Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table...

44
March 29, 2019 John Ritchie, Water Compliance Supervisor [email protected] Ministry of the Environment and Climate Change 3 rd floor, 101 17 th Street East Owen Sound, Ontario N4K 0A5 RE: 2018 Annual Performance Report, Requirement for Tobermory Sewage Treatment System under Certificate of Approval (C of A) 3-0046-93-006) dated February 24, 1993 Dear Mr. Ritchie, The Ontario Clean Water Agency entered into an agreement with the Municipality of Northern Bruce Peninsula to operate and maintain the Tobermory Sewage Treatment System, effective July 1, 2009. Please see attached for the 2018 Annual Performance Report for the Tobermory Sewage Treatment System which covers the reporting period of January 1, 2018 to December 31, 2018. This report was completed in accordance with the requirements set out in condition 15.a. to i. of C of A 3-0046-93-006. Should you require further clarification of information regarding this report, please feel free to contact me. Sincerely, Camille Leung Safety, Process and Compliance Manager Ontario Clean Water Agency Georgian Highlands Region

Transcript of Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table...

Page 1: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

March 29, 2019

John Ritchie, Water Compliance Supervisor

[email protected]

Ministry of the Environment and Climate Change

3rd

floor, 101 17th Street East

Owen Sound, Ontario

N4K 0A5

RE: 2018 Annual Performance Report, Requirement for Tobermory Sewage Treatment System under

Certificate of Approval (C of A) 3-0046-93-006) dated February 24, 1993

Dear Mr. Ritchie,

The Ontario Clean Water Agency entered into an agreement with the Municipality of Northern Bruce Peninsula to

operate and maintain the Tobermory Sewage Treatment System, effective July 1, 2009.

Please see attached for the 2018 Annual Performance Report for the Tobermory Sewage Treatment System which

covers the reporting period of January 1, 2018 to December 31, 2018. This report was completed in accordance

with the requirements set out in condition 15.a. to i. of C of A 3-0046-93-006.

Should you require further clarification of information regarding this report, please feel free to contact me.

Sincerely,

Camille Leung

Safety, Process and Compliance Manager

Ontario Clean Water Agency

Georgian Highlands Region

Page 2: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

TOBERMORY

SEWAGE TREATMENT FACILITY

ANNUAL PERFORMANCE REPORT

For the period of

JANUARY 1, 2018 TO DECEMBER 31, 2018

Prepared by the Ontario Clean Water Agency

For The Corporation of the Municipality of Northern Bruce Peninsula

Page 3: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Annual Performance Report Municipality of Northern Bruce Peninsula: Tobermory Sewage Treatment Facility

C of A # 3-0046-93-006

Page 2 of 9

1. System Description

The Tobermory Sewage Works System in the Municipality of Northern Bruce Peninsula (former Township of St.

Edmunds) comprises a wastewater treatment plant and one sewage pumping station. The wastewater generated

within the collection area of Tobermory is collected into the sewer system and pumped to the wastewater

treatment plant by way of a 150 mm forcemain. The wastewater treatment plant consists of two aerated cells, one

storage cell, two exfiltration ponds and one overflow cell.

The wastewater treatment plant contains two (2) aerated lagoons. The capacity of aeration cells #1 and #2 is

10,800 m³ each. The aeration provided is tapered coarse bubble, diffused aeration. The aeration Cell #2 has a

quiescent settling zone to permit effluent clarification. The effluent from the aeration Cell #2 can be recycled to

aeration Cell #1, can be transferred to storage Cell #1 for winter storage, or can be transferred to the exfiltration

Cells #2 or 3 during summer operations. The exfiltration cells have a combined minimum rated capacity of 317

m³/day, and each cell has approximately 13,750 m² of surface area. There is one (1) back-up exfiltration cell with

a minimum rated capacity of 625 m3/d and approximately 21,875 m

2 surface area is also available.

To provide coarse bubble diffused aeration for the two aerated cells, the plant is provided with one duty and two

standby blowers, each rated with a firm capacity of 193 L/sec at approximately 38 kPa.

The sewage pumping station (Little Tub Harbour Pumping Station), is located near the harbor and has two

submersible pumps each rated at 18.3 L/sec capacity at 50.5 m TDH. The wet well has a normal operating volume

of 5.7 m³. Due to its location near the harbour, the sewage pumping station wet well is provided with an odour

control activated carbon adsorption unit with a capacity of 188.8 L/sec, for adsorbing hydrogen sulphide gas

emissions from the wet well. The pumping station is also equipped with a 150-kW diesel generator set for

providing emergency power for the sewage pumps. An overview of Tobermory Sewage Treatment System can be

found in Table 1 and a summary of the monitoring program can be found in Table 2.

Table 1. Tobermory Sewage Treatment System Overview

Facility Name Tobermory Sewage Treatment System

Facility Type Lagoon

Plant Classification II

Works Number 120001577

Design Capacity 625 m3/day

Receiving Water None

Certificate of Approval 3-0046-93-006 (Sewage Treatment System)

8-1063-94-006 (Air)

Table 2.Tobermory Sewage Treatment System Monitoring Program

Source Parameter Frequency Method

Influent Flow (m3) Daily Flowmeter

Secondary Aeration

Cell Effluent

BOD5, SS, TP, TKN, NH3+NH4(N), Nitrate,

Nitrite

Monthly – March, June, July, August and

October

External

analysis

Aeration Cells pH, Dissolved Oxygen Weekly In-House

Groundwater Wells

Alkalinity, Conductivity, Free Ammonia,

Phenols, pH, Chloride, Sulphate, Nitrite,

Magnesium, Iron, Nitrate, Calcium, Hardness,

Sodium, DOC, Organic Nitrogen, TKN,

Dissolved Reactive Phosphorous *, Total P*. (*

= Shallow Wells Only)

Semi-Annual in May and October (for all

30 wells)

Annual in August (for OW-6S, OW-6I,

OW-6D, OW-7S, OW-9S, OW-9I, OW-

9D, OW-10S, OW-11S, OW-12S)

External

analysis

Ground Water Wells Aluminum, Barium, Cadmium, Chromium,

Copper, Lead, Manganese, Zinc Every 3 years in October

External

Analysis

Page 4: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Annual Performance Report Municipality of Northern Bruce Peninsula: Tobermory Sewage Treatment Facility

C of A # 3-0046-93-006

Page 3 of 9

2. Monitoring and Compliance Reports

As per Section 15a. of C of A 3-0046-96-006, a summary of all monitoring and compliance reports submitted in

the reporting period, including an overview of the success and adequacy of the sewage treatment program is

required.

During the reporting period, the following reports were submitted:

Discharge Data Report (Ministry of Environment, Conservation and Parks, MECP)

2.1 Discharge Data Report (MECP) The Ontario Clean Water Agency (OCWA) has an agreement with the MECP to submit quarterly discharge data

for all OCWA operated municipal sewage treatment facilities 45 days at the end of each quarter. Monitoring data

is submitted via the Ministry of Environment Wastewater System (MEWS). The MECP has these reports stored

in a shared location where MECP Inspectors can obtain and review them. There are no limits/ objectives for

discharge for the quarterly Discharge Data Report.

2.2 Adequacy of the Sewage Treatment Program The current sewage treatment program provided effluent that was within the effluent objectives set out in the C of

A for Suspended Solids 100% of the time and was within the effluent objectives for BOD5 set out in the C of A

the majority of the time, though there was one sample that exceeded the objective. Based on this, the current

sewage treatment program is deemed adequate. OCWA continues to work towards staying within effluent

objectives during each reporting period.

3. Monitoring and Analytical Data

As per Section 15b. of C of A 3-0046-96-006, a comprehensive interpretation of all monitoring data and

analytical data collected relative to the Tobermory Sewage Treatment System during the reporting period is

required.

All laboratory samples are analyzed by SGS Canada Inc., which is an ISO 17025 accredited laboratory. In-house

readings (pH, DO, Temperature) are conducted for monitoring purposes by licensed operators using standardized

methods. Calibrations and preventative maintenance are performed on facility equipment and monitoring

equipment, see Section 10 for more details.

Page 5: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Annual Performance Report Municipality of Northern Bruce Peninsula: Tobermory Sewage Treatment Facility

C of A # 3-0046-93-006

Page 4 of 9

3.1 Sampling Frequency Both groundwater and secondary aeration cell effluent are sampled on a regular basis. The sampling types and

frequencies are summarized in Table 3, Table 4, Table 5 and Table 6.

All sampling frequencies either meet or exceed the requirements set out in Section 15 of C of A 3-0046-93-006.

Table 1. Complete Groundwater Monitoring Program– Sampling Frequencies for all 30 Observation Wells

Parameter Frequency

Alkalinity Semi-annually in May and October

Conductivity Semi-annually in May and October

Free Ammonia Semi-annually in May and October

Phenols Semi-annually in May and October

pH Semi-annually in May and October

Chloride Semi-annually in May and October

Sulphate Semi-annually in May and October

Nitrite Semi-annually in May and October

Magnesium Semi-annually in May and October

Iron Semi-annually in May and October

Nitrate Semi-annually in May and October

Calcium Semi-annually in May and October

Hardness Semi-annually in May and October

Sodium Semi-annually in May and October

Dissolved Organic Carbon Semi-annually in May and October

Organic Nitrogen Semi-annually in May and October

Total Kjeldahl Nitrogen Semi-annually in May and October

Phosphorous-Dissolved Reactive* Semi-annually in May and October

Total Phosphorous* Semi-annually in May and October

Aluminum Every 36 Months in October

Barium Every 36 Months in October

Cadmium Every 36 Months in October

Chromium Every 36 Months in October

Copper Every 36 Months in October

Lead Every 36 Months in October

Manganese Every 36 Months in October

Zinc Every 36 Months in October

Table 4. Limited Groundwater Monitoring Program– Sampling Frequencies for Wells 6S, 6I, 6D, 7S, 9S, 9I, 9D, 10S, 11S, 12S

Parameter Frequency

Alkalinity Annually in August

Conductivity Annually in August

Free Ammonia Annually in August

Phenols Annually in August

pH Annually in August

Chloride Annually in August

Sulphate Annually in August

Nitrite Annually in August

Magnesium Annually in August

Iron Annually in August

Nitrate Annually in August

Calcium Annually in August

Hardness Annually in August

Sodium Annually in August

Dissolved Organic Carbon Annually in August

Organic Nitrogen Annually in August

Total Kjeldahl Nitrogen Annually in August

Phosphorous-Dissolved Reactive* Annually in August

Total Phosphorous* Annually in August

Page 6: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Annual Performance Report Municipality of Northern Bruce Peninsula: Tobermory Sewage Treatment Facility

