P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to...

21
09-02-1994 02:58PM FROM HOMESTAKE GRANTS TO 13014155397 P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir- HOMESTAKE MINING COMPANY OF CALIFORNIA GRANTS RECLAMATION PROJECT P.O. Box as GRANTS, NEW MEXICO 87020-0011 TELEPHONE - (505) 287-4456 FACSIMILE - (505) 287-9289 LQr.ATW 4.8 MIAS NORTH OF MILAN. NEW MEXCOO ON 111G1 [WAY 006 DATE _____ TO: COMPANY: FACSIMILE NUMBER: TIME. FROM: COMPANY: FACSIMILE NUMBER: MESSAGE: •&!• A _ , NUMBER OF PAGES: '-J CINCLUDING THIS SHEET) PLEASE CALL (505) 287-9289 IF ALL THE PAGES ARE NOT RECEIVED. dRANTS - REV 7 PATI" O•mM 1 250100 9411290267 94C9q'j- PDR ADOCK 04ooB8'cyý

Transcript of P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to...

Page 1: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 02:58PM FROM HOMESTAKE GRANTS TO 13014155397 P.01

I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-

HOMESTAKE MINING COMPANY OF CALIFORNIA

GRANTS RECLAMATION PROJECT

P.O. Box asGRANTS, NEW MEXICO 87020-0011

TELEPHONE - (505) 287-4456

FACSIMILE - (505) 287-9289

LQr.ATW 4.8 MIAS NORTH OF MILAN. NEW MEXCOO ON 111G1 [WAY 006

DATE _____

TO:

COMPANY:

FACSIMILE NUMBER:

TIME.

FROM:

COMPANY:

FACSIMILE NUMBER:

MESSAGE: •&!• A _ ,

NUMBER OF PAGES: '-J CINCLUDING THIS SHEET)

PLEASE CALL (505) 287-9289 IF ALL THE PAGES ARE NOT RECEIVED.

dRANTS - REV 7PATI" O•mM 1

2501009411290267 94C9q'j-PDR ADOCK 04ooB8'cyý

Page 2: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 02:59PM FROM HOMESTAKE GRANTS TO 13014155397 P.02

STABILITY IfLXESI

UfDOPJltION V= #2

NO 8TW0 mm~s P8lRo•C

Reised 9/1/94

CALCUALTION METHOD: Simplified Bishop

COMPUTER CODE" STABL5

CONDITIONS ANALYZUD:

A) Bonith Dike

1) Highest cross-section (Dike on southwest side)

2) Pond level at maximum pool of elevation 6580

3) Phreatic surface in dike assumed to extend atelevation 6580 horizontally through dike tooutsl ope surface, then along outelope to toethen alo n ground surface (fully saturated dikeand foundation - y•EI conservative)

4) EarthquaXe peak acceleration of 0-1g

5) Natural soil (foundation) and dike fill propertiesbased on 5PT blow counts or test b urins EP2-1throuqh EP2-6, and all strength attributed tointernal Zriction of soil (cohzaion ignored -conservative).

B) East Slope of £P2 through West Slope of EPI

1) EP2 empty, EPI at full pool (water surface at6597.1). Maximum driving ve recicting forces.

2) Phreatig surface extends from EPI pwool to upslopeedge of EP2 crest bench, than along ground surfaceof 1P2 liope and pond bottom (fully maturated EP2slope - conservative)

3) Earthquake peak acceleration of 0.1g

4) Natural soil (foundation) and dike fill propertiesbased on SPT blow counts of test borings 3P2-1through EP2-5, a&d tailings properties based on

UNKNllTh5L .342 1

Page 3: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 02:59PM FROM HOMESTAKE GRANTS TO 13014155397 P.03

field density records from Epi construction gC(contained in Completion Report). All strengthattributed to internal friction of soil (cohesionignored - conservative).

RESULTS:

A) south Dike

1) minlim factor of safety under pseudoetatic loadconditions: 1"L

2) Mininum factor of safety under static loadcunditions;

B) Bast Slope

1) Minimum factor of safety under pseudostatic loadconditions: 1.03

2) Minimum factor of safety under static loadconditions: 1,92

References for nelection of friction anglo'

Terzagbhi and Pock, 19677; Soil Mechanics in EmninaerjrnZn&MQti , Zohn Wiley & Sons

U.S. Navy, Naval Facilities Engineerinq Conand, 1971; ;ga.snManual -NAVPAC I4-7; Soil Mechanics. Foundationns- and RaLIIh

WCWEPRTAB$-fl22 2

Page 4: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 03:00PM FROM HOMESTAKE GRANTS TO 13014155397 P.04

