Oxfordshire Clinical Commissioning Group · Title of Presentation: Integrated Performance Report Is...
Transcript of Oxfordshire Clinical Commissioning Group · Title of Presentation: Integrated Performance Report Is...
Paper 16/66 29 September 2016 Page 1 of 2
Oxfordshire Clinical Commissioning Group
Oxfordshire Clinical Commissioning Group Board Meeting
Date of Meeting: 29 September 2016
Paper No: 16/66
Title of Presentation: Integrated Performance Report
Is this paper for (delete as appropriate)
Discussion
Decision
Information �
Purpose and Executive Summary (if paper longer than 3 pages): To update the Committee on quality and performance issues to date. The Integrated Performance Report is designed to give OCCG Board assurance of the processes and controls around quality and performance. It contains analysis of how OCCG and associated organisations are performing. The report is comprehensive, but seeks to direct members to instances of exception.
Financial Implications of Paper:
Action Required:
The OCCG Board is asked to note the report.
NHS Outcomes Framework Domains Supported (please delete tick as appropriate) � Preventing People from Dying Prematurely � Enhancing Quality of Life for People with Long Term Conditions � Helping People to Recover from Episodes of Ill Health or Following Injury � Ensuring that People have a Positive Experience of Care � Treating and Caring for People in a Safe Environment and Protecting them
from Avoidable harm
Equality Analysis completed (please delete tick and attach as appropriate)
Yes
No
Not applicable �
Outcome of Equality Analysis
Paper 16/53 28 July 2016 Page 2 of 2
Author: Diane Hedges, Chief Operating Officer and Deputy Chief Executive; Sula Wiltshire, Director of Quality; Sharon Barrington, Head of Planned Care and Long Term Conditions
Clinical Lead: Sula Wiltshire, Director of Quality
Oxfordshire
Clinical Commissioning Group
Oxfordshire CCG
Integrated Performance Report
for Board v.Final
September 2016
1
Oxfordshire
Clinical Commissioning GroupExecutive Dashboard
2
Plan cost Actual
£
000
% Rating £
000
£
000
£
000
% Rating
5 Oxford University Hospitals NHS
Foundation Trust
£132,083 £132,084 £1 0.00% Green 317,000£ £ 317,000 £ - 0.00% Amber →
5 Royal Berkshire NHS Foundation
Trust (not excluded drugs)
£8,584 £8,403 -£181 -2.11% Green £ 20,600 £ 20,168 -£ 432 -2.10% Green ↑
5 Horton Treatment Centre (Ramsay) £3,095 £3,149 £54 1.74% Amber £ 7,428 £ 8,058 £ 630 8.48% Amber ↓
5 Oxford Health FT £50,476 £50,678 £202 0.40% Amber £ 122,996 £ 123,252 £ 256 0.21% Amber ↓
5 SCAS 999 £8,831 £9,041 £210 2.38% Amber £ 21,194 £ 21,782 £ 588 2.77% Amber →
Target Period OCCG Rating OUHT^ Tracking RBFT^ Tracking
RTT 92% 4 91.20% Red 90.00% Red 94.50% Green
93% 4 95.40% Green 95.10% Green 97.00% Green
93% 4 94.90% Green 95.50% Green 98.00% Green
96% 4 94.40% Red 92.40% Red 98.30% Green
94% 4 97.50% Green 97.20% Green 94.40% Green
98% 4 100.00% Green 100.00% Green 98.50% Green
94% 4 97.40% Green 96.10% Green 99.00% Green
85% 4 76.30% Red 73.00% Red 82.80% Red
90% 4 100.00% Green 100.00% Green 81.40% Red
75% 4 65.40% Red
75% 4 69.70% Red
95% 4 91.60% Red
95% 4 87.60% Red 87.60% Red
95% 4 91.00% Red 91.00% Red
95% 4 94.96% Red
Oxon* Primary
care
OUHT RBFT KPI May Jun
4 2 0.0^ Access 15% 15.9% 15.1%
Limit 0 0 0 0Recovery 50% 50.6% 50.0%
Actual 4 2 2 0 6 week wait
75% 74.5% 82.5%
Limit 61 29 29 11 18 week wait
95% 94.9% 95.9%
Actual 80 45 29 7
OUHT RBFT OHFT National
NHS
88% 85% 78% 80% 10% Over/under
96% 99% N/A 95% 3.00% Over/under
plan83% 92% N/A 85% <3.0% Over/under
↑ Variance =
↔ variance =
↓ Variance =
Key - for Finance overview
Forecast Move-
ment
from last
month
Plan cost
£000
Actual
cost
£000
Variance Variance
6.3 - Cancer Two week waits
6.4 - Breast symptoms Two week waits
Reporting
period
Provider YTD
Finance Overview – note different reporting months
Performance Overview
N/A
Independe
nt
Cat A19
4 hour wait OUHT
RBFT
OHFT
Ambulance
response
time
Cat A8 - Red 1
Cat A8 - Red 2
Measure
Incomplete Pathways - all patients
2 week
62 Day 8.4 - Cancer Plan 62 day standard (Tumour)
9.4 - CRS 62 Day screening standard (Tumour)
Independent
providers
2
2016/17 YTD (to end August) OHFT
31 Day 7.4 - 31 Day First Treatment
7.11 - 31 Day Subsequent Treatment (Surgery)
7.11 - 31 Day Subsequent Treatment
(chemotherapy)
7.11 - 31 Day Subsequent Treatment
(radiotherapy)
2
Never events
MRSA
incidents
C Difficile
incidents
0.0
0
0
3
7
0
0
Friends and family - patients likely or extremely likely to
recommend (July 2016)
The care given at this organisation (staff - Q1 16/17)
Inpatient (Patient)
Accident & Emergency (Patient) N/A
98%
Oxfordshire
Clinical Commissioning GroupQuality and Performance Dashboard -all providers
3
Key Issues and mitigation
52 week waits
The number for month 4 has reduced slightly at OUH. The
specialty is trauma and orthopaedics. The other 2 long waits
are at Imperial College FT and North Bristol and are both
T&O.
Incompletes
OUH did not meet this standard with 90%. The specialties are:
T&O, Spinal, Neurosurgery, Gynaecology, ENT and Plastics.
