OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center...

53
OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University

Transcript of OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center...

Page 1: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

OVERVIEW: CDM FINANCING

DENR Training CourseNovember 4-6, 2003

Climate Change Information CenterManila ObservatoryAteneo de Manila University

Page 2: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Contents

1. Basics of CDM Financing

2. CDM Transaction Costs

3. Risks in CDM Financing

4. State of the Carbon Market

Page 3: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

1. Basics of CDM Financing

Page 4: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Starting Point: Viable Project

• A potential CDM Project is a feasible project Technologically feasible Financially sound

• A potential CDM Project is a project which has an Environmental Compliance Certificate (ECC)

Page 5: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Total Project Costs and Sources of Finance

Total Project Cost Estimates • Investment costs, including development costs, up to

commissioning of project

Sources of Finance to be Sought or Already Identified

• Critical to identify other debt and/or equity finance• Typical sources of funding: international development

banks, government funding, private financing, supplier credit

• CDM contribution = typically 5-15% of total project costs

Page 6: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Financing Options in a CDM Project

Emission Reductions Purchase Agreement

• Annex I investor agrees to buy CERs as they are produced by the project

Page 7: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

BanksInvestor

DebtEquity

Power Purchase Agreement

$$

Electricity

Emission Reductions Purchase Agreement

CDM Investor$$

CERs

Emission Reduction Purchase Agreement

Page 8: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Emission Reduction Purchase Agreement

• Will improve IRRs• Forward contract

– Payment upon delivery of verified ERs– Upfront payments are rare

• Will provide a hard currency revenue• Helps secure financing and reduce project risk

– Future ER payments as collateral for project loans– Can be paid into an escrow account, protecting

lenders from currency convertibility and transfer risks

Page 9: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Financing Options in a CDM Project

Carbon Funds

• Annex I investors contribute to a mutual fund

• Mutual fund agrees to buy CERs as they are produced by the project

• Examples– WB Prototype Carbon Fund– Netherland’s CERUPT

Page 10: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

How Carbon Funds Work..

Industrialized Governments

and Companies

Developing Countries and Communities

Carbon FundCarbon Fund

$$Technology

Finance $$Technology

Finance

CO EquivalentCO Equivalent22

Emission Reductions

CO EquivalentCO Equivalent22

Emission Reductions

Page 11: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Carbon Fund

Carbon Fund

$$ $$

22 22

Emission ReductionPurchase Agreement

BanksInvestor

DebtEquity

Power Purchase Agreement

$$

Electricity

$$

CarbonCredits

Nature of Carbon Financing Contract

Page 12: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Carbon Fund

Carbon Fund

$$ $$

22 22

Emission ReductionPurchase Agreement

BanksInvestor

DebtEquity

Power Purchase Agreement

$$

Electricity

$$CarbonCredits

Emission Reduction Purchase AgreementODA

Non-ODA

Page 13: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Financing Options in a CDM Project

Full or partial equity

• Annex I Investor finances all or co-finances part of a CDM project in return for full or shared financial returns and CERs

• Local investors co-financing CDM projects in a host country may wish to share in CERs so that they have the opportunity to sell the credits at a later time

Page 14: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

BanksInvestor

DebtEquity

Power Purchase Agreement

$$

Electricity

CDM Equity Financing

CDM InvestorEquity $$

CERs

ODA

Non-ODA

Page 15: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Financing Options in a CDM Project

Loan

• Annex I Investor provides loan or lease financing at concessional rates in return for CERs

Page 16: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

BanksInvestor

DebtEquity

CDM Debt Financing

CDM Investor

CERsElectricity

$$Debt $$

ODA

Non-ODA

Page 17: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

2. CDM Transaction Costs

Page 18: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Pre-implementation costs

• Search costs

• Negotiation costs

• Baseline determination costs

• Approval costs

• Validation costs

• Review costs

• Registration costs

Page 19: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Implementation costs

