Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall...

90

Transcript of Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall...

Page 1: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and
Page 2: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

EGEC Profile

Overview 1

About Us 1

Facts 1

Group Members 2

Mission 3

Core Values 3

Board of Directors 4

ISO Certificate 5

Business Lines 6

Services 7

Company Structure 10

Appendices:

Appendix 1: Featured Projects

Contents

Page 3: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

EGEC Profile 2

About Us

EGEC – Group is a multi-disciplinary engineering consultancy group of firms working in the areas of Buildings, Water and Environment, Transportation, Urban Development (Integrated Infrastructure), Management Systems & Solutions and Energy with a strong presence as a regional group of firms in Middle East and North Africa.

The Origin of EGEC Group was in 1986 in Cairo, Egypt where the first firm EGEC-Engineering House of Expertise has been established as a share holding company that has been given a remarkable recognition as one of the leading consultancy firms in Egypt. Providing a reliable expertise value, over some 28 years of hard work and aspired commitment to quality, EGEC Group has gained a solid reputation as one of the top consulting firms in the region, certified in accordance with ISO 9001:2008 requirements. In addition to Quality Management, also maintained and applied extensive regulations in Operation Management, HSE (Health, Safety and Environment), Training & Staff Development, Human Resource Management, Business Integrity, and Social Responsibility.

A wide range of projects covered by EGEC Group expertise including: Residential, Commercial, Educational, Health Care, and other Public Buildings, Industrial Facilities, and Infrastructure including Transportation Engineering, Highways and Bridges, Water & Environment projects, as well as Heavy Civil Works such as Tunnels, Dams and Marine Works (as shown in Appendix 1: Featured Projects).

A wide geographical extent including projects in Egypt, Qatar, Saudi Arabia, United Arab Emirates, Yemen, Oman, Algeria, The Philippines, Bulgaria and USA.

Integrity and Diversity are the major elements of EGEC Group excellence, covering a wide range of engineering specializations and activities performed by highly qualified staff of about 680 team members of different nationalities, educational backgrounds and cultures.

Pursuing the fast paced market challenges, EGEC Group business model was able to keep an organized pattern of growth spearheaded by EGEC-House of Expertise in Egypt with other group members in the Middle East & North Africa that are strongly competing within and beyond their geographical and expertise horizons.

Facts [

Legal Status : Joint Stock Company

Offices : Egypt (HQ), KSA, Qatar, UAE, Libya

Total No. of Employees : 680

Founded : 1986

Overview

Page 4: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

EGEC Profile 3

Group Members

EGEC – Engineering House of Expertise was founded in 1986 in Cairo, Egypt (EGEC Group Headquarters) as a share holding company and a registered House of Expertise; EGEC- Engineering House of Expertise experience includes various multi-disciplinary engineering projects for major clients as The Holding Company for Water & Wastewater, General Authority for Roads, Arab Contractors, Emaar Misr, Pfizer, & many other key players that affect the construction market in Egypt.

EGEC & Partner is duly formed under the laws of The Kingdom of Saudi Arabia, having its head office at Jubail and branches in Riyadh, Yanbu and Makkah. EGEC & Partner has many projects for reputable clients in Saudi Arabia including The Royal Commission of Jubail and Yanbu, SABIC, ARAMCO, MARAFIQ, The Ministry of Water and Electricity, Ministry of Transportation and most of the Municipalities in different regions.

EGEC – Qatar is duly formed under the laws of Qatar, registered & having its head office at Doha, EGEC – Qatar has projects for major clients including many governmental authorities as Ashghal, Kahrmaa’, …etc.

EGEC – House of Expertise, UAE is duly formed under the laws of the United Arab of Emirates registered at Sharjah, and has many projects for major clients in UAE including Ministry of Public Works (MOPW), Sharjah Transport, Ministry of Health, Sheikh Zayed Housing Fund, Sharjah Municipality, Abu Dhabi Municipality and Command of Military Works (CMW), The Emirates Central Cooling Systems Corporation (Empower).

EGEC – Libya is a newly established firm with a head office in Benghazi & a branch office in Tripoli, Libya.

MSS (Management Systems & Solutions), based in Egypt is a Project Management company specialized in providing the Engineering industry with numerous Management Services & Solutions. EGEC – MSS provides a first class service which meets and exceeds expectations starting from the very early stages of the project to the handing over stage, through: Project Management, Construction Management and Organizational Management.

Page 5: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

EGEC Profile 4

Mission & Values

Mission EGEC was established with the aim of providing quality engineering and project management services, capable of competing with international firms operating in Egypt, and the Middle East/ North Africa region. EGEC is keen to attract, maintain and develop a coherent team of highly educated and well trained engineering professionals and support staff, and to provide opportunities for professional growth in a conductive and caring work environment, equipped with advanced work tools. EGEC is strongly committed to achieving client’s satisfaction and trust through professional support; helping clients identify their needs and translating these needs into creatively engineered projects, with persistent and strong emphasis on, ethics, quality, safety, economy and efficiency.

Core Values

Quality Quality management and assurance over all work procedures

Ethics Ethics are to be strictly adhered to by each member, in all aspects of practices, relations & transactions.

Client Client is the end-point of EGEC Group services that must be met with the highest levels of quality and commitment in order to achieve client satisfaction.

Employee Employee is EGEC Group’s greatest asset and its intellectual capital that requires its full care, development & motivation.

Teamwork Teamwork spirit must be maintained in all administrative levels and harmony among all employees must be achieved.

Achievement Achievement is a major part in EGEC Group culture rather than just a higher management goal; therefore each team member is a partner of success.

Innovation Innovation is a powerful practice EGEC Group must circulate through all activities and procedures and guarantee

the contribution of all members to cope with the global changing & challenging marketplace.

Page 6: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

EGEC Profile 5

Board of Directors

Human resources in EGEC are certainly its most valuable asset. EGEC Directors, who supervise closely all technical activities, cover a wide spectrum of engineering disciplines. The Directors and most of EGEC associates hold academic positions at different universities. Thus an efficient blend of the depth of academic meticulousness and practicality of professional experience constitutes the group’s target as a final product

presented to the client.

Dr. Adel Abdel Gawad Dr. Moustafa M. Elsayed Chairman and Managing

Director

Dr. Safwan Khedr Dr. Hisham Hafez

Dr. Mohamed Naiem Dr. Samer Ezeldin Dr. Ehab Rashed

Page 7: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

EGEC Profile 6

ISO Certificate

Page 8: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

EGEC Profile 7

Energy

Business Lines

Buildings & Urban Development

Water & Environment Transportation

Management Systems & Solutions

Page 9: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

EGEC Profile 8

Services

The wide range of expertise available within EGEC has always enabled us to form, for different projects, the best teams that fulfill clients’ requirements. With our in-house expertise and capabilities we can provide a full scale of consulting services as follows:

Architecture and Urban Planning / Design Town Planning Urban Design Architectural Design

Landscape Design Interior Design for substation

Structural Engineering

Structural Modeling and Design Structural Design of Concrete and Steel

Structures Seismic Hazard Assessment Studies Dynamic Impact on Adjacent Structures

Restoration / Rehabilitation of Ancient Monuments

Seismic Retrofit Analysis and Design Structural Analysis of Piping Networks

Geotechnical Engineering

Geotechnical Investigations and Foundation Studies

Deep Excavation Support Rock Slope Stabilization Foundation Underpinning

Soil Improvement and Advanced Foundation Technology

Ground Water Control Land Fill Design

Electromechanical Engineering

Lighting and Electrical Installations HVAC BMS (Building Management Systems) EMS (Environmental Management Systems) Fire Alarm & Fighting

Plumbing and Piping Electrical Power Light Current Telecommunications and ICT Noise / Vibration Analysis

Transportation Engineering (Highways, Bridges, Tunnels & Traffic Studies)

Geometric Design Pavement Structural Design Road Drainage

Parking Studies Traffic Signage Traffic Impact Assessment Studies

Page 10: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

EGEC Profile 9

Services

Water / Wastewater and Environment Engineering

Pipelines and Pipe Networks Hydraulic Analysis Anti-Hammer Systems Leak Detection Analysis

Environmental Engineering Dump Sites Lining and Closure Environmental Impact Assessment Mathematical Modeling / Simulation Water & Wastewater Treatment Plant Pump Stations

Coastal, Marine & Ports Engineering

Bathymetric Surveys Mathematical Modeling Shoreline Evolution Analysis Wave Hindcasting Studies

Sediment Transport Analysis Shore Protection Engineering Marine Engineering Design of Harbors & Coastal Structures

Topographical Surveys and GIS Application

Topographic Survey: Gathering survey data about the natural and

man - made features of the land, as well as its elevations .