C of A # 3-0046-93-006

Page 5 of 9

Table 5. Effluent (Secondary Aeration Cell) Sample Monitoring – Sampling Frequencies

Parameters Frequency

BOD5 Monthly, during March, June, July, August and October

Total Solids Monthly, during March, June, July, August and October

Total Phosphorous Monthly, during March, June, July, August and October

Total Kjeldahl Nitrogen Monthly, during March, June, July, August and October

Ammonia Nitrogen Monthly, during March, June, July, August and October

Nitrite Monthly, during March, June, July, August and October

Nitrate Monthly, during March, June, July, August and October

pH In-house, weekly from May to September

Dissolved Oxygen In-house, weekly from May to September

Table 6. Sludge Haulage Sample Monitoring – Sampling Frequencies

Parameters Frequency

Total Solids April, where sludge haulage is expected

Total Phosphorus April, where sludge haulage is expected

Arsenic April, where sludge haulage is expected

Cadmium April, where sludge haulage is expected

Cobalt April, where sludge haulage is expected

Chromium April, where sludge haulage is expected

Copper April, where sludge haulage is expected

Zinc April, where sludge haulage is expected

Free Ammonia April, where sludge haulage is expected

Nitrate – N April, where sludge haulage is expected

Mercury April, where sludge haulage is expected

Molybdenum April, where sludge haulage is expected

Nickel April, where sludge haulage is expected

Selenium April, where sludge haulage is expected

Lead April, where sludge haulage is expected

3.2 Effluent Limits & Effluent Objectives There are no effluent limits specified in C of A 3-0046-93-006 for the Tobermory Sewage Treatment System.

The effluent objectives as per Section 10 of C of A 3-0046-93-006 for the Tobermory Sewage Treatment System

are:

Table 7. Effluent (Secondary Aeration Cell) Objectives for Tobermory Sewage Treatment System

Effluent Parameter Average Monthly Concentration (mg/L)

BOD5 50

Suspended Solids 50

3.3 Comparison of Data to Effluent Objectives Analytical and monitoring data for the Tobermory Sewage Treatment System is housed in OCWA’s data

management system (PDM). A comparison of the analytical results compared to the effluent objectives can be

found in Table 8.

Table 2. Comparison of Effluent Objectives to Sampled Effluent (Secondary Aeration Cell)

BOD5 Suspended Solids

Monthly Average

Concentration (mg/L)

Within Objectives?

(50.0 mg/L)

Monthly Average

Concentration (mg/L)

Within Objectives?

(50.0 mg/L)

March 9.0 Yes 4.0 Yes June 7.0 Yes 6.0 Yes July 12.0 Yes 6.0 Yes

August 67.0 No 11.0 Yes October 4.0 Yes 6.0 Yes

Page 7: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Annual Performance Report Municipality of Northern Bruce Peninsula: Tobermory Sewage Treatment Facility

C of A # 3-0046-93-006

Page 6 of 9

It is recommended that sludge levels be monitored to determine if sludge management is required. Operators

recorded sludge levels on September 12, 2017. The average sludge level in Aeration Cell #1 at that time was 28

inches.

3.4 Additional Monitoring Parameters The following parameters do not have effluent limits or objectives but are monitored on a regular basis (see

Section 3.1 for sampling frequency) as required by C of A 3-0046-93-006. Table 9, Table 10 and Table 11

summarizes the monitoring data for the reporting period.

3.4.1 Flows

The Tobermory Sewage Treatment Facility was designed to treat an average summer day flow of 625 m3/d. The

total raw sewage flow including hauled septage volumes for 2018 was 105,205.88 m3 with an annual average

daily flow of 288.2 m3/day which is 46.1% of the design capacity of the system. Total and average daily flows for

2018 have increased in comparison to 2017. A summary of the average daily flows on a monthly basis can be

found in Table 9. For more detailed information regarding flows, refer to Appendix A.

Table 9. Summary of Average Day Flow by Month

Month Average Day Flow (m3)

January 234

February 153

March 174*

April 320*

May 251*

June 280*

July 312*

August 334

September 298

October 304

November 300

December 305

*Flows were calculated using pump run hours.

Hauled septage volumes were added to the Sewage Pump Station flows. According to item 11.b. of C of A 3-

0046-93-006, “For the purposes of this Certificate and Subsection 107 (3) of the Ontario Water Resources Act,

the introduction of sewage flows in excess of 625 m3/d for any consecutive period of time greater than one year is

not approved under this Certificate”. The sewage flows for 2018 were less than 625 m3/d

3.4.2 Aeration Cell Effluent

In addition to the parameters which have effluent objectives, Total Phosphorous, Total Kjeldahl Nitrogen (TKN),

Ammonia-Nitrogen, Nitrite, Nitrate, pH and DO are monitored. Please refer to Table 10 and 11 for monitoring

and analytical results.

Table 10. Average Monthly Aeration Cell Effluent Monitoring Laboratory Analysis Results

Total Phosphorus

(mg/L)

Total Kjeldahl Nitrogen

(as N mg/L)

Ammonia+Ammonium

(N) (mg/L)

Nitrite

(mg/L as N)

Nitrate

(mg/L as N)

March 2.2 3.2 3.0 0.04 2.25

June 4.28 9.70 8.0 0.16 0.67

July 5.42 23.60 21.6 0.64 3.68

August 11.00 18.40 16.7 4.58 2.80

October 5.63 14.30 11.7 0.20 1.56

Page 8: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Annual Performance Report Municipality of Northern Bruce Peninsula: Tobermory Sewage Treatment Facility

C of A # 3-0046-93-006

Page 7 of 9

Table 11. Aeration Cell In-House Monitoring - Average Monthly pH and DO

pH Dissolved Oxygen

Cell #1 Cell #2 Cell #1 Cell #2

Minimum Maximum Minimum Maximum Minimum Maximum Minimum Maximum

May 6.61 7.07 7.11 7.36 0.42 9.15 5.36 13.37

June 6.80 7.26 7.16 7.48 2.79 5.26 4.34 5.64

July 7.09 7.47 7.08 7.57 0.23 2.24 0.27 3.62

August 7.33 7.74 7.35 7.65 0.73 3.41 1.96 3.26

September 7.13 8.01 7.49 7.81 0.26 5.61 3.32 5.36

For sewage, it is optimal if the effluent is between pH 6.0 and 9.5. The pH of Cell#1 and Cell#2 remained within

the optimal range. The DO range for Cell #1 and Cell #2 was between 0.23 and 13.37 in 2018 in comparison to

0.21 to 6.89 in 2017. Overall, the average DO in 2018 (5.89) is higher than the average DO in 2017 (3.62).

3.4.3 Groundwater Sampling Program

The complete and limited groundwater sampling of all on-site observation wells was completed in the Spring

(May), Summer (August) and Fall (October) of 2018.

Due to dry wells, the following samples were not taken:

Summer (August) OW6-S, OW7-S

Fall (October) OW8-S

Table 12. Ground Water Sampling Program

Minimum Average Maximum

2018 2015-2017 2018 2015-2017 2018 2015-2017

4AAP-Phenols (mg/L) 0.002 0.002 0.003 0.004 0.004 0.013

Alkalinity (mg/L as CaCO3) 173 201 291 300 534 465

Calcium (mg/L) 46 46 88 82 164 164

Chloride (mg/L) 1 1 26.3 14.6 170 120

Conductivity (uS/cm) 314 395 582 599 1,040 1100

Dissolved Organic Carbon (mg/L) 1 1 1.66 1.62 3 4

Iron (mg/L) 0.007 0.004 0.129 0.07 1.57 0.431

Phosphorous - Dissolved Reactive (mg/L) 0.003 0.003 0.076 0.022 0.308 0.751

Magnesium (mg/L) 13.6 14.8 24.7 24.9 43.1 37.7

Nitrate + Nitrite (mg/L) 0.06 0.06 0.24 0.24 2.08 1.91

Nitrite (mg/L) 0.03 0.03 0.03 0.03 0.14 0.03

Nitrate (mg/L) 0.06 0.06 0.23 0.24 2.08 1.91

Organic Nitrogen (mg/L) 0.15 0.05 0.19 0.28 0.39 0.50

Sodium (mg/L) 0.42 0.33 18 14 109 94

Sulphate (mg/L) 2 2 11.7 12.1 31 30

Total Ammonia (mg/L) 0.1 0.1 0.12 0.12 0.4 0.6

Total Kjeldahl Nitrogen (mg/L) 0.5 0.5 0.52 0.50 1.0 0.8

Total Phosphorous (mg/L) 0.03 0.03 0.12 0.15 1.81 0.9

Hardness (dissolved) (mg/L as CaCO3) 188 160 322 309 587 512

Unionized Ammonia (mg/L) 0.001 0.001 0.003 0.002 0.016 0.015

pH 7.66 7.22 7.99 7.91 8.27 8.35

Page 9: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Annual Performance Report Municipality of Northern Bruce Peninsula: Tobermory Sewage Treatment Facility

C of A # 3-0046-93-006

Page 8 of 9

Table 13. Ground Water Sampling Program – 36 Month Sampling (October 2018) Minimum Average Maximum

Aluminum 0.001 0.003 0.16

Barium 0.005 0.015 0.048

Cadmium 0.000003 0.000006 0.000153

Chromium 0.00003 0.00013 0.00090

Copper 0.00009 0.00078 0.00458

Lead 0.00001 0.00008 0.00049

Manganese 0.00005 0.04672 0.258

Zinc 0.002 0.002 0.007

Refer to Appendix B for the laboratory analysis results for the groundwater sampling program.

4. Major Maintenance Activities

As per Section 15c. of C of A 3-0046-96-006, a summary of all maintenance carried out on any major structure,

equipment, apparatus, mechanisms or thing forming part of the facility is required.

During 2018, the following major maintenance activities were conducted:

Wet well at the Sewage pump station and lagoon chambers were cleaned out

Heating units were replaced to improve energy efficiency

Replaced sewage pump station flow meter.

Replaced one of the two 75 hp pumps at the sewage pump station

5. Operating Challenges

As per Section 15d. of C of A 3-0046-96-006, a description of any operating problems encountered and

corrective actions taken during the reporting period are to be identified.