62 day standard
RBHFT remedial action plan in place and performance has
improved. July standard and screening standard were missed
(82.58% and 81.40%) but was much higher than the agreed
trajectory (76.8%) . Recovery expected Q3 for both targets.
OUHFT failed to meet the 62 day standard as per the agreed
trajectory. However, their position is lower (73.02%) than the
agreed target for July (78%). Recovery is expected September
16 reported in November 16. OUHFT and OCCG Cancer
action plans are in place but concerns are being escalated.
A and E – four hour waits
The A&E performance against the 4 hour target continues to
show signs of improvement and consistency. Whilst OUHFT
have not met the 95% target, they are ahead of schedule on
their revised trajectory which states achievement of 84% in
Q1, 87.6% was actually achieved. There is, however, an
unresolved issue on NHSI trajectory and OUHFT claimed
agreed trajectory, whilst the Q1 submitted trajectory still to be
formally agreed and remaining quarterly trajectories currently
subject to negotiation.
September 2016 saw the inaugural meeting of the
Oxfordshire A&E Delivery Board. OUHFT have identified the
following Top 3 actions to improve A&E performance:
1. Streaming at the front door
2. Better patient flow management
3. Improving discharge processes
All patients have similarly identified priority areas, additional
doctors and reshaping of the assessment actions should
impact in October.
High numbers of attendances continue to make way to A&E at
both the Horton and the JR an increase of 8% on last year
(YTD).
Dementia Diagnosis
On track.
Target Jul '15 Aug '15 Sep '15 Oct '15 Nov '15 Dec '15 Jan '16 Feb '16 Mar '16 Apr '16 May '16 Jun '16 Jul '16 YTD *
92% 93.7% 93.8% 93.6% 93.6% 94.0% 93.6% 93.3% 93.2% 92.7% 92.7% 92.7% 92.3% 91.2% 92.2%
0 2 3 4 0 1 3 2 2 1 3 8 9 6
1% 0.2% 0.2% 0.3% 0.4% 0.3% 0.7% 0.7% 0.4% 0.8% 0.9% 0.7% 0.6% 0.5% 0.7%
93% 94.2% 91.9% 93.1% 94.1% 93.5% 90.7% 89.0% 93.3% 91.5% 88.7% 92.8% 94.7% 95.4% 92.8%
93% 92.1% 92.5% 94.9% 97.8% 97.4% 94.8% 92.3% 95.8% 97.9% 93.2% 90.6% 94.6% 94.9% 93.4%
96% 98.5% 97.5% 96.3% 98.4% 98.5% 98.0% 96.0% 96.1% 96.3% 96.6% 94.8% 96.0% 94.4% 95.5%
94% 98.0% 97.3% 96.4% 97.5% 100.0% 98.1% 96.1% 93.7% 94.6% 93.2% 95.5% 100.0% 97.5% 96.5%
98% 100% 100% 100% 100% 100.0% 98.5% 98.1% 100.0% 98.8% 100.0% 98.9% 100.0% 100.0% 99.7%
94% 99.0% 98.9% 94.9% 97.3% 95.7% 100.0% 92.2% 100.0% 91.9% 78.0% 94.7% 96.2% 97.4% 91.6%
85% 86.7% 88.9% 89.3% 84.6% 88.9% 87.3% 87.4% 83.9% 86.0% 79.1% 84.9% 75.3% 76.3% 78.9%
90% 91.7% 95.0% 100.0% 100.0% 88.2% 100.0% 100.0% 94.1% 100.0% 100.0% 95.8% 84.6% 100.0% 94.6%
OUHT 95% 96.5% 93.8% 90.6% 88.0% 88.8% 88.2% 84.4% 77.6% 78.9% 87.6% 87.0% 88.2% 87.6% 87.6%
RBFT 95% 95.7% 96.1% 95.3% 94.5% 94.9% 95.8% 93.9% 88.0% 88.9% 91.1% 93.2% 95.3% 91.0% 92.6%
OHFT 95% 96.1% 97.1% 96.3% 95.1% 96.9% 97.5% 97.0% 95.2% 96.2% 94.5% 95.5% 97.5% 94.96% 95.6%
OUHT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
RBFT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1052 974 969 1018 1005 791 890 784 881 717 712 622 506 635
Target 64.8% 65.0% 65.3% 65.5% 65.8% 66.0% 66.3% 66.5% 67.0% 65.1% 65.3% 65.4% 65.5% 67.0%
Actuals 64.9% 65.3% 65.5% 66.0% 66.0% 66.5% 66.4% 66.7% 65.8% 65.7% 66.3% 67.0% 67.0%
52 63 79 106 117 131 140 148 157 15 35 19 59 59
48 61 73 85 98 111 124 135 145 11 23 35 48 48
0 2 1 1 2 0 1 0 1 0 0 1 2 0 3
4 hour wait 95% 96.1% 97.1% 96.3% 95.1% 96.9% 97.5% 97.0% 95.2% 96.2% 94.5% 95.5% 97.5% 94.96% 95.6%
Access 15% 17.1% 13.9% 14.6% 18.3% 17.2% 13.2% 16.7% 18.0% 16.5% 15.9% 15.1% 15.5%
Recovery 50% 50.6% 52.7% 51.2% 46.1% 45.3% 46.7% 49.4% 49.5% 51.0% 50.6% 50.0% 50.3%
6 weeks 75% 65.3% 73.9% 66.3% 66.4% 66.7% 72.5% 73.7% 70.6% 70.1% 74.5% 82.5% 78.5%
18 weeks 95% 92.1% 94.3% 90.5% 91.6% 91.7% 92.2% 94.9% 93.3% 95.7% 94.9% 95.9% 95.4%
Cat 1 75% 68.8% 70.6% 69.5% 70.1% 65.4% 78.4% 72.0% 72.6% 58.0% 73.8% 74.5% 72.4% 65.4% 71.1%
Cat 2 75% 68.3% 68.4% 68.7% 72.5% 75.8% 73.1% 72.8% 68.6% 65.9% 74.5% 71.9% 73.4% 69.7% 72.4%
Cat 19 95% 91.7% 92.5% 92.9% 93.3% 95.0% 93.7% 94.6% 92.8% 92.5% 95.3% 93.6% 92.2% 91.6% 93.2%
Dementia Diagnosis
HC
AI Incidence of C-Diff - YTD
A&E (MIU-Type 3)
Incomplete % within 18 weeks
Incomplete 52+ week waits
4 Hour Wait
Oxfordshire Ambulance Response Time
Me
nta
l H
ea
lth IAPT
People waiting from referral to entering a course of IAPT treatment
as % of people who finish a course of treatment.