Preparation of three - dimensional map: Through establishing horizontal and vertical control to serve as framework of the survey,

determining enough horizontal location and elevation of ground points to provide enough data for plotting when the map is prepared,

GIS: is a system designed to capture, store,

manipulate, analyze, manage, and present all types of geographical data.

Project Control & Management

Contract Management Planning and Scheduling Cost Control Coordination Quality Management Document Management

Safety Engineering (HSE) Professional Training and Technical Assistance Quality Control Value Engineering Construction Supervision

Flood Protection and Hydraulic Studies

Flash Flood Catchments Analysis Flood Protection Engineering

Hydraulic Studies

Sustainable Design and Environmental Impact Assessment

Technico-Economic Studies in Energy Technico-Economic Studies for Water and

Environment Conservation Energy Audits Environmental Audits Strategic Studies in Energy Sector

Environmental Project Assessment Project Studies in Renewable Energies Project Studies in Energy Efficiency Integrated Sustainable Development Project

Page 11: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

EGEC Profile 10

Company Structure

Board of Directors

Dr. Moustafa Elsayed (Chairman of the Board)

Dr. Safwan Khedr Dr. Adel Abdel Gawwad Dr. Hisham Hafez Dr. Mohamad Naiem Dr. Ehab Rashed Dr. Samer Ezeldin

Managing Director Dr. Moustafa Elsayed

Engineering Departments

Architectural

Structural

Structural

Geotechnical, Heavy Civil & Marine

MEP, Energy & Power

Water & Environmental

Transportation (Highways & Traffic)

Construction Supervision

Projects Control Units

Operation Management Unit (OMU)

Design Management Unit (DMU)

Technical Quality Unit (TQU)

Basic Supporting Units / Dept.

Human Resources

Information Technology

Financial and Legal Affairs

Administration

Sister Companies

EGEC – Qatar

EGEC – UAE

EGEC – Libya

EGEC – KSA

MSS

Specialized Supporting Units

Quality Management Unit (QMU)

Strategic Management Unit (SMU)

Business Development Unit (BDU)

Page 12: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Appendix 1:

Featured Projects

Page 13: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and
Page 14: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Complete task package includes the followings: Overview:

Site development of Buffer Zones (East & West) P&C of high / medium / low voltage substations P&C of government facilities P&C of royal commission facilities P&C of Al-Reggah General/ Specialist hospital Master planning of Al-Surouge District Diversion and update of Tareeq 6 Continuation of Tareeq 2 to Tareeq 7 Buffer zone potable / treated effluent water facility / pump station / storage tanks P&C of royal commission city center headquarters building

Providing complete conceptual and detailed engineering design, planning and technical studies Scope: and associated engineering services. The work also involves changes to and / or additions to existing facilities, reports on specific engineering problems and issues, and the preparation of complete construction bid packages, engineering services in support of construction activities.

Location Jubail Industrial City, KSA

Scope Duration 2012 – 2017

Project Estimated Value SAR 2.5 Billion

Owner Royal Commission for Jubail & Yanbu, KSA

Client Royal Commission for Jubail & Yanbu, KSA

Design Services for Residential Area in Jubail, KSA Contract No. 101 – T18

Page 15: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

The scope of work shall include design of various public buildings & facilities, shoreline & Overview: parklands/landscaping design development, engineering studies & reports, detailed engineering of general & institutional building, infrastructure facilities & utilities, and preparation of construction bid packages in accordance with the Terms & Conditions of the Contract.

Full design scope including concept, schematic, design development and detailed design. The Scope:

design includes architectural, landscape, civil, structural, MEP, QS, specs up to the “Issue for Construction” IFC package, infrastructure, building design and preparation of tender documents, including site preparation, roads, water, wastewater, drainage, irrigation, electrical, and telecomm networks. Scope also included conducting an extensive traffic impact study.

Location Jubail Industrial City, KSA

Scope Duration 2010 – 2015

Project Estimated Value SAR 2 Billion

Owner Royal Commission for Jubail & Yanbu, KSA

Client Royal Commission for Jubail & Yanbu, KSA

Design Services for Residential Area in Jubail, KSA Contract No. 027 – T18

Page 16: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

The scope of work shall include design of various public buildings and facilities, shoreline and Overview: parklands / landscaping design development, engineering studies and reports, detailed engineering of infrastructure facilities and utilities, and preparation of construction bid packages in accordance with the Terms and Conditions of the Contract.

Design of all infrastructure systems including: conceptual, preliminary, intermediate, pre-final Scope: and final designs on different tasks related to infrastructure development projects. The scope also includes preparing engineering drawings, specifications and BOQ.

Location Yanbu, KSA

Scope Duration 2012 – 2015

Project Estimated Value SAR 1.5 Billion

Owner Royal Commission for Jubail & Yanbu, KSA

Client Royal Commission for Jubail & Yanbu, KSA

Engineering Services for Infrastructure Projects in Yanbu, KSA Contract No. A- 0070 C

Page 17: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview:

The project aims to improve the cultural, social and health characteristics of the study areas in Makkah city by offering ideas for investment projects including the ideas of an integrated plan for the development of areas.

Preparing economic studies for the proposed projects, financing methods, ways of presentation and implementation schedules.

Preparation of a general perception of each region after the implementation of the project.

Consultant Scope of Work:

Data collection and analysis Studying the existing urban conditions Tender documents preparation Preparing a development plan for the regions of the study Preparing GIS schemes for the proposed projects Preparation of the implementation plan and institutional development

Scope:

Preparing detailed designs Preparing tender documents

Location Makkah, KSA

Scope Duration 2011 – 2012

Project Estimated Value SAR 200 Million

Owner Holy Makkah Municipality – Developing Agency and Projects

Client Holy Makkah Municipality – Developing Agency and Projects

Makkah Slums Urban Development, KSA

Rabea Zakher Region

Jabel El Saida Khadeja Region

Page 18: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview:

South of Shamkha is a New Developed Community located in the heart of Abu Dhabi 50 km from the City Centre.

South of Shamkha project developed by Abu Dhabi Centre for Housing and Services Facilities Development to provide 10,000 villas, parks, shopping and retail outlets, mosques, hospitals, clinics, health clubs, schools and entertainment areas. Once completed, the development will be home to 200,000 residents. A regional shopping, health support services and entertainment center.

The total project area is around 43 Million m2 divided into four design packages

Design of all infrastructure systems for package No. (3) including: Scope:

Roads networks Water networks Wastewater networks Irrigation networks Storm water drainage networks Electrical networks

Location Abu Dhabi, UAE

Scope Duration 2008 – 2011

Project Estimated Value AED 10 Billion (Infrastructure only)

Owner Abu Dhabi Urban Design Committee

Client IDROESSE

South Shamkha Project, UAE

Page 19: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Al Shumoos Hills development is located in Sharjah, UAE and has an approximate total Overview: area of one million m2. It is a multi-use development including residential, commercial and retail facilities.

Infrastructure design and preparation of tender documents, including roads, water, Scope: wastewater, drainage, irrigation, electrical, firefighting networks. Scope also included conducting an extensive traffic impact study and included providing a construction supervision

team through the construction phase.

Location Sharjah, UAE

Scope Duration 2014 – 2015

Project Estimated Value AED 500 Million

Owner Shumous Properties Company

Client Shumous Properties Company

Shumoos Hills, UAE

Page 20: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Al Remah is located in the Western Region of Al Ain, UAE and has an approximate total area of Overview: 1.3 Million m2. It is a multi-use development including residential, commercial and retail facilities.

Design of infrastructure systems for zone 54A including: Scope:

Roads Water networks Wastewater networks Electrical and Telecommunication networks

Location Al Ain, UAE

Scope Duration 2010 – 2012

Project Estimated Value AED 110 Million

Owner Abu Dhabi General Services Company (PJSC) (“Musanada”)

Client Al Suweidi (Engineering Consultants Bureau)

Remah Residential Complex, UAE

Layout of water networks Layout of sewer networks

Page 21: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview:

The action area of the Investment area is located along the 22km of Cairo / Alex desert road

The project area is about 3200 feddans The project includes all infrastructure networks: Roads, potable water, wastewater and electricity & telephone

networks Topographical surveys and geotechnical investigation

Scope: Topographical survey, soil investigation, complete engineering design including:

Detailed drawings BOQ Specifications for all relevant infrastructure networks

Location Investment area (3200 feddan) from El Remaia Club till the 22 km on Cairo – Alex. Highway - Giza

Scope Duration 2004 – 2007

Project Estimated Value EGP 2 Billion

Owner Giza Governorate

Client Ministry of Housing

Infrastructure Network for Investment Area (Action Area), Egypt

Page 22: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

The scope including the followings: Scope:

Collecting existing geotechnical data Designing a comprehensive geotechnical database Extracting and migrating digital and scanned geotechnical data into designed geotechnical

database Supplying and installing gINT software Training ADM staff, maintenance and technical support for one year

Location Abu Dhabi, UAE

Scope Duration 2011 – 2013

Project Estimated Value AED 6.5 Million

Owner Abu Dhabi Municipality

Client Abu Dhabi Municipality

Geotechnical Information Management System for Abu Dhabi Municipality, UAE

Page 23: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Al J assimya O ffice Tower is an office building that consists of 3 basements, ground floor,

mez z anine, and 4 0 storeys. The area per floor ranges from 74 3 m P

2P to 8 9 52 m P

2P and the total

built- up area is 79 ,79 1 m P

2P.