There were no bypasses of raw sewage or spills at the Tobermory Sewage Treatment System or any associated

pumping stations during the reporting period.

6. Proposed Alterations, Extensions or Replacements

As per Section 15e. of C of A 3-0046-96-006, a summary of any proposed alteration, extension or replacement in

the process or operations of the sewage treatment plant to be completed over the next reporting period which may

require approval under the Ontario Water Resources Act (OWRA) is required.

The following alterations, extensions/ replacements are proposed for 2019, some of which may not require

approval under OWRA:

Generator load test inspection and maintenance

Roof doors and metalwork

Lagoon aeration system upgrade

Sampling reduction request

7. Sludge Generation

As per Section 15f. of C of A 3-0046-96-006, a tabulation of the volume of sludge generated in the reporting

period and an outline of anticipated volumes to be generated over the next reporting period is required.

Page 10: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Annual Performance Report Municipality of Northern Bruce Peninsula: Tobermory Sewage Treatment Facility

C of A # 3-0046-93-006

Page 9 of 9

Since the facility is a sewage lagoon system, accumulated sludge is currently being stored in lagoon cell no. 1.

The lagoons have been de-sludged once since the existing facility was constructed and approximately 800 m3 of

dewatered sludge was removed in October 2004. Sludge levels were measured in lagoon cell no. 1 in September

of 2017 and sludge volumes were estimated at approximately 987 m3. The estimated volume of sludge generated

during this reporting period is 76 m3

. It is anticipated that 76 m3 of sludge will be produced during 2019.

8. Sludge Handling

As per Section 15g. of C of A 3-0046-96-006, an outline of the sludge handing methods and disposal areas to be

utilized over the next reporting period are to be specified.

Since the facility is a sewage lagoon system, sludge levels in the lagoons are monitored regularly and disposal is

arranged when sludge storage has reached its limit. No disposal areas are expected to be utilized over the next

reporting period.

9. Septage Receiving Works

In 2018, approximately 5,584.28 m3 (1,228, imperial gallons) of septage was received by the Tobermory Sewage

Treatment. The septage was received from various sources including:

Bruce Peninsula Septic Service

Scott Septic Pumping

Mountain Trout Camp

The total monthly volume of septage received can be found in Table 12. Detailed haulage volumes can be found

in Appendix C.

Table 12. Total Volume of Septage Received in 2018

Month Total Volume of Septage Received (m3)

January 18.2

February 66.6

March 32.4

April 39.1

May 838.5

June 661.9

July 1,454.7

August 1,476.0

September 717.3

October 119.1

November 137.1

December 23.4

10. Calibration and Maintenance Procedures

As per Section 15.h. of C of A 3-0046-96-006, an evaluation of the calibration and maintenance procedures

conducted on all monitoring equipment is required.

All in-house monitoring equipment is calibrated as per manufacturer’s recommendations. Monitoring and

metering equipment is also calibrated by a third party on an annual basis. On May 16, 2018 Hach calibrated and

performed the annual maintenance on the DO probe. On August 2, 2018 Flowmetrix installed a new flow meter at

the Tobermory Pump Station. In addition to sample analysis, preventative maintenance is scheduled for all

equipment at the sewage treatment plant and pumping stations on at least a monthly basis. Maintenance activities

were scheduled within the work management system MAXIMO, upon completion, Operators record their time

and close off the work order.

All records for calibrations/ verifications can be found in Appendix D.

Page 11: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Annual Performance Report Municipality of Northern Bruce Peninsula: Tobermory Sewage Treatment Facility

C of A # 3-0046-93-006

Page 10 of 9

11. Modifications for Performance and Reliability

As per Section 15j. of C of A 3-0046-96-006an evaluation for the need for modifications to the Tobermory

Sewage Treatment Facility to improve performance and reliability and to minimize upsets and bypasses is

required.

During the reporting period the Tobermory Sewage Treatment Facility met the effluent objectives 80% of the

time. Based on this evaluation, modifications for performance and reliability are not needed at this time.

Page 12: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Appendix A Performance Assessment Report

Page 13: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Report extracted 03/30/2019 05:39 From:

Facility: [1132] TOBERMORY WASTEWATER TREATMENT FACILITY

Works: [120001577]

01/2018 02/2018 03/2018 04/2018 05/2018 06/2018 07/2018 08/2018 09/2018 10/2018 11/2018 12/2018 <--Total--> <--Avg.--> <--Max.--> <--Criteria-->

Flows:

Raw Flow: Total - Sewage Pumping Station (m³) 7266.00 4296.40 5409.00 9603.90 7789.50 8397.00 9687.30 10339.52 8944.68 9420.32 8995.00 9467.98 99616.60

Raw Flow: Avg - Sewage Pumping Station (m³/d) 234.39 153.44 174.48 320.13 251.27 279.90 312.49 333.53 298.16 303.88 299.83 305.42 272.24 625.0

Raw Flow: Max - Sewage Pumping Station (m³/d) 384.75 359.00 837.00 1069.20 926.10 756.00 864.00 998.00 1112.00 1355.00 1214.00 958.00 1355.00

Ontario Clean Water Agency

Performance Assessment Report Wastewater/Lagoon

01/01/2018 to 31/12/2018

Page 14: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Appendix B Groundwater Sampling Program Laboratory Analysis Results

Page 15: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

OCWA-Southampton (Tobermory Sewage Plant) Attn : Megan Edney

P.O. Box 760Southampton, ONN0H 2L0,

Phone: 519-797-2561Fax:pdf

23-May-2018

Date Rec. : 12 May 2018

LR Report: CA12638-MAY18

Copy: #1

CERTIFICATE OF ANALYSIS Final Report

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

28:Well 60-OW60 (Well

14)

29:Well 61-OW61 (Well

15)

30:Well 8S-OW8-S

(Well 26)

Sample Date & Time 10-May-18 08:45 10-May-18 09:00 10-May-18 13:25

Temperature Upon Receipt [°C] --- --- --- --- 15.0 15.0 15.0

Alkalinity [mg/L as CaCO3] 14-May-18 13:13 15-May-18 21:50 333 337 249

Conductivity [uS/cm] 14-May-18 13:13 15-May-18 21:50 927 820 434

pH [no unit] 14-May-18 13:13 15-May-18 21:50 7.66 7.97 7.93

Temperature @ pH [°C] 14-May-18 13:13 15-May-18 21:50 18.7 18.7 18.4

Organic Nitrogen [mg/L] 14-May-18 20:30 15-May-18 13:45 < 0.15 < 0.15 0.28

Total Kjeldahl Nitrogen [as N mg/L] 14-May-18 20:30 15-May-18 13:44 < 0.5 < 0.5 < 0.5

Unionized Ammonia [mg/L as N] 14-May-18 18:00 15-May-18 12:52 0.001 <0.002 <0.002

Ammonia+Ammonium (N) [mg/L] 14-May-18 18:00 15-May-18 12:50 < 0.1 < 0.1 < 0.1

4AAP-Phenolics [mg/L] 15-May-18 12:00 16-May-18 10:11 < 0.002 < 0.002 < 0.002

Dissolved Organic Carbon [mg/L] 14-May-18 20:00 17-May-18 08:41 2 1 < 1

Phosphorus (total) [mg/L] 14-May-18 22:15 15-May-18 09:36 --- --- < 0.03

Phosphorus (dissolved reactive) [mg/L] 17-May-18 09:00 17-May-18 16:27 --- --- < 0.03

Chloride [mg/L] 18-May-18 11:58 23-May-18 13:50 99 71 7

Sulphate [mg/L] 18-May-18 12:22 23-May-18 13:50 17 30 4

Nitrite (as N) [mg/L] 17-May-18 13:04 23-May-18 12:07 < 0.03 < 0.03 < 0.03

Nitrate (as N) [mg/L] 17-May-18 13:04 23-May-18 12:07 0.29 0.12 0.13

Nitrate + Nitrite (as N) [mg/L] 17-May-18 13:04 23-May-18 12:07 0.29 0.12 0.13

Hardness (dissolved) [mg/L as CaCO3] 17-May-18 16:00 18-May-18 13:18 461 436 283

Magnesium (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 27.2 29.8 25.6

Calcium (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 140 126 71.3

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St.

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001381760

Page 1 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 16: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

28:Well 60-OW60 (Well

14)

29:Well 61-OW61 (Well

15)

30:Well 8S-OW8-S

(Well 26)

Iron (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 0.440 0.016 0.195

Sodium (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 67.4 36.6 3.39

Phosphorus (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 0.226 0.152 0.168

Note: Provincial unionized ammonia calculated using lab results for pH and temperature.

__________________________

Carrie GreenlawProject Specialist Environmental Services, Analytical

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St. LR Report : CA12638-MAY18

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001381760

Page 2 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 17: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

OCWA-Southampton (Tobermory Sewage Plant) Attn : Megan Edney

P.O. Box 760Southampton, ONN0H 2L0,

Phone: 519-797-2561Fax:pdf

23-May-2018

Date Rec. : 12 May 2018

LR Report: CA12638-MAY18

Copy: #1

CERTIFICATE OF ANALYSIS Final Report

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

5:Well 5S-OW5-S

(Well 4)

6:Well 5I-OW5-I (Well

5)

7:Well 5D-OW5-D

(Well 6)

8:Well 9D-OW9-D

(Well 20)

9:Well 9I-OW9-I (Well

19)

10:Well 9S-OW9-S

(Well 18)

Sample Date & Time 10-May-18 13:05 10-May-18 12:45 10-May-18 12:55 10-May-18 14:10 10-May-18 14:00 10-May-18 14:20

Temperature Upon Receipt [°C] --- --- --- --- 15.0 15.0 15.0 15.0 15.0 15.0

Alkalinity [mg/L as CaCO3] 14-May-18 13:13 15-May-18 21:50 220 255 329 220 246 175

Conductivity [uS/cm] 14-May-18 13:13 15-May-18 21:50 605 939 719 415 485 314

pH [no unit] 14-May-18 13:13 15-May-18 21:50 7.94 7.87 7.96 8.05 8.09 7.98

Temperature @ pH [°C] 14-May-18 13:13 15-May-18 21:50 18.6 18.8 18.5 19.0 18.5 19.1

Organic Nitrogen [mg/L] 14-May-18 20:30 15-May-18 13:45 0.22 < 0.15 0.20 < 0.15 0.27 < 0.15