Singfira "T3atrm%'Illi.6 CFOpenow a ces

PNWAm DND, PTZcOZ W1C70ýARAT1011 POND $2 HORST7§ CS y4v5-Ak

BONDARY COOVD33NAflS

xirYTAP

lo

1 0AS

6310I 0S

T¶~t fljlT Yg

HE IISOTROPIC SOIL

2 Type() of s*U

s• Salt tt: :h nfriction . PoreSVIED'O rmecf pj Cg Par*& SVCn!50

i 1100 1118 :8 RA: :88 18 1

-w -•

I2 PZUCThXC sun•ACs(S) HAVE BMW SPvCZrD

Unit Weight at water = 63.40

Ptnnmutric Surface Kb- I SpeciEfed by 4 Coordinate Points

Pain

bem m R 2jjqn~gn~miftgOoefficinxtCavitation prscusur - .0 poi

Page 5: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 03:00PM FROM HOMESTAKE GRANTS TO 13014155397 P.05

agg-i flqqj Failure ace.Seaachingsethod, r nit.• ,-lmFor Generar-Ing CirC'ULar 2 -acm, #za JAA•. •fjd

1i0 Trial Surfaces uHave Been Generated .

£4 Surfame Yntttate Prom Rash Of 23 int Eunatly Spaced110Wg Tme rGround Suzrttf vezt g 98:00 FBach Surface Teorinatas Betwme - d.30AWA 130, 00

4,00 f•. Line Segmnts Define Each Trial. Failure Surface.

Te ugg~fl t Of 0 rfThei

S0safety Factors At Calculated By The Hodifi4 Bishop Method *

Failure surface Specified By is coordinate Points

nt X-Surf y- f(It) (

IIU II.1IlCir=le Cnta-c At X = 57,6 ; Y 1 110.2 and "adius, 50a4

L9529

Page 6: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 03:01PM FROM HOMESTAKE GRANTS TO 13014155397 P.06

Sarapencar 5 e~ fSie

flODfIm DRCpTZOU SE E&TffON P•tmw ntn~A=Oc." #2 WORST C&SS

- A~46 -wsd %~SWUD&RY COORDfi=vA6T

iL,°, 1 flgflflgNcmROILv 00910

I tutUy ,Tit),H.10:19:8863.59063. 3o

IJill 64-40fl aI!:113*-MtI4 • O

zsroflpCc SOIL PABLAUTURU

2 Type(s) of Soil

i HE1:R -W:A :8 fli: :88 :8 1

I 71121WRc StMhIACE(s) HAVE BERN SPECIFIED

Unit Weight of Water = 62-40

Pissonetric Surface go. I Spewified by 4 Coordinate Paints

Cts11ic I1

cvtfljar'fra4mo odif Coefficient

*cavitation Prasuna a .0 pat

Page 7: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 03:01PM FROM HOMESTRKE GRANTS TO 13014155397 P.07

ýe ' -VaSlre facs gefchlfJthd"MnIQ•e For Generating •Ied-lir fte N a a,

200 Trial Surfaces Rave Bee Generated.

4 Sua aca Initiat Each Of 25 Poinat mly Spaced

lack Surface Terminates Betvgw: 3:Sel

IteXinmw u~evatian

4.00 ft. tin Segmonts Delti Each Trial Pail Surs fao.

3mloin IAceq fl Agl Thitkina va~ac Bs k rrntmul Tgil "M mArenIdqlesIIf cTr -n a.O

* safety Factors Are Calculated By 7he Modified Bishop Method t *

Failure Surface Specified By 25 Coordinats PainRts

I iyt Y I

cile Center 52.0 y: 130.9 aid RadiuS, 73.7

•,.* 1.007 *

Page 8: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

MO'A" ______ /73,9,

46$ -- - . '7; AC-. tZ.% 76

"Jr I."

IEZ- q7,1

2 1 lo-.-

&D

Lv1

I-D

0o

0o

-n,

m3)-ACF

/

I;..1!4'

HO ~og5Jo p al /50•IZ

F~ c%~- 9oc 2ce,to Vsr ZM.&rC

-A0

I;

I'* I

It

I.

hua

'I I

.I-

i,

'I:1

(Ii-

. ji

I 1 :11 ml

I:

II

I:

~ii t~II It

II. i'I

-u)OD

Page 9: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 03:02PM FROM HOMESTAKE GRANTS TO 13014155397 P.09

o .0 s a i-nl£

Pm3LS DjmB~cXflzo MC 312 EAST SrLPE - OIgsT cI''/'/t *

uowmarnr CmDDlMs

IIOLMLAwe(II)41I. 0

~I II

I. 0I

*I-" tIGo0NIliYiI

minus

I

ItSOMflC SO=L PAIAJWTrm

3 Type(s) of sail

1%,ts Cques an Fritio PM +

Unit Wei.ght of Water - 63.40

Piexaustric surfac No. 1 Specified by 6 Coordinate Points

I IS"liii

1-111

R??I89X 1 SI91~!~kwnl1 Coefflcasnt

cavitatim, Pres="r - =Ft w

Page 10: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 03:03PM FROM HOMESTAKE GRANTS TO 130141555397 P10

• •I alFailur~e Ch~•8 iq_• ,_so

.00 Trtal surfacs Pave D)een Generat;d.