Scope:

Complete value engineering studies for the structural & MEP Auditing the architectural drawings and related specification Detailed engineering re- design Prepare the tender documents and bid evaluation Construction supervision and technical support

Location Doha, Q atar

Scope Duration 2009 − 2011

Project Estimated Value Q AR 4 00 Million

Owner Sh. J assim Bin Hammad Al Thani

Client Al J assimya Real Estate Company

A l J assimya Of f ice T ower, Q atar

Page 24: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The proj ect consists of two towers:

The first one is 36 00 m2 plot area and consists of 3 basements, ground floor and 52 repeated floors each of 1100 m2 area

The second tower is 24 70 m2 plot area and consists of 3 basements, ground floor and 4 7 repeated floors each of 750 m2 area

The total built – up area is 9 5,000 m2, of which 28 ,000 m2 is parking area Scope: Structural and geotechnical design and field technical support.

Location Doha, Q atar

Scope Duration 2007 – 2008

Project Estimated Value Q AR 4 25 Million

Owner Ahmed Bin Abdul Az iz Al Baker

Client J ames Cubitt & Partners Engineering Consultancy

A l B ak er Ex ecutive T owers ( 1 & 2 ) , Q atar

Page 25: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Parcels N o. 2, 3, and 4 are fully finished residential villages within Emaar’ s high standard community proj ect called “ Mivida” . The proj ect comprises single and multiple- family residential units of various siz es (apartments, townhouses and villas), healthcare and sports facilities, a hotel and other supporting services such as commercial and mix - use centers, clubhouses, parks, and water features.

Parcel 2 is called Palmera Townhomes and contains 218 town homes, each having an area varying between 158 m² and 19 1 m²

Parcel 3 is called Entry V illas and contains 110 villas, each having an area varying between 228 m² and 34 0 m²

Parcel 4 is called Estate V illas and contains 54 villas, each having an area varying between 26 5 m² and 4 9 6 m²

Scope: Construction supervision

Location N ew Cairo, Egypt

Scope Duration 2010 − 2014

Project Estimated Value EGP 4 00 Million

Owner Emaar Misr for Development

Project M anager Turner Construction International

Client Emaar Misr for Development

Emaar M isr - M ivida Project : Parcels 2 , 3 and 4 , Egypt

Page 26: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The proj ect consists of 34 7 villas. Each villa consists of ground and first floor each of approx imate 300 m2 area. The proj ect contains green areas, swimming pools, fences and the req uired infrastructure.

Scope: Architectural, structural and MEP shop drawings

Location Al Madina, KSA

Scope Duration 2007 − 2008

Project Estimated Value SAR 4 30 Million

Owner Dar Al Arkan Real Estate Development

Project M anager Turner Construction International

Client Az meel Contracting & Construction Company

A ttilal R esidential Compound, K SA

Page 27: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: GEM is a colossal proj ect planned to house a State of the Art ex position in addition to

educational, cultural and recreational activities with an area of about 500,000 m2, the main building includes the museum and the conference center. The proj ect involves an ex clusive scheme for landscape to be integrated with the building. State of the Art ex hibition and ICT technology shall be utiliz ed.

Scope: Design management, design review and control for the development and construction

drawings/ tender documents works. The scope includes architectural, structural, electromechanical, IT, security systems, landscape designs and all relevant disciplines.

Location Giz a, Egypt

Scope Duration 2006 – 2008

Project Estimated Value EGP 2 Billion

Owner Ministry of Culture

Client Ministry of Culture

T he G rand Egyptian M useum ( G EM ) , Egypt

Page 28: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Al Q assimy hospital is a 200 bed general hospital located in the Emirate of Sharj ah, (UAE). The hospital has dedicated services to healthcare of W omen and Children. The built up area of the hospital is about 27,9 00 m P

2

Scope: Design of MEP systems for all phases of proj ect (data collection, design concept, developed design, tender document)

Location Sharj ah, UAE

Scope Duration 2007 − 2009

Project Estimated Value USD 9 0 Million

Owner Ministry of Medicine, Sharj ah, UAE

Client Ministry of Public W orks, Sharj ah, UAE

A l Q assimy Hospital, U A E

Page 29: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Masfout hospital is a 50 bed general hospital located in Masfout, near the Town of Hatta, in the N orth East Rural Area of Emirate of Dubai (UAE). The hospital is planned to allow two general wards (male and female e- pediatric wards), general treatment department with 3 operating theatres, a delivery suite and a general Accident & Emergency Department. The facility will have a medium technology level assessment. The hospital consists of three floors, the built up area of the hospital is 9 ,000 m P

2P.

Scope: Design of MEP systems for all phases of proj ect (data collection, design concept, developed

design, tender document)

Location Aj man, UAE

Scope Duration 2007 − 2008

Project Estimated Value USD 30 Million

Italian A rchitect General Planning

Owner Ministry of Medicine, UAE

Client Ministry of Public W orks, UAE

M asf out Hospital, U A E

Page 30: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The Ministry of F oreign Affairs (MF A), Singapore intends to develop a new Embassy in Z amalek with an estimated site area of 2,8 4 7m2 and an estimated floor area of 2,300 m2.

Scope:

Renovation and strengthening of ex isting heritage main building and annex block including interior design to fit the function of the embassy

Adding new basement ex tension, ex cavation, side support system, and bomb blast resistant design of the whole facility

Construction supervision

Location Z amalek, Cairo, Egypt

Scope Duration 2012 − 2015

Project Estimated Value EGP 20 Million

Owner Ministry of F oreign Affairs of Singapore

Client Ministry of F oreign Affairs of Singapore

Development of the N ew Singapore Emb assy, Egypt

Page 31: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: N ational F ire F ighting Manufacturing Company (N AF F CO ) started to build a new plant in 6 th of O ctober City, Egypt. The plant is planned to be constructed on a total site area of about 21,6 50 m2 and with a total built up area of 10,6 00 m2.

Scope:

Geotechnical investigation Architectural design Structural design Road network Electromechanical design Infrastructural network design Construction supervision

Location 6 th of O ctober City, Egypt

Scope Duration 2012

Project Estimated Value EGP 35 Million

Owner N ational F ire F ighting Manufacturing Company (N AF F CO )

Client N ational F ire F ighting Manufacturing Company (N AF F CO )

Industrial Park Development ( N A F F CO) , Egypt

Page 32: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The proj ect built up area is 25,000 m2, it consists of the following:

Two basement floors Data center building (ground floor, first floor, second floor and roof floor) Telecom building (ground floor, first floor, second floor and roof floor)

Scope: Detailed design and supervision of architecture, civil and electromechanical systems of the

buildings.

Location Riyadh, KSA

Scope Duration 2011 − 2012

Project Estimated Value SAR 100 Million

Owner Etihad Etisalat Company (Mobily)

Client Etihad Etisalat Company (Mobily)

M ob ily T echnical B uilding 1 0 0 1 R iyadh 3 , K SA

Page 33: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The hotel comprises 351 lux urious guest rooms over an area of 100,000 m2 over- looking the

N ile River, including restaurants, five tennis courts, swimming pools, and a health club.

Scope: Provided proj ect management services for the multi contracting packages (more than 20 packages) including: time control, contract administration, q uantity surveying, and coordination & follow up.

Location Lux or City, Egypt

Scope Duration 2000 − 2003

Project Estimated Value EGP 100 Million

Owner Misr Arab Hotel Company (M.A.H.)

Client W S Atkins International of U.K

Sof itel El- K arnak Hotel, Egypt

Page 34: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The AMTP in J ubail Industrial 02, the Eastern Region, KSA, is an integrated facility which includes the Hot Rolling Mill and the F inishing F loor for the production of Seamless Pipes in carbon and alloy steel to be used in O il & Gas production and in the Energy Production sector. The factory total area including future plant ex pansion is 4 8 0,9 75 m P

2P.