Total Kjeldahl Nitrogen [as N mg/L] 14-May-18 20:30 15-May-18 13:44 < 0.5 < 0.5 < 0.5 < 0.5 < 0.5 < 0.5

Unionized Ammonia [mg/L as N] 14-May-18 18:00 15-May-18 12:52 <0.002 0.008 0.005 <0.003 <0.003 0.004

Ammonia+Ammonium (N) [mg/L] 14-May-18 18:00 15-May-18 12:50 < 0.1 0.3 0.2 < 0.1 < 0.1 0.1

4AAP-Phenolics [mg/L] 15-May-18 12:00 16-May-18 10:11 < 0.002 < 0.002 < 0.002 < 0.002 < 0.002 < 0.002

Dissolved Organic Carbon [mg/L] 14-May-18 20:00 17-May-18 08:41 2 3 2 1 < 1 2

Phosphorus (total) [mg/L] 14-May-18 22:15 15-May-18 09:36 0.13 --- --- --- --- < 0.03

Phosphorus (dissolved reactive) [mg/L] 17-May-18 09:00 17-May-18 16:27 < 0.03 --- --- --- --- < 0.03

Chloride [mg/L] 18-May-18 11:58 23-May-18 13:50 110 140 46 1 2 2

Sulphate [mg/L] 18-May-18 12:22 23-May-18 13:50 21 21 13 15 20 4

Nitrite (as N) [mg/L] 17-May-18 13:04 23-May-18 12:07 < 0.03 0.05 < 0.03 < 0.03 < 0.03 < 0.03

Nitrate (as N) [mg/L] 17-May-18 13:04 23-May-18 12:07 0.50 0.88 < 0.06 < 0.06 < 0.06 < 0.06

Nitrate + Nitrite (as N) [mg/L] 17-May-18 13:04 23-May-18 12:07 0.50 0.93 < 0.06 < 0.06 < 0.06 < 0.06

Hardness (dissolved) [mg/L as CaCO3] 17-May-18 16:00 18-May-18 13:18 379 400 365 279 291 233

Magnesium (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 21.5 20.8 21.1 24.0 25.1 18.0

Calcium (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 116 126 111 72.2 75.1 63.8

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St.

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001381744

Page 1 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 18: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

5:Well 5S-OW5-S

(Well 4)

6:Well 5I-OW5-I (Well

5)

7:Well 5D-OW5-D

(Well 6)

8:Well 9D-OW9-D

(Well 20)

9:Well 9I-OW9-I (Well

19)

10:Well 9S-OW9-S

(Well 18)

Iron (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 0.038 0.027 0.025 0.104 0.021 0.066

Sodium (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 60.1 82.2 40.1 3.36 7.08 1.04

Phosphorus (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 0.191 0.189 0.108 0.069 0.137 0.107

Note: Provincial unionized ammonia calculated using lab results for pH and temperature.

__________________________

Carrie GreenlawProject Specialist Environmental Services, Analytical

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St. LR Report : CA12638-MAY18

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001381744

Page 2 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 19: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

OCWA-Southampton (Tobermory Sewage Plant) Attn : Megan Edney

P.O. Box 760Southampton, ONN0H 2L0,

Phone: 519-797-2561Fax:pdf

23-May-2018

Date Rec. : 12 May 2018

LR Report: CA12638-MAY18

Copy: #1

CERTIFICATE OF ANALYSIS Final Report

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

11:Well 8I-OW8-I (Well

16)

12:Well 8D-OW8-D

(Well 17)

13:Well 10S-OW10-S

(Well 23)

14:Well 11S-OW11-S

(Well 24)

15:Well 12S-OW12-S

(Well 10)

16:Well 1D-OW1-D

(Well 22)

Sample Date & Time 10-May-18 13:35 10-May-18 13:45 10-May-18 08:30 10-May-18 08:15 10-May-18 14:30 10-May-18 11:30

Temperature Upon Receipt [°C] --- --- --- --- 15.0 15.0 15.0 15.0 15.0 15.0

Alkalinity [mg/L as CaCO3] 14-May-18 13:13 15-May-18 21:50 277 297 211 314 252 270

Conductivity [uS/cm] 14-May-18 13:13 15-May-18 21:50 489 507 383 560 854 494

pH [no unit] 14-May-18 13:13 15-May-18 21:50 7.99 7.94 8.11 7.96 7.84 7.95

Temperature @ pH [°C] 14-May-18 13:13 15-May-18 21:50 18.6 18.7 18.9 19.1 18.8 18.8

Organic Nitrogen [mg/L] 14-May-18 20:30 15-May-18 13:45 0.21 < 0.15 < 0.15 0.29 < 0.15 0.17

Total Kjeldahl Nitrogen [as N mg/L] 14-May-18 20:30 15-May-18 13:44 < 0.5 < 0.5 < 0.5 < 0.5 < 0.5 < 0.5

Unionized Ammonia [mg/L as N] 14-May-18 18:00 15-May-18 12:52 <0.002 0.002 0.006 0.002 < 0.001 0.002

Ammonia+Ammonium (N) [mg/L] 14-May-18 18:00 15-May-18 12:50 < 0.1 < 0.1 0.1 < 0.1 < 0.1 < 0.1

4AAP-Phenolics [mg/L] 15-May-18 12:00 16-May-18 10:11 < 0.002 < 0.002 < 0.002 < 0.002 < 0.002 < 0.002

Dissolved Organic Carbon [mg/L] 14-May-18 20:00 17-May-18 08:41 1 < 1 3 2 2 1

Phosphorus (total) [mg/L] 14-May-18 22:15 15-May-18 09:36 --- --- 0.07 < 0.03 0.04 ---

Phosphorus (dissolved reactive) [mg/L] 17-May-18 09:00 17-May-18 16:27 --- --- < 0.03 < 0.03 < 0.03 ---

Chloride [mg/L] 18-May-18 11:58 23-May-18 13:50 5 6 1 2 130 2

Sulphate [mg/L] 18-May-18 12:22 23-May-18 13:50 11 13 16 12 16 9

Nitrite (as N) [mg/L] 17-May-18 13:04 23-May-18 12:07 < 0.03 < 0.03 < 0.03 < 0.03 < 0.03 < 0.03

Nitrate (as N) [mg/L] 17-May-18 13:04 23-May-18 12:07 0.09 < 0.06 < 0.06 0.90 2.08 < 0.06

Nitrate + Nitrite (as N) [mg/L] 17-May-18 13:04 23-May-18 12:07 0.09 < 0.06 < 0.06 0.90 2.08 < 0.06

Hardness (dissolved) [mg/L as CaCO3] 17-May-18 16:00 18-May-18 13:18 309 340 252 368 324 317

Magnesium (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 26.8 27.8 21.1 26.3 14.6 26.5

Calcium (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 79.7 90.1 66.2 104 106 83.2

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St.

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001381747

Page 1 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 20: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

11:Well 8I-OW8-I (Well

16)

12:Well 8D-OW8-D

(Well 17)

13:Well 10S-OW10-S

(Well 23)

14:Well 11S-OW11-S

(Well 24)

15:Well 12S-OW12-S

(Well 10)

16:Well 1D-OW1-D

(Well 22)

Iron (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 0.386 0.621 0.073 0.017 0.016 0.211

Sodium (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 4.48 2.11 3.12 1.35 84.4 2.60

Phosphorus (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 0.217 0.254 0.136 0.141 0.139 0.168

Note: Provincial unionized ammonia calculated using lab results for pH and temperature.

__________________________

Carrie GreenlawProject Specialist Environmental Services, Analytical

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St. LR Report : CA12638-MAY18

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001381747

Page 2 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 21: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

OCWA-Southampton (Tobermory Sewage Plant) Attn : Megan Edney

P.O. Box 760Southampton, ONN0H 2L0,

Phone: 519-797-2561Fax:pdf

23-May-2018

Date Rec. : 12 May 2018

LR Report: CA12638-MAY18

Copy: #1

CERTIFICATE OF ANALYSIS Final Report

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

17:Well 1I-OW1-I (Well

21)

18:Well 6S-OW6-S

(Well 1)

19:Well 6D-OW6-D

(Well 2)

20:Well 6I-OW6-I (Well

3)

21:Well 57-OW57 (Well

13)

22:Well 56-OW56 (Well

12)

Sample Date & Time 10-May-18 11:15 10-May-18 11:10 10-May-18 11:00 10-May-18 10:45 10-May-18 10:35 10-May-18 10:20

Temperature Upon Receipt [°C] --- --- --- --- 15.0 15.0 15.0 15.0 15.0 15.0

Alkalinity [mg/L as CaCO3] 14-May-18 13:13 15-May-18 21:50 380 219 290 343 447 217

Conductivity [uS/cm] 14-May-18 13:13 15-May-18 21:50 663 383 498 602 736 381

pH [no unit] 14-May-18 13:13 15-May-18 21:50 7.80 8.14 8.13 8.04 7.95 7.80

Temperature @ pH [°C] 14-May-18 13:13 15-May-18 21:50 18.8 19.2 18.7 19.7 19.4 18.9

Organic Nitrogen [mg/L] 14-May-18 20:30 15-May-18 13:45 < 0.15 < 0.15 0.16 < 0.15 0.17 < 0.15

Total Kjeldahl Nitrogen [as N mg/L] 14-May-18 20:30 15-May-18 13:44 < 0.5 < 0.5 < 0.5 < 0.5 < 0.5 < 0.5

Unionized Ammonia [mg/L as N] 14-May-18 18:00 15-May-18 12:52 0.003 <0.003 0.007 0.002 <0.002 < 0.001

Ammonia+Ammonium (N) [mg/L] 14-May-18 18:00 15-May-18 12:50 0.1 < 0.1 0.2 < 0.1 < 0.1 < 0.1

4AAP-Phenolics [mg/L] 15-May-18 12:00 16-May-18 10:11 < 0.002 < 0.002 < 0.002 < 0.002 < 0.002 < 0.002

Dissolved Organic Carbon [mg/L] 14-May-18 20:00 17-May-18 08:41 2 3 2 < 1 2 2

Phosphorus (total) [mg/L] 14-May-18 22:15 15-May-18 09:36 --- < 0.03 --- --- --- ---

Phosphorus (dissolved reactive) [mg/L] 17-May-18 09:00 17-May-18 16:27 --- < 0.03 --- --- --- ---

Chloride [mg/L] 18-May-18 11:58 23-May-18 13:50 2 < 1 4 3 1 1

Sulphate [mg/L] 18-May-18 12:22 23-May-18 13:50 5 < 2 6 7 6 < 2

Nitrite (as N) [mg/L] 17-May-18 13:04 23-May-18 12:07 < 0.03 < 0.03 < 0.03 < 0.03 < 0.03 < 0.03

Nitrate (as N) [mg/L] 17-May-18 13:04 23-May-18 12:07 < 0.06 0.07 < 0.06 < 0.06 0.64 < 0.06

Nitrate + Nitrite (as N) [mg/L] 17-May-18 13:04 23-May-18 12:07 < 0.06 0.07 < 0.06 < 0.06 0.64 < 0.06

Hardness (dissolved) [mg/L as CaCO3] 17-May-18 16:00 18-May-18 13:18 443 209 257 392 517 251

Magnesium (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 29.9 23.0 20.9 30.5 30.6 14.0

Calcium (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 128 45.9 68.5 107 156 77.6

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St.