A&
EC
an
cer
RT
T
Incidence of C-Diff - YTD Ceiling
MRSA
Delayed Transfers of Care from hospital per 100,000 pop. per month
Two Week Wait - Breast Symptom
31 Day First Treatment (Diagnosis to Treatment)
31 Day Subsequent Treatment (Surgery)
31 Day Subsequent Treatment (Chemotherapy)
31 Day Subsequent Treatment (Radiotherapy)
62 Day Standard
62 Day Screening
12 Hours Trolley Wait
Diagnostics % waiting over 6 weeks
Two Week Wait
Oxfordshire
Clinical Commissioning Group
Quality premium – 16/17 tracker
4
Constitution standard Owner Penalty OCCG July 16 position
Actions and mitigation
RTT-incomplete (92%) Sharon
Barrington
-25% 91.2% Providers challenged by exception by specialty through the contract by Planned Care team and in regular meetings outside of
contract meetings. Cancellations of theatre time is being worked on with improved access to preadmission clinics for high risk patients. Capacity matching to demand is ongoing both for outpatients and elective surgery. July is the only month we have not
been compliant this year.
A&E waits (95% within 4
hrs)
Sara Wilds -25% 87.6% Provider, commissioners and NHS E discussing trajectory for 16/17, A+E delivery board established with new system wide plan to
be reported in October 2016.
Cancer waits – 62 days
(85%)
Shelley Hayles
& Laura Carter
-25% 76.3% Regular meetings in place with provider to address waits as well as bi-monthly OUHFT/OCCG Cancer meetings. OUHFT and OCCG
Cancer Action Plans in place. Focus on 62 week target, launch of SCAN, Screening, Survivorship and use of mandatory 2ww proforma.
Category A Red 1
ambulance calls (75%)
Sara Wilds -25% 65.4% Thames Valley CCGs have issued a contract notice, and are managing a comprehensive remedial action plan in that context. OCCG
are supporting.
Quality premium measures Position
National (20%) – 4% improvement of a subset of cancers diagnosed at stage 1 or 2 against
previous year
Unclear and at risk– 12+ month lag, so last years’ performance will be used for final payment. Historic
data (Q4 2013 = 48.3%, rate of improvement ~1-3% a yr) shows improvement required unlikely.
National (20%) – 83.25% improvement of respondents to GP Patient Survey report a good
experience of making an appointment
July 2016 survey showed 80.25%. Data collection for next year starting January. Further investment for
GP access sought by primary care team but not likely to impact in the short term. Increasing pressure on primary care are likely to affect patients’ experience of making an appointment.
National (20%) – >80% of GP referrals made as e-referrals against previous year 81% M2 2016/17. 2 week wait referrals coming online, which should increase performance.
National (10%) – 5% reduction in antibiotics prescribed by primary care, and a 5% reduction in the
proportion of a subset that are broad spectrum
The overall antibiotic items per STAR PU (weighted population) has already achieved its target.
The second target - set of broad spectrum antimicrobials as a proportion is close to the target but
requires further work from the pharmacy advisors.
Local (10%) – >49.5% of pregnant women are vaccinated for flu from 1st Sept 16 to 31st Jan 17 (i.e.
an increase on 2015/16 performance)
Jemma Graham & Claire Ward Jackson working with provider and flu group respectively to support.
Localities team has been briefed on messaging.
Local (10%) – Increase the proportion of those with anxiety/depression accessing IAPT to 15.3% by
end of 2016
Q1 HSCIC reports show 2,615 contacts against an annual target of 9,289, which provides a margin of
293 patients for Q1. Provider reports suggest Q2 will provide more of a margin but national reports do not always correspond.
Local (10%) – 35.6% of Oxfordshire residents will have had an NHS Health Check by 31st Dec 16 The public health team are on track with a comfortable margin, with GPs having seen 8,162 in the first 6
months against a target of 13,142 for the whole year
The Quality Premium is a financial incentive for the CCG. The incentive requires both achievement of the constitution measures and achievement of each of the quality premium
measures. For each constitution measure achieved, 25% of the £3.5m is available depending on achievement of the quality premium measures. Based on July’s performance, we
would achieve £0. However, performance for the constitution measures is based on Q4 2016/17 according to our STP trajectories. This means that we have time to improve
performance and achieve the incentive.
Oxfordshire
Clinical Commissioning Group
New: Six clinical priority areas baseline assessment� The CCG Improvement and Assessment Framework (CCGIAF) will include the six clinical priority areas. These are diabetes,
dementia, learning disability, maternity, cancer and mental health.
� The initial assessment has been released for 3 of the 6 areas which are diabetes, dementia and learning disability. For some
of the areas there is lack of clarity regarding the source and timing of the numbers being used: we are exploring these with
NHSE.
� Diabetes: The overall rating for diabetes considers two indicators which are recognised measures of whether patients with
type 1 or type 2 diabetes are being successfully supported to manage their condition. The two indicators have each been
assessed using National Diabetes Audit (NDA) data to give CCGs a RAG rating. The CCG was given a rating of “Performing
Well”.
� Dementia: The 2016 initial rating for dementia considers two indicators: dementia diagnosis rates and care plan reviews for
people with dementia. The CCG was rated as “Top Performing” in this area.
� Learning Disability: For Learning Disabilities, two indicators are combined to give an overall rating: reliance on specialist
inpatient care for people with a learning disability and/or autism and the proportion of people with a learning disability on the
GP register receiving an annual health check. The CCG was rated “Needs Improvement”. This rating is driven partly by the
incorporation of secure beds commissioned by NHS England specialist for Oxfordshire patients into our numbers. This is in
line with national Transforming Care Plan guidance but currently OCCG has no controls over these numbers. In terms of
health checks our most recent performance from 2014/15 (41%) was lower than the national average of 47%. This forms a
key part of our local Transforming Care Plan.
5
Oxfordshire
Clinical Commissioning GroupExecutive Summary 1
6
Key Issues
Delayed Transfers of care (DToC)
• The impact of the DTOC plan has reduced the average weekly headcount from
158 Dec 15 to 113 at 8 September 2016. There has been a steady downward
trajectory until an increase in the last 3 weeks. The head count result of 156 on 8th
sept is cause for concern.