The AMTP Al J ubail nominal capacity is 6 00,000 tons per year (tpy) of finished products in the diameter range 2.3/ 8 ” ÷ 14 ” as follows: 58 0,000 tons per year (tpy) produced in the SPF Hot Rolling Line, covering the diameter

pipe range (O D) 4 .1/ 2” ÷ 14 ” 20,000 tons from imported green pipes and finished in the SPF F inishing F loor, covering

the O D 2.3/ 8 ” ÷ 3.1/ 2”

Scope: To provide CISDI with consulting services on site layout req uirements and all necessary Saudi Arabian standards and regulations. Scope also includes local technical support in most engineering disciplines.

Location J ubail, KSA

Scope Duration 2009 − 2013

Project Estimated Value EGP 4 00 Million

Owner Arcelor Mittal Tubular Products (AMTP)

Client CISDI

A rcelor M ittal T ub ular Products ( A M T P) , Seamless Pipe F actory, K SA

Page 35: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Saint Gobain factory consists of seven structures: administration building, warehouse, float building, furnace, annealing lehr, batch house and cullet building. This factory is intended to produce clear or coloured glass sheets according to the F lat Process on a continuous basis, 24 hours a day 36 5 days a year, throughout the 15- year service life of the furnace.

Scope:

Geotechnical, geological and multi- geophysical investigations (electrical resistivity and shallow seismic refraction)

Structural design of administration building and mosq ue Design of ex ternal works (roads, drain network, and lighting) Structural design review and modification to suit Egyptian Code Bill of q uantities review and modification to suit Egyptian Material Construction supervision

M EP Scope:

Batch Plant Design (Earthing System, Lightening Protection System, Compressed Air System, Hot W ater System, MCC' s and Distribution, etc)

MEP detailed design (utility z ones, piping and ducting systems of production process systems Building Services (HV AC, Plumbing, sewer network, fire alarm & firefighting)

Location Ain El Sokhna, Egypt

Scope Duration Phase (1) 2008 – 2009 , Phase (2) 2009 – 2010

Project Estimated Value EGP 9 6 5 Million

Owner Saint Gobain Group, F rance

Client Saint Gobain Group, F rance

Saint G ob ain G lass F actory, Egypt

Page 36: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview:

The first operating seamless pipe mill in the GCC & the Middle East Production capacity of 4 00,000 tons of seamless pipes Danieli spa Italy is supplying a State of the Art technology for seamless pipes manufacturing to J ESCO . O verall Proj ect Area; 727,8 75 m2 Built up Area – Main Plant, Aux iliary Buildings, Roads/ Parking; 4 12,6 4 6 m2 Soil F illing Area; 770,000 m2 Tentative Concrete V olume; 8 5,000 m2 Tentative Steel Rebar Consumption; 15,000 tons Internal Roads; 38 ,000 m2

Scope:

Design of foundations, piling / soil improvement / earth works Concrete works Technological cabins & ancillary buildings Infrastructures Underground electrical works Technical support for civil works during construction

Location J ubail, KSA

Scope Duration 2007 − 2009

Project Estimated Value SAR 74 0 Million

Production Line Designer Danieli Engineering

Owner J ubail Energy Services Company (J ESCO )

Client Az meel Contracting & Construction Company

J ESCO Seamless Pipe Plant, K SA

Page 37: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: A new pharmaceutical plant for O ral Solid production and Packaging in KSA. The proj ect site area is 32,000 m P

2P and comprises four buildings:

Production building on an area of 4 336 m P

2

W arehouse building on an area of 134 1 m P

2 Administration building on an area of 104 4 m P

2 Utility building on an area of 118 8 m P

2

Scope: F ull design scope including concept, preliminary, detailed design and tendering. The design includes architecture, structure, process & utilities, HV AC, automation, firefighting, electrical and low current systems. Scope includes Construction Management as well.

Location King Abdullah Economic City, KSA

Scope Duration 2010 − 2011

Project Estimated Value Confidential

Pharma Sub - consultant F oster W heeler Italiana

Owner Confidential

Client Confidential

N ew Pharmaceutical Plant, K SA

Page 38: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: An industrial building for the new production line of the solid oral dosage. The building comprises 2 stories of approx imately 3,000 m2 of built- up area, in addition to the rehabilitation of the raw material warehouse.

Scope:

Architectural, structural, sewer network, fire alarm and firefighting systems Engineering design for Electrical Substation, and firefighting tank Proj ect management and construction supervision of the whole proj ect

Location Pfiz er F actory, Almaz a, Cairo, Egypt

Scope Duration 2004 − 2007

Project Estimated Value EGP 120 Million

Owner Pfiz er

Client Pfiz er

Pf iz er N ew Solid Oral Dosage Production B uilding, Egypt

Page 39: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The proj ect consists of the Main line buildings:

Production Building (1000 m P

2P)

Intermediate Storage Building (6 00 m P

2P)

Bagging Station Building (500 m P

2P)

F inal Storage Building (6 000 m P

2P)

Electrical Substation Laboratories Administration Building V arious Utilities Buildings Pipe Racks & Belt Conveyors

Scope: Architectural, structural design and construction supervision

Location Suez , Egypt

Scope Duration 2006 − 2008

Project Estimated Value EGP 50 Million

Owner Suez International N itrate Company (SIN CO )

Client Egyptian Company for Petrochemical Studies − Dr. Ashraf O mar

Low Density A mmonium N itrate Plant, Egypt

Page 40: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Z ahira Asphalt factory for production Asphalt with total area of 19 ,712 m2 at Mesaieed Industrial City.

Scope: Design & supervision of the consultancy services (architecture, civil & MEP).

Location Mesaieed Industrial City, Q atar

Scope Duration 2009

Project Estimated Value Q AR 18 Million

Owner Z ahira Asphalt Co.

Client Z ahira Asphalt Plant Co.

Z ahira A sphalt Plant, Q atar

Page 41: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and
Page 42: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Protection for Makkah V illages from floods at 3 main W adies (W adi F atma, W adi O rna,

and W adi N ooman).

Scope: Design review & construction supervision

Location Makkah, KSA

Scope Duration 2011 – 2014

Project Estimated Value SAR 9 .7 Million

Owner The Ministry for Municipal and Rural Affairs - Holy Makkah Municipality

Client The Ministry for Municipal and Rural Affairs - Holy Makkah Municipality

M ak k ah F lood Projects, K SA

Page 43: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview:

Detailed engineering services for Al Taif – Al Baha water transmission system in Saudi Arabia The W ater Transmission System consists of:

- Al Taif Pump Station ARADA (2 sets of pumps, flow rates 6 36 l/ sec. and heads 370,16 0 m) - Reservoirs of (Al Baha, Shuhada, Sudyrah, Shugsan, Gaz ail, & Mandaq ) with capacities from

1500 to 14 0,000m3 - Transmission main pipe line of diameter 1000 mm from steel pipes with total length about 200

km

Scope:

Providing detailed design for the main pipe line including preparing pipe alignment sheets, stress analysis, determine the wall thickness for the steel pipes and its grade

Preparing the detail design for all the civil, electrical, mechanical, landscape and architectural works for the main pump station (PS ARADA) and all the reservoir stations along the pipe line route

Location KSA

Scope Duration 2011 – O ngoing

Project Estimated Value SAR 1.2 Billion

Owner Saline W ater Conversion Corporation

Client Arabian Pipeline Proj ects Company (APPCO )

A l T aif – A l B aha W ater T ransmission System, K SA

Page 44: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Study and analysis of ground water wells for 4 villages at Siwa O asis to implement Iron and Manganese removal units.

Scope:

Chemical water analysis for ground water Detailed design drawings Technical specification Geotechnical investigation Bill of q uantities

Location Marsa Matrouh, Egypt

Scope Duration 2008 – 2010

Project Estimated Value EGP 8 Million

Owner Holding Company for W ater & W astewater (HCW W )

Client Research and Construction Authority

Design f or f our Iron M anganese R emoval U nits f or G round W ater Plants f or Siwa Oasis, Egypt

Page 45: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The main W ater carrier from Q unfada to Al Laith of

diameter 1500 mm from steel with total length about 175 km including civil and mechanical drawings of valve rooms, RO W , Maintenance and access roads and F O C conduits.

