Outline Planning Application for land at Gors Farm, …...3 Land at Gors Farm, Gors Road Towyn...
Transcript of Outline Planning Application for land at Gors Farm, …...3 Land at Gors Farm, Gors Road Towyn...
1
Land at Gors Farm, Gors Road Towyn Design and Access Statement
Outline Planning Application for land at Gors Farm, Gors Road, Towyn
Design & Access Statement
April 2017
Stone Planning Services
2
Land at Gors Farm, Gors Road Towyn Design and Access Statement
Contents:
1. Introduction - p3
2. Site & Context Analysis - p7
3. Design Proposals & Illustrative Layout - p13
4. Summary - p24
Gors Farm D&AS Rev B
Client: Mr. C. Holden
3
Land at Gors Farm, Gors Road Towyn Design and Access Statement
1. Introduction
This Design and Access Statement (D&AS) accompanies an Outline Planning Application for land at
Gors Farm, Gors Road, Towyn. The team which has prepared the planning application, comprises
the following profession firms. The project team has worked to Mr. C Holden (Guild of Travelling
Showmen) as client:
Planning Consultant / Urban Design: Stone Planning Services
Architect: BR Architecture
Engineering: M-EC Consulting Engineers
Structural Engineers: J M cKernon & Co.
Ecology, Landscape & Trees: CEB Associates
Noise Consultants: Apex Acoustics
Drainage: M-EC Consulting Engineers
The D&AS is prepared to meet the requirements of Conwy County Borough Council and the Welsh
Government’s Technical Advice Note 12: Design (March 2016). The document provides the
following:
Explanation of the Design Principles & Concepts for the scheme.
Demonstration of the site and context appraisal that has been undertaken and how this has
then informed the scheme design.
Explanation of the Access & Circulation arrangements for the scheme
Confirmation of how specific issues – including access issues (amongst others) - have been
addressed through the design proposal.
The Site
The application site extends to 1.87 hectares (4.62 acres) and includes the now redundant Gors Farm
and associated land / buildings. Gors Road forms the eastern boundary to the site and the River
(Afon) Gele forms the northern boundary. The southern boundary extends up to and includes areas
of an area of undulating and unmanaged vegetation, whilst the western boundary is more distinct
being formed by a timber post and rail fence with a large agricultural storage building beyond.
There are two existing junctions serving the site from Gors Road. The northern-most junction serves
the adjacent large-format steel framed storage building and provides access to agricultural land via
an unmade farm-track running alongside the River Gele. The second southern junction provides
access to the main site past a feature stone wall and a pair of gateposts. This entrance feature was
constructed to serve a previous approved scheme. This site access will be remade as part of the
prosed development, in the same location.
There are several existing buildings on site. The largest of these is the two-storey original Gors
farmhouse, which is to be demolished now that the replacement farm is occupied. There are a
number of associated outbuildings, close to the original farmhouse, including a former granary,
which will be retained and reinstated. Other outbuilding also exist on site. There is a partly
constructed internal track, low bridge parapets to a now defunct pond and several concrete slabs
laid to accommodate tourist lodges. (as approved by an earlier extant planning permission).
4
Land at Gors Farm, Gors Road Towyn Design and Access Statement
The landscape character and quality of the site is modest. Much of the site is now overgrown and
the unmanaged vegetation has little intrinsic value. The tall hedgerow to the site frontage along
Gors Road is the most distinctive landscape feature. There is undulation land covered with grasses
and gors to the western portion of the site and extending beyond the site boundary to the west.
The Proposed Development
The outline planning application comprises the following elements, which combine to create an
attractive and appropriate development:
Erection of a manager’s house.
13 no. park-homes for Travelling Showmen’s families.
An area for the storage of resident-only touring caravans.
A further external storage area.
Erection of covered barn for the maintenance of equipment relating to Travelling
Showmen’s business.
The restoration of the former granary to garden store.
The Access onto Gors Road from the site.
Landscaping of the site, including boundaries, planting, green space and play space.
The following planning application drawings should be read alongside this statement, and as
relevant these drawings are included within the statement for reference.
Site location and red-line boundary (ref BR:Holden:OS01)
Illustrative masterplan (ref: BR:Holden:FS01)
Indicative Park Home (ref: BR:Holden:FS02 )
Planning and Urban Design Policy Context
Planning Policy Wales describes design as… ‘The relationship between all elements of the natural
and built environment.’ The site at Gors Farm illustrates this concept where new development can
enhance both the landscape setting and contribute positively to the built character of Towyn at one
of the town’s gateways. The relationship between buildings - existing and proposed, boundaries -
both built and natural edges, the wider landscape and the local townscape have been carefully
considered in developing design solutions on this important site.