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001381750

Page 1 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 22: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

17:Well 1I-OW1-I (Well

21)

18:Well 6S-OW6-S

(Well 1)

19:Well 6D-OW6-D

(Well 2)

20:Well 6I-OW6-I (Well

3)

21:Well 57-OW57 (Well

13)

22:Well 56-OW56 (Well

12)

Iron (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 0.039 0.009 0.066 0.545 0.010 0.019

Sodium (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 3.02 0.90 19.9 4.58 0.94 0.56

Phosphorus (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 0.308 0.138 0.115 0.134 0.153 0.116

Note: Provincial unionized ammonia calculated using lab results for pH and temperature.

__________________________

Carrie GreenlawProject Specialist Environmental Services, Analytical

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St. LR Report : CA12638-MAY18

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001381750

Page 2 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 23: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

OCWA-Southampton (Tobermory Sewage Plant) Attn : Megan Edney

P.O. Box 760Southampton, ONN0H 2L0,

Phone: 519-797-2561Fax:pdf

23-May-2018

Date Rec. : 12 May 2018

LR Report: CA12638-MAY18

Copy: #1

CERTIFICATE OF ANALYSIS Final Report

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

23:Well 2S-OW2-S

(Well 7)

24:Well 2I-OW2-I (Well

8)

25:Well 2D-OW2-D

(Well 9)

26:Well 55-OW55 (Well

11)

27:Well 7S-OW7-S

(Well 25)

Sample Date & Time 10-May-18 09:45 10-May-18 09:35 10-May-18 09:25 10-May-18 09:15 10-May-18 13:15

Temperature Upon Receipt [°C] --- --- --- --- 15.0 15.0 15.0 15.0 15.0

Alkalinity [mg/L as CaCO3] 14-May-18 13:13 15-May-18 21:50 173 378 254 385 218

Conductivity [uS/cm] 14-May-18 13:13 15-May-18 21:50 321 647 499 684 395

pH [no unit] 14-May-18 13:13 15-May-18 21:50 8.05 7.76 7.79 7.67 7.81

Temperature @ pH [°C] 14-May-18 13:13 15-May-18 21:50 18.6 18.4 18.2 18.6 18.2

Organic Nitrogen [mg/L] 14-May-18 20:30 15-May-18 13:45 0.15 < 0.15 < 0.15 < 0.15 < 0.15

Total Kjeldahl Nitrogen [as N mg/L] 14-May-18 20:30 15-May-18 13:44 < 0.5 < 0.5 < 0.5 < 0.5 < 0.5

Unionized Ammonia [mg/L as N] 14-May-18 18:00 15-May-18 12:52 <0.003 0.002 0.003 0.002 0.002

Ammonia+Ammonium (N) [mg/L] 14-May-18 18:00 15-May-18 12:50 < 0.1 < 0.1 0.1 0.1 0.1

4AAP-Phenolics [mg/L] 15-May-18 12:00 16-May-18 10:11 < 0.002 0.002 < 0.002 < 0.002 < 0.002

Dissolved Organic Carbon [mg/L] 14-May-18 20:00 17-May-18 08:41 1 2 < 1 2 2

Phosphorus (total) [mg/L] 14-May-18 22:15 15-May-18 09:36 0.04 --- --- --- < 0.03

Phosphorus (dissolved reactive) [mg/L] 17-May-18 09:00 17-May-18 16:27 < 0.03 --- --- --- < 0.03

Chloride [mg/L] 18-May-18 11:58 23-May-18 13:50 < 1 2 2 1 1

Sulphate [mg/L] 18-May-18 12:22 23-May-18 13:50 < 2 5 23 6 5

Nitrite (as N) [mg/L] 17-May-18 13:04 23-May-18 12:07 < 0.03 < 0.03 < 0.03 < 0.03 < 0.03

Nitrate (as N) [mg/L] 17-May-18 13:04 23-May-18 12:07 < 0.06 0.06 < 0.06 0.17 < 0.06

Nitrate + Nitrite (as N) [mg/L] 17-May-18 13:04 23-May-18 12:07 < 0.06 0.06 < 0.06 0.17 < 0.06

Hardness (dissolved) [mg/L as CaCO3] 17-May-18 16:00 18-May-18 13:18 188 429 240 479 275

Magnesium (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 13.6 31.1 22.4 22.0 19.6

Calcium (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 53.1 121 59.0 155 77.7

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St.

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001381757

Page 1 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 24: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

23:Well 2S-OW2-S

(Well 7)

24:Well 2I-OW2-I (Well

8)

25:Well 2D-OW2-D

(Well 9)

26:Well 55-OW55 (Well

11)

27:Well 7S-OW7-S

(Well 25)

Iron (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 0.068 0.012 0.033 0.012 0.421

Sodium (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 0.42 3.94 19.1 0.81 1.13

Phosphorus (dissolved) [mg/L] 17-May-18 16:00 18-May-18 13:18 0.131 0.193 0.116 0.129 0.180

Note: Provincial unionized ammonia calculated using lab results for pH and temperature.

__________________________

Carrie GreenlawProject Specialist Environmental Services, Analytical

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St. LR Report : CA12638-MAY18

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001381757

Page 2 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 25: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

OCWA-Southampton (Tobermory Sewage Plant) Attn : Megan Edney

P.O. Box 760Southampton, ONN0H 2L0, Canada

Phone: 519-797-2561Fax:pdf

28-August-2018

Date Rec. : 15 August 2018

LR Report: CA15324-AUG18

Copy: #1

CERTIFICATE OF ANALYSIS Final Report

Analysis 1:

AnalysisStart Date

2:Analysis Start

Time

3:Analysis

Completed Date

4:Analysis

CompletedTime

9:Well 9D

10:Well 10S

11:Well 11S

12:Well 12S

Sample Date & Time 14-Aug-18 12:05 14-Aug-18 11:25 14-Aug-18 11:20 14-Aug-18 12:45

Temperature Upon Receipt [°C] --- --- --- --- 14.0 14.0 14.0 14.0

Alkalinity [mg/L as CaCO3] 15-Aug-18 15:50 17-Aug-18 13:10 230 229 308 253

Conductivity [uS/cm] 15-Aug-18 15:50 17-Aug-18 13:10 436 398 589 833

pH [no unit] 15-Aug-18 15:50 17-Aug-18 13:10 8.08 8.00 8.03 8.02

Temperature @ pH [°C] 15-Aug-18 14:12 28-Aug-18 12:08 20.6 20.7 21.8 21.8

Organic Nitrogen [mg/L] 16-Aug-18 06:00 28-Aug-18 09:00 < 0.15 0.28 0.39 < 0.15

Total Kjeldahl Nitrogen [as N mg/L] 16-Aug-18 06:00 23-Aug-18 15:31 < 0.5 < 0.5 < 0.5 < 0.5

Unionized Ammonia [mg/L as N] 15-Aug-18 17:39 28-Aug-18 08:59 <0.003 0.003 0.002 <0.003

Ammonia+Ammonium (N) [as N mg/L] 15-Aug-18 17:39 16-Aug-18 17:48 < 0.1 < 0.1 < 0.1 < 0.1

4AAP-Phenolics [mg/L] 16-Aug-18 10:05 17-Aug-18 14:22 < 0.002 < 0.002 --- < 0.002

Dissolved Organic Carbon [mg/L] 16-Aug-18 11:49 17-Aug-18 15:05 < 1 2 2 2

Phosphorus (total) [mg/L] 15-Aug-18 17:00 17-Aug-18 10:51 --- 0.09 0.04 0.05

Phosphorus (dissolved reactive) [mg/L] 16-Aug-18 15:24 17-Aug-18 13:49 --- < 0.03 < 0.03 < 0.03

Chloride [mg/L] 22-Aug-18 15:56 24-Aug-18 13:31 1 1 2 98

Sulphate [mg/L] 22-Aug-18 16:03 24-Aug-18 13:31 15 17 11 15

Nitrite (as N) [mg/L] 17-Aug-18 12:28 23-Aug-18 08:59 < 0.03 < 0.03 < 0.03 < 0.03

Nitrate (as N) [mg/L] 17-Aug-18 12:28 23-Aug-18 08:59 < 0.06 < 0.06 0.90 0.55

Nitrate + Nitrite (as N) [mg/L] 17-Aug-18 12:28 23-Aug-18 08:59 < 0.06 < 0.06 0.90 0.55

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St.