Scope: Confirmation of basic system configuration and design

including determining valves and flanges, and mechanical supports and necessary design work for valve stations

System analysis / hydraulic calculations V alue engineering Provide survey data for pipeline in coordination with the contractor Pipeline alignment sheets drawings Guide and construction drawings for roads and pipeline crossings, wady crossings and protections

by special locations Soil investigation and reports on pipeline routing Analysis of Soil Conditions for Construction W orks and Soil resistivity measurements for Cathodic

protection for pile lines Civil design and construction drawings for the line valve chambers General Specification req uirements for Cathodic protection system to tendered on Sub-

Contractor and/ or Suppliers As built drawings Shop drawings Technical support during construction O peration Manual

Location J eddah, KSA

Scope Duration 2011 – O ngoing

Project Estimated Value SAR 700 Million

Owner Ministry of W ater and Electricity, KSA

Client Y UKSEL IN SAAT Saudia Co.LTD.

W ater T ransmission Completion project f rom Hili & Y ab b a & A l Laith Dams to A l Shuaib a Plant (Phase 2), K SA

Page 46: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview:

Surface plants for potable water treatment, compact units, ground water wells and desalination W ater distribution networks including reservoirs and booster Sewerage networks Lifting sewage pump stations and force mains W astewater treatment plants Scope:

Evaluation of the current situation of W & W W systems Preparation of master plan for the governorates till 2037 on GIS basis Preparation of tender documents Construction supervision Hydraulic modeling and upgrading of W & W W systems F low measurements for W & W W plants and networks GIS works for all W & W W

Location Red Sea, Egypt

Scope Duration 2007 – 2008

Project Estimated Value EGP 200 Million

Owner Holding Company for W ater & W astewater (HCW W )

Client Holding Company for W ater & W astewater (HCW W )

Preparation of M aster Plan f or W ater & W astewater f or R ed Sea G overnorate, Egypt

Page 47: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview:

Surface plants for potable water treatment, compact units, ground water wells and desalination W ater distribution networks including reservoirs and booster Sewerage networks Lifting sewage pump stations and force mains W astewater treatment plants

Scope:

Evaluation of the current situation of W & W W systems Preparation of master plan for the governorates till 2037 on GIS basis Preparation of tender documents Construction supervision Hydraulic modeling and upgrading of W & W W systems F low measurements for W & W W plants and networks GIS works for all W & W W

Location Assiut, Egypt

Scope Duration 2007 – 2008

Project Estimated Value EGP 4 00 Million

Owner Holding Company for W ater & W astewater (HCW W )

Client Holding Company for W ater & W astewater (HCW W )

Preparation of M aster Plan f or W ater & W astewater f or A ssiut & R ed Sea G overnorates, Egypt

Page 48: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview:

Surface plants for potable water treatment, compact units, and ground water wells W ater distribution networks including reservoirs and boosters Sewerage networks Lifting sewage pump stations and force mains W astewater treatment plants

Scope:

Evaluation of the current situation of water & wastewater systems Preparation of master plan for the Governorate till 2037 on GIS Preparation of tender documents for the proj ects with highest priorities Construction supervision of the proj ects with highest priorities Hydraulic analysis and upgrading of water & wastewater systems

Location El Menia Governorate, Egypt

Scope Duration 2006 – 2007

Project Estimated Value EGP 4 00 Million

Owner Holding Company for W ater & W astewater (HCW W )

Client El Menia Company for W ater & W astewater

Preparation of M aster Plan f or W ater & W astewater f or El M enia G overnorate, Egypt

Page 49: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview:

CAPW has signed an agreement with Arab Contractors Company for carrying out the construction of the extension of Abu Rawash Wastewater Treatment Plant as a primary treatment plant (400,000 – 1,200,000) m3/d.

Then CAPW has decided to extend the agreement to construct secondary and tertiary treatment for part of the existing primary treatment plant on two stages (100,000 – 150,000 m3/day).

Reuse treated wastewater for irrigation purpose at Sheikh Zayed City green areas & saving potable water that be used in irrigation purposes at Sheikh Zayed green areas and to reduce the contamination of Barkat Drain by reducing the primary treated wastewater discharged to the drain from 400,000 to 250,000 m3/day.

Scope: Preparing detailed design for Secondary & Tertiary Treatment Process for 100 – 150,000 m3/day from Abu Rawash WWTP including:

Geotechnical investigation Design report Detailed design drawings Tender documents (technical specification – bill of quantities - detailed design drawings)

Location Abu Rawash, Giza, Egypt

Scope Duration 2005 – 2008

Project Estimated Value EGP 465 Million

Owner The Construction Authority for Potable Water and Wastewater (CAPW)

Client The Arab Contractors (AC)

Main Data

Average Flow 150,000 mP

3P/day

Peak Flow 225,000 mP

3P/day

Secondary &Tertiary Treatment Process Proposed by EGEC

Secondary & Tertiary Treatment for Abu Rawash WWTP, Egypt

Page 50: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: This proj ect is divided to 7 z ones, each z one contains several plant units.

Z one ( A ) : Inlet W ork Z one ( B ) : Inlet Pumping Station, Screening Sand Removal, Sand W ashing and Grease

Separator, Inlet F low Measuring, Air Compressor House, Electrical Substation (A) Z one ( C) : Primary Sedimentation Tanks, Distribution Chamber for Primary Sedimentation

Tanks, Primary Sludge Pumping Station, Drainage Pumping Station Z one ( D) : Aeration Tanks, Distribution Chamber for Aeration Tanks, Blower House, Return

and W aste Activated Sludge Pumping Station, Electrical Substation (B) Z one ( E) : F inal Clarifier Tanks, Distribution Chamber for F inal Clarifier Tanks Z one ( F ) : Chlorine Contact Tank, Chlorine House, Chlorinated Effluent Pumping Station,

Electrical Substation (C) Z one ( G ) : (Piping W ork)

Scope: Design and Proj ect Planning

Location Cairo, Egypt

Scope Duration 2008 – 2009

Project Estimated Value EGP 376 Million

Owner Holding Company for W ater & W astewater (HCW W )

Client The Arab Contractors (AC)

Optimiz ation of 1 st Stage A l J ab al A l A sf ar W astewater T reatment Plant, Egypt

Page 51: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview:

El Arish (1) & (2) are two R.O . Desalination Plants with capacities of 5,000 m³ / d, for each will be built to supply El Arish City with potable water

The main technological items are as follows: - Beach W ell Pumps (five duties and one standby)

the delivery the raw water buffer tank with capacity (3000 m P

3P).

- F ilter F eed Pumping Station (four with capacity 170 m P

3P/ h)

- Dual Media F iltration (four) and backwash / air scour system

- Cartridge F iltration (three) - Reverse O smosis Desalination with 3 x 33 % R.O .

Trains - Post Treatment (Potabilisation & Disinfection),

produced water transfer pumps (four) - Membrane Cleaning System

Scope: Design revision and construction supervision: Checking process design of the plant Checking adeq uacy of (Electromechanical) eq uipment Civil works of El Arish (1) & (2) R.O . plant with capacity 5,000 mP

3P/ d

Location El Arish , N orth Sinai, Egypt

Scope Duration 2009 – 2011

Project Estimated Value EGP 150 Million

Owner The N ational Authority for Potable W ater and W astewater (N O PW ASD)

Client The N ational Authority for Potable W ater and W astewater (N O PW ASD)

El A rish Desalination Plants ( 5 ,0 0 0 m3 / day) , Egypt

Page 52: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The RO Desalination Plant with a capacity of 5,000 m³ / d will be built to supply potable water for the areas at El Sheikh Z owayed City. The sea water for the desalination plant is drawn from six beach wells.

Scope:

Design revision and construction supervision for:− Checking process design of the plant − Checking adeq uacy of electromechanical eq uipment − Civil works of Sheikh Z owayed R.O . plant with capacity 5000 m3/ d

Location El Sheikh Z owayed, N orth Sinai, Egypt

Scope Duration 2009 – 2011

Project Estimated Value EGP 6 6 .5 Million

Owner The N ational Authority for Potable W ater and W astewater (N O PW ASD)

Client The N ational Authority for Potable W ater and W astewater (N O PW ASD)

El Sheik h Z owayed R . O. Plant ( 5 0 0 0 m3 / d) , Egypt

Page 53: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Irrigation network (110 – 1200) mm diameter & length of 4 00 km for all stages of the city and its ex tensions.