Planning Policy Wales (PPW) confirms the role of ‘design’ in creating inclusive and sustainable
places. These design objectives are directly relevant to design proposals at Gors Farm, where strong
social, environmental and economic principles underpin the scheme. PPW describes that… ‘To
create sustainable development design must go beyond the aesthetic to include social,
environmental and economic aspects of development’. In social terms, development proposals will
provide much-needed facilities and new homes for the travelling showmen community.
The development will underpin future business and economic success for that community and
provide new homes for travelling showmen families. Providing these new homes, in proximity to
local facilities, is very important.
PPW also describes how… ‘Good design is about inclusive design…’ and that…’inclusive design places
people at the heart of the design process, acknowledging diversity and difference’.
5
Land at Gors Farm, Gors Road Towyn Design and Access Statement
Proposals support the way of life of the travelling showmen community. In many ways, this is a
different way of life to many people, involving travelling far and wide to provide leisure facilities
across Wales and beyond. In other ways, the community requires the everyday facilities for families
based around a family home and local services. The proposed development supports diversity and
inclusion. Good design will ensure development is attractive and appropriate within its setting and
contributes to the character and community of Towyn.
Technical Advice Note 12: Design (March 2016) defines the facets of good design as follows and this
has helped to structure this document:
Access & Movement - Ensuring access for all and sustainable patterns of travel
Character – Creating a sense place and a development which relates well to the townscape
vernacular of Towyn with buildings of quality in design and construction.
Environmental Sustainability – Ensuring landscape character, green infrastructure and
sustainable buildings and places.
Community safety – Promoting safe, attractive and welcoming places which offer good levels
of natural surveillance.
The D&AS also reflects the requirements of the sister document TAN12 which relates specifically to
Design and Access Statements. The design process, moving from site assessment through to
developing options and confirming proposals is important. The design work building up to the
planning application, has reflected this iterative process. Design decisions have been based upon a
strong vision for the development and have balanced key considerations. This document explains
and justifies the proposals and the design approach.
Conwy County Borough Council prioritise good design. Conwy Local Development Plan was
adopted in 2013 and Policy DP/3 Promoting Design Quality and Reducing Crime is of central
importance. The Council has also adopted a thorough Supplementary Planning document on Design
in July 2015 (LDP09), which sets out the expectations of the local planning authority. The
requirements of the SPD have been addressed through the design process and planning application
submission.
The SPD describes the character of this diverse and attractive part of Wales, with its striking
architecture, picturesque landscapes and busy towns. The setting of the Gors Farm site reflects
many of the key features of the Borough. There are low-lying grassland pastures abutting the
coastal townscape of Towyn. The sea-side character of the town, with its abundance of park-homes,
static caravans, amusement arcades and fairground rides is distinctly part of the north wales
character in this geography. There is the sea, shoreline and beaches to the north. To the south-east
and south-west are hills and upland areas which frame and encircling the landscape either side of
the River Clwyd.
The SPD explains that new development should support the character of the borough and its local
contexts and this is what the proposals at Gors farm seek to achieve. They are intended to be in-
tune with the context in terms of built form and landscape character. Guidance highlights the
importance of scale, form, materials and planting all these are carefully considered.
6
Land at Gors Farm, Gors Road Towyn Design and Access Statement
Site Location
7
Land at Gors Farm, Gors Road Towyn Design and Access Statement
Site Context
2. Site and Context Analysis
Landscape and Townscape Setting
Towyn is a seaside resort town in the borough of Conwy on the north coast of wales between Rhyl
and Abergele. The town is linked with the adjacent settlement of Kinnmel Bay. The landscape
character of the town is defined by three key features. First the seafront and beaches to the north
which was a key reason for the growth of the town over the last century. Second, the low-lying
agricultural landscape in a patchwork of arable fields and pasture enclosures. These provide the
immediate setting of the town. There are several stands of trees which punctuate this landscape.
The third landscape feature is the broad sweep of hills which rise to the south-west and south-east
to encircle and enclose the landscape.
