![Page 1: Overview of SoCalGas/SDG&E System Design & Operations...System Capacity Design » Designed to CPUC-mandated standards: 1-in-35 year peak day for core service 1-in-10 year peak day](https://reader034.fdocuments.in/reader034/viewer/2022042804/5f562c476aebf21a4d6bf942/html5/thumbnails/1.jpg)
1 7/25/2014
7/25/2014
Beth Musich
Director - Energy Markets & Capacity Products
Overview of Southern California
Gas / San Diego Gas & Electric
System Design & Operations
![Page 2: Overview of SoCalGas/SDG&E System Design & Operations...System Capacity Design » Designed to CPUC-mandated standards: 1-in-35 year peak day for core service 1-in-10 year peak day](https://reader034.fdocuments.in/reader034/viewer/2022042804/5f562c476aebf21a4d6bf942/html5/thumbnails/2.jpg)
SoCalGas/SDG&E Gas Transmission
System with Electric Generation Plants
2
![Page 3: Overview of SoCalGas/SDG&E System Design & Operations...System Capacity Design » Designed to CPUC-mandated standards: 1-in-35 year peak day for core service 1-in-10 year peak day](https://reader034.fdocuments.in/reader034/viewer/2022042804/5f562c476aebf21a4d6bf942/html5/thumbnails/3.jpg)
SoCalGas/SDG&E Gas Transmission
System » 24,100 square mile service territory
» 24.3 million consumers, 6.6 million meters
» 3500 miles of transmission pipeline
» Designed to transport supply from fringes of service territory to primary load centers in Los Angeles and San Diego
» SoCalGas has provided service for more than 140 years Approximately 5% of total US market for natural gas
Throughput averages 1 trillion cubic feet per year
» SDG&E has provided service for more than 125 years Throughput averages 130 billion cubic feet per year
3
![Page 4: Overview of SoCalGas/SDG&E System Design & Operations...System Capacity Design » Designed to CPUC-mandated standards: 1-in-35 year peak day for core service 1-in-10 year peak day](https://reader034.fdocuments.in/reader034/viewer/2022042804/5f562c476aebf21a4d6bf942/html5/thumbnails/4.jpg)
System Capacity Design
» Designed to CPUC-mandated standards:
1-in-35 year peak day for core service
1-in-10 year peak day for firm noncore service
» Design capacity of 6.0 BCFD
Highest recorded demand: 5.3 BCFD in Dec.
1990
4
![Page 5: Overview of SoCalGas/SDG&E System Design & Operations...System Capacity Design » Designed to CPUC-mandated standards: 1-in-35 year peak day for core service 1-in-10 year peak day](https://reader034.fdocuments.in/reader034/viewer/2022042804/5f562c476aebf21a4d6bf942/html5/thumbnails/5.jpg)
Sources of Supply and Receipt Points
Zone Receipt Points Supply Source Capacity (MMCFD)
Northern North Needles, Topock, Kramer Junction
San Juan Basin, Rocky Mountain
1590
Southern Ehrenberg, Blythe, Otay Mesa
Permian Basin, LNG 1210
Wheeler Wheeler Ridge, Kern River Sta.
San Juan Basin, Rocky Mountain, Western Canada
765
California San Joaquin Valley, Coastal
Local 310
5
3875 million cubic feet per day of firm receipt capacity
![Page 6: Overview of SoCalGas/SDG&E System Design & Operations...System Capacity Design » Designed to CPUC-mandated standards: 1-in-35 year peak day for core service 1-in-10 year peak day](https://reader034.fdocuments.in/reader034/viewer/2022042804/5f562c476aebf21a4d6bf942/html5/thumbnails/6.jpg)
Storage Fields
» Four storage fields, located in southwest quadrant of service territory: 137.1 BCF of storage capacity
850 MMcfd of firm injection capacity
3195 MMcfd of firm withdrawal capacity
» Storage rights are allocated and sold on a system-wide basis Rights are not tied to a specific storage field
» Gas Control Department operates to maximize system-wide capacities
6
![Page 7: Overview of SoCalGas/SDG&E System Design & Operations...System Capacity Design » Designed to CPUC-mandated standards: 1-in-35 year peak day for core service 1-in-10 year peak day](https://reader034.fdocuments.in/reader034/viewer/2022042804/5f562c476aebf21a4d6bf942/html5/thumbnails/7.jpg)
Mainline Compressor Stations
» SoCalGas/SDG&E own and operate 13
mainline compressor stations with a
combined total of 142,000 horsepower
» Compressor stations are operated as
necessary to maintain system integrity
Move supplies to changing load centers
Increase system pressures
Balance gas entering and leaving the system
7
![Page 8: Overview of SoCalGas/SDG&E System Design & Operations...System Capacity Design » Designed to CPUC-mandated standards: 1-in-35 year peak day for core service 1-in-10 year peak day](https://reader034.fdocuments.in/reader034/viewer/2022042804/5f562c476aebf21a4d6bf942/html5/thumbnails/8.jpg)
Electric Generation in Southern
California
» The SoCalGas/SDG&E system serves
20,000 MW of electric generation from 79
individual power plants
246 BCF of average EG demand
Winter maximum of 1000 MMcfd (11/13/2013)
Summer maximum of 1835 MMcfd (8/13/2012)
» Power plants are primarily concentrated in
the Los Angeles and San Diego load centers
Newer power plants have also sited outside of the
LA basin
8
![Page 9: Overview of SoCalGas/SDG&E System Design & Operations...System Capacity Design » Designed to CPUC-mandated standards: 1-in-35 year peak day for core service 1-in-10 year peak day](https://reader034.fdocuments.in/reader034/viewer/2022042804/5f562c476aebf21a4d6bf942/html5/thumbnails/9.jpg)
Quick-Start Power Plants
» Recent requests for service to new natural gas power plants have included quick-start technology 0-100% demand in 10 min
0-50% demand in 9 min, 50-100% in 1 min
» If a power plant is on the end of the system, linepack in vicinity of the plant is more limited
» Sudden and rapid pipeline pressure loss can occur on quick-start units 40 psig drop over quick-start ramp not uncommon
Up to 70 psig drop in extreme situations
9
![Page 10: Overview of SoCalGas/SDG&E System Design & Operations...System Capacity Design » Designed to CPUC-mandated standards: 1-in-35 year peak day for core service 1-in-10 year peak day](https://reader034.fdocuments.in/reader034/viewer/2022042804/5f562c476aebf21a4d6bf942/html5/thumbnails/10.jpg)
Quick-Start vs Traditional Start-up Profile
10
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
120.00%
0 20 40 60 80 100 120 140 160 180 200
Pe
rce
nt
Gas
Usa
ge (
%)
Time (Minutes)
Quick-Start Startup Profile
OTC Steam Generation Startup Profile
![Page 11: Overview of SoCalGas/SDG&E System Design & Operations...System Capacity Design » Designed to CPUC-mandated standards: 1-in-35 year peak day for core service 1-in-10 year peak day](https://reader034.fdocuments.in/reader034/viewer/2022042804/5f562c476aebf21a4d6bf942/html5/thumbnails/11.jpg)
Pressure Drops from Quick-Start Plants
Can Be Much Greater than Traditional Facilities
11
290.00
300.00
310.00
320.00
330.00
340.00
350.00
360.00
370.00
380.00
390.00
400.00
6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 PM 1 PM 2 PM
Pre
ssu
re (p
sig
)
Time (Hours)
Pressure Surrounding Facility Morning Start
TraditionalOperations1 Quick-StartPlant3 Quick-StartPlants
320.00
330.00
340.00
350.00
360.00
370.00
380.00
390.00
400.00
410.00
3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM
Pre
ssu
re (p
sig
)
Time (Hours)
Pressure Surrounding Facility Afternoon Start
TraditionalOperations1 Quick-StartPlant3 Quick-StartPlants
![Page 12: Overview of SoCalGas/SDG&E System Design & Operations...System Capacity Design » Designed to CPUC-mandated standards: 1-in-35 year peak day for core service 1-in-10 year peak day](https://reader034.fdocuments.in/reader034/viewer/2022042804/5f562c476aebf21a4d6bf942/html5/thumbnails/12.jpg)
Summary
» The SoCalGas and SDG&E transmission
system is designed to handle up to 6
BCFD of natural gas load
» The system provides flexibility for our
customers, however some level of pipeline
supply is always needed – we cannot
operate solely from storage supplies
» Quick start EG plants are changing the
nature of gas use on our system
12