Scope:

Detailed design drawings Technical specification Geotechnical investigation Bill of q uantities Construction supervision

Location 10th of Ramadan, Egypt

Scope Duration 2008 – 2010

Project Estimated Value EGP 200 Million

Owner Holding Company for W ater & W astewater (HCW W )

Client The Construction Authority for Potable W ater and W astewater (CAPW )

Irrigation N etwork f or 1 0 th of R amadan City f rom T ertiary treated W astewater, Egypt

Page 54: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview:

Upgrading of all Boosters along N orth Coast (19 Booster) SCADA System

Scope: Preparation of tender documents, BO Q , technical specifications and construction supervision

Location Alex andria – Matrouh –N orth Coast, Egypt

Scope Duration 2008 – 2012

Project Estimated Value EGP 700 Million

Owner The Construction Authority for Potable W ater and W astewater (CAPW )

Client The Construction Authority for Potable W ater and W astewater (CAPW )

U pgrading of B oosters Pump Stations along A lex andria – M atrouh and Supervisory Control and Data A cq uisition ( SCA DA ) , Egypt

Page 55: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview:

W ater Trunk Main (1000 mm) with length 30 km. Anti- hammer System. Booster Pump Station (100,000) m³ / d at El O bour W TP Booster Pump Station (4 0,000) m³ / d at El Shorook City to lift water to Badr City with Trunk main

1000 mm & length 25 km.

Scope:

Detailed design drawings Technical specification Geotechnical investigation Bill of q uantities Construction supervision

Location El Shorook - Badr, Egypt

Scope Duration 2008 – 2010

Project Estimated Value EGP 100 Million

Owner Holding Company for W ater & W astewater (HCW W )

Client The Construction Authority for Potable W ater and W astewater (CAPW )

Strategic W ater T runk main ( 1 0 0 0 mm) and B ooster Pump Station f rom El Ob our W T P to El Shorook & B adr Cities, Egypt

Page 56: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The proj ect includes Environmental & Socio- economic Assessment for 24 villages in Assiut Governorate. Providing wastewater services in some villages in Sedfa, Ghanayim, Badary, Dayrout and Q useya Districts. The proj ect is funded by the W orld Bank.

Scope:

Environmental & Socio- economic Assessment Assess the current status of the proj ect F easibility Study & Investments plan Study of different alternatives for sewage systems Preparing strategic plan, detailed designs, technical specifications, and geotechnical

investigations of: - W astewater networks (150 mm – 1200 mm) and with total length 4 00 km - 24 pumping stations & force main lines with diameters (200 mm – 1000 mm) - 6 wastewater treatment plants

Location Assiut, Egypt

Scope Duration 2010 – 2012

Project Estimated Value USD 75 Million

Owner Holding Company for W ater & W astewater (HCW W )

Client Holding Company for W ater & W astewater (HCW W )

2 nd Integrated Sanitation & Sewerage Inf rastructure Project ( ISSIP 2 ) , Egypt

Page 57: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and
Page 58: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Upgrading the 5th segment of the International Coastal Highway. The segment is 70 km length between the Al Borollous and Gamasa cities. The upgrading includes increasing the numbers of lanes from 2 to 3 per each direction with no at grade the intersections which will be replaced by tunnels under the highway.

Scope: Design and construction supervision

Location Kafr Al Sheikh, Egypt

Scope Duration 2007 – 2010

Project Estimated Value EGP 250 Million

Owner General Authority for Roads, Bridges, and Land Transport (GARBLT)

Client General Authority for Roads, Bridges, and Land Transport (GARBLT)

International Coastal Highway, Egypt

Page 59: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The road length is 110 km, the number of lanes from 2 to 3 per each direction and preventing the intersections which will be replaced by tunnels under the highway, and connecting El Ein El Sokhna and El Q attamia.

Scope: Detailed design and shop drawings for the 1st and 3rd sector with shop drawings preparation.

Location El Suez Governorate, Egypt

Scope Duration 2002 – 2003

Project Estimated Value EGP 200 Million

Owner General Authority for Roads, Bridges & Land Transport (GARBLT)

Client F arouk Abd El W ahab Construction Company

Development and Design of El Ein El Sok hna El Q attamia Highway, Egypt

Page 60: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Selecting a new route connecting Ras El N aq ab Airport and the N orth of Taba city at the Gulf of Aq aba.

Scope:

Traffic studies Reconnaissance Geotechnical studies Topographical survey Hydrological studies Geometric design Road structural design Tender document preparation

Location South Sinai, Egypt

Scope Duration 2001 – 2003

Project Estimated Value EGP 300 Million

Owner General Authority for Roads, Bridges & Land Transport (GARBLT) in behalf of the Touristic Development

Client General Authority for Roads, Bridges & Land Transport (GARBLT) in behalf of the Touristic Development

R as El N aq ab – T ab a ( G ulf of A q ab a – N ew R oute) , Egypt

Page 61: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Conducting studies necessary to locate 8 00 bus stops, for mass transit on the paths proposed in previous studies and provide engineering designs and tender documents for each station including bill of q uantities and technical specifications.

Scope: Basic design, traffic studies, technical surveys,

station selection, and detailed design / tender documents for construction of all bus stops.

Location Sharj ah, UAE

Scope Duration 2009 – 2010

Estimated Value AED 6 0 Million

Owner Sharj ah Transport

Client Sharj ah Transport

Estab lishment and Design of B us Stops across Sharjah, U A E

Page 62: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: This phase will be the central section of the Metro line 3 route, a total length of about 4 .3 km underground, between Attaba and Abbasiya, where there will be an interchange with line 2. There will be 5 underground stations and a light repair workshop at Abbasiya.

Scope: Proj ect overall planning including scheduling, budgeting, and control for the activities of the five

contractors involved in the Proj ect.

Location Cairo, Egypt

Scope Duration 2008 – 2011

Estimated Value EGP 7.3 Billion

Owner N ational Authority for Tunnels (N AT)

Client Systra Consulting F irm

Cairo U nderground M etro Line 3 ( Phase 2 ) , Egypt

Page 63: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The proj ect consists of Grade Bridge and underground tunnel. The grade bridges consist of precast pre- stressing deck rested on the underpass retaining walls. Pile foundation system is used under all the intersection elements.

Scope:

Structural design review of the different elements of tunnel Structural redesign of the unsafe elements of tunnel Preparing the shop drawings of the different elements of tunnel

Location El Dammam, KSA

Scope Duration 2009

Owner Ministry of Municipal & Rural Affairs, Municipality of Dammam

Client Sinopec International Company

K ing F ahd B in A b dul A z iz R oad & A b u B ak r Siddiq ue, K SA

Page 64: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Rehabilitation and maintenance of maj or bridges and tunnels of Giz a region (15 structures), which include different types of concrete and steel bridges, and different types of tunnel systems.

Scope: Engineering & structural design and tender documents preparation for the req uired annual and

emergency rehabilitation and maintenance of the bridges and tunnels. The scope also includes the construction management and supervision, and operational testing supervision.

Location Giz a Region, Egypt

Scope Duration 2005 – 2008 (Renewable contract on annual basis)

Project Estimated Value EGP 117.2 Million

Owner Giz a Municipality

Client Giz a Municipality

R ehab ilitation and M aintenance of M ajor B ridges and T unnels in G iz a R egion, Egypt

Page 65: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: A new bulk cargo terminal (Terminal 2A) is to be constructed to meet the future demand of bulk cargo handling, under the port of Bourgas ex pansion proj ect. The reclamation area of this terminal is 26 ha req uires about 1,8 4 0,000 m3 reclamation materials.

Scope: Environmental Impact Assessment.

Location The W estern Coast of the Black Sea

Scope Duration 2000 – 2001

Estimated Value USD 150 Million

Owner The Port of Bourgas Authority

Client Pacific Consultants International of J apan (PCI)

B ourgas Port, B ulgaria

Page 66: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The port is to include Access Channel, N aval Base Basin, five cargo terminals and berths, four container terminals and berths, one berth for roll- on / roll- off vessels, a livestock berth along with storage, administrative and Customs facilities.

Scope:

Estimation of q uantities of materials (sand, caprock, limestone) obtained by dredging the Access Channel and N aval Base Basin

Assessment of properties of dredged material as to comply with types specified for the proj ect to be used for reclamation

Design of soil improvement in the reclamation area using RIC and vibratory rollers

Location Mesaieed, Q atar

Scope Duration 2011

Owner State of Q atar

Client The N ational Marine Dredging Company (N MDC), Abu Dhabi

N ew Doha Port, Q atar Contract N DPP 0 0 1 3 - Dredging, R eclamation, and B reak water Construction

Page 67: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Improvement of roads conditions, training, and institutional strengthening.

Scope: Strategic planning, roads and traffic condition evaluation, needs assessment of Rural and Urban

roads networks in El- F ayoum Governorate, as well as the assessment of the future req uirements including improvement of roads conditions, training, and institutional strengthening through selected strategic plan.