SAPP04toz" at fcmr~h f 5po Fr~ally Spaced

Mobh Srface Terminates Betvrw: I:Shftltftnflerf~sita~W !¶'I?6railai xu Eevation

20.00 rt. WM* hgauets Define Each Trial Failure Surface.

jr t~ tn~ X zA g~h %AfO 14r1&tta

* * SUZtY Factors Ax calculated by Tbhe Xdif led uistop Neth cd

failure Suwface Specifie By 13 Caar4inate nints

41Circle Center A I = 19.1 ; Y a 542.9 aM Radius, 486.0

Cu 1._ *e

Page 11: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 03:04PM FROM HOMESTAKE GRANTS TO 13014155397 P.12

J. IqaJLFaAjre $,rface_ SeaohigLmgetd, Usi &

100 Trial Surfaces Have Bean Generated.

nS urfl~aLas0 tiafl r¶Jjft-kOras POiinh- JMMflY Spaced

Each Surface T2rminates Betvf X m 268",33K = 23319

ggIutjgI~ yOeIw¶ h. inimum Elevation

20.00 ft. Line Segments DefLne Ech Tral Failure Surface.

r L tjwn ft Vipsq The Tnfa rt O.

* *Safety Factors Are Calculated By The Modified Bishop Method * &

Valium Surtfae Specifi ed -• 12 Coordinate Points

Circle Center At X - 132-1 1 Y -315.4 656 Radius, 261.2

1.015 3

TOTrL. P.12

Page 12: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 03:03PM FROM HOMESTAKE GRANTS TO 13014155397 P.11

fl£ Jabu. s Bishop•r Spencer s ketl o0 •ices

robazam DZmacR1 TIOa HM EP2 fl5¶C UJAPS - WORST CASE

SOUKDpjY COORDIfLTES

ig~ •E L% gage

Ti~ft 63. 0

II

ii183:00203.99

iii:g88009.10

75.0010.00

30O

3.00

400.00

3 a: S0'D1:iila: (a)i" 8800

23.00ii

9tjg0

I7ni0IISOTROPIC SOIL PKRAERZRB

3 Type(s) of Soil

Soil aitsa1 stunted cohesion Friction~vgaUi w nU1~t IntellTr.p A

- (Pat; a Pa(w

IIL -I~ 3§~

Pare PressurePg re Cor tS4 P1

I PUZEZOC MC SUflC(S) HAVE BL= SPSCUD

Unit Weight of Water - 62.40

Piezasotric surface No. I Specified by 6 Coordinate Points

InIII

H ~ IIgtoi&R talartnJu te LaigCofii

~ Coef ficient

Cavitation Pressure ..0 paf

Page 13: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 03:04PM FROM HOMESTAKE GRANTS TO 13014155397 P.13

w9in BoMW meuAauR FOR %%=r DOWN=U3VflOflTZQN ION= 42 SBUSu0Onsnn RAM cnr s oawa

Uoariiq S

1P2-1

192-2

SP2-3

1P2-4

EP2-5

7;2-6

Worthing

1541765.7

154.•596.3

1542075.3

1541975.7

1542370.0

1542355.0

lasting

490551.0

490782.0

430668.0

4flOlb,0

490785.0

491250.0

Drill to:

25 ft.

25

40

40

25

25

SflPlIhNS "D !Z8TZENG

Drill to total depth with 4.0 in. hollow stam auger, taking SPT,swith spilt spono snmplas at 2.0 ft, 5.0 ft and at intarvals of notmore than 5.0 to total depth.

Preserve samples for USCS soil classification

Racord blow counts for each 6-0 in interval for 18.0 in. sampler

drive.

Reocrd moistu•re condition of sample upon remOva from sampler, andsaturation where ewiountered.

Record each Iog an standard Log fto= approved by Homestaxe.

-t A ..,~r- aw.

gfl-9

U

-I6 et

V

a

-alt-t • 'I.