• Current key issues in the DTOC numbers are
• Flow into and through community hospitals; the number of patients waiting
to move from OUH to OH spiked to 41 in the most recent count
• Continuing delays relating to patients with family issues and/or availability of
privately funded care, especially moving out of Community Hospitals
• Managing the impact of the transfer of reablement services to a new
provider from 1 October 2016
• Oxon has improved its comparative position from 151st In terms of head count in
Nov 15 to 108th in September 16. In terms of bed days lost we have improved to
113th.
• However, the national measure (which looks at the number of bed days relative to
the total occupied bed days) is more problematic given the number of beds that
have been realigned as part of the Balancing the System initiative.
• The key long-term issue facing the system is the availability of onward care (beds
and home care) for people with dementia
Outpatient clinical communication
Trusts are expected to communicate with GPs within 14 days of any outpatient
appointment. This is to ensure the patients ongoing management is clearly
understood by the GP and any changes in medication are continued by the GP.
Inpatient clinical communication
Discharge summaries should be sent to the GP within 24 hours of a patient leaving
hospital. Patients often need significant support from their GP so it is imperative they
receive prompt communication from the hospital in order to manage the care of their
patients.
Actions
The plan remains mostly on target
• OCC Help to Live at Home initiative delivering additional domiciliary care hours
• New integrated community and hospital discharge reablement pathway has been
procured and will commence 1 October 2016
• OCC has procured 17 interim beds
• Implementation of agreed Choice Policy to enable swifter movement of patients in
to end place of residence over a 7 day process.
Outstanding/new actions to manage the current pressures
• An audit is taking place of community hospital delays relating to private funders and
or family-related delays to identify any areas of practice that could be modified to
support flow
• OCC are seeking to maintain levels of dom. care via discussions with providers
• OCC is managing the reablement transition
• A workshop is being set up to identify the needs and the offer to support
commissioning of accommodation for people with dementia
The CCG has issued a Contract Query Notice (CQN) and is currently monitoring
performance. In July 2016, 82.03% (improving slightly) of letters were sent to GPs
within 10 working days. Performance data suggest that there are excessive delays in
some specialties and with individual clinicians. Consequently, the Trust are
undertaking a “deep dive” to fully understand if these delays relate to technical,
administrational or clinical issues. A detailed report will be provided to the October 16
Quality Review Meeting
July 16 figures show that 76.7% of discharge summaries were sent within 24 hours of
discharge. The CCG has issued a First Exception Report to the Trust. There has been
limited improvement in performance in the previous 9 months. The CCG are currently
considering the Trust’s new Remedial Action Plan. The Heads of Terms agreed a
review of the trajectory and this is the next step to enable us to fully hold to account.
Oxfordshire
Clinical Commissioning GroupExecutive Summary 2
7
Key Issues
Management of test results
OUHFT undertakes over 110,000 investigations each week with the vast
majority being managed efficiently and effectively; however, the CCG has
concerns about the administration of this process. OUHFT has reported a
small number of SIRIs and OCCG regularly receives GP feedback where
clinicians have failed to follow up results or inform the patient’s GP of the
result where clinically appropriate. OUHFT has acknowledged that this
represents a potential patient safety risk.
C. difficile
Clostridium difficile, is a bacterium that can infect the bowel and cause
diarrhoea. The elderly, people with multiple co-morbidities and those who
have received multiple courses of antibiotics are most commonly affected by
the organism. C. difficile infections are unpleasant and can sometimes cause
serious bowel problems, but they can usually be treated with another course
of antibiotics. The period to end of August saw a total of 80 cases of
C.difficile isolated in Oxfordshire patients. This is against a limit of 61 for this
time period.
MRSA
MRSA is a type of bacteria that is resistant to a number of widely used
antibiotics. This means MRSA infections can be more difficult to treat than
other bacterial infections. There have been 2 cases of MRSA bacteraemia
attributed to OUHFT between April and the end of August 16/17, and two
cases in the community. One community case has been assigned to third
party, the second case has been put forward as third party and is awaiting
arbitration by PHE. The target remains 0 for 2016/17.
CAMHS
The provider is expected to see 75% of children referred to the CAMHS
service within 12 weeks. Waiting times remain some way below target, with
41% (up from 30% last month) of referrals assessed within 12 weeks, and
some families waiting over 6 months. Recruitment remains a persistent
challenge. There has been a 10% reduction in the total number of children
waiting.
Actions
In July 2016, 77.9% of test results were endorsed (electronically signed off by a
clinician) within 7 days. This represents a 2-3% improvement each month and is
the best performance the Trust has achieved to date. The CCG is currently
considering the Trust’s new Remedial Action Plan. The Heads of Terms agreed a
review of the trajectory and this is the next step to enable us to fully hold to
account.
Each case up to the end of August has been discussed at the Health Economy
meeting, consisting of Public Health England (PHE), OUHFT, OHFT and OCCG.
The meeting establishes if there were any lapses in care leading to the
acquisition of C.difficile and therefore if the case was avoidable or unavoidable.
Of the 80 cases reviewed, 5 cases were deemed avoidable and 4 require further
investigation prior to a decision being made.
For both cases at the OUH, post infection reviews have been completed, and
identified lapses in care. However, one case was classed as unavoidable, as the
source could not be identified and the second was considered avoidable.
Learning points regarding nursing and medical care and documentation were
identified and a remedial action plan is in place. Both community cases had no
interaction with health care services in the three weeks preceding the
bacteraemia.
The CCG is monitoring waiting times and provider action plans closely.
Recruitment and referrals continue to challenge the service. The NHS England
sponsored transformation plan is progressing, and a risk mitigation plan to pro-
actively survey patients waiting to ensure that their condition hasn’t deteriorated
is live and monitored through the contract. Further information is provided in the
appendix
Oxfordshire
Clinical Commissioning GroupCCG Provider Summary
8
Oxford University Hospitals NHS Trust (OUHFT)Month 4 position
The primary cost drivers at month 4 are:
• A&E,
• Non Elective spells,
• Non elective excess beddays,
• Outpatient Firsts, and Follow Ups.