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001489782

Page 1 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 26: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

Completed Date

4:Analysis

CompletedTime

9:Well 9D

10:Well 10S

11:Well 11S

12:Well 12S

Hardness (dissolved) [mg/L as CaCO3] 17-Aug-18 12:37 21-Aug-18 10:57 222 207 304 272

Magnesium (dissolved) [mg/L] 17-Aug-18 12:37 21-Aug-18 10:56 21.8 18.9 24.9 16.6

Calcium (dissolved) [mg/L] 17-Aug-18 12:37 21-Aug-18 10:56 53.1 51.7 80.6 81.7

Iron (dissolved) [mg/L] 17-Aug-18 12:37 21-Aug-18 10:56 0.028 0.168 < 0.007 0.011

Sodium (dissolved) [mg/L] 17-Aug-18 12:37 23-Aug-18 18:02 2.91 2.96 1.36 48.4

Phosphorus (dissolved) [mg/L] 17-Aug-18 12:37 23-Aug-18 18:02 < 0.003 < 0.003 < 0.003 < 0.003

__________________________

Carrie GreenlawProject Specialist Environmental Services, Analytical

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St. LR Report : CA15324-AUG18

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001489782

Page 2 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 27: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

OCWA-Southampton (Tobermory Sewage Plant) Attn : Megan Edney

P.O. Box 760Southampton, ONN0H 2L0, Canada

Phone: 519-797-2561Fax:pdf

28-August-2018

Date Rec. : 15 August 2018

LR Report: CA15324-AUG18

Copy: #1

CERTIFICATE OF ANALYSIS Final Report

Analysis 1:

AnalysisStart Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

5:Well 6I

6:Well 6D

7:Well 9S

8:Well 9I

Sample Date & Time 14-Aug-18 12:20 14-Aug-18 12:25 14-Aug-18 12:00 14-Aug-18 11:45

Temperature Upon Receipt [°C] --- --- --- --- 14.0 14.0 14.0 14.0

Alkalinity [mg/L as CaCO3] 15-Aug-18 15:50 17-Aug-18 13:10 338 270 226 229

Conductivity [uS/cm] 15-Aug-18 15:50 17-Aug-18 13:10 637 518 420 455

pH [no unit] 15-Aug-18 15:50 17-Aug-18 13:10 8.01 8.12 7.94 8.01

Temperature @ pH [°C] 15-Aug-18 14:12 28-Aug-18 12:08 21.8 21.8 20.7 20.6

Organic Nitrogen [mg/L] 16-Aug-18 06:00 28-Aug-18 09:00 0.17 < 0.15 0.37 < 0.15

Total Kjeldahl Nitrogen [as N mg/L] 16-Aug-18 06:00 23-Aug-18 15:31 < 0.5 < 0.5 < 0.5 < 0.5

Unionized Ammonia [mg/L as N] 15-Aug-18 17:39 28-Aug-18 08:59 <0.003 0.004 0.002 0.003

Ammonia+Ammonium (N) [as N mg/L] 15-Aug-18 17:39 16-Aug-18 17:48 < 0.1 < 0.1 < 0.1 < 0.1

4AAP-Phenolics [mg/L] 16-Aug-18 10:05 17-Aug-18 14:22 < 0.002 < 0.002 < 0.002 < 0.002

Dissolved Organic Carbon [mg/L] 16-Aug-18 11:49 17-Aug-18 15:05 2 1 1 < 1

Phosphorus (total) [mg/L] 15-Aug-18 17:00 17-Aug-18 10:51 --- 0.03 0.05 ---

Phosphorus (dissolved reactive) [mg/L] 16-Aug-18 15:24 17-Aug-18 13:49 --- < 0.03 < 0.03 ---

Chloride [mg/L] 22-Aug-18 15:56 24-Aug-18 13:31 3 4 3 2

Sulphate [mg/L] 22-Aug-18 16:03 24-Aug-18 13:31 9 6 5 19

Nitrite (as N) [mg/L] 17-Aug-18 12:28 23-Aug-18 08:59 < 0.03 < 0.03 < 0.03 < 0.03

Nitrate (as N) [mg/L] 17-Aug-18 12:28 23-Aug-18 08:59 < 0.06 < 0.06 < 0.06 < 0.06

Nitrate + Nitrite (as N) [mg/L] 17-Aug-18 12:28 23-Aug-18 08:59 < 0.06 < 0.06 < 0.06 < 0.06

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St.

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001489779

Page 1 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 28: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

5:Well 6I

6:Well 6D

7:Well 9S

8:Well 9I

Hardness (dissolved) [mg/L as CaCO3] 17-Aug-18 12:37 21-Aug-18 10:57 326 216 238 227

Magnesium (dissolved) [mg/L] 17-Aug-18 12:37 21-Aug-18 10:56 30.0 20.3 19.6 21.8

Calcium (dissolved) [mg/L] 17-Aug-18 12:37 21-Aug-18 10:56 81.0 53.1 63.3 55.2

Iron (dissolved) [mg/L] 17-Aug-18 12:37 21-Aug-18 10:56 0.175 0.020 0.010 0.009

Sodium (dissolved) [mg/L] 17-Aug-18 12:37 23-Aug-18 18:02 3.07 18.7 1.15 6.12

Phosphorus (dissolved) [mg/L] 17-Aug-18 12:37 23-Aug-18 18:02 < 0.003 < 0.003 < 0.003 < 0.003

__________________________

Carrie GreenlawProject Specialist Environmental Services, Analytical

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St. LR Report : CA15324-AUG18

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001489779

Page 2 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 29: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

OCWA-Southampton (Tobermory Sewage Plant) Attn : Megan Edney

P.O. Box 760Southampton, ONN0H 2L0, Canada

Phone: 519-797-2561Fax:pdf

09-November-2018

Date Rec. : 24 October 2018

LR Report: CA15455-OCT18

Copy: #1

CERTIFICATE OF ANALYSIS Final Report

Analysis 1:Analysis Start

Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

23:Well 2S-OW2-S

(Well 7)

24:Well 2I-OW2-I

(Well 8)

25:Well 2D-OW2-D

(Well 9)

26:Well 55-OW55

(Well 11)

27:Well 7S-OW7-S

(Well 25)

28:Well 60-OW60

(Well 14)

29:Well 61-OW61

(Well 15)

Sample Date & Time 23-Oct-18 09:20 23-Oct-18 09:25 23-Oct-18 09:30 23-Oct-18 09:15 23-Oct-18 09:10 23-Oct-18 11:15 23-Oct-18 11:10

Temperature Upon Receipt [°C] --- --- --- --- 10.0 10.0 10.0 10.0 10.0 10.0 10.0

Alkalinity [mg/L as CaCO3] 24-Oct-18 16:15 26-Oct-18 16:35 534 381 262 406 351 376 315

Conductivity [uS/cm] 24-Oct-18 16:15 26-Oct-18 16:35 867 634 492 711 583 1040 795

pH [no unit] 24-Oct-18 16:15 26-Oct-18 16:35 8.20 7.97 8.01 7.74 7.88 7.85 7.94

Temperature @ pH [°C] 24-Oct-18 16:15 26-Oct-18 16:35 21.3 21.6 21.4 20.3 17.9 20.7 20.6

Organic Nitrogen [mg/L] 24-Oct-18 15:05 06-Nov-18 12:55 < 0.15 < 0.15 < 0.15 0.66 < 0.15 < 0.15 0.15

Total Kjeldahl Nitrogen [as N mg/L] 06-Nov-18 08:48 06-Nov-18 12:55 < 0.5 < 0.5 < 0.5 0.9 < 0.5 < 0.5 < 0.5

Unionized Ammonia [mg/L as N] 24-Oct-18 15:05 06-Nov-18 12:55 0.003 0.016 0.001 0.005 <0.002 0.001 0.002

Ammonia+Ammonium (N) [as N mg/L] 24-Oct-18 15:05 26-Oct-18 10:58 < 0.1 0.4 < 0.1 0.2 < 0.1 < 0.1 < 0.1

4AAP-Phenolics [mg/L] 31-Oct-18 10:03 01-Nov-18 11:18 < 0.002 < 0.002 < 0.002 0.004 < 0.002 0.002 < 0.002

Dissolved Organic Carbon [mg/L] 26-Oct-18 20:00 09-Nov-18 11:29 2 1 < 1 2 2 2 < 1

Phosphorus (total) [mg/L] 07-Nov-18 12:05 08-Nov-18 12:33 < 0.03 --- --- --- < 0.03 --- ---

Phosphorus (dissolved reactive) [mg/L] 24-Oct-18 16:30 29-Oct-18 10:47 < 0.03 --- --- --- < 0.03 --- ---

Chloride [mg/L] 31-Oct-18 13:55 02-Nov-18 12:21 2 2 2 1 2 130 67

Sulphate [mg/L] 31-Oct-18 14:18 01-Nov-18 16:05 3 5 18 4 5 23 31

Nitrite (as N) [mg/L] 25-Oct-18 21:09 30-Oct-18 13:32 < 0.03 < 0.03 < 0.03 < 0.03 < 0.03 < 0.03 < 0.03

Nitrate (as N) [mg/L] 25-Oct-18 21:09 30-Oct-18 13:32 < 0.06 0.07 < 0.06 0.25 < 0.06 0.45 0.13

Nitrate + Nitrite (as N) [mg/L] 25-Oct-18 21:09 30-Oct-18 13:32 < 0.06 0.07 < 0.06 0.25 < 0.06 0.45 0.13

Hardness (dissolved) [mg/L as CaCO3] 30-Oct-18 08:48 02-Nov-18 14:41 587 355 234 447 336 451 368

Aluminum (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.004 0.006 0.015 < 0.001 0.029 0.001 0.160

Barium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00642 0.0171 0.0192 0.0106 0.00507 0.0102 0.0150

Cadmium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.000004 0.000009 0.000005 0.000008 < 0.000003 < 0.000003 0.000004

Chromium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00012 < 0.00003 < 0.00003 0.00003 0.00011 < 0.00003 0.00032

Magnesium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 43.1 30.6 23.6 22.9 27.2 29.6 30.8

Copper (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00111 0.00030 0.00010 0.00026 0.00047 0.00090 0.00060

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St.

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001571077

Page 1 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 30: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Analysis 1:Analysis Start

Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

23:Well 2S-OW2-S

(Well 7)

24:Well 2I-OW2-I

(Well 8)

25:Well 2D-OW2-D

(Well 9)

26:Well 55-OW55

(Well 11)

27:Well 7S-OW7-S

(Well 25)

28:Well 60-OW60

(Well 14)

29:Well 61-OW61

(Well 15)

Calcium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 164 91.7 54.9 141 89.7 132 96.7

Iron (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.009 0.014 0.012 0.132 0.028 0.063 0.305

Sodium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 1.38 15.1 23.0 0.84 0.90 83.0 34.5

Phosphorus (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.013 0.096 < 0.003 0.003 0.005 0.068 0.029

Lead (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00003 0.00003 0.00004 0.00006 0.00027 0.00002 0.00035

Manganese (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00230 0.00250 0.00053 0.0724 0.00138 0.0821 0.00771

Zinc (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 < 0.002 < 0.002 < 0.002 < 0.002 0.003 < 0.002 < 0.002

Note: Provincial unionized ammonia calculated from field pH and temperature provided on the chain of custody form.

