Outline Poseidon OGCM and GMAO coupled forecasting system

13
Ensemble Data Assimilation and its Ensemble Data Assimilation and its Impact Impact on Seasonal Hindcast Skill on Seasonal Hindcast Skill Christian Keppenne Christian Keppenne 1 , Michele Rienecker , Michele Rienecker 2 , Nicole Kurkowski , Nicole Kurkowski 3 , Jossy Jacob , Jossy Jacob 4 & Robin & Robin Kovach Kovach 5 1,3,4,5 1,3,4,5 Science Applications International Corporation Science Applications International Corporation San Diego, CA 92121 San Diego, CA 92121 2 Global Modeling and Assimilation Office Global Modeling and Assimilation Office NASA Goddard Space Flight Center NASA Goddard Space Flight Center Greenbelt, MD 20771 Greenbelt, MD 20771 AGU 2006 Spring Meeting, Baltimore, MD AGU 2006 Spring Meeting, Baltimore, MD 1 [email protected], 2 [email protected], 3 [email protected] , 4 [email protected] , 5 [email protected]

description

- PowerPoint PPT Presentation

Transcript of Outline Poseidon OGCM and GMAO coupled forecasting system

Page 1: Outline Poseidon OGCM and GMAO coupled forecasting system

Ensemble Data Assimilation and its ImpactEnsemble Data Assimilation and its Impacton Seasonal Hindcast Skillon Seasonal Hindcast Skill

Christian KeppenneChristian Keppenne11, Michele Rienecker, Michele Rienecker22, Nicole Kurkowski, Nicole Kurkowski33, Jossy Jacob, Jossy Jacob44 & Robin & Robin

KovachKovach55

1,3,4,51,3,4,5Science Applications International Corporation Science Applications International Corporation San Diego, CA 92121San Diego, CA 92121

22Global Modeling and Assimilation OfficeGlobal Modeling and Assimilation OfficeNASA Goddard Space Flight CenterNASA Goddard Space Flight Center

Greenbelt, MD 20771Greenbelt, MD 20771

AGU 2006 Spring Meeting, Baltimore, MDAGU 2006 Spring Meeting, Baltimore, MD

[email protected], [email protected], [email protected] , [email protected] , [email protected]

Page 2: Outline Poseidon OGCM and GMAO coupled forecasting system

OutlineOutline• Poseidon OGCM and GMAO coupled forecasting systemPoseidon OGCM and GMAO coupled forecasting system• Ensemble Kalman filter (EnKF) implementation for PoseidonEnsemble Kalman filter (EnKF) implementation for Poseidon• Impact of T+SSH assimilation on CGCM seasonal hindcast skill Impact of T+SSH assimilation on CGCM seasonal hindcast skill

Page 3: Outline Poseidon OGCM and GMAO coupled forecasting system

OGCM• Poseidon (Schopf and Loughe, 1995)• Quasi-isopycnal vertical coordinate• Prognostic variables are h, t, s, u and v• Sea surface height (SSH) is diagnostic: = ibuoyancy(ti, si) hi

• About 30 million prognostic variables at 1/3 x 5/8 x L27 resolution

GMAO CGCM coupled forecasting system- GMAO AGCM, 2 x 2.5 x L34- LSM: Mosaic (SVAT)- OGCM: Poseidon v4, 1/3 x 5/8 x L27

- Production ODAS: OI of in situ temperature profiles with salinity adjustment- Experimental ODAS: EnKFNote: ODAS is run on OGCM prior to coupling to AGCM & LSM

CGCM and OGCMCGCM and OGCM

Page 4: Outline Poseidon OGCM and GMAO coupled forecasting system

System-noise modelling• Model errors: use model EOFs to generate state perturbations• Forcing errors: add random perturbations to wind stress forcing

Multivariate update• Multivariate compactly supported covariances• Update T, S, u & v• Layer thicknesses (h) adjust between analyses • Incremental update• Process SSH and T observations separately

Online bias estimation• Used in SSH assimilationHybrid (3DVAR + ensemble) covariances• Used in T assimilationSpatio-temporal filtering of covariances• To mitigate effect of small ensemble sizesComputational cost• About 4 hours/month on 240 SGI Altix CPUs for 16 members

EnKF implementation

Page 5: Outline Poseidon OGCM and GMAO coupled forecasting system

true climate

model climate

obse

rvab

le

a) Standard assimilation

Assimilation alters the model

climatology

true climate

model climate

obse

rvab

le

b) Assimilation with Online bias estimation (OBE)

est.

