OVERHEAD COSTOverhead costs are the operating costs of a business enterprise
which can not be traced directly to a particular unit of output.
ALLOCATION AND APPORTIONMENT OF OVERHEADSi) Allocation and apportionment overheads among production &
service departments (primary distribution)ii) Apportionment of service deptt among production deptt
(secondary distribution)ALLOCATION
Allocation is the process of charging the full amount of overheads costs to a particular cost centre. This is possible when the nature of expenses is such that it can be easily identified with a particular cost centre.
APPORTIONMENT It is the process of splitting up an item of overhead cost and
charging it to the cost centers on an equitable basis.
BASES FOR APPORTIONMENT
OVERHEAD COST BASIS FOR APPORTIONMENT
1. Rent & other building expenses, Fire precaution services, Air conditioning
Floor area, or volume of department
2. Fringe benefits, Labour welfare exp, Time keeping, Supervision
Number of workers
3. ESI and PF contribution, Fringe benefits
Direct wages
4. Depreciation, repairs, insurance of machinery
Capital values
5. General overhead Direct labour hours or direct wages, or machine hours
BASIS FOR APPORTIONMENT
OVERHEAD COST BASIS FOR APPORTIONMENT
6. Electric power Horse power of machines or machine hours or both
7. Lighting expenses No of light points or area
Primary distribution
A co. Ltd has three production deptt A, B and C and two service deptt D and E. the following figures are extracted from the records of the company
Rent & rates 5,000 General lighting 600Indirect wages 1,500 Power 1,500Depreciation of 10,000 Sundry expenses
10,000Machinery
The following details are further available:
Total A B C D E
Floor space (sq ft)
20,000 4,000 5,000 6,000 4,000 1,000
Light points 120 20 30 40 20 10
Direct wages (RS)
10,000 3,000 2,000 3,000 1,500 500
H.P of machines
150 60 30 50 10 -
Value of machinery
2,50,000 60,000 80,000 1,00,000
5,000 5,000
Apportion the cost to various deptt on most equitable basis and [prepare overhead distribution summary.
RE-APPORTIONMENT OF SERVICE DEPARTMENT COSTS(Secondary Distribution)
Apportionment of Service Department Overheads
Apportionment to production deptt only
Apportionment of production & other service deptt
Non reciprocal Reciprocal
Simultaneous equations methods
Repeated distribution method
Trial & error method
BASIS FOR RE-APPORTIONMENT OF SERVICE DEPARTMENT COSTS OVER DIFFERENT PRODUCTION DEPTT (Secondary Distribution)Service deptt cost Basis for apportionment
Maintenance deptt Actual service utilised or hours worked for each deptt
Payroll/Time keeping deptt Direct labour hours, Machine hours, Number of employees
Personnel deptt Number of employees, rate of labour turnover
Store keeping deptt No of requisition, Qty or value of materials
Purchase deptt No of purchase orders, value of materials purchased
Welfare deptt No of employees
Internal transport service Value or weight of goods transported or distance covered
(A) Apportionment to production department only
Question.
(B) Apportionment to production as well as service deptt.
i) Non reciprocal basis Questionii) Reciprocal Basis Question
ABSORPTION OF OVERHEADS
Absorption of factory overheads refers to charging of the factory overheads of a particular production deptt to various product manufactured, or jobs completed or orders expected in that department. It is basically charging of overheads to cost units.
Two steps:
i) Computation of overhead rate : Total overheads of cost centre/total units in baseii) Application of these rates to cost units: overhead absorbed = No. of unit of base in cost unit X
Overhead rate
METHOD OF ABSORPTION OF FACTORY OVERHEADS
1) Direct material cost percentage method: Production overhead/Direct materials *100 2) Direct labour cost percentage method: Production overhead/Direct labour cost *100 3) Prime cost percentage method: Production overhead/Prime Cost*100 4) Direct labour hour method: Production overhead/Direct labour hour5) Machine hour method: Production overhead/No of machine hour
Q. The following are the details of costs incurred in respect of production deptt of factory:
Direct Materials Rs.4,000 4,000 2,000
Direct labour Rs.2,000 3,000 3,000
Direct expenses Rs.1,000 1,000 -----
The share of the factory overheads of the deptt comes to Rs.5,000 which is to be apportioned to different jobs on the basis of direct material used. Find out the share of factory overheads and the cost of each job.
Basis of apportionment of different overheads to machines
EXPENSES BASIS
STANDING CHARGES
1. Rent & Rates Floor area occupied by each machine
2. Heating & Lighting No. of light points for each machine, or floor area occupied by each machine
3. Supervision Estimated time devoted by the supervisor on each machine
4. Insurance Insured value of each machine
5. Lubricating oil and other consumable stores
Capital values/machine hours
6. Miscellaneous expenses Equitable basis depending upon the facts
Basis of apportionment of different overheads to machines
EXPENSES BASIS
RUNNING/MACHINE CHARGES
1. Depreciation Machine hours or capital value or multiple of both
2. Power Horse power of machines or machine hours or both
3. Repairs Machine hours or capital values
Question on machine hour rate
Q.1 The following information compute a machine hour rate in respect of machine No. 10 for the month of January:
Cost of the machine Rs.32,000Estimated scrap value Rs.2,000Effective working life 10,000 hoursRepair & maintenance over the life period of the machine
Rs.2,500Standing charges allocated to this machine for January Rs.400Power consumed by the machine @ Rs.0.30 per unit, Rs.600The machine consumes 10 units of power per hour.