__________________________

Carrie GreenlawProject Specialist Environmental Services, Analytical

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St. LR Report : CA15455-OCT18

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001571077

Page 2 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 31: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

OCWA-Southampton (Tobermory Sewage Plant) Attn : Megan Edney

P.O. Box 760Southampton, ONN0H 2L0, Canada

Phone: 519-797-2561Fax:pdf

09-November-2018

Date Rec. : 24 October 2018

LR Report: CA15455-OCT18

Copy: #1

CERTIFICATE OF ANALYSIS Final Report

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

5:Well 5S-OW5-S

(Well 4)

6:Well 5I-OW5-I

(Well 5)

7:Well 5D-OW5-D

(Well 6)

8:Well 9D-OW9-D

(Well 20)

9:Well 9I-OW9-I

(Well 19)

10:Well 9S-OW9-S

(Well 18)

Sample Date & Time 23-Oct-18 11:05 23-Oct-18 11:00 23-Oct-18 10:55 23-Oct-18 08:45 23-Oct-18 08:55 23-Oct-18 08:50

Temperature Upon Receipt [°C] --- --- --- --- 10.0 10.0 10.0 10.0 10.0 10.0

Alkalinity [mg/L as CaCO3] 24-Oct-18 16:15 26-Oct-18 16:35 236 308 305 225 250 281

Conductivity [uS/cm] 24-Oct-18 16:15 26-Oct-18 16:35 631 727 732 421 475 509

pH [no unit] 24-Oct-18 16:15 26-Oct-18 16:35 7.71 8.13 8.12 8.09 8.13 7.92

Temperature @ pH [°C] 24-Oct-18 16:15 26-Oct-18 16:35 18.6 21.4 21.5 21.2 21.4 21.0

Organic Nitrogen [mg/L] 24-Oct-18 15:05 06-Nov-18 12:55 < 0.15 < 0.15 < 0.15 < 0.15 < 0.15 0.99

Total Kjeldahl Nitrogen [as N mg/L] 06-Nov-18 08:48 06-Nov-18 12:55 < 0.5 < 0.5 < 0.5 < 0.5 < 0.5 1.0

Unionized Ammonia [mg/L as N] 24-Oct-18 15:05 06-Nov-18 12:55 < 0.001 <0.003 0.002 <0.003 <0.003 <0.002

Ammonia+Ammonium (N) [as N mg/L] 24-Oct-18 15:05 26-Oct-18 10:58 < 0.1 < 0.1 < 0.1 < 0.1 < 0.1 < 0.1

4AAP-Phenolics [mg/L] 31-Oct-18 10:03 01-Nov-18 11:18 < 0.002 0.003 < 0.002 < 0.002 < 0.002 < 0.002

Dissolved Organic Carbon [mg/L] 26-Oct-18 20:00 09-Nov-18 11:29 3 3 2 < 1 < 1 < 1

Phosphorus (total) [mg/L] 07-Nov-18 12:05 08-Nov-18 12:33 < 0.03 --- --- --- --- 0.03

Phosphorus (dissolved reactive) [mg/L] 24-Oct-18 16:30 29-Oct-18 10:47 < 0.03 --- --- --- --- < 0.03

Chloride [mg/L] 31-Oct-18 13:55 02-Nov-18 12:21 150 170 120 1 2 4

Sulphate [mg/L] 31-Oct-18 14:18 01-Nov-18 16:05 22 23 19 15 20 5

Nitrite (as N) [mg/L] 25-Oct-18 21:09 30-Oct-18 13:32 0.04 0.14 0.09 < 0.03 < 0.03 < 0.03

Nitrate (as N) [mg/L] 25-Oct-18 21:09 30-Oct-18 13:32 0.60 0.62 0.34 < 0.06 < 0.06 < 0.06

Nitrate + Nitrite (as N) [mg/L] 25-Oct-18 21:09 30-Oct-18 13:32 0.64 0.76 0.43 < 0.06 < 0.06 < 0.06

Hardness (dissolved) [mg/L as CaCO3] 30-Oct-18 08:48 02-Nov-18 14:41 289 303 290 248 246 277

Aluminum (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.013 0.067 0.054 0.042 0.005 0.008

Barium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.0161 0.0181 0.0183 0.0287 0.0240 0.00475

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St.

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001571063

Page 1 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 32: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

5:Well 5S-OW5-S

(Well 4)

6:Well 5I-OW5-I

(Well 5)

7:Well 5D-OW5-D

(Well 6)

8:Well 9D-OW9-D

(Well 20)

9:Well 9I-OW9-I

(Well 19)

10:Well 9S-OW9-S

(Well 18)

Cadmium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.000003 0.000034 0.000009 0.000007 < 0.000003 0.000003

Chromium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00003 0.00050 0.00008 0.00005 < 0.00003 0.00015

Magnesium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 19.2 19.2 17.4 24.1 24.5 22.9

Copper (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00216 0.00458 0.00379 0.00040 0.00020 0.00041

Calcium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 83.9 89.6 87.7 59.7 58.1 73.2

Iron (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.038 0.355 0.034 0.014 < 0.007 0.007

Sodium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 58.7 100 109 3.96 7.13 1.12

Phosphorus (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.005 0.006 0.003 0.004 < 0.003 0.003

Lead (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00004 0.00049 0.00010 0.00002 < 0.00001 0.00003

Manganese (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.114 0.229 0.258 0.00046 0.00005 0.00037

Zinc (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 < 0.002 0.003 < 0.002 0.007 < 0.002 0.002

Note: Provincial unionized ammonia calculated from field pH and temperature provided on the chain of custody form.

__________________________

Carrie GreenlawProject Specialist Environmental Services, Analytical

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St. LR Report : CA15455-OCT18

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001571063

Page 2 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 33: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

OCWA-Southampton (Tobermory Sewage Plant) Attn : Megan Edney

P.O. Box 760Southampton, ONN0H 2L0, Canada

Phone: 519-797-2561Fax:pdf

09-November-2018

Date Rec. : 24 October 2018

LR Report: CA15455-OCT18

Copy: #1

CERTIFICATE OF ANALYSIS Final Report

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

11:Well 8I-OW8-I

(Well 16)

12:Well 8D-OW8-D

(Well 17)

13:Well 10S-OW10-S

(Well 23)

14:Well 11S-OW11-S

(Well 24)

15:Well 12S-OW12-S

(Well 10)

16:Well 1D-OW1-D

(Well 22)

Sample Date & Time 23-Oct-18 09:00 23-Oct-18 09:05 23-Oct-18 11:30 23-Oct-18 11:20 23-Oct-18 10:45 23-Oct-18 10:35

Temperature Upon Receipt [°C] --- --- --- --- 10.0 10.0 10.0 10.0 10.0 10.0

Alkalinity [mg/L as CaCO3] 24-Oct-18 16:15 26-Oct-18 16:35 255 266 210 316 266 270

Conductivity [uS/cm] 24-Oct-18 16:15 26-Oct-18 16:35 478 504 399 566 829 488

pH [no unit] 24-Oct-18 16:15 26-Oct-18 16:35 8.20 8.17 8.27 8.16 8.15 8.13

Temperature @ pH [°C] 24-Oct-18 16:15 26-Oct-18 16:35 21.4 21.5 21.3 21.4 21.3 21.7

Organic Nitrogen [mg/L] 24-Oct-18 15:05 06-Nov-18 12:55 < 0.15 < 0.15 < 0.15 < 0.15 < 0.15 < 0.15

Total Kjeldahl Nitrogen [as N mg/L] 06-Nov-18 08:48 06-Nov-18 12:55 < 0.5 < 0.5 < 0.5 < 0.5 < 0.5 < 0.5

Unionized Ammonia [mg/L as N] 24-Oct-18 15:05 06-Nov-18 12:55 0.003 <0.003 0.003 0.002 0.002 0.002

Ammonia+Ammonium (N) [as N mg/L] 24-Oct-18 15:05 26-Oct-18 10:58 < 0.1 < 0.1 < 0.1 < 0.1 < 0.1 < 0.1

4AAP-Phenolics [mg/L] 31-Oct-18 10:03 01-Nov-18 11:18 < 0.002 < 0.002 < 0.002 < 0.002 < 0.002 < 0.002

Dissolved Organic Carbon [mg/L] 26-Oct-18 20:00 09-Nov-18 11:29 < 1 < 1 2 1 < 1 < 1

Phosphorus (total) [mg/L] 07-Nov-18 12:05 08-Nov-18 12:33 --- --- 1.81 < 0.03 < 0.03 ---

Phosphorus (dissolved reactive) [mg/L] 24-Oct-18 16:30 29-Oct-18 10:47 --- --- < 0.03 < 0.03 < 0.03 ---

Chloride [mg/L] 31-Oct-18 13:55 02-Nov-18 12:21 5 6 2 2 110 2

Sulphate [mg/L] 31-Oct-18 14:18 01-Nov-18 16:05 11 13 17 11 17 8

Nitrite (as N) [mg/L] 25-Oct-18 21:09 30-Oct-18 13:32 < 0.03 < 0.03 < 0.03 < 0.03 < 0.03 < 0.03

Nitrate (as N) [mg/L] 25-Oct-18 21:09 30-Oct-18 13:32 0.09 < 0.06 < 0.06 0.80 0.25 < 0.06

Nitrate + Nitrite (as N) [mg/L] 25-Oct-18 21:09 30-Oct-18 13:32 0.09 < 0.06 < 0.06 0.80 0.25 < 0.06

Hardness (dissolved) [mg/L as CaCO3] 30-Oct-18 08:48 02-Nov-18 14:41 238 293 224 340 338 285

Aluminum (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.008 0.040 0.077 0.008 0.005 0.073

Barium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.0069 0.0113 0.0322 0.00539 0.0103 0.0185

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St.

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001571067

Page 1 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 34: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

11:Well 8I-OW8-I

(Well 16)

12:Well 8D-OW8-D

(Well 17)

13:Well 10S-OW10-S

(Well 23)

14:Well 11S-OW11-S

(Well 24)

15:Well 12S-OW12-S

(Well 10)

16:Well 1D-OW1-D

(Well 22)

Cadmium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 < 0.000003 0.000009 0.000004 0.000003 0.000004 0.000005

Chromium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00006 0.00090 0.00020 0.00013 0.00016 0.00014

Magnesium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 25.8 26.3 21.2 28.7 22.8 27.0

Copper (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00025 0.00044 0.00022 0.00046 0.00085 0.00019

Calcium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 52.7 74.2 54.8 88.8 97.6 69.6

Iron (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 < 0.007 0.028 0.103 < 0.007 < 0.007 0.082

Sodium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 4.70 2.16 3.26 1.24 56.1 2.62

Phosphorus (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 < 0.003 < 0.003 0.005 0.004 < 0.003 0.028

Lead (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00002 0.00005 0.00007 0.00004 0.00004 0.00009

Manganese (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00005 0.00059 0.00673 0.00017 0.00019 0.01616

Zinc (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.004 < 0.002 < 0.002 < 0.002 < 0.002 < 0.002

Note: Provincial unionized ammonia calculated from field pH and temperature provided on the chain of custody form.

__________________________

Carrie GreenlawProject Specialist Environmental Services, Analytical

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St. LR Report : CA15455-OCT18

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001571067

Page 2 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 35: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

OCWA-Southampton (Tobermory Sewage Plant) Attn : Megan Edney

P.O. Box 760Southampton, ONN0H 2L0, Canada

Phone: 519-797-2561Fax:pdf

09-November-2018

Date Rec. : 24 October 2018

LR Report: CA15455-OCT18

Copy: #1

CERTIFICATE OF ANALYSIS Final Report

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

17:Well 1I-OW1-I

(Well 21)

18:Well 6S-OW6-S

(Well 1)

19:Well 6D-OW6-D

(Well 2)

20:Well 6I-OW6-I

(Well 3)

21:Well 57-OW57

(Well 13)

22:Well 56-OW56

(Well 12)

Sample Date & Time 23-Oct-18 10:40 23-Oct-18 10:15 23-Oct-18 10:10 23-Oct-18 10:20 23-Oct-18 10:00 23-Oct-18 09:50

Temperature Upon Receipt [°C] --- --- --- --- 10.0 10.0 10.0 10.0 10.0 10.0

Alkalinity [mg/L as CaCO3] 24-Oct-18 16:15 26-Oct-18 16:35 344 314 271 320 442 284

Conductivity [uS/cm] 24-Oct-18 16:15 26-Oct-18 16:35 589 537 491 563 758 495

pH [no unit] 24-Oct-18 16:15 26-Oct-18 16:35 8.22 7.89 8.23 8.19 8.04 7.67

Temperature @ pH [°C] 24-Oct-18 16:15 26-Oct-18 16:35 21.4 21.2 21.4 21.3 21.3 21.4

Organic Nitrogen [mg/L] 24-Oct-18 15:05 06-Nov-18 12:55 < 0.15 < 0.15 < 0.15 < 0.15 < 0.15 < 0.15

Total Kjeldahl Nitrogen [as N mg/L] 06-Nov-18 08:48 06-Nov-18 12:55 < 0.5 < 0.5 < 0.5 < 0.5 < 0.5 < 0.5

Unionized Ammonia [mg/L as N] 24-Oct-18 15:05 06-Nov-18 12:55 0.003 0.001 0.003 0.004 0.003 0.005

Ammonia+Ammonium (N) [as N mg/L] 24-Oct-18 15:05 26-Oct-18 10:58 < 0.1 < 0.1 < 0.1 < 0.1 < 0.1 0.2

4AAP-Phenolics [mg/L] 31-Oct-18 10:03 01-Nov-18 11:18 < 0.002 < 0.002 < 0.002 < 0.002 < 0.002 < 0.002

Dissolved Organic Carbon [mg/L] 26-Oct-18 20:00 09-Nov-18 11:29 2 3 1 < 1 2 3

Phosphorus (total) [mg/L] 07-Nov-18 12:05 08-Nov-18 12:33 --- < 0.03 --- --- --- ---

Phosphorus (dissolved reactive) [mg/L] 24-Oct-18 16:30 29-Oct-18 10:47 --- < 0.03 --- --- --- ---

Chloride [mg/L] 31-Oct-18 13:55 02-Nov-18 12:21 3 1 4 3 2 1

Sulphate [mg/L] 31-Oct-18 14:18 01-Nov-18 16:05 5 < 2 7 8 7 < 2

Nitrite (as N) [mg/L] 25-Oct-18 21:09 30-Oct-18 13:32 < 0.03 < 0.03 < 0.03 < 0.03 < 0.03 < 0.03

Nitrate (as N) [mg/L] 25-Oct-18 21:09 30-Oct-18 13:32 < 0.06 < 0.06 < 0.06 < 0.06 0.62 < 0.06

Nitrate + Nitrite (as N) [mg/L] 25-Oct-18 21:09 30-Oct-18 13:32 < 0.06 < 0.06 < 0.06 < 0.06 0.62 < 0.06

Hardness (dissolved) [mg/L as CaCO3] 30-Oct-18 08:48 02-Nov-18 14:41 391 334 251 319 499 350

Aluminum (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.027 0.003 0.006 0.032 < 0.001 0.006

Barium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00755 0.00516 0.0278 0.0476 0.00934 0.00652

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St.

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001571073

Page 1 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 36: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Analysis 1:Analysis

Start Date

2:Analysis Start

Time

3:Analysis

CompletedDate

4:Analysis

CompletedTime

17:Well 1I-OW1-I

(Well 21)

18:Well 6S-OW6-S

(Well 1)

19:Well 6D-OW6-D

(Well 2)

20:Well 6I-OW6-I

(Well 3)

21:Well 57-OW57

(Well 13)

22:Well 56-OW56

(Well 12)

Cadmium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 < 0.000003 0.000005 0.000005 < 0.000003 0.000005 0.000009

Chromium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00005 < 0.00003 0.00003 0.00006 < 0.00003 0.00003

Magnesium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 31.4 37.8 23.9 30.2 34.5 25.1

Copper (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00025 0.00045 0.00013 0.00009 0.00056 0.00035

Calcium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 105 71.4 61.0 77.9 143 98.7

Iron (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.023 < 0.007 0.013 0.034 0.048 1.57

Sodium (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 2.68 0.70 17.5 5.13 0.87 0.97

Phosphorus (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.082 < 0.003 < 0.003 < 0.003 0.006 0.006

Lead (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00007 0.00003 0.00005 0.00012 0.00005 0.00010

Manganese (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 0.00508 0.00128 0.0391 0.0152 0.0606 0.252

Zinc (dissolved) [mg/L] 30-Oct-18 08:48 02-Nov-18 14:40 < 0.002 < 0.002 < 0.002 < 0.002 < 0.002 < 0.002

Note: Provincial unionized ammonia calculated from field pH and temperature provided on the chain of custody form.

__________________________

Carrie GreenlawProject Specialist Environmental Services, Analytical

Works #: 120001577

Project : PO#017018

SGS Canada Inc. P.O. Box 4300 - 185 Concession St. LR Report : CA15455-OCT18

Lakefield - Ontario - KOL 2HO

Phone: 705-652-2000 FAX: 705-652-6365

OnL

ine

LIM

S 0001571073

Page 2 of 2 Data reported represents the sample submitted to SGS. Reproduction of this analytical report in full or in part is prohibited without prior written approval. Please refer to SGS General Conditions of Services located at

http://www.sgs.com/terms_and_conditions_service.htm. (Printed copies are available upon request.) Test method information available upon request. “Temperature Upon Receipt” is representative of the whole shipment and may not reflect the temperature of individual samples.

Page 37: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Appendix C Sludge Haulage Volumes

Page 38: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

January February March April May June July August September October November December TOTAL

Bruce Peninsula

Septic Service4,000 14,650 7,130 8,600 30,840 18,600 38,390 48,480 10,980 20,200 30,150 5,150 237,170

Scott Septic

Pumping0 0 0 0 152,400 123,400 272,000 264,200 140,800 0 0 0 952,800

Mountain Trout

Camp0 0 0 0 1,200 3,600 9,600 12,000 6,000 6,000 0 0 38,400

Total 4,000 14,650 7,130 8,600 184,440 145,600 319,990 324,680 157,780 26,200 30,150 5,150 1,228,370

*amounts in gallons

2018 - Hauled Sewage

Page 39: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Appendix D Calibration Reports

Page 40: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

Certificate of Instrument PerformanceCertificat de Conformité

Company Name / Nom de la Compagnie : ONTARIO CLEAN WATER AGENCY

Account Number / No. de compte : 40302465

Certification Number / Numéro du Certificat : 7682598

Part Number / No. de pièce : HQ40D vv HQ40d MULTI PORTABLE METERSerial Number / No. de série : 120800077858External Reference / Référence externe : Tobermory WWTP

Hach Sales & Service Canada Ltd. certifies that your instrument has been serviced, calibrated, verified with standards and now meets new product specifications.

Hach Sales & Service Canada Ltd. atteste que votre instrument a été entretenu, calibré et vérifié selon les normes en vigueur. Ses spécifications actuelles sont équivalentes à celles d'un produit neuf.

Certified by / Certifié par : Bilton, Stephen

Certification Date / Date de certification : 16-MAY-18

Page 41: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method
Page 42: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method
Page 43: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method

START-UP REPORT

PROJECT : TOBERMORY SEWAGE LIFT STATION

METCON JOB NO. : N/A

CONTRACTOR P.O. # : N/A

START-UP DATE(S) : August 2, 2018

SERVICE REP. : TRAVIS KRAYETKI

SUBJECT : INSTALL ABB MAGNETIC FLOW METER

: AT THE TOBERMORY SEWAGE LIFT STATION

The site visit was to commission new equipment under Selecta.

The new equipment configurations are outlined below.

Electro-Magnetic Flow Meter

Tag # : N/A

Equipment : ABB Water-Master Flow Meter

Model No. : FEW325150H1S4A1B1A1A2P2B3A1M5

Serial No. : 3K620000270131

Meter Size : 150 mm (6 inch)

Flow Range : 0.0 – 25.00 L/Sec

Flow Mode : Normal

Flow Direction : Forward/ Reverse

Display Mode : 2X9

(Operator Page 1) : 1 Line @ Volume Flow rate

: 2nd Line @ Forward Flow Volume (Totalizer)

Totalizer Units : M3

Low Flow Cut-off : 1.00 %

Hysteresis : 50 %

Analog Output : 4-20mAmps @ Forward & Reverse Mode

: Damping @ 5 Sec

Note: All other parameters are at default value

I/O was checked and verified

The polyurethane seal at the flow tube junction box was applied.

Page 44: Owen Sound, Ontario€¦ · 3-0046-93-006 (Sewage Treatment System) 8-1063-94-006 (Air) Table 2.Tobermory Sewage Treatment System Monitoring Program Source Parameter Frequency Method