• Monitoring costs

• Verification costs

• Review costs

• Certification costs

• Enforcement costs

Page 20: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Trading costs

• Transfer costs

• Registration costs

Page 21: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Transaction costs Relation to project size

Estimate (k€)

Search costs Fixed 15

Negotiation costs Degressive 25 – 400

Baseline determination costs Fixed 35

Approval costs Fixed 40

Validation costs Fixed 15 – 30

Registration costs Fixed 10

Monitoring costs Fixed 10

Verification costs Degressive 8 per turn

Certification costs Degressive NA

Enforcement costs Proportional

Transfer costs Proportional 1%

Registry costs Proportional 0.03%

Minimum fixed costs (k€) 150Source: Michaelowa et al (2003)

Page 22: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Project size, types & total transaction costsSize Type Reduction

(t CO2 per yr)

€ / t CO2

Very Large

Large hydro, geothermal, landfill methane

>200,000 0.1

Large Wind power, solar thermal, energy efficiency

20,000 – 200,000

0.3 – 1

Small Boiler conversion, DSM, small hydro

2000 – 20,000 10

Mini Energy efficiency in housing & SME, mini-hydro

200 – 2000 100

Micro PV < 200 1000

Source: Michaelowa et al (2003)

Page 23: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Project size thresholds

• PCF considers any project with a volume below 3 million € greenhouse gas benefits would not be attractive due to transaction costs Threshold of about 50,000 t CO2 per year for

a 20–year project• Transaction costs should not be more than 25%

of proceeds of CER sales to make a project viable (Shell, 2001)

• Cost threshold of about 1 € / t CO2

Page 24: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Viability of CDM Projects

• Given CER market price estimates of 1 – 5 € pet t CO2 (Jotzo and Michaelowa, 2001)

• Given PCF transactions priced at 3 – 4 € per t CO2

Only projects classified as large and very large are viable

Many small-scale projects would not be viable

Page 25: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Ways to reduce transactions costs

Bundle projects to jointly undertake each step of the project cycle

1 2 3

4 5

Page 26: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Ways to reduce transactions costs

• Do verification and certification not annually but at long intervals

• Exempt projects from one or more steps of the project cycle

• Streamline the information needs on each step of the project cycle

• Standardization of parameters

Source: Michaelowa et al (2003)

Page 27: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Ways to reduce transactions costs

• Do unilateral CDM projects that reduce search and negotiation costs

• Registration and certification fees proportional to the size of the project

• Validation and verification fees proportional to the size of the project

Source: Michaelowa et al (2003)

Page 28: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

3. Risks in CDM Financing

Page 29: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Risks in CDM Financing

• Renewable energy projects are considered risky by financing institutions

• Multitude of risks could reduce the value of the project to zero

• Measures are needed to mitigate risks at different stages of the project

Page 30: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

“Normal” Project Risks

• Political/Country Risks• Sponsor Risks

• Construction Risks• Technical Risks

• Fuel Risks• Environmental Risks

• Financial Risks• Legal Risks

• Operation Risks

Page 31: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

CDM-Specific Risks

• Market/Price Risk– Will there be a market for project-based ERs? – Will contract price exceed market price?

• Policy/Compliance Risk– What if no Kyoto Protocol?– What if host country does not ratify or comply?– What if host country does not approve project?

Market and Policy Risk are closely linked

Page 32: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

• Baseline Risks– Eligibility--will ERs be Kyoto-compliant?

– Will project be validated and registered?– Will ERs be verified and certified?

– Baseline design--is the baseline robust? Will its assumptions remain valid over time?