• The original cost of the machine used (purchased in June 2004) was Rs. 10,000. Its estimated life is 10 years. The estimated scrap value at the end of its life is Rs. 1,000 and the estimated working timer per year (50 weeks of 44 hours) is 2,200 hours, of which machine maintenance, etc. is estimated to take up 200 hours.
• Setting up time of 100 hours is estimated.• Electricity used by the machine during production is 16
units per hour at a cost of 20 paise per unit. No current is taken during maintenance or setting up.
• The machine requires a chemical solution which is replaced at the end of each week at a cost of Rs. 20 each time.
• The estimated cost of maintenance per year is Rs. 1,200.• Two attendances control the operation of the machine
together with five other identical machines. Their combined weekly wages, insurance, and the employer’s contributions to holidays pay amount to Rs. 120.
• Departmental and general works overheads allocated to this machine for the year 2003-04 amount to Rs. 2,000.
• Calculate machine hour rate when—• Setting up time is unproductive.• Setting up time is productive
TYPES OF OVERHEAD RATES
Actual and Pre-determined Rates
• Actual Rate It is calculated by dividing the actual overheads by actual base thus:
• Actual amount of overheads• Actual overhead rate = ----------------------------------• Actual baseLimitations are:• Actual rate cannot be computed until the end of the
accounting period. This result in delay in computing cost.
• When costs are used to calculate the selling prices for quotations and tenders hare is bound to be a considerable delay before the sales department can invoice customers due to delay in information from costing department.
• Pre-determined Rate This rate is determined in advance of the period in which it is to be used. It is computed by dividing the estimated or budgeted amount of overheads by the budgeted base.
• Budgeted amount of overhead• Thus Pre-determined rate = ------------------------------------• Budgeted base• As compared to actual rate, a pre-determined rate is of
greater utility. This is because a pre-determine rate enables prompt preparation of tenders and quotations and fixation of selling prices. Cost control is also facilitated by comparing the actual overheads with the pre-determined overhead recovered.
• Blanket and Multiple Rates• A blanket overhead rate is a single, overhead rate
for the entire factory. It is computed as follows:• Total overheads for the
factoryBlanket rate =-------------------------------------------• Total number of units of base for
the factory• Blanket overhead rate should not be used except
when output is uniform. Otherwise it will result in overcastting or undercosting of certain cost units.
• Blanket rate is also know as ‘Plant-wide’ or ‘Plant –wise’ rate.– Production department– Service department– Cost centre– Product– Fixed overhead and variable overhead
• Overhead of department or cost centre• Overhead rate = ------------------------------------------------• Corresponding base• Blanket rates have a very limited application and can be
usefully employed in (i) small firms, or (ii)when one single product is produced, or (iii) when a firm is producing more than one product and all of these products pass through all the departments and the incidence of overhead is uniform.
QUESTION
UNDER & OVER ABSORPTION OF OVERHEADS
• Under-absorption When the amount of overheads absorbed it is called under-absorption or under-recovery the cost because the overheads incurred jobs, processes etc.
• When the amount of overhead absorbed is more than it is know as over absorption or over-recovery the cost of jobs, processes, etc.
Example• Pre-determined overhead rate = Rs. 5 per machine
hour• Actual machine hours = 1,500• Actual overheads = Rs. 9,000• Overhead absorbed = 1,500 hrs. x Rs. 5 =
Rs. 7,500Under-absorption = Rs. 9,000-Rs. 7500 =
Rs. 1,500
If the actual machine hours worked were 1,900, then:
• Overhead absorbed = 1,900 hrs. x Rs. 5= Rs. 9,500Overhead over-absorbed = Rs. 9,500 – Rs. 9,000 = Rs.
500
• Accounting Treatment of Under- and Over-absorption
1. USE OF SUPPLEMENTARY RATES: Where the amount of under or over-absorbed overhead is significant, a supplementary overhead absorption rate is calculated to adjust this amount in the cost. However, adjustment is made in the cost of (i) work-in-progress; (ii) finished stock, and (iii) cost of sales. In the case of under-absorption, the overhead is adjust by a plus rate since the amount is to be added, whereas over-absorption is adjusted by a minus rate since the amount is to be deducted.
Supplementary rate = unabsorbed overhead/total cost
Accounting Treatment of Under- and Over-absorption
Example: A company absorbs overheads on pre-determine
rates. For the year ending 31st, Dec., 2004, factory overheads absorbed were Rs. 3,66,250. Actual amount of overheads incurred totaled Rs. 4,26,890. The following figures are also derived from the trial balance.
Finished stock Rs. 2,30,732Cost of goods sold Rs. 8,40,588Work-in-progress Rs. 1,41,480
How would you dispose of under/over-absorbed overhead by use of supplementary rate method.
• Writing off to Costing Profit and Loss Account. This method is used when the under or over-absorbed amount is quite negligible and it is not worthwhile to absorb it by supplementary rate.
• Carry over-to the next year. Under this method the under or over-absorbed amount is transferred to Overhead Reserve Account or Suspense Account for carry over to the next accounting year.