2;MCS3,5,6,7,8,9 5/5 78.39 3:40 PM Good 137.43 73.99

8 Point-8 CXMRD5C 0 34.9 4 MCS3,5,6,7,8,9 5/5 165.99 2:45 PM Very Good 159.92 110.05

9 Point-9 CXRMU2A 0 34.2 4 MCS 3,5,6,7,8,9 5/5 189.98 1:50 PM Very Good 172.51 96.62

10 Point-10 BBNKC1B 0 22.9 3 CS-1;MCS 3,5,6,7,8,9 5/5 126.4 12:55 PM Good 155.4 77.23

Table 11: Summary of Data Test Performance at different location before swap

Page 18: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before swap

2010

All rights reserved Page 18 of 22

Sl N

o

Loca

tion

Serv

ing

Cel

l

Rx

Qua

l

C/I

No

of T

ime

Slot

Cod

ing

Sche

me

Performance Status

Performance

Evaluation

[Internal

FTP]

Performance Status

[INTERNAL FTP]

Con

nect

ivity

Spee

d(K

bps)

TIM

E

EXTERNAL

FTP HTTP

Browsing

Speed

(kbps)

Speed

(kbps)

1 Point-1 CXKTL2A 0 34.43 4 CS-1;MCS 1,2,5,6,7,8,9 5/5 209.85 8:04 PM Excellent 197.79 127.88

2 Point-2 CXKLL1B 0 26 4 CS-1;MCS 1,5,6,7,8,9 5/5 151.53 5:38 PM Very Good 169.09 98.45

3 Point-3 CXKTL1C 0 26.62 3 CS-1;MCS 1,2,5,6,7,8,9 5/5 90.02 1:41 PM Good 112.74 67.34

4 Point-4 CXAIR1B 0 34.31 4 CS-1; MCS 1,5,6,7,8,9 5/5 197.57 4:39 PM Excellent 173.06 88.49

5 Point-5 CXUKA1B 0 30.92 4 CS-1,MCS 1,5,6,7,8,9 5/5 188.63 8:58 AM Very Good 177.04 126.04

6 Point-6 CXTEK2C 0 33.17 3 CS-1,MCS 1,5,6,7,8,9 5/5 112.87 10:42 AM Good 107.23 95.53

7 Point-7 CXMRD1C 0 15.53 3 CS-2;MCS 1,5,6,7,8,9 5/5 145.67 3:09 PM Very Good 112.48 85.34

8 Point-8 CXMRD5C 0 33.17 3 CS-1;MCS 1,2,5,6,7,8,9 5/5 146.6 4:33 PM Very Good 138.03 105.73

9 Point-9 CXRMU1B 0 31.77 4 CS-1,MCS 1,5,6,7,8,9 5/5 174.57 2:04 PM Very Good 161.32 96.29

10 Point-10 BBNKC1B 0 29.58 4 CS-1,MCS 1,5,6,7,8,9 5/5 153.75 12:49 PM Very Good 147.79 99.07

Table 12: Summary of Data Test Performance at different location after swap

Location Address Latitude Longitude

Point-1 KOLATOLI MOR 21.416125 91.984508

Point-2 HOTEL SEA GUL 21.424558 91.975511

Point-3 HOTEL SEA SUN 21.427165 91.977951

Point-4 AIRPORT ROAD 21.444143 91.97146

Point-5 UKHIYA CIRCLE 21.214053 92.167045

Point-6 TEKNUF CIRCLE 20.868321 92.298308

Point-7 BARMIZ MARKET 21.443703 91.975155

Point-8 JHAWTOLA MAIN ROAD 21.442508 91.980336

Point-9 RAMU 21.428905 92.1425

Point-10 NAIKHANCHARI BAZAR 21.427716 92.179903

Table 13: Address & Co-ordinate of test location

Page 19: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before swap

2010

All rights reserved Page 19 of 22

Annex:

Internal FTP : Definition of Terms

7. Cluster Audit Report

SL. No. Site Lon Lat Cluster Status

1 BBNKC1 92.17639 21.42678 HS2PH1CL039 On-Air

2 CXAIR1 91.96942 21.44736 HS2PH1CL039 On-Air

3 CXBCH1 91.97411 21.43917 HS2PH1CL039 On-Air

4 CXBSCM 92.02939 21.42047 HS2PH1CL039 On-Air

5 CXBST1 92.00267 21.42617 HS2PH1CL039 On-Air

6 CXDMD1 92.26808 20.92014 HS2PH1CL039 On-Air

7 CXGZN1 92.19506 21.44047 HS2PH1CL039 On-Air

8 CXJLA1 92.01347 21.42486 HS2PH1CL039 On-Air

9 CXJRL1 92.09942 21.47239 HS2PH1CL039 On-Air

10 CXKHK1 91.99183 21.46967 HS2PH1CL039 On-Air

11 CXKLL1 91.97392 21.42819 HS2PH1CL039 On-Air

12 CXKRL1 92.05953 21.42811 HS2PH1CL039 On-Air

13 CXKRL2 92.05969 21.42828 HS2PH1CL039 On-Air

Value Definition No of Successful attempts out of 5

Speed in kbps

Excellent 5 &  >= 192 Very Good

4-5

&  128-192

Good 4-5 3

&  64-128 128-192

Fair

3-4 2

&  32-64 64-128

Poor 2-3 &  16-32

Very Poor

1-2 &  <16

Page 20: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before swap

2010

All rights reserved Page 20 of 22

14 CXKTB1 92.10353 21.27575 HS2PH1CL039 On-Air

15 CXKTL1 91.97872 21.42736 HS2PH1CL039 On-Air

16 CXKTL2 91.98472 21.41531 HS2PH1CL039 On-Air

17 CXMIA1 92.02936 21.52053 HS2PH1CL039 On-Air

18 CXMRC1 92.09597 21.30953 HS2PH1CL039 On-Air

19 CXMRD1 91.9775 21.44306 HS2PH1CL039 On-Air

20 CXMRD2 91.98922 21.44064 HS2PH1CL039 On-Air

21 CXMRD3 91.97358 21.44383 HS2PH1CL039 On-Air

22 CXMRD4 92.00014 21.43258 HS2PH1CL039 On-Air

23 CXMRD5 91.98328 21.44194 HS2PH1CL039 On-Air

24 CXNBZ1 92.23231 21.05186 HS2PH1CL039 On-Air

25 CXNIL1 92.25133 21.00939 HS2PH1CL039 On-Air

26 CXNYP1 92.31342 20.80778 HS2PH1CL039 On-Air

27 CXPLN1 92.15789 21.14572 HS2PH1CL039 On-Air

28 CXPMK1 92.03492 21.44733 HS2PH1CL039 On-Air

29 CXPNC1 92.07669 21.49681 HS2PH1CL039 On-Air

30 CXRAB1 92.07808 21.32836 HS2PH1CL039 On-Air

31 CXRMU1 92.10494 21.43214 HS2PH1CL039 On-Air

32 CXRMU2 92.10489 21.43233 HS2PH1CL039 On-Air

33 CXSLV1 91.98942 21.40769 HS2PH1CL039 On-Air

34 CXSMP1 92.14319 21.07564 HS2PH1CL039 On-Air

35 CXSMT1 92.32175 20.633 HS2PH1CL039 On-Air

36 CXSNP1 92.05708 21.28428 HS2PH1CL039 On-Air

37 CXSPD1 92.33183 20.76742 HS2PH1CL039 On-Air

38 CXSPL1 91.98072 21.42186 HS2PH1CL039 On-Air

39 CXTEK1 92.29808 20.88183 HS2PH1CL039 On-Air

40 CXTEK2 92.29919 20.86714 HS2PH1CL039 On-Air

41 CXUKA1 92.16831 21.21392 HS2PH1CL039 On-Air

Page 21: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before swap

2010

All rights reserved Page 21 of 22

42 CXUKA2 92.13658 21.24633 HS2PH1CL039 On-Air

43 CXVLK1 92.14242 21.28519 HS2PH1CL039 On-Air

44 CXWKK1 92.19831 21.11578 HS2PH1CL039 On-Air

45 CXRMUM 92.11878 21.37794 HS2PH1CL039 Under con

Table 7: sites in cluster before and after swap

Page 22: P1 cl39 bm_dt kpi_acceptance report

Cluster benchmark DT report before swap

2010

All rights reserved Page 22 of 22

9. Benchmark cluster DT after swap Approval

It is hereby agreed that the cluster named below meet the specifications Huawei and GP,

by signing this paper, confirmation that the cluster’s service status is as related above.

Cluster No. HS2PH1CL039 Sites number 45

Performing date

Pre 16/03/2011 to

22/03/2011 Result approve

Post 31/05/2011 to

01/06/2011

Additional information

On behalf of Huawei On behalf of GP

Originator:…………………………. Approved by:…………..…………..

Signature:………………………….. Signature:…………………………..

Date: ………………………….. Date: …………………………..

On behalf of Huawei On behalf of GP

Originator:…………………………. Approved by:………...……………..

Signature:………………………….. Signature:…………………………..

Date: ………………………….. Date: …………………………..