This is offset by under performance in:
• Maternity antenatal and post natal pathways,
• Outpatient Procedures,
• Ambulatory Units and
• “Other”. Most of Other relates to Unbundled Inpatient palliative care.
Critical Care has moved back to an underspend this month.
A&E Attendances
A&E continues to over-perform at levels similar to last month at 352k (6.9%), and 4.3% over the activity plan. The higher percentage overspend compared to activity suggests a higher acuity
linked to the increased activity in NEL.
Ambulatory Care Pathways
The activity recorded and charged within the ambulatory units is still under Plan, by 30% in activity terms and 38% (£385k) under against the financial plan. Within this, AAU is running at 71%
under plan, and the DDU activity is also less than the same period last year. At the same time short stay and same day NEL admissions are running at respectively 18% and 14% over plan.
It is still paramount that the Trust is able to explain to OCCG the relationship between the reduced non admitted ambulatory activity and the significant increase in admitted short stay and same
day activity. Given the apparent financial over-performance in NEL, it is also essential that activity is captured and charged in a robust and transparent way.
If non admitted ambulatory activity was running to plan, and activity currently charged as NEL admissions was instead charged as ambulatory, the estimated financial impact would equate to
just over £1m for the first 4 months of 2016/17.
Non Elective
The Non-Elective POD (including non-elective non-emergency admissions) is £1.9m (1486 spells) above plan at Month 4, and compared to month 4 last year, activity is 9% higher. The
overspend against the NEL POD, however, is partially offset by the MRET credit above plan of £898k and the MT lag credit of £245k.
PODActivity
Plan
Activity
Actual
Activity
Variance % Price Plan Price Actual
Price
Variance %
Activity
Actual Price Actual Activity % Price %
39,991 41,721 1,730 4.3% £5,129,123 £5,481,138 £352,015 6.9% A&E 38,795 £4,421,084 8% 24%
2,871 2,002 -869 -30.3% £1,025,740 £640,512 -£385,227 -37.6% 1,531 £589,703 31% 9%
18,270 19,756 1,486 8.1% £31,523,899 £33,413,655 £1,889,756 6.0% 18,043 £31,130,743 9% 7%
17,132 17,670 538 3.1% £19,157,802 £19,082,047 -£75,755 -0.4% 17,285 £19,648,579 2% -3%
5,203 6,345 1,142 22.0% £1,260,060 £1,515,939 £255,879 20.3% 6,636 £1,601,362 -4% -5%
3,545 3,031 -514 1.2% £3,243,935 £3,097,849 -£146,086 -4.5% CRITICAL CARE3,620 £3,237,887 -85% -82%
25,077 25,639 562 2.2% £2,556,491 £2,522,689 -£33,802 -1.3% Diagnostic Imaging whilst Outpatients24,916 £2,519,396 3% 0%
1,534,636 1,539,527 4,891 0.3% £4,805,808 £4,892,363 £86,554 1.8% Direct Access1,501,412 £4,767,197 3% 3%
6,179 6,257 78 1.3% £6,216,178 £6,242,869 £26,691 0.4% 5,569 £5,172,924 12% 21%
4,896 4,816 -80 -1.6% £4,598,182 £4,401,303 -£196,878 -4.3% 5,037 £4,580,159 -4% -4%
60,797 61,690 893 1.5% £8,389,627 £8,630,226 £240,599 2.9% 52,660 £6,963,269 17% 31%
94,430 101,403 6,973 7.4% £8,446,035 £8,774,170 £328,135 3.9% 85,091 £7,147,921 19% 24%
7,655 8,074 419 5.5% £341,076 £364,538 £23,463 6.9% 9,679 £1,241,033 -17% -71%
24,690 23,041 -1,649 -6.7% £4,610,035 £4,378,541 -£231,494 -5.0% OPPROC 23,613 £4,459,704 -2% -13%
1,848,492 1,864,151 15,659 0.8% £105,822,513 £107,668,549 £1,846,036 1.7% £101,384,365 4%
Outpatient Other
Month 4 YTD 2015/16
Activity Driven Total
Outpatient Procedure
Maternity
Outpatient First
Outpatient Follow Up
Diagnostic Imaging whilst Outpatients
Direct Access
Drugs & Devices
Critical Care
Elective
Excess Bed Days
A&E
Ambulatory Emergency Care
Non-Elective
Month 4 YTD 2016/17
Grouped POD
Oxfordshire
Clinical Commissioning GroupOUHT Activity vs contract dashboard
Planned care:
Outpatient first appointments
At Month 4 first outpatients shows a reduced overspend but still over performing by 2.9%, £241k (5% at month 3) in cost and 1.5% (4% at month 3) in activity. The month on month improvement is
within both consultant led and non consultant led activity, however consultant led activity is still over by 4.6%, compared to an underspend against non consultant led of 10.5%.
Outpatient Follow Ups
At Month 4 follow up outpatients show a reduced overspend, but still over performing by 7.4% in activity (9% last month) and 3.9% in cost, £328k (7.5%) last month. This is mainly driven by single
professional consultant led activity – over by 7.3% with non consultant led activity under by 4.7%.
Suspected Cancer Pathway (SCAN): The aim of this project is to achieve a faster diagnosis for those patients who have low risk but not no-risk symptoms of cancer, this is largely
being funded by Cancer Research UK (CRUK) and NHS England. Finances have been approved by CRUK and the first amount of monies has been sent through. The project group is
currently within the implementation phase; baseline data collection for the project cohort is due to start in October and the Go-live for this project is November 2016 and work is
currently on track for achieving this.
Headache: This project aims to Improve quality of service delivery and accessibility for headache patients in Oxfordshire via a community headache clinic. The business case has
been completed and was accepted by PMB in August. The service specification is now being developed and go-live for this project is April 2017
ENT: The ENT project is delayed whilst OUHFT ENT submit an outline business case to its management team this does not completely align with recommendations of the CCG GP
Lead for ENT. A paper has been written by the ENT Clinical Lead outlining the service model and this will be discussed at the next Planned Care Programme Board.
Ophthalmology: The Contract for this project has now been signed. Service is now live the initial data analysis is expected at the contract meeting in September 2016.
Cardiology: A full business case has been completed and accepted by PMB. The service specification is now being developed and go live for this project is April 2017.
Bladder and Bowel Service: Finances have now been agreed and the project can now move into implementation phase.