Location F ayoum, Egypt

Scope Duration 19 9 2 – 19 9 3

Owner F ayoum Governorate

Client Directorate of Roads and Transportation

Strategic Planning of R oad Sector F ayoum G overnorate, Egypt

Page 68: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Improvement of roads conditions, training, and institutional strengthening. Total lengths of 6 50 km roads have been studied.

Scope: Strategic planning, roads and traffic condition evaluation,

needs assessment of Rural and Urban roads networks in N orth Sinai Governorate, as well as the assessment of the future req uirements including improvement of roads conditions, training, and institutional strengthening through selected strategic plan.

Location N orth Sinai, Egypt

Scope Duration 19 9 2 – 19 9 3

Project Estimated Value EGP 50 Million (O ver ten years period)

Owner N orth Sinai Governorate

Client Directorate of Roads and Transportation

Strategic Planning of R oad Sector, Egypt

Page 69: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and
Page 70: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The project includes, the provisions of all required studies and assessments including the necessary engineering design of the following:

High Voltage Substations up to 380 KV High Voltage Overhead Transmission Lines up to 380 KV High Voltage UG Cables up to 380 KV Medium Primary and Secondary Infrastructure Systems Building Mechanical, Electrical and Telecom Systems Site Development Landscaping Potable Water and Irrigation Systems Sanitary Waste Water Systems Specialized Services, like, Security Cameras Support, and other support services as required by the Royal Commission

Scope: Providing complete conceptual and detailed engineering design, planning and technical

studies and associated engineering services. The work also involves changes to and / or additions to existing facilities, reports on specific engineering problems and issues, and the preparation of complete construction bid packages, engineering services in support of construction activities.

Location Jubail, KSA

Scope Duration 2013 2017

Project Estimated Value SAR 3.7 Billion

Owner Royal Commission for Jubail and Yanbu, KSA

Client Royal Commission for Jubail and Yanbu, KSA

Power and Telecommunications Engineering Services, KSA Contract No. 027-T09

Page 71: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: This project is a part of RC contract no. (027-T09) for Power and Telecommunications Engineering Services and located in Ras El Kheir project includes two parts:

Indoor type GIS 380/115/33kV electrical substation#3 380kV overhead transmission line to connect SS#3 with two existing substations Objectives

The substation shall equipped with Substation Automation System (SAS) The substation shall be remotely controlled through SCADA system The project also includes the necessary modifications/additions to the protection, control,

communication, SCADA and associated equipment at remote end 380kV substations supplying power to substation#3

Scope:

Preparation of project technical specifications/ Scope of Work (PTS/SOW) Preparation of Request for Proposal (RFP) Drawings

Location Jubail, KSA

Scope Duration 2013 2017

Project Estimated Value SAR 250 Million

Owner Royal Commission for Jubail and Yanbu, KSA

Client Royal Commission for Jubail and Yanbu, KSA

EPC of Primary Electrical Substation # 3 (380/115/33KV) in Ras El Khair, KSA

Page 72: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The proj ect is part of Z afarana W ind Park. It consists of the following:

8 0 N o. of W ind Converter Units of height 4 5 m and funded by KF W of Germany 100 N o. of W ind Converter Units of height 4 5 m and funded by Spanish government (Y ear 2004 ) 9 4 N o. of W ind Converter Units of height 4 5 m and funded by Spanish government (Y ear 2006 )

Scope:

Geotechnical studies, geological, electrical resistivity, soil investigations F oundation construction technical support

Location South of El Ein El Sokhna, Egypt

Scope Duration 2003 − 2006

Project Estimated Value USD 200 Million

Owner N ew and Renewable Energy Authority (N REA)

Client W estas and Kollaly Engineering Co. (J . V .)

Z af arana W ind Park , Phases II & III, Egypt

Page 73: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The Education City Club House belongs to Qatar Foundation and located in Lot 4 of the Education City Community Housing premises. The Club House gross area is 4725 with building floor area of 2747 m2 and average daily users of about 284.

Scope: Perform an initial energy assessment / audit (Walk through Energy Audit), prioritize investment recommendations and preliminary survey to benchmark existing Club House facilities performance.

Location Qatar

Scope Duration 2012

Project Estimated Value QAR 500,000

Owner Qatar Environment and Energy Research Institute (QEERI), Qatar Foundation

Client Qatar Foundation Club House

Energy Audit Consultancy Services for QF Club House, Qatar

Page 74: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The proj ect includes a large number of tanks, process areas and pipe racks, all founded on some 5000 piles

Scope: Geotechnical investigations, geotechnical analyses for ground improvement and deep foundations, Design of pile foundations and Supervision of pile installation (around 5000 driven – cast – in – situ piles).

Location Alex andria, Egypt

Scope Duration 19 9 8 − 19 9 9

Project Estimated Value USD 500 Million

Owner Tecnicas Reunidas, S.A., Spain

Client Tecnicas Reunidas, S.A., Spain

A M OC G as – Oil Production M ax imiz ation, Egypt

Page 75: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Industrial station for production of special petroleum products used in engineering field

Scope:

Geotechnical, geological and electrical resistivity investigations. Geotechnical analysis for ground improvement and deep foundations. Design of pile foundations, review of structural design of the foundations, supervision and q uality

management of pile installation (around 1500 piles).

Location Alex andria, Egypt

Scope Duration 2000 − 2001

Project Estimated Value USD 150 Million

Owner Alex andria Specialty Petroleum Products Co. (ASPPC)

Client Tecnicas Reunidas, S.A., Spain

A SPPC Special Petroleum Products Plant, Egypt

Page 76: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The proj ect includes four huge LN G tanks, two LN G trains pipe racks, sea j etty, power generation facilities, and other relevant infrastructure elements. The proj ect is aimed at the liq uefaction and storage of natural gas, and ex porting it using LN G vessels

Scope: Structural design of the plant in accordance with the Egyptian Code req uirements.

Geotechnical and geological investigations, seismic haz ard assessment, down- hole seismic testing, design of foundations, a probabilistic seismic haz ard assessment study for the proj ect site, and other technical assistance responsibilities.

Location Damietta, Egypt

Scope Duration 2001 − 2006

Project Estimated Value USD 1.5 Billion

Owner Union F enosa, Spain

Client MW Kellogg, USA

LN G Plant, Egypt

Page 77: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and
Page 78: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview:

The first operating seamless pipe mill in the GCC & the Middle East Production capacity of 4 00,000 tons of seamless pipes Danieli spa Italy is supplying a State of the Art technology for seamless pipes manufacturing to J ESCO . O verall Proj ect Area; 727,8 75 m2 Built up Area – Main Plant, Aux iliary Buildings, Roads/ Parking; 4 12,6 4 6 m2 Soil F illing Area; 770,000 m2 Tentative Concrete V olume; 8 5,000 m2 Tentative Steel Rebar Consumption; 15,000 tons Internal Roads; 38 ,000 m2

Scope:

Design of foundations, piling / soil improvement / earth works Concrete works Technological cabins & ancillary buildings Infrastructures Underground electrical works Technical support for civil works during construction

Location J ubail, KSA

Scope Duration 2007 − 2009

Project Estimated Value SAR 74 0 Million

Production Line Designer Danieli Engineering

Owner J ubail Energy Services Company (J ESCO )

Client Az meel Contracting & Construction Company

J ESCO Seamless Pipe Plant, K SA

Page 79: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Upgrading of water networks in the following areas:

Z one ( 1 ) : Cairo / Alex andria desert road until km 8 with a total area of 4 .7 km P

2 Z one ( 2 and 3 ) : N orthern F aysal with a total area of 11 km P

2 Z one ( 4 ) : El Remaya and Pyramids plateau district with a total area of 8 .2 km P

2 Saft El Laban area with total population of 100,000 capita Kafr Ghatati village of total 20,000 capita The water network diameter (150 – 1000 mm) with total length of 18 5 km Connection works for Remaya storage tanks with a capacity of 30,000 mP

3P

Scope: Preparing tender documents, BO Q and technical specification, geotechnical

investigations, and construction supervision

Location Giz a, Egypt

Scope Duration 2005 – 2010

Project Estimated Value EGP 102 Million

Owner Holding Company for W ater & W astewater (HCW W )

Client The Construction Authority for Potable W ater and W astewater (CAPW )

U pgrading of Potab le W ater System f or N orthern El Haram District, G iz a G overnorate, Egypt

Page 80: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The F airmont Hotel is located in Heliopolis, Cairo, Egypt. The Hotel’ s O wner is Gulf Egypt for

Hotels and Tourism (GEHT).The O wner (GEHT) is planning to renovate the old section of the hotel complex . As such, GEHT aims at selecting a professional Consultant for Planning and Management Support (CPMS) on its behalf to follow- up the works of this proj ect.