– Performance--actual performance will determine level of ERs generated

CDM-Specific Risks

Page 33: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

4. Emerging Trends in the Carbon Market

Page 34: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Summary of carbon markets currently in operation

Project-based Emission Reduction purchases

Allowance Trading

Within National trading systems

Intra-Firm tradingRetail

UK

DK

Shell

BP

“Pre-Compliance”

From voluntary

To Kyoto Pre-Compliance

Page 35: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Market Intelligence:“Few Countries Benefiting,

Little Private Sector Buying” • Market: cumulative 200 million tonnes CO2

traded ($500 million) since 1996

• Five-fold increase between 2001 and 2002

• Only 43% of all carbon transactions made in CDM/JI (2001-2002), dominated by Dutch and PCF

• Only 13% of the private sector’s purchases were in CDM (2001-2002)

• African countries, smaller countries and small-scale projects are largely bypassed

Page 36: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Carbon Market Volume has increased

Source: Authors’ own calculation, as above, volume projection by PointCarbon

0

10

20

30

40

50

60

70

80

1996 1997 1998 1999 2000 2001 2002(to date)

2002(Proj.)

Est

imat

ed v

olu

mes

tra

nsa

cted

(M

tCO

2e)

ER TransactionNational MarketsPoint Carbon 02 proj.

Page 37: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Who is buying ER Credits?

Source: Authors’ own calculation, based on transaction database assembled with Natsource, Co2e.com and PointCarbon

1996-2000 2001-2002

Canada

USA

Netherlands

Other WEU

Japan PCF

Australia

Canada

USA

Other WEU

Japan

Australia

PCF

Netherlands

Page 38: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Balance in Asset Classes Emerging

Source: Authors’ own calculation, based on transaction database assembled with Natsource, Co2e.com and PointCarbon

0%

10%

20%

30%

40%

50%

60%

70%

Fuel-Switching EnergyEfficiency

Renewables Industrial Transportation LFG LULUCF GeologicalSequestration

1996-2000

2001-2002

Page 39: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

0

2

4

6

8

10

12

14

16

18

Annex II JI Countries CDM Countries

Volu

me

of

ER

Pro

ject

s (M

tCo

2e)

Carbon Finance flows 2001-2002

Source: Authors’ own calculation, based on transaction database assembled with Natsource, Co2e.com and PointCarbon

USA

Canada

Australia

Latin America

AsiaAfrica

Page 40: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Who’s buying where? (2001-2002)

Source: Authors’ own calculation, based on transaction database assembled with Natsource, Co2e.com and PointCarbon

0

2

4

6

8

10

12

14

16

18

20

Annex II JI CDM

Volu

me

(MtC

o2e

)

Private

Private/Public partnerships

Public

In 2001-2002, private companies acting alone have purchased only 13% of their reductions in developing countries.

Page 41: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

World BankCarbon Finance Vehicles

                                             

  

BioCarbon Fund

Netherlands CDM Facility

Italian Carbon Fund

Page 42: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

World Bank’s Carbon Finance Business- at a Glance

 

Carbon Purchases agreed and under negotiation: ~40, ~US$250 million Number/Value of PCF and Netherlands Projects approved for carbon purchase: 64, US$ 440 millionCarbon Asset portfolio: ~50 million tCO2e

Underlying CDM/JI project finance: ~$3.0 bn

Page 43: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Regional Distribution of Active PCF Pipeline ProjectsTotal of Approx. US$ 227 Million

East Asia23%

Eastern Europe17%

Latin America 24%

Africa20%

South and Central Asia

16%

Page 44: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Technological Distribution of Active PCF Pipeline ProjectsTotal of Approx. US$ 227 Million

Bagasse6% Biomass

8%

Energy Efficiency

18%

Geothermal12%

LULUCF4%

Waste Management

21%

N20 Removal5%

Small Hydro12%

Wind14%

Page 45: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Sample Projects• Latvia: $2.5 million PCF Purchase

– anaerobic decomposition of about 20,000 tons of garbage a year– ERs from the existing landfill site gas recovery began June 2002

• Uganda: $3.9 million PCF purchase– a 5.1 MW and 1.5 MW small hydro generating facilities in the