Musculo-Skeletal: Procurement has been suspended to reconfigure the physio and triage elements of the service.
9
PODActivity
Plan
Activity
Actual
Activity
Variance % Price Plan Price Actual
Price
Variance %
Activity
Variance %
Price
Variance %
39,991 41,721 1,730 4.3% £5,129,123 £5,481,138 £352,015 6.9% A&E 1,009 3.4% £237,291 6.2%
2,871 2,002 -869 -30.3% £1,025,740 £640,512 -£385,227 -37.6% -621 -28.8% -£282,300 -36.8%
18,270 19,756 1,486 8.1% £31,523,899 £33,413,655 £1,889,756 6.0% 1,070 7.9% £1,366,182 5.8%
17,132 17,670 538 3.1% £19,157,802 £19,082,047 -£75,755 -0.4% 665 5.2% £61,036 0.4%
5,203 6,345 1,142 22.0% £1,260,060 £1,515,939 £255,879 20.3% 1,206 31.1% £250,282 26.6%
3,545 3,031 -514 1.2% £3,243,935 £3,097,849 -£146,086 -4.5% CRITICAL CARE-101 -3.8% £66,957 2.8%
25,077 25,639 562 2.2% £2,556,491 £2,522,689 -£33,802 -1.3% Diagnostic Imaging whilst Outpatients1,143 6.1% £27,099 1.4%
1,534,636 1,539,527 4,891 0.3% £4,805,808 £4,892,363 £86,554 1.8% Direct Access10,024 0.9% £113,130 3.1%
6,179 6,257 78 1.3% £6,216,178 £6,242,869 £26,691 0.4% -19 -0.4% £21,047 0.5%
4,896 4,816 -80 -1.6% £4,598,182 £4,401,303 -£196,878 -4.3% -17 -0.5% -£76,507 -2.2%
60,797 61,690 893 1.5% £8,389,627 £8,630,226 £240,599 2.9% 1,832 4.1% £330,969 5.3%
94,430 101,403 6,973 7.4% £8,446,035 £8,774,170 £328,135 3.9% 6,359 9.0% £472,795 7.5%
7,655 8,074 419 5.5% £341,076 £364,538 £23,463 6.9% 433 7.5% £14,437 5.6%
24,690 23,041 -1,649 -6.7% £4,610,035 £4,378,541 -£231,494 -5.0% OPPROC-1,167 -6.0% -£145,976 -4.2%
1,848,492 1,864,151 15,659 0.8% £105,822,513 £107,668,549 £1,846,036 1.7% £2,258,200 2.9%
Outpatient First
Outpatient Follow Up
Outpatient Other
Excess Bed Days
Drugs & Devices
Maternity
Activity Driven Total
Outpatient Procedure
Diagnostic Imaging whilst Outpatients
Direct Access
Critical Care
Elective
A&E
Ambulatory Emergency Care
Non-Elective
Month 4 YTD 2016/17 Month 3 YTD 2016/17
Grouped POD
Oxfordshire
Clinical Commissioning GroupCCG Provider Summary
10
South Central Ambulance Service
Summary of performance on 999
• The 999 service has under performed at month 4 of 2016/17 at Thames Valley contractual level.
• Month 4 activity has declined across the contract for Red 1, Red 2 and Red 19 has declined significantly compared with improved performance over Q1. Improvements
had been seen in the service throughout the previous 6 months which is directly linked to the Remedial Action Plan that has been agreed between the provider and the
commissioners for 2015/16. Actions put in place by the provider were previouslyhaving a positive effect on performance across the board.
• Month 4 total calls (Oxfordshire) amounted to 8,011 compared to an indicative plan of 7,623
• On 8th September NHS Improvement wrote to Rachel Pearce and Dominic Hardy at NHS England to advise that SCAS application for Sustainability & Transformation
Funds (STF) has been approved. Under the rules of STF providers that meet the conditions of the fund will not face a ‘double jeopardy’ scenario where they incur contract
penalties as well as losing access to STF funding. NHS Improvement have advised NHS England that they do not expect commissioners to apply penalties for the year
2016/17. However commissioners responsibility to monitor and hold providers to account for relevant operational and clinical quality standards still stand.
• Currently the continuation of the Remedial Action Plan and Contract Performance Notice that were in place for Red 1, Red 2 and Red 19 performance on the 2015/16
contract, has been agreed by the CRM for 16/17, however the trajectory for 2016/17 for improved performance is still being negotiated, as proposed trajectories (developed
with the lead commissioner) do not see performance achievement in the year 2016/17. Oxfordshire CCG have requested additional assurances from SCAS prior to
agreeing to these trajectories.
• On 15th September a TV and SHIP Commissioner and Provider workshop was held around SCAS workforce. The session outlined the current workforce issues for SCAS,
the vacancy factor, the actions being taken to address recruitment issues in the short and long term, and also the actions being taken to reduce attrition within the current
workforce. This session has provided much needed assurance to commissioners around the Thames Valley patch that workforce problems were being owned at the most
senior level within SCAS.
• SCAS continues with the National Ambulance Resilience Project (NARP) which is making a positive impact on performance and appropriateness of resources that are
dispatched to call outs. NARP is influencing national ambulance performance targets and later this year NHS England will make recommendations for change based on
evidence gathered.
• The Contract Performance Notice for Stroke has now been closed down. Contract review meeting will continue to monitor over the next 2 months for assurance.
% of RED 1 Incidents
within 8 Minute Target
(75%)
% of RED 2 Incidents
within 8 Minute Target
(75%)
% of RED 19 Incidents
within 19 Minute Target
(95%)
% of RED 1 Incidents
within 8 Minute
Target (75%)
% of RED 2 Incidents
within 8 Minute Target
(75%)
% of RED 19 Incidents
within 19 Minute Target
(95%)
Oxfordshire 65.4% 69.7% 93.2% 71.1% 72.4% 91.6%
North Cluster (TV
Contractual Level) 68.2% 71.0% 94.6% 73.2% 74.2% 92.5%
SCAS Overall 68.4% 70.9% 94.6% 72.7% 73.0% 93.1%
SCAS Performance
Month 4 and year
to date
Month 4 - July 2016/17 Year to Date
Oxfordshire
Clinical Commissioning GroupCCG Provider Summary
11
South Central Ambulance Service
Summary of performance on 111
• The 999 service has performed in the most part at month 4 of 2016/17.