8
Land at Gors Farm, Gors Road Towyn Design and Access Statement
The town’s development is overlain on this landscape setting. The mainline railway line serving the
Holyhead and London separates the town from the seafront. The historic core of the town is evident
in places with traditional cottages constructed ion local stone. St. Mary’s Church is the town’s most
notable building designed by renowned Gothic Revival architect George Edmund Street. The historic
heart of the town, focused on Towyn Road / Gors Road / Sandbank Road, is now subsumed in a very
much larger settlement defined by a very extensive area of static-caravan parks, park homes and
touring caravan pitches. These areas are much greater in extent than conventional hosing in the
town. Beyond the settlement envelope of the town a series of stone-built farmsteads punctuate the
landscape.
The site is located close to the existing settlement edge. Its development marks the transition from
town to country. The green character of the development, with park-homes in a planted setting,
and with agricultural character maintenance buildings grouped together will be unsurprising in the
landscape. The analysis of the character of the site and the town moreover has influenced the
design and character of the scheme strongly. The character of the site has been described earlier in
this D&AS in terms of its edges, its boundaries and general condition. Further constraints and
information is also provided later in this section. In summary, the key aspects of the site are as
follows and as illustrated in the associated photography.
A native hedgerow alongside Gors Road of modest quality and overgrown.
A generally flat and green site, which transitions to more undulating ground to the south and
beyond the site.
Unmade track, defunct feature pond and faux bridge walls and parapet beside the track.
Recently constructed feature stone wall which will be rebuilt through development.
Slabs associated with the previously approved holiday chalet scheme
The old stone-built granary building which is in a poor state of repair, but which is to be
retained
The original Gors Farmhouse which is to be demolished now the replacement building has
been constructed.
(180-degree panorama of the site from Gors Road looking westwards)
9
Land at Gors Farm, Gors Road Towyn Design and Access Statement
Typical static caravans behind clipped hedgerow Amusement arcade in the centre of Towyn
View to seafront fun-fair along Gors Rd. Park Homes with their gable orientated to street.
Existing hedgerow edging site to Gors Rd. Site to the south of existing dwellings on Gors Rd.
River (Afon) Gele to the norther edge of site. Farmstead beside pastures and copse to south
10
Land at Gors Farm, Gors Road Towyn Design and Access Statement
The existing stone walls at the southern access Stone wall / hedgerow looking south at Gors Rd.
Farmhouse from southern junction Stone wall / hedgerow looking north at Gors Rd.
The stone granary in a state of dilapidation Undulating ground in / beyond the site to south
Over-grown slab of approved timber lodge Tall timber fencing to northern access / site edge
11
Land at Gors Farm, Gors Road Towyn Design and Access Statement
Local Facilities and Services
Towyn is served by primary schools, places of worship, community centres, leisure and employment
opportunities. Towyn and Kinmel Bay has a large convenience store in Asda and closer to the site
(approximately 1km to the north) is a parade of local shops including a (Londis) convenience store,
pharmacy, newsagent, delicatessen, hot food take-aways and a public house. Facilities further afield
can be accessed via public transport with service 46 providing a local Towyn Town link service to the
north at Gors Road and service 14 linking from the town to Llandudno and Rhyl. The tourist facilities
provide additional seasonal attractions including the arcades, amusements, fairground and a
racecourse.
Site Constraints
Detailed assessment of the site has been undertaken to understand and respond positively to
development constraints.
Coastal flooding: Like much of Towyn, the site is affected by coastal flooding from storm
surges and high tides. Natural Resources Wales Flood risk mapping highlights that the town
benefits from coastal flood defences. Nevertheless, to mitigate the risk of coastal flooding, a
flood defence wall will need to be constructed around the site to offer protection to the
development. A Flood Consequences Report has been prepared as part of the planning and
design process. This provides more detailed information in respect of the design of this wall.
The wall will be required to provide flood defences to a specific datum and this is in the
order of 1.8m around the perimeter of the site. Along Gors Road this wall shall be to the
site-ward side of the existing mature hedgerow where possible.
The River (Afon) Clwyd: Natural Resources Wales Flood risk mapping highlights that the site
benefits from flood defences protecting against flooding from the River Clwyd. The River
(Afon) Gele: Natural Resources Wales Flood risk mapping highlight that there is not risk of
flooding from the River Gele.
Foul and surface water: A foul water strategy and a surface water drainage strategy have
been prepared for this development and the scheme and drainage solution have evolved in
an iterative manner. Proposals include separate foul and surface water drainage systems,
along with a separate Petrol separator system for the maintenance / storage areas. A mains
sewer connection was proposed with the previous more intensive development of the site.