West Nile region– Displaces >200 small and few large public diesel gensets

• Chile: $6 m PCF Purchase– 26MW run-of-river hydro generating 175 GWh to replace

coal/gas

• Brazil: $5 mm of PCF Purchase– Substituting coal/coke by sustainably produced charcoal in pig

iron production, plus afforestation and ecosystem restoration, biodiversity and health benefits

Page 46: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Contrasting the New FundsContrasting the New Funds

CF to small-scale energy projects

Generate high-value ERs (contract prices: $4-5t/CO2e)

“Development + Carbon”

CDM countries only:

emphasis on smaller, poorer

countries and communities

Multiple tranches

Community Development Carbon Fund (CDCF) BioCarbon Fund

CF to agricultural, forestry, and land use

Generate cost-effective ERs (contract prices: $3-4/tCO2e)

Carbon + biodiversity cons., fight against desertification, reduction in rural poverty

CDM and JI

Learn-by-doing prototype

Page 47: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

  Historical Emissions

Low Surplus (High Demand, Low

Supply)

High Surplus (Low Demand, High

Supply)

  1990 2000 % change2000-2010

CarbonBalanc

e

% change2000-2010

CarbonBalanc

eGROSS DEMAND       220   53

EU Carbon 911.4 895.5 7% 120 -3% 30

Japan Carbon 305.3 313.7 10% 58 -3% 17

Canada Carbon 128.6 158.0 15% 61 0% 37

+ Net other GHGs (+5, -5%)       12   -2

- Managed forest allowance       -30   -30

Buyers of Carbon Credits[MtCe/yr]

(Source: Grubb, March 2003)

Page 48: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

  Historical Emissions

Low Surplus (High Demand, Low

Supply)

High Surplus (Low Demand, High

Supply)

  1990 2000 % change2000-2010

CarbonBalance

% change2000-2010

CarbonBalance

SUPPLY       331   587

Russia Carbon 647 450.7 20% 106 0% 196

Ukraine Carbon 191.9 104.5 20% 67 0% 87

Accession 10 Carbon 245.2 146.6 25% 45 5% 75

Other EITs 87.8 45.4 25% 24 0% 36

Other GHGs (10, 20%)       24   79

+ Managed forest allowance       40   40

 

CDM       

15   

50

Sellers of Carbon Credits[MtCeq/yr]

(Grubb, March 2003)

Page 49: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Kyoto Protocol:Flexibility Mechanisms

Present day

2012 (BaU)

Assigned Amounts

Domestic Actions

Joint Implementation

Emission TradingAnnex I

Emission Trading

Clean Development Mechanism

Domestic Actions

2012 with KP

- 5%

1990 level

Page 50: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Probable prices for CERs(£/tCO2e)

(Grubb, March 2003)

• Renewable energy and energy efficiency projects under CDM fast-track procedures for small scale projects £10 – 25 per tCO2e

• Land use and other CDM projects £ 5 – 15 per tCO2e

Page 51: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Key Factors in CDM Market Development

• Need 5 years+ for carbon finance to make a difference in a project at current prices;

• Buyers only want ERs delivered by 2012. They heavily discount ERs after 2012

• If value of post 2012 ERs is not assured by 2006, CDM market activity will decline sharply

Page 52: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Lead Time and Uncertainty Constraints on Project-Based

Mechanism (esp. CDM)

2006 20082003 2012

Operating

Wind, Efficiency, Waste to Energy

Large Hydro, Geothermal, Coal to Gas PowerCDM Investment Window: 3years

IF NO Decision; No Incentive beyond 2012,

No Investment, Market Development Stalled

Operating

= Start Construction

Page 53: OVERVIEW: CDM FINANCING DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo de Manila University.

Roberto C. Yap, S.J., Ph.D.

Environmental Economist

Climate Change Information Center

Manila Observatory

Ateneo de Manila University

Tel +63 2 426-6144

Fax +63 2 426-6070

[email protected]