biasEstimates of variability (biased

model state) and climatological error (bias) are evolved side by

side

Online bias estimationOnline bias estimation

Page 6: Outline Poseidon OGCM and GMAO coupled forecasting system

EnKF-32: No filter, H-section

EnKF-32: No filter, V-section

EnKF-8: filter, H-section

EnKF-8: filter, V-section

EnKF-8: No filter, H-section

EnKF-8: No filter, V-section

Covariance Covariance filteringfiltering

•Temporal filter (exponential moving average) to reduce weather noiseTemporal filter (exponential moving average) to reduce weather noise•Spatial filter to lessen effect of running small ensemblesSpatial filter to lessen effect of running small ensembles

Page 7: Outline Poseidon OGCM and GMAO coupled forecasting system

Assimilation experimentAssimilation experiment• Assimilate T/P anomalies + TAO & XBT temperature profiles 1/1/2001-12/31/2001Assimilate T/P anomalies + TAO & XBT temperature profiles 1/1/2001-12/31/2001• Online bias estimation in SSH assimilationOnline bias estimation in SSH assimilation• Random forcing from 32 OGCM leading EOFs + wind-stress perturbationsRandom forcing from 32 OGCM leading EOFs + wind-stress perturbations• Compare 8, 16 & 32 member EnKFCompare 8, 16 & 32 member EnKF• Compare with Compare with

• no-assimilation controlno-assimilation control• Production ODAS (temperature OI + salinity correction)Production ODAS (temperature OI + salinity correction)

ExperimentsExperiments

Page 8: Outline Poseidon OGCM and GMAO coupled forecasting system

EnKF8

EnKF16

EnKF32OI+S(T)

Control

• Control is most biased • OI partly corrects SSH bias• EnKF runs have no noticeable SSH bias

SSH OMF and OMA statisticsmean OMFRMS OMF

mean OMA

RMS OMA

Note the differences in scales!

T OMF and OMA statistics

EnKF8 EnKF16 EnKF32OI+S(T)Control

(Hybrid covariances used in T assimilation with EnKF result in stronger data weights than OI+S(T))

Page 9: Outline Poseidon OGCM and GMAO coupled forecasting system

Impact of assimilation on CGCM hindcast skillImpact of assimilation on CGCM hindcast skill• 16-member EnKF16-member EnKF• Assimilate T + SSH for February-April of each year of 1993-2002Assimilate T + SSH for February-April of each year of 1993-2002• Couple OGCM to AGCM & LSM after running ODASCouple OGCM to AGCM & LSM after running ODAS• 12-month CGCM hindcasts initialized using ocean states from EnKF runs12-month CGCM hindcasts initialized using ocean states from EnKF runs

(to save CPU time, CGCM hindcasts have only 5 ensemble member) (to save CPU time, CGCM hindcasts have only 5 ensemble member)

• Assess impact of assimilation on SST & SSH hindcast skillAssess impact of assimilation on SST & SSH hindcast skill• Compare to history of CGCMv1 May-start hindcasts (problematic month)Compare to history of CGCMv1 May-start hindcasts (problematic month)

Page 10: Outline Poseidon OGCM and GMAO coupled forecasting system

Niño-3.4 SSTNiño-3.4 SST

EnKF T+SSH, OBEEnKF T+SSH, OBE

missed EN missed EN

NSIPP CGCMv1 tier 1NSIPP CGCMv1 tier 1

false LN alert false LN alert

missed EN

False EN alert

Page 11: Outline Poseidon OGCM and GMAO coupled forecasting system

Niño-3 SSTNiño-3 SST

EnKF T+SSH, OBEEnKF T+SSH, OBEEN underestimated

missed EN missed EN

NSIPP CGCMv1 tier 1NSIPP CGCMv1 tier 1

false LN alertfalse LN alertmissed EN

False EN alert

Page 12: Outline Poseidon OGCM and GMAO coupled forecasting system

Niño-3 SSHNiño-3 SSH

EnKF T+SSH, OBEEnKF T+SSH, OBE

GMAO CGCMv1GMAO CGCMv1

SSH hindcastsSSH hindcasts

Although minor 1995 warm event is Although minor 1995 warm event is missed and 1998 EN is missed and 1998 EN is underestimated, the correlation with underestimated, the correlation with TOPEX is generally higher in the TOPEX is generally higher in the hindcasts initialized with EnKF T+SSHhindcasts initialized with EnKF T+SSH

Niño-3.4 SSHNiño-3.4 SSH

Page 13: Outline Poseidon OGCM and GMAO coupled forecasting system

ConclusionsConclusions

• Online bias correction important when T data & SSH anomalies are assimilated.

• Filtering of covariances effective in lessening the impact of running a low-rank EnKF

• EnKF-initialized hindcasts can miss or underestimate El Niño events but result in less false El Niño or La Niña alerts than production forecasts