• 95.49% of calls were answered within 60 seconds in Month 4 (Target 95%). SCAS has made significant improvement to call answering following a Contract Performance
notice and implementation of a Remedial Actions Plan agreed by commissioners. This CPN has now been closed due to achievement and will be monitored for the next 3
months at CRM for assurance purposes.
• 9.57% of 111 calls were transferred to the 999 service in month 3 against a KPI target of <10%. Additionally the total number of 111 calls resulting in an A&E disposition
was 8.38% against a KPI target of <5%, this has been discussed in depth at CRM and commissioners are concerned around the failure of this target. Commissioners are
assured that SCAS are not causing the increase in ED disposition and in fact this is a refection of higher demand for the service. Using the Intelligent Data Tool
Commissioners will be looking further in to the ED dispositions to ascertain if there are gaps in service provision that is driving the increased activity.
• There are still concerns regarding the % of calls transferred directly to the clinician which in month 4 was 26.79% against a target of 85%. A remedial action plan and
trajectory is in place to recover the position on this target and while this currently sits below acceptable levels, SCAS is making improvements monthly and it has also
been identified that there are potential data quality issues within SCAS’s clinical system which means the counting of Warm Transfers is excluding a large number. SCAS
have procured an IT Solution to rectify this issue and go live is in September 2016. SCAS have advised at the current time they are underreporting this target (due to data
quality issues) by 30-45%. As soon as the IT solution is live, commissioners should see an instant improvement in performance. This is being monitored via contract
review meetings, which are now in Thames Valley shadow form
KPI # % KPI # %
14,240 87.71%Calls
Offered16,511
1,822 12.79% 16,236 98.33%
12,418 87.21% 96
Calls Not Triaged 1,920 11.83% 0
2,605 18.29% 15,504 95.49%
698 26.79% 15,654 96.42%
1,907 73.21% 15,843 97.58%
0:19:11 2,473 15.23%
0:08:54 13,763 84.77%
0:10:12
Calls
Abandoned 91 0.55%
111 to 999 Incidents
1,554 9.57%
Call
Answer
Delay
0:11:02
Calls To A&E 1,360 8.38%
Calls
Answered
Incident Reporting
Telephony Reporting
NHS 111 Oxfordshire - July 2016 Contract SITREP
Calls Answered In 90 Seconds
Calls Answered In Hours
Calls Answered Out Of Hours
Calls Abandoned After 30
Seconds
Maximum Call Answer Delay
Total Calls Answered
Total HCP Calls Answered
Total Dental Calls Answered
Calls Answered In 60 Seconds
Calls Answered In 70 Seconds
KPI Description
Total Calls Offered
Total Incidents To 999
Total Calls Sent To A&E
Calls To A Clinical
AdvisorTotal Calls To Clinicians
Clinician Warm Transfers
Clinician Callbacks
Episode Lengths Avg Episode Length
Avg Health Advisor Episode
Length
Avg Clinician Episode Length
Calls TriagedTotal Calls Triaged
Calls Triaged In Hours
Calls Triaged Out Of Hours
Total Calls Not Requiring 111
KPI Description
Oxfordshire
Clinical Commissioning GroupCCG Provider Summary
Oxford Health Foundation Trust (OHFT)
• OHFT is meeting the national targets in relation to mental health performance and is making good progress in respect of the new waiting targets for early intervention in
psychosis and access to psychological therapy from April 2016. Further national standards are expected in relation to Crisis intervention and we are working with OH to
anticipate the reporting requirements.
• The Outcomes Based Contract in respect of mental health services for adults with severe mental illness commenced on 1 October 2015. Outcome indicators and thresholds
have been agreed and performance reports are being provided. Achievement against indicators will be baselined in the first year of the contract. Issues regarding the delivery
of baselines have been identified and remedial action required by the provider.
• The OHFT Emergency Department Psychiatric Service has experienced some challenges owing to staff absence and recruitment in meeting access targets of 1 hour in the
John Radcliffe hospital and 1.5 Hours in the Horton General hospital. This is being monitored through the contract review meeting
• The OHFT-SCAS ambulance triage project is reporting a high number of callers to 999/111 that are known to MH services (>60%) and that the pilot has managed to avoid
ambulance dispatch in more than 40% of cases. A review of the way in which we commission MH urgent care is under way under the scope of the local Crisis Concordat.
• The process of reviewing all OH service specification is ongoing. OCCG and CSU are meeting on a weekly basis to discuss outstanding areas and meetings between OH and
OCCG are being set up to conclude each specification before the longstop date.
• Key Performance Indicators (KPIs) and Audit:
• In July the Older People's Directorate was required to report against 44 KPIs. 32 were achieved = 73% compliance rate ( an increase of 6% on M3). 5 of the 10 National
Quality Requirements were not achieved (50%) and all relate to OOH performance. 4 of the 16 Local Quality Requirements were not achieved (75%) and are for Safeguarding
Children Level 3 compliance (targeted training in hand and compliance due by September 16), completed induction programme, inpatient letters sent to GPs within 24 hours
(weekly reporting implemented and compliance due by the end of August 16) and no more than 4% cancellations by all provider services (data error).
• In July the Adults Directorate was required to report against 8 Local Quality Requirements and only 3 were achieved (38% compliance). The following were not achieved:
Safeguarding Children's Level 1, 2 and 3 training (targeted training in place), completed induction programme and 1 x Datix responded to within 2 weeks.
• 18 KPIs were reportable in July with 2 indicators not being achieved (89%). The following were not achieved; rehabilitation patients having on improved FIM score of 11+ (an
analysis tool and robust methodology for evaluating FIM was launched in July and individual domain reporting now in place) and patients being seen with 12 week wait for
MSK Physiotherapy (high numbers of referrals – 17% over plan, change in referral patterns from OUHFT – trauma patients from North and City now being sent to OH and
have a higher complexity, and changes to MSK Hub upload of clinical information with referrals reduces efficiency when accepting patients). MSK Physiotherapy performance
is being discussed regularly as part of the OCCG Deep Dive meetings and separate meetings with OH and OUHFT are in place to discuss referral patterns for trauma patients
and clinical uploads from the Hub). Patient outcomes and patient satisfaction remain on target.