AAe-4-ftS

~~ TM

€,,

TrOTA. P.02

Page 14: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09 '-02-1994 03:05PM FROM HOMESTRKE GRANTS TO 13014155397 P.14

LOG OF TEST HQLE NO. .. _ ______

A Pojct: Project No. q 4 - .levation Top of Test Hole: _riled: /+

Depth to Groundwater lo+ go poLhivg* " .' ; S - Drillins Method: , "7

I - Sieve Analysis 2 - Atterberg Limits 3 r- Direct Shear 4 a R.Alue 5 a Other

Fiqure

Page 15: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 03:05PM FROM HOMESTAKE GRANTS TO 13014155397 P.15

V&A

LOG OF T4ST HOLE NO.Project, '- -~- o -Elevation -Topr of Tam Hc6Iu - _ ____________ Date Dvifled

Depth to Grourndwatw.r: rngt &PIC014m±2..±recd Drilling Methodc H ,

I

I -Sieve Analysis 2 - Atterberg Limits 3 m Direct Shear 4 - R.Malue 5 = OtherFigure .. .. _

Page 16: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-199'

V

A

03:06PM FROM HOMESTAKE GRANTS TO 13014155397 P. 16

LOG OF TEST HOLE NO. . :' 2 -10

Project: h4 -,z s1,.k'E .," 1 Project No. q " -Elevation . Top of Test Hole:,, Dote Drilled 2 q_ 4Depth to Groundwater: D Drillin9 Method: -"" ,

I Sieve Analysis 2 a Atterberg Limits 3 m Direct Shear 4 =R.Wue 5 Other

Figure __....._-

Page 17: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 03:06PM FROM HOMESTAKE GRANTS TO 13014155397 P.17

VA

LOG OF TEST HOLE NO. iPProject, A t 'ti bitiA. pu.Q/4a 7 Project No. ' '~

Flavpffion - Top of Tom: Hole:- Date 014114d.Depth to Groundwater:~ 402 Drilifig Method: 6H5'

I - Sieve Analysis 2 a Atterbers Limits 3 r Direct Shear 4 aR-W~ue 5 OtherFigure

Page 18: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 03:07PM FROM HOMESTAKE GRANTS TO 13014155397 P.18

V&A

JJLOG OF TEST HOLE NO. 9.Project: /Ir "*Ke ' C rAJDI&M Project No.qElevation. Too of Test Hole- Dote Drille.d

Depth to Groundw•ater C " Drilling Method:

2 = Atterber9 Limits 3 m Direct Shear 4 - R-Value 5 =

Fiqure

Page 19: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-199.

V

A

4 03:07PM FROM HOMESTAKE GRANTS TO 13014155397 P.19

LOG OF TEST HOLE NO. fP&- 4 -4Project~~~~ _O+t J Ot17S12 PbiWProject No.

Elevation " Top of Test Hole. , Date Drilled: / "

Depth to Groundwater: ?0"+ CCOwl -rem C Drillinq Method: " .,

- i I I I ~I

I-

Ieq

I--v

Material Description

p S S - S - & - a - iI I T

Is SMl 64mciý

,t& C620C

e,;I4~ Ch:Ila+41SO . O

mini mJ[i II|W I

- r - t

C Y cpa.*,

- I I - m .... . ....-

I f Sieve Analysis 2 Atterberg Limits 3 -m Direct Shear 4 m R. alue 5 Otmer

Fiqure

Page 20: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09-02-1994 03:08PM FROM HOMESTAKE GRANTS TO 13014155397 P.20

N/.•/I/4

LOG OF TEST HOLE NO. ..... -

A Project: Loedftedz----Elevation - Top of Test Hole:

Depth to Groundwater- m0' e _._. _ _______

Project No. qDate Drilled: .

Drilling Method:

I = Sieve Analysis 2 -At'erbers Limits 3 - Direct Shear 4 a Rvlue 5 Other

Figure

Page 21: P.01 I-AU.. VIELE I nAlMI~iVIIQalJm1 %o'v r-r -Wrir-09-02-1994 02:58pm from homestake grants to 13014155397 p.01 i-au.. viele i nalmi~iviiqaljm1 %o'v r-r -wrir-homestake mining company

09--02-1994 03:08PM FROM HOMESTAKE GRANTS TO 13014155397 P.21

LOG OF TEST HOLE NO. F____Z_& Poet ,-fA Pr6&9t 4VX4* aXA!6I4~ a~m~roject No. ~e

Elevation -Top of Test Hole*- _ _ __ _ _ _ Date Drlle~d:qDeoth to Groundwa~ter -M~ 0- 8" CgS M p i -- Drilling Method. i

1 - Sieve Analysis 2 zArttrberg Limits 3 aDirect Shear 4 zR.A/alue 5 igOther

Fict.ure _________

TOTAL P.21