Scope: Planning (Time Control), Document control and proj ect control

Location Heliopolis, Cairo, Egypt

Scope Duration 2010 – 2011

Project Estimated Value EGP 50 Million

Owner Gulf Egypt for Hotels and Tourism (GEHT)

Client Gulf Egypt for Hotels and Tourism (GEHT)

R enovation of F airmont Hotel, Egypt

Page 81: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

0

Overview: F lowers Park is a residential compound, consists of 8 7 villas. The compound also contains

mosq ue, social club recreational area and services area.

Scope:

Proj ect management Construction Management

Location N ew Cairo City, Cairo, Egypt

Scope Duration 2007 – 2012

Project Estimated Value EGP 120 Million

Owner Staff Insurance F und – The Arab Contractors (AC)

Client Staff Insurance F und – The Arab Contractors (AC)

" F lowers Park " R esidential Compound, Egypt

Page 82: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The proj ect is located at Al- Az iz ya district with total area of 19 4 0.25 m2, north side leads to Sedky St; 4 8 m2 wide. And this Street has the main entrance to the proj ect building, west, south side leads to open streets, and the proj ects located 750 m far of Ramy El J amarat area.

Scope: Coordination & Planning - Cost control, Document Control & Archiving, Contract Administration,

and Q C/ Q A

Location Makkah, KSA

Scope Duration 2009 – 2011

Project Estimated Value SAR 4 0 Million

Owner Makkiyoon Company

Client Makkiyoon Company

M ak k ah T ower, K SA

Page 83: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: An industrial building for the new production line of the solid oral dosage. The building comprises 2 stories of approx imately 3,000 m2 of built- up area, in addition to the rehabilitation of the raw material warehouse.

Scope:

Architectural, structural, sewer network, fire alarm and firefighting systems Engineering design for Electrical Substation, and firefighting tank Proj ect management and construction supervision of the whole proj ect

Location Pfiz er F actory, Almaz a, Cairo, Egypt

Scope Duration 2004 – 2007

Project Estimated Value EGP 120 Million

Owner Pfiz er

Client Pfiz er

Pf iz er N ew Solid Oral Dosage Production B uilding, Egypt

Page 84: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: The hotel comprises ten stories, basement and mez z anine over an area of 1,700 m2. The renovation process includes raising additional two floors and provision of swimming pool at the top. The building skeleton and the foundations were completely changed without demolition.

Scope: Preparation of q uality and safety plans, design review, preparation of rehabilitation plans and

repair designs for various structural elements including foundations, detailed electrical engineering designs. Construction supervision

Location Cairo, Egypt

Scope Duration 2003 – 2007

Project Estimated Value EGP 50 Million

Owner Amarante El N ile Company for Hotels

Client Alex andria Construction Company, ACC (Tala' at Mostafa)

K empinsk i Hotel ( Previously A marante El N ile) , Egypt

Page 85: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: GEM is a colossal proj ect planned to house a State of the Art ex position in addition to

educational, cultural and recreational activities with an area of about 500,000 m2, the main building includes the museum and the conference center. The proj ect involves an ex clusive scheme for landscape to be integrated with the building. State of the Art ex hibition and ICT technology shall be utiliz ed.

Scope: Design management, design review and control for the development and construction

drawings/ tender documents works. The scope includes architectural, structural, electromechanical, IT, security systems, landscape designs and all relevant disciplines.

Location Giz a, Egypt

Scope Duration 2006 – 2008

Project Estimated Value EGP 2 Billion

Owner Ministry of Culture

Client Ministry of Culture

T he G rand Egyptian M useum ( G EM ) , Egypt

Page 86: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: This phase will be the central section of the Metro line 3 route, a total length of about 4 .3 km

underground, between Attaba and Abbasiya, where there will be an interchange with line 2. There will be 5 underground stations and a light repair workshop at Abbasiya.

Scope: Proj ect overall planning including scheduling, budgeting, and control for the activities of the five

contractors involved in the Proj ect.

Location Cairo, Egypt

Scope Duration 2008 – 2011

Project Estimated Value EGP 7.3 Billion

Owner N ational Authority for Tunnels (N AT)

Client Systra Consulting F irm

Cairo U nderground M etro Line 3 ( Phase 2 ) , Egypt

Page 87: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: A 4 .1 km cable - stayed road bridge across the Suez Canal, it is 4 - lane divided carriage way

rises 70 m above the MSL of the Suez Canal.

Scope: Q uality management for the Eastern Approach

Location Q antara City, Suez Canal, Egypt

Scope Duration 19 9 7 – 2000

Project Estimated Value EGP 130 Million

Owner General Authority for Roads, Bridges & Land Transport (GARBLT)

Client The Arab Contractors (AC)

Suez Canal Cab le – Stayed B ridge ( Eastern A pproach) , Egypt

Page 88: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Upgrading the 5th segment of the International Coastal Highway. The segment is 70 km length

between the Al Borollous and Gamasa cities. The upgrading includes increasing the numbers of lanes from 2 to 3 per each direction with no at grade the intersections which will be replaced by tunnels under the highway.

Scope: Design and construction supervision

Location Kafr Al Sheikh Governorate, Egypt

Scope Duration 2007 – 2010

Project Estimated Value EGP 250 Million

Owner General Authority for Roads, Bridges, and Land Transport (GARBLT)

Client General Authority for Roads, Bridges, and Land Transport (GARBLT)

International Coastal Highway, Egypt

Page 89: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Overview: Khobar Garden is a 2 story residential villas project and is divided in 5 phases. Phase 1 consists of 38 villas, divided into 6 types of villas A1, A2, B1, B2, C and D1 type. The total built up area of Phase 1 is 13,990 m2. The plot area of Phase 1 is 24,452 m2. The project is located in Al Azizia at North Western Side of Al Remal Development

Scope: Construction Supervision & Project Management of Phase 1

Location Al Khobar, KSA

Scope Duration 2013 – 2015

Project Estimated Value SAR 316 Million

Owner JENAN Real Estate

Client Advanced Construction Center (ACC)

Khobar Gardens Project, Egypt

Page 90: Overview - EGEC · BMS (Building Management Systems) EMS ... Overview: The scope of work shall include design of various public buildings and facilities, shoreline and

Contact us

www.egec-xprt.com

Egypt (Headquarters)

4 Taha Hussein St., Al Haram, Giza, Egypt

Tel.: (+202) 3582 9599 – 3586 7968 – 3582 9685

Fax: (+202) 3582 2908

Email: [email protected]

[email protected]

Egypt (Branch Office)

95 Hafez Ramadan St., Nasr City, Cairo

Tel.: (+202) 2671 2586 – 2671 2582 – 2287 5608

Fax: (+202) 2275 5368

Email: [email protected]

Egypt (MSS)

15 Ahmed Abu El Alaa St., from Abbas El Akkad St., Behind Egypt

Air, Nasr City, Cairo

Tel.: (+202) 2287 2471 – 2287 7130

Fax: (+202) 2287 7130

Email: [email protected]

Libya (Benghazi)

32433 Al-Andalus St., El-Keish, Benghazi City Tel.: (+218) 925 334 493 – 917 106 103

Email: [email protected]

Libya (Tripoli) Zawiyat Al-dahmani, Tripoli City

Tel.: (+218) 925 663 934 – 217 316 710

Email: [email protected]

Saudi Arabia (Head Office)

Al Fanateer Mall, Third Floor, No: 212 – 213, Jubail Industrial

City, 31961

P.O. Box: 11575, Jubail, Saudi Arabia

Tel.: (+966) 3347 6507 – 3347 6508

Fax: (+966) 3347 6506

Email: [email protected]

Saudi Arabia (Makkah)

4427 Abdul Aziz Al Kordy St., Awaly District, Makkah

Saudi Arabia (Riyadh)

P.O. Box: 300481, Riyadh, Olya 11372, Riyadh

Tel.: (+966) 11 463 6074

Fax: (+966) 11 464 4301

Qatar

110 D-Ring Road, App. 3 & 4

P.O. Box: 21686, Doha

Tel.: (+974) 4464 3135 – 4436 3690

Fax: (+974) 4465 3562

Email: [email protected]

United Arab Emirates (Sharjah)

901 Al Dana Tower, Sheikh Khaled Lagoon Corniche

P.O. Box: 72702, Sharjah

Tel.: (+971) 6556 7402

Fax: (+971) 6556 7403

Email: [email protected]