P RefStd 1110 L03 H v090201 en Local-Amendment

2
Short Name: 111 O_L03_H_v090201 Petrom OMV Refining Standard Local Amendment PETROM Membru CMV Grup Short Description: Petrom Refineries Local Amendment to Piping Design Subject: Minimum Requirements for Design and Objective: Calculation of Refinery Piping This document describes the additions and alterations to Refining Standard 1110_H_v090201 at Petrorn Refineries. Scope of Effectiveness Notes: The scope of effectiveness is limited to Refin’ng business segment within Petrom Refineries. Organizational Unit Name 1. In the interests of simpl’c’ty and readability the language of this statement is as far as possible gender neutral, Where applicable, the masculine inc udes the feminine. 2. Hardcopies of th’s document may not represent the current applicable standard, check for latest document on the Regulations Platform P RefStd 1110 L03 H_v090201_EN_Local Amendament.doc Page Valid as of: 090401 1 of 2 ,[______ Version: 090201 Petrom OMV Refining Division all rights reserved Maintenance PBZ Ion Nita Author Maintenance ARP Valerian Lazarescu .c V Responsible for the Maintenance PBZ Ion Nita content Maintenance ARP Valerian Lazarescu Approved regarding formal correctness by Norms Department Verified regarding correctness of content by Felicia Decusara Toader Stefan Head of Maintenance PBZ Head of Maintenance ARP Head of Maintenance MRE-M Released by Sorin Coltan Karl Graf Date Minimum Requirements for Design and Calculation of Refinery Piping

description

l03 h

Transcript of P RefStd 1110 L03 H v090201 en Local-Amendment

  • Short Name:111 O_L03_H_v090201

    Petrom OMV RefiningStandard

    Local Amendment PETROMMembru CMV Grup

    Short Description:Petrom Refineries Local Amendment toPiping Design

    Subject: Minimum Requirements for Design and

    Objective:

    Calculation of Refinery PipingThis document describes the additions and alterations to Refining Standard1110_H_v090201 at Petrorn Refineries.

    Scope ofEffectiveness

    Notes:

    The scope of effectiveness is limited to Refinng business segment within PetromRefineries.

    Organizational Unit Name

    1. In the interests of simplcty and readability the language of this statement is as far as possible gender neutral, Whereapplicable, the masculine inc udes the feminine.

    2. Hardcopies of ths document may not represent the current applicable standard, check for latest document on theRegulations Platform

    P RefStd 1110 L03 H_v090201_EN_Local Amendament.docPage Valid as of: 0904011 of 2 ,[______ Version: 090201

    Petrom OMV Refining Division all rights reserved

    Maintenance PBZ Ion NitaAuthor Maintenance ARP Valerian Lazarescu.c

    VResponsible for the Maintenance PBZ Ion Nitacontent Maintenance ARP Valerian LazarescuApproved regardingformal correctness by

    NormsDepartment

    Verified regardingcorrectness of content by

    Felicia Decusara

    Toader StefanHead ofMaintenance PBZHead ofMaintenance ARPHead ofMaintenanceMRE-MReleased by

    Sorin Coltan

    Karl Graf

    Date

    Minimum Requirements for Design and Calculationof Refinery Piping

  • ntroductionBlank

    2. Regulatory ContentBlank

    3. Terms and AbbreviationsTermsTerm DefinitionLocal Amendment Addition to a Refining Standard with which a Refin ng Subsidiary

    adopts a Standard. Necessary for the respective Standard to beapplicable at the subsidiary.

    AbbreviationsAbbreviation DefinitionLA or L.A. Local AmendmentPBZ PetrobraziARP Arpechim

    4. Keywords (Search Criteria, Search Terms)Local Amendment

    5. Sub-Documents & ReferencesSub-DocumentsTemplates[TAO1J Template for Fixed-Format Sub-Documents

    Refining_Standard_MRE-T_01 00302_EN_Refining-Standards-Subs-TempFormat-Documents

    (TAO2] Template for Free-Format Sub-DocumentsRefining_Standard_MRE-T_01 00_T02_EN_Refining-Standards Subs-TempFormat-Documents

    References

    6. Amendments from Previous VersionsDate Comment090401 First version

    P RefStd_1 1 1O_L03_H.y090201_EN_Local Amendament.docPage Validasof: 0904012 of 2 j______ Version: 090201

    Petrom OMV Refining Division all rights reserved

    a e-Fxed

    a e Free-

    Minimum Requirements for Design and Calculationof Refinery Piping