This option is now not considered necessary or sustainable with the less intensive
development of the site. Instead a sewage treatment plant with discharge to Bodoryn
Marsh is proposed. Surface water will be retained and attenuated on site involving a
treatment train and will outfall into Bodoryn Marsh also. These systems will be gravity-fed.
Other options for the treatment of all surface water were considered and dismissed on the
grounds of sustainability as this would have required a pumping station. Some surface water
will outfall into the River Gele for the maintenance and storage areas involving petrol
separation. The design of the scheme has reflected the above drainage considerations.
12
Land at Gors Farm, Gors Road Towyn Design and Access Statement
Landscape trees and vegetation: A landscape strategy has been prepared to support the
application and the landscape character of the site. The findings of this work have informed
the design of the development.
Ecology and Bio-diversity: A bio-diversity Statement has been prepared for this site /
development. Landscape proposals will conserve and enhance biodiversity on site.
Below Ground Services: There are no below ground services affecting the site which the
design / layout needs to make special provision to accommodate. There are existing services
within the Gors Road Corridor. There will be new services laid to the site / plots as the
development is constructed.
Noise: A noise assessment has been undertaken by Apex Acoustics and this has concluded
that no special noise mitigation measures are required in terms of the residential
component of the site, where dwellings were 10m approximately set back from Gors Road.
The principal noise source affecting the site is from traffic travelling along Gors Road. In
terms of the impact of development of the site itself on nearby residential development, the
proposed maintenance activities are a principal consideration and the noise assessment
demonstrates a low risk of adverse noise effects during the potentially noisiest activities,
provided they are undertaken within the enclosed dry storage barn.
Access locations. The existing junctions on site provide the locations for the future site
access / egress. The northernmost junction provides access to ‘other’ land (see next) and it
is envisaged that this will not provide direct access into the main residential part of the
proposed development. The southerly junction will need to be reconfigured to provide the
main access into the site / development. The existing junction and stone walls / gateposts
will need to be dismantled, reconfigured and rebuilt. The new southerly access will be in the
same location of the existing junction.
Rights of access to third party land through the development. There is a right of access
through the site to adjacent land and barn. This runs to the north of the site. Access is
required from the northerly junction along the existing lane / track, which runs alongside the
River Gele. The development will need to ensure this right of access is maintained at all
times.
Residential amenity: The site is located adjacent to the edge of Towyn. The nearest
residential properties will not be affected in terms of amenity of privacy as a result of the
proposals. There will be no overlooking, over-shading or other negative impact from
development. Residential amenity is not considered to be a consideration in the layout of
this site.
13
Land at Gors Farm, Gors Road Towyn Design and Access Statement
Key Opportunities
The old Granary is an important local building the conservation and reinstatement of which will
provide a visible link with the history of the site. The present condition of this stone building is poor
and the roof has been removed (or collapsed) in the past so re-instatement will require significant
work and investment. A structural survey has been undertaken of this building to ascertain its
potential for renovation. This concludes the building is structurally sound. Securing a new use for
this building within the development is important, particularly as the old Gors Farmhouse and other
outbuildings are to be demolished.
The River Gele is an important natural landscape feature running adjacent to the site. At present a
tall timber fence of approximately 1.8m high forms a solid boundary to the river and the access lane.
This fence provides security to the site in its present redundant use. With redevelopment, there is
the opportunity to form a more appropriate boundary to the river and access lane. This boundary
would allow views of the river and a more pleasant visual aspect of the site / scheme. Pedestrian
access to the development would be beneficial in this location.
The general appearance of the existing site is unattractive and this creates a poor first impression of
Towyn when arriving from the west along Gors Road. The unmanaged vegetation, which is
overgrown. The redundant buildings are in a state of dilapidation. New development provides the
opportunity to enhance the site and create a more fitting and attractive gateway into Towyn. The
previously approved development established that development of this site was appropriate and
these new proposals can bring about much needed improvement in the condition and character of
this visible site.
3. Design Proposals & Illustrative Layout
The Design Concept
The Design Concept is compelling. To provide a new home and development for hard-working
travelling showmen and their families. The proposal includes domestic-scaled Park Homes and a
traditional built gatehouse. These will provide a range of sustainable family homes. There will also
be children’s play.