12
Oxfordshire
Clinical Commissioning GroupCCG Provider Summary
Oxford Health Foundation Trust (OHFT)
• Out of Hours (OOH) Service Cost and Volume: activity broadly in line with plan.
• 6 of the 10 reportable monthly national quality requirements (NQRs) were achieved in June. The following NQRs were not achieved;
OOH % of unfilled shifts (</= 2%): 21%;
OOH urgent triage (walk in) - time to triage (</=95% within 20 minutes): 81%;
OOH non-urgent triage (walk in) - time to triage (</= 95% within 60 minutes):89%
OOH urgent face to face base visit - time to triage (</=95% within 2 hours): 82%
• Recruitment action continues unabated with Emergency Practitioner band 6 recruitment met with an increased number of applicants and interviews held for Advanced
Practitioners with offers of appointments to now follow. Sessional GP interest now stands at 38 with 28 applications received of which 12 individuals have been started in
shifts. References continue to be the main cause of application delays. A third advertisement for permanent salaried GPs has closed with one applicant who was not
qualified.
• A trial has been conducted at Abingdon involving an Emergency Nurse Assessor taking observations on every walk in patient to better inform patient safety. This proved 100%
successful and is now being considered for role out to Oxford and Witney subject to the availability of staff to work additional shifts.
Community services
Deep-dives
A series of deep dives into specific areas is being carried out. Two areas were identified initially; Physiotherapy and Podiatry, both of which have long waits for the service. A full
report will identify any issues and any actions agreed to manage these areas.
Further deep dives are planned in other areas. These are: Care Home Support, End of Life, and Physical Disability. These will be in Q3.
OH Rebasing
CSU has undertaken a rebasing exercise on OH data and the following observations can be made (on data October 2015 to March 2016)
• District Nursing
167 patients had over 101 contacts in the 6 month period, of which 5 patients had an average of 355 contacts each.
1322 patients received 21-100 contacts, 4965 had 2-20 contacts and 1508 had 1 contact.
• Podiatry
Trendline shows an overall increase in activity but this is very slight. There has been an overall increase in Biomechanics (follow ups) which is due to the complexity of patients
and the increasing needs for Orthotics
• Tissue viability
Activity increased in 2015/16 from an average of 8 to 15 contacts (Q3) to 19-24 contacts per working day (Q4), this is a stepped change and likely suggests changes in staffing
or demand.
• Diabetes activity
February and March 2016 showed a decline from the prior months which will need to be tested in the 2016/17 data.
13
Oxfordshire
Clinical Commissioning GroupCCG Provider SummaryRoyal Berkshire Foundation Trust (RBFT)Summary month 3 June 2016
• Month M03 performance against plan – activity is 117 above plan which equals to 0.1% variance. Financial underperformance against plan is £95k which equals to 1.9% variance.
There are 32 uncoded episodes of care with estimated value of £36k.
• Areas of particular over performance are:
• Outpatient Procedures
• Ad hoc adjustments
• Other Items (rehabilitation bed days)
Further information on areas of over performance
Outpatient Procedures - YTD over performance of £51k - Increase in reported performance is being challenged as counting and coding change as a result of RBFT introducing new data
warehouse. M3 YTD challenge value is £38k and is part of the overall counting and coding challenge listed above in the table of financial adjustment.
Other items – over performance of £37k
The main activity causing over performance are rehabilitation bed days. 142 bed days were reported in M03 against plan of 19. CSU Informatics is currently reviewing this data and challenging it
as appropriate.
Independent Acute ProvidersSummary• At M5, total activity within the Independent Acute Providers is up 5.68% (£704,000) with underperformance at The Manor and Berkshire Independent Hospital.
• Provisions have been made under the Activity Planning Assumptions across all contracts for 16/17 to ensure that all Patella Resurfacing is costed as HB21C (as opposed to
the most expensive HR05Z) which will adjust spend when 16/17 contracts are signed.
• Results of audit work is ongoing – Foscote has been issued with its final reconciliation letter and OCCG is awaiting a response. Manor financial reconciliation letter has been
sent and a negative response has been received by OCCG. This is being pursed. Ramsay has also been issued with their final reconciliation letter but they have yet to
respond – this is being chased.
• The new Prior Approval Process is in place and due to go live in October 2016. This is contained within all provider contracts for 16/17.
14
Plan
cost
Actual
cost
£0 % Rating £0 £0 £0 % Rating
5 Circle Reading £551 £653 £102 18.51% 1,322£ £ 1,566 £ 244 18.46%
5 Berkshire Independent
Hospital
£246 £222 -£24 -9.76% £ 590 £ 533 -£ 57 -9.66%
5 Spire Dunedin Hospital £176 £197 £21 11.93% £ 422 £ 473 £ 51 12.09%
5 Ramsey (does not
include spinal)
£3,095 £3,149 £54 1.74% £ 7,428 £ 8,058 £ 630 8.48%
5 Nuffield the Manor £780 £655 -£125 -16.03% £ 1,873 £ 1,572 -£ 301 -16.07%
5 Foscote £314 £372 £58 18.47% £ 755 £ 892 £ 137 18.15%
Month period Provider YTD Forecast
Plan cost
£000
Actual
cost
£000
Variance Variance
Oxfordshire
Clinical Commissioning GroupGeneral Practice– access to services
15
� The data shows results of the GP patient survey at locality level – it is the most recent data available and covers aggregated data collected July-September 2015 and January-March 2016.
� In all cases the CCG achievement is above the England average, although there are individual practices and localities that fall below this average
� One practice is deemed an outlier in 4 out of the 6 indicators and one practice is an outlier in 3 out of 6 indicators. The Locality Co-ordinators will work with these practices to understand the reasons.
� The CCG continues to commission improved access through the same day urgent hubs until such time as the new GP Access Fund is launched and commissioned and is working with localities to invest in primary care to ensure that is sustainable for the future.
Outliers are defined using the Inter quartile Range (IQR). The IQR is the size of the 2nd quartile or the difference between the 75th percentileminus the 25th percentile. Therefore it is the spread of the “middle” values. Using the IQR, data values which are substantially larger or smaller
than the 75th percentile or 25th percentile respectively are referred to as Outliers.
K In top 25% of OCCG
E Within middle 50% of OCCG
Y In bottom 25% of OCCG