Overview of programmes and latest developments 21 AUGUST 2014 By: Lerato Mokoena.
-
Upload
lorraine-paul -
Category
Documents
-
view
216 -
download
2
Transcript of Overview of programmes and latest developments 21 AUGUST 2014 By: Lerato Mokoena.
Overview of programmes and latest developments
21 AUGUST 2014
By: Lerato Mokoena
WS Infrastructure Programme
Contents
1. Latest Developments1. Government Outcomes2. SONA3. Strategic Planning (Minister’s presentation)4. NT bid 5. Capacity Plan6. Grant Review process
2. RBIG review3. MWIG review4. WSOS review5. Conclusions
1: Latest Developments;1.1 Government OutcomesActions Indicators / measures 2014 targets
41 Develop comprehensive investment programme for water-resource development, bulk-water supply and wastewater management, assessing requirements to achieve universal access, and prioritise a new dam on the Umzimvubu River
100% capacity in place by dates approved
43 Establish regional water and waste-water utilities to support municipalities
Percentage of municipalities covered by approved functional regional utilities created
100% of municipalities covered by approved functional regional utilities created by 2019
45 Urgent review of water and sanitation norms and standards together with the financial provisions to meet these
Completion of the review process of water and sanitation norms and standards; % Implementation of approved recommendations
Review report by Oct 2014; 100% implementation as per approved timelines
46Additional water supplies for Lephalale area
% completion of the Mokolo and Crocodile River (West) Augmentation Project phase 1
100% completion by December 2015
47 Establish a dedicated national programme to provide support to local and sectoral efforts to reduce water demand and improve water-use efficiency in the Agricultural sector
Support programme in place Approval by June 2015; target completion as per plan
48 Investigate and implement water re-use and desalination projects and continue with applied research.
Cabinet memorandum on research findings
Jun-15
Current: Water Resources Current: Bulk Water Regional Schemes : Programme ongoing
Municipalities
Current: Water Boards Projects: Programme ongoing
Water Boards
Outcome 6: An efficient, competitive and responsive economic infrastructure network
Sun Outcome 4: Maintenance and supply availability of our bulk water resources infrastructure ensured: dams and inter-basin transfers, bulk water and wastewater
67
Sub Outcome 6: Coordination, planning, integration and monitoring implementation of strategic integrated projects in the National Infrastructure Plan
SIP 18: Water and Sanitation InfrastructureMaster Plan
…OutcomesOutcome
Sub-Out
Actions Indicators / measures 2014 targets
7
5 Increased access to quality basic infrastructure and services, particularly in education, healthcare and public transport in rural areas
Provide access to piped water in rural areas % of rural households with access to piped water
100% of households by March 2019
9
1 Members of society have sustainable and reliable access to basic services.
Support municipalities to plan, implement, operate and maintain infrastructure projects or implement alternative delivery mechanisms where local municipalities and or districts lack technical capacity.
• Institutional support plans for municipalities developed or alternative delivery mechansims utilized
Dec-16
5 Proactively build capacity of non-profit implementing agencies and participants through skills development at site level.
• Capacity building strategy and programme developed.• Number of participants trained to enhance ability for self-help.
New institutional arrangements implemented
5 Establish 15 new sites in identified municipalities.
15 additional sites established with a minimum of 1000 participants per site.
15 000 new work opportunities by March 2015 giving a cumulative total of 187000 participants
101 Implement strategies for water conservation
and demand managementPercentage reduction of projected demand for 8 large water supply
20% by 2019
1 Water resources protection Number of sites with River Health Programme implemented
550 river sites
2 Sub-outcome 2: An effective climate change mitigation and adaptation response
2 Development and Implementation of sector adaptation strategies/plans
Number of sector adaptation strategies/plans completed
5 Sectors by 2019
1 Sub-outcome 1: Ecosystems are sustained and natural resource are used efficiently
Responsive, accountable, effective and efficient developmental local government system
PROTECT AND ENHANCE OUR ENVIRONMENTAL ASSETS AND NATURAL RESOURCES
5 Local public employment programmes expanded through the Community Work Programme.
Comprehensive Rural Development
1.2: SONA SONA requirments RBIG projects1) Mining
a. Motlosana noneb. Emalahleni, 2 projectsc. Sekhukhune, 4 projectd. Lephalale, 1 projecte. West Rand and (Mogale City, Merafong City, Randfontein and Westonaria) 3 projectsf. Matjhabeng. none
2) Clanwilliam Dam 2 projects3) Objective is to complete new projects over the next 12 months 57 projects RBIG4) Alfred Nzo District 3 projects5) Lukhanji Local Municipality 1 projects6) OR Tambo District municipality 2 projects7) Mbashe Local Municipality ; WW and water quality 3 projects8) Ngaka Modiri Molema 2 projects
9) Moqhaka Local Municipality , bucket eradication1 project
10) Bucket eradication plan 2 RBIG projects
Provided significant
budget increase
1.3: DWS Strategic Planning session (15 Aug)(Extract of Minister’s presentation)Scene Setting• This approach in the delivery of service should be
people-centred and underpinned by the notion “there is nothing about us without us.”;
• At all times communities have to be involved and consulted, not in a peripheral manner, but in a more inclusive and engaging approach, to ensure that there is a shared-vision for every development we bring.
….Minister’s presentation• Transition Plan from the Dept of Water Affairs to Dept
of Water and sanitation:– The Presidential Proclamation no. 43 of 2014 (dated 8 July
2014) paves way for the establishment of a new Department of Water and Sanitation (DWS) in support of the new ministerial portfolio;
– The Department of Water and Sanitation thus incorporates the mandates of the Department of Water Affairs and the sanitation function transferred from the Department of Human Settlements (DHS).
8
Key Areas of The Declaration of the Summit
1. Innovative Service Delivery Model
2. Water & Sanitation 10 Year Plan (2015-2025)
3. Effective use of Knowledge & Information
4. National Water Resource Strategy 3
Or National Water & Sanitation Resource Strategy 1
SERVICE DELIVERY MODEL
Introduction of Regulatory Reform
Integrated Planning and Implementation processes for both Infrastructure and Water
Resources
Effective licensing regime
National Water Services Policy
Partnerships, participation and stakeholder relations
Water Loss target regime
7% Operations and Maintenance Investment
1. Innovative Service Delivery Model
Efficient and Effective Service Delivery Model
Implemented
Evaluation of powers and functions of local/district municipalities as Water
Service Authorities
Procurement Reform
10
…Minister’s PresentationGAME CHANGERS
– Reconsideration of water ownership patterns and water use rights;
– Educate and create awareness on water conservation; preservation, innovation and security;
– Harmonise roles and responsibilities of institutions and all spheres of government.
1.4: NT Bid summary
PROG StatusR (X 1000) 2015 MTEF R ( X 1000)
2014/15 2015/16 2016/17 2017/18total 2015 MTEF
RBIGexisting R 4 654 148 R 5 313 764 R 5 726 895 R 6 070 509 R 17 111 168proposed R 10 647 373 R 12 140 846 R 9 528 940 R 32 317 159increase R 5 333 609 R 6 413 951 R 3 458 431 R 15 205 991
RBIG New scope, Asset Management
existing R 0 R 0 R 0 R 0proposed R 580 000 R 680 000 R 880 000 R 2 140 000increase R 580 000 R 680 000 R 880 000 R 2 140 000
MWIG Schedule 5bexisting R 524 826 R 1 291 729 R 1 511 545 R 0 R 2 803 274proposed R 1 291 729 R 1 511 545 R 1 602 238 R 4 405 512increase R 0 R 0 R 1 602 238 R 1 602 238
MWIG Schedule 6bexisting R 534 150 R 1 380 205 R 1 302 002 R 0 R 2 682 207proposed R 1 435 413 R 1 354 082 R 1 435 327 R 4 224 822increase R 55 208 R 52 080 R 1 435 327 R 1 542 615
WSOS Schedule 5bexisting R 499 558 R 470 238 R 495 160 R 519 918 R 1 485 316proposed R 470 238 R 495 160 R 519 918 R 1 485 316increase R 0 R 0 R 0 R 0
WSOS Schedule 6bexisting R 142 013 R 151 185 R 159 199 R 0 R 310 384proposed R 151 185 R 159 199 R 0 R 310 384increase R 0 R 0 R 0 R 0
ACIPexisting R 246 959 R 246 959 R 246 959 R 246 959 R 740 877
proposed R 350 000 R 350 000 R 350 000 R 1 050 000increase R 103 041 R 103 041 R 103 041 R 309 123
TOTALexisting R 6 601 654 R 8 854 080 R 9 441 760 R 6 837 386 R 25 133 226proposed R 14 925 938 R 16 690 832 R 14 316 422 R 45 933 193increase R 6 071 858 R 7 249 072 R 7 479 037 R 20 799 967
Key proposalsMWIG: 1) the DWA has selected not to request for an increase in funds
for the 2015/16 & 2016/17 for project implementation until such a time that the MWIG programme is performing satisfactory and is fully utilising its current allocation.
2) The DWA is however requesting that the MWIG programme is increased to a fifth year and a budget allocation is made for the 2017/18 financial year of R 1.602 billion for schedule 5b and R 1.435 billion for schedule 6b.
3) Additional funds are requested for managing the schedule 6b programme allocations and for implementing a required training and capacity building plan.
4) The additional funds for MWIG programme management costs and for direct training and support are limited to a 4% of the total budget allocation of MWIG schedule 6b, and is calculated as R 55.2 million , for 2015/16
Key proposalsWSOS:
1. The WSOS is coming towards its end of its life span, and therefore no additional funds are required over and above its existing 2014 MTEF allocation for the schedule 6b. The funds allocated under schedule 5b which are for the cost of seconded staff will however continue.
ACIP:
1. ACIP programme drivers:– Significant refurbishment needs of aging infrastructure.– Significant need for WC/WDM.– The increasing number of service delivery related “hot-spots”
2. The current budget of ACIP for the 2014/15 financial year is R247 million. It is proposed that as from 2015/16 the budget for ACIP is increased to R350 million p.a.
..RBIG
2015/16 2016/17 2017/18R000 R000 R000
5 313 764 5 726 895 6 070 509 17 111 168
Programme Management/ Feasibility Studies
92 109 103 293 109 490 304 892
Other projects 1 368 986 1 761 455 1 518 453 4 648 894
Flagship 666 735 803 491 643 045 2 113 271
Bulk Water 27 DM 2 669 028 2 722 342 3 589 902 8 981 272
WWT 516 906 336 314 209 619 1 062 839
Total Budget allocation committed
5 313 764 5 726 895 6 070 509 17 111 168
Net fund available (1) 0 0 0 02015/16 2016/17 2017/18R000 R000 R000
Other projects 537 598 595 766 -45 000 1 088 364
Flagship 1 146 651 622 924 0 1 769 575
Bulk Water 27 DM 1 635 855 1 997 149 593 268 4 226 272
WWT 341 297 -18 297 0 323 000
Total 3 661 401 3 197 542 548 268 7 407 211
Other projects & hot spots 319 183 517 815 380 000 1 216 998
Flagship 0 0 0 0
Bulk Water 27 DM 239 000 627 000 735 000 1 601 000
WWT 292 725 183 500 61 235 537 460
Total 850 908 1 328 315 1 176 235 3 355 458
Other projects & hot spots 404 300 664 877 1 109 928 2 179 105
Flagship 145 000 270 000 0 415 000
Bulk Water 27 DM 240 000 919 217 600 000 1 759 217
WWT 32 000 34 000 24 000 90 000
Total 821 300 1 888 094 1 733 928 4 443 322
Total Additional Requirements
5 333 609 6 413 951 3 458 431 15 205 991
Total MTEFBaseline allocation
Additional funds required
Projects currently in feasibility phase (2nd priority) or projects identified
Total MTEF
Committed Programme
Existing committed projects (projects in construction)
Projects currently in feasibility phase (1st priority)
1.5 Capacity Plan for MWIG /RBIGLetter received from NT
Overview of skills / training strategies
MINI PLAN
WATER SECTOR CAPACITY PLAN
LOCAL GOVERNMENT CAPACITY PLAN
Draft DWS Mini skills transfer capacity plan
1. Initiative A: Capacity programme to implement sustainable reticulation projects to ensure basic water services (meet the requirements of MIG /MWIG/ACIP). – Annual Workshops
2. Initiative B: Capacity programme to implement and maintain bulk infrastructure projects.- Annual Workshops
3. Initiative C: General capacity programme for planning and managing water services.- Annual Workshop
4. Initiative D: Conditions, Regulations, governance and inter- governmental co-operation.
5. Initiative E: Mentorship and skills transfer programme6. Initiative F: Institutional capacity assessment and capacity
development support
1.6 Grant Review process (DWS Proposal (draft)
Small Water Resource (dams)
Acid Mine Drainage
Regional Bulk water supply
Consolidating : part of RBIG, AMD, part of ACIP
Regional effl uent schemes
Regional WC/WDM schemes
Regional raw water supply
New scope: Regional raw water schemes,
WC/WDM
Internal BulkRefurbishment of WWTW and WTW
Water distribution
Consolidating : part of RBIG, ACIP, WSOS, MWIG,
RRU, MIG, RHIG
Water Demand Management
O & M and Asset Management
support
27 DMs (Backlogs in rural area)
New scope: O & M support, Institutional
capacity, planning
Rapid response / Hot-spots
Institutional capacity building
Planning support
(new) Municipal Water Infrastructure Grant
Regional Bulk Infrastructure Grant
Land aquisition ????
2: RBIG review• NT has complimented DWS on the
performance of RBIG• NT has complimented DWS fro being the only
Department to submit a capacity plan and on the quality of the plan
2. RBIG ; 2.1ChallengesA. Budget /cost
i. Overall programme budget insufficient (2016 MTEF Bid requests double in order to complete existing projects and implement new priority projects)
ii. A number of municipalities cannot afford the co-funding, which could create a significant risk to the programme. (not adequately budgeted)
iii. Some projects cost have escalated considerably B. Institutional capacity
(95 % of budget is on projects > R 100 million, 110 projects)i. WSA poor capacity to implement and manage projectsii. WSA often do not want Water Boardsiii. Often there is no adequate institution to operate /manage
infrastructure .iv. WSA are unsustainable due to lack of financial management
… Challenges
C. Scope of Programmei. Need to make RBIG part of holistic programme
addressing the following weaknesses:• WC/WDM• Asset Management• Financial Management• Institutional development• Planning
ii. Need to improve integration / alignment• MIG• Planning• Water Boards• Metros
…ChallengesD. Project implementation
i. Project /cost creepii. Completing initial large projects iii. Quality of procurementiv. Quality of planning
E. Sustainability /functionality after completioni. Inadequate O & Mii. Lack of institutional capacityiii. Lack of financesiv. Other commitments / projects not materialising
2.2 RBIG Recommendations
A. Budget /costi. Budget: High level discussion and assessment of DWA bid
(consequences /risks of budget constraints need to be acknowledged) ; Alternative funding streams must be considered.
ii. Co-funding: Establish an urgent inter-governmental review panel on co-funding.
iii. Project cost: DWA to review all large on-going projects and implement phases; DWA to introduce tighter controls.
….RBIG Recommendations B. Institutional capacity
i. RWU: Policy and the establishment of RWU should be acceleratedii. WSA capacity: A more dedicated/specific to WSA and integrated
capacity building programme involving all key role playersiii. IA: Escalation & political involvement in the choice of IA / WBs. iv. DWA to implement more stringent controls regarding weak WSA .v. Comprehensive guidelines on > R 100 projects developed vi. Facilitate and agree on process (through current legislation) to allow
easier intervention by National Government when WSA fail. C. Scope of Programme
i. RBIG scope: Discuss with NT a more holistic programmeii. Integration:
• DWA to develop /improve internal capacity for planning;• Improve the provincial planning committees.• Centralise the planning for the entire water supply chain
D. Project implementationi. Improve planning: governance and fundingii. Increase DWA capacity to project manage and M&Eiii. Introduce more stringent financial management controlsiv. Review scope /phasing of all large projectsv. Accelerate (budget permitting) completion of projects
E. Sustainabilityi. Propose to NT some O & M support for first 2 years ii. DWA to improve monitoring after project completioniii. Legislation ??!!! On Minimum O & M standards / liability.iv. Re-assess all IA of projects > R 100 million (60 projects)
….RBIG Recommendations
3 MWIG 3.1 Challenges
A. Project implementationi. Lack of capacity by many WSA to manage projects and Servicesii. Money transferred to WSA are not used to implement projectsiii. Resistance to the use of Water Boards by some weak WSAiv. Significant unit cost for rural water supply particularly in KZN v. Demographics: Scattered and informal settlements over vast
distances and over difficult terrainvi. Resistance/rejection to localised solutions, interim or intermediate
solutions and the use of Community based organisationsvii. Unsustainable, unaffordable operating and maintenance (O & M )
costs.viii. Inadequate planning, inadequate BP and technical reportsix. Lengthy delays due to various reasons.x. Lack of capacity / poor performance / long delays by Water Boardsxi. Schedule 5 syndrome by many WSA who tend to use the money as
they like or for other projects / initiatives besides the original BP.
…. MWIG challenges B. Programme management
i. Risk of role overs not been approved will have a significant impact on the overall budget of the programme.
ii. Limited internal capacity with DWA to deal with the many challenges and requirements of this new programme
iii. Additional priority DMs ?? 24 are now 27 DMsiv. Need for similar interventions outside the 24 DMs.(now 27 DMs)v. Lack of revenue connection /financial management (and
governance) of financial management in WSA threatens sustainability of interventions
vi. Moving target, new backlogs.vii. Overall costs are far greater than originally anticipated (MWIG budget
R 4,3 billion, revised estimate of need is greater than R20 billion.viii. Lack of integration of projects between various programmes.
3.2 MWIG Recommendationsi. Urgent escalation and engagement with Water Boards to
improve their performance.ii. Need to urgently secure funding for DWA to improve support on
planning (technical reports and BP) and programme management – bid proposes a PM fee of 4% of schedule 6b
iii. Increase / improve capacity and resources within DWA allocated to managing programmes.
iv. Escalate if necessary to political level disputes regarding IA and the involvement of Water Boards and resolve.
v. Introduce a comprehensive “term-contract” that will speed up/ improve procurement.
……MWIG Recommendations
vi. Introduce more stringent assessments of projects approved.vii. Improve DWA systems/procedures and guidelines.viii. Motivate for the expansion of the programme as from year 3 to
go beyond the 27 DMs and address all WSA with backlogs.ix. Develop and implement a capacity building programme for
specific WSA in conjunction with other key role players.x. Hold a National workshop to discuss / deliberate on interim /
intermediate and rural water supply.
ChallengesWSOS
4 WSOS4.1 WSOS Challenges
1. Ensuring compliance with the conditions of the grant and in accordance with the residual scope statement established in June 2013.
2. Under-expenditure & non-performance of certain WSAs is negatively impacting the completion of the programme.
3. Acceleration of refurbishment required in certain WSAs to ensure completion of the programme within the next two years. Capacity of the WSAs to enable such acceleration is questioned.
4. The insufficient attention to O & M by WSAs, including the adequate assignment of budget, are a serious concern to the Department and threatens the longer term sustainability of refurbishment projects.
5. Staff retained within the Department in Limpopo due to receiving WSAs not accepting the transfer of such staff.
6. > R100 million schemes not yet officially transferred to the books of receiving WSA’s, however the water services function has been transferred
Recommendations WSOS
4.2 WSOS Recommendations
1. Focused programme management (completion strategy) to ensure compliance and completion of residual scope
2. Implement alternative implementing arrangements for areas with ‘high’ residual need
3. Allocations to address and align with residual scope statements4. Finalize alternative institutional arrangements to enable transfer of
remaining staff and > R100 million schemes
5: Conclusion1. RBIG: Although there is always room for improvement
DWA is satisfied with the progress and achievements of RBIG.
2. MWIG: CD is very concerned with the slow progress and the number of challenges faced with MWIG and will be placing extra focus and resources to resolve the problems.
3. WSOS: The programme is coming to an end and DWA is developing /implementing an exit /completion strategy
…conclusion4. A number of the programme challenges require industry related
solutions involving all key role players:– Institutional arrangements / capacity– Governance and regulations– Integrated planning
5. The constraints of limited funding (RBIG) need to be addressed and / or the implication fully appreciated /acknowledged.
6. DWA’s new official role on sanitation, should have a significant impact on its infrastructure support programmes.
7. The following critical issues will require high level involvement from all key stakeholders to resolve:
– Lack of co-funding by WSA– Ownership / management and transfer of infrastructure for
projects > R 100 million (more than 65 projects)– Performance of Water Boards– Inadequate integrated planning