The mixed-use nature of the development is integral to the place. This includes purpose built
buildings for the maintenance of travelling showmen’s equipment and the storage and associated
touring caravans. Equipment layout and maintenance space is an essential requirement of the
development concept as part of the ‘home-base’ for the travelling showmen community. The ability
to maintain fairground rides, stalls etc. within a development which is also safe and attractive as a
place to live and for children is important.
In the past travelling showmen sites were based on individual yards grouped together. Each yard
would include a dwelling, storage area and maintenance space, all side by side. The more modern
approach, employed at Gors Farm, is to move away from these grouped units of yards and to create
a place where uses are grouped together. This supports a much more efficient and tidy layout.
Grouping and separating dwellings, storage areas and maintenance spaces provides better
functionality and improved residential amenity.
14
Land at Gors Farm, Gors Road Towyn Design and Access Statement
The quality of the scheme, its buildings, structures and landscape will be tidy and of a high standard.
Maintenance of the development will also be of a similarly high standard. The landscape quality will
be very important including existing and new planting. There will be large areas of retained and
improved green space.
The frontage and setting of Gors Road will be remain as an attractive green corridor after
development. Once the new access (and associated visibility splay) has been set-out and the new
1.8m stone boundary wall is constructed, new native planting (gors) will be established to create to
soften this edge and create the green corridor.
Development in this location will be modest in scale and will not create a continuous frontage. This
is an important concept which will retain a green character along this road on the approach into
Towyn.
The distinction between this development for travelling showmen is different to travellers and
gypsies’ sites is very important. The two communities are very different. This site will be the
domestic home and base for a community whose working residents travel widely across the UK to
work. This site will remain in active use by a stable and rooted community who will contribute to
local civic and economic life. In terms of accommodation, the Park Homes specifically are
characteristic of much of Towyn. These will provide good quality homes. These are not touring
caravan pitches and that must be made clear. These will be complete homes. There will not be
amenity blocks as is the case with gypsy and traveller pitches. The development will also be funded
and built by the travelling showmen community and will not rely on government or local authority
funding.
Design Principles
The following design principles underpin the development:
Create an attractive green corridor to Gors Road, including new native planting (gors) along
the site frontage. This will be to the front of the proposed boundary wall. Planting will
respect limitations of visibility splays. The existing hedgerow to the site frontage at Gors
Road will need to be cut-back to facilitate the southerly site access and where this is
required replacement low-level hedge planting will be undertaken to ensure an effective
landscape setting.
Retention of the open green aspect to the south of the site, as viewed from the site and
from the south towards the site. As part of the development there shall be a soft feathered
landscape edge which provides a gentle gradation from the developed site to the wider
landscape beyond. Planting alongside the existing scrubland and the undulating land
beyond site as part of the development will assist with this aspiration.
The location of domestic-scaled Park Homes at single storey towards the frontage of the site
closer to Gors Road is important in creating a character of development which will resonate
with and be comfortable with the character of Towyn. Park homes shall not create a wall of
development along Gors Road and will orientate the narrow gable end to the road.
Locating the maintenance and storage areas within the interior and northern parts of the
site, closer to existing large scale agricultural-style storage buildings will assist the character
and scale of the site. The proposed dry storage barn which provides a series of internal
maintenance spaces is well located close to the adjacent property.
15
Land at Gors Farm, Gors Road Towyn Design and Access Statement
The manager’s house is to act as a ‘gatelodge’ into the development as a whole and as a
transition point between the residential areas of the site and the operational areas of the
site dedicated to maintenance and storage. Whilst the design of this building is not fixed
with this outline application, the need for a high quality, traditional building is made clear as
a key site development principle. This house will be well-related to the character of existing
vernacular or period farm houses within this local area and wider landscape of Towyn and
Conwy.
The character of development will be appropriate to its landscape setting and to the in scale
and visual appearance of the town of Towyn. Proposed buildings will be unsurprising in the
context of the town and the development will have a familiar look and feel to the wider
settlement.
The domestic nature of this development with family homes and children’s play is an
important principle ensuring an attractive environment for family life.
The integrated nature of the site preserving and sustaining the special and valuable way of
life of Travelling Showmen and the families is also an important design principle ensuring
that the design and layout of the site meets their needs fully as a home base.
Uses and Layout Considerations
The uses proposed with the application and making up the scheme have been outlined in terms of
quantum earlier in this document. The illustrative layout defines where these key uses will be
located on the site spatially. The main principle which has guided the layout is for the residential
part of the development to be located closer to Gors Road and the storage and maintenance uses
towards the interior / rear of the site. The larger format buildings would be more appropriate in this
location close to existing large format agricultural type buildings and away from Gors Road. The
existing steel frame and clad building adjacent to the site sets the context in this location. The finer-
grain buildings of the Park Homes are more in keeping with the scale of the wider area and the
character of Towyn towards the Gors Road frontage. The manager’s house will act as a gateway
building to the site.
Access, Movement & Circulation
The organisation of the site based around a simple access and movement structure which promotes
good levels of circulation along well-defined and overlooked streets and spaces. The main access to
the site is from the southerly junction of Gors Road. This provide vehicular and pedestrian access to
the development. A further pedestrian access to the residential site is located to the north of the
site close to the northern junction with Gors Road. This additional pedestrian junction will ensure
residents can access Gors Road and head towards the town centre and nearby facilities in a direct
fashion avoiding the necessity to use the main southerly access. Park Homes are located off a
central access lane which links through the site in a north-south direction. Access to the working
part of the site and the storage areas is from the southern access. Travelling showmen’s equipment
can be manoeuvred onto site without affecting the residential amenity of the main site. The link
form the residential site to the working part of the site is important however in permitting direct
access to the storage area for touring caravans.
Development Character
The key design principle has been to create development that looks like it belongs within Towyn.
The ambition for character is that the development will be appropriate and unsurprising in its
context. To achieve this, several deliberate design decisions have been made. The location of the
16
Land at Gors Farm, Gors Road Towyn Design and Access Statement
park homes on site, to create a setting to Gors Road, is a common settlement pattern in Towyn.
Proposed park homes will present their gables to the road, where possible. The retention of existing
planting on site and along Gors Road (subject to visibility splays) and the provision of new planting
across the site to the interior and around the periphery of the site. Retaining a green character in
this location is important and the reduced scale and quantum of this development compared with
the original approved scheme is helpful in this regard.
In terms of existing buildings on site today, the retention and refurbishment of the former Granary
building which will provide a visible link to the history of the site. This is an attractive building in the
simple local tradition of agricultural buildings. There is a further opportunity to create sense of place
with through the erection of the manager’s house. This has been located to form a gateway and
vista to the development. The detailed design of this building will need to create an attractive
frontage inspired by traditional farmhouses of the area, utilising traditional materials and details. A
further opportunity to reinforce a sense of place is presented by the necessity to construct a flood
defence wall to the perimeter of the site. This wall will be of stone construction (or stone clad /
faced) and will be planted against (to soften the overall effect) where the wall is to be visible from
the public highway / vantage points.
Landscape Proposals
Landscape proposals help to consolidate the site and root development into the wider setting. A
landscape strategy is provided with this application which confirms the basic approach to planting.
Firstly, as much of the existing planting will be retained as possible. Second new planting will be
introduced to do several important jobs. Around the perimeter and periphery of the site native and
naturalistic planting will soften the edges of the scheme and relate the development to its landscape
surroundings. Within the scheme more formal and ornamental planting will help create the place.
Sustainability
The development offers a sustainable economic use for the site. It also provides good social
sustainability in terms of the specific community benefits for the Travelling Showmen community
and new family accommodation. The ability for the community to create their own place to support
their business and family needs is important in both planning and placemaking terms. The layout
includes several important sustainable features. In terms of drainage, the surface water drainage
system is based on a sustainable drainage approach (SUDS), where rainwater is attenuated on site in
swales and a detention basin which form a treatment-train before being discharged in the adjacent
Brodoryn Marsh. The fouls treatment system proposed for the site deals with foul water in a
sustainable fashion without placing any additional burden on the existing local sewer system. The
on-site treatment works is described in more detail in the associated report.
Community Safety
The layout ensures good levels of overlooking and natural surveillance throughout the scheme. This
is an integral part of any successful residential development (see next section also). All principal
routes and open spaces through and within the residential area are overlooked to support
community safety. There is a pedestrian route to the north of the development connecting with
Gors Road and this will allow for a direct-line of sight through the development. The hard-standing
areas for storage and the maintenance areas will be secured by landscaping and secure fencing. This
part of the site will be secured when not in use and well-overlooked from the residential parts of the
scheme.
17
Land at Gors Farm, Gors Road Towyn Design and Access Statement
Design Concept Underpinning the indicative Layout of the development
18
Land at Gors Farm, Gors Road Towyn Design and Access Statement
Indicative Layout
19
Land at Gors Farm, Gors Road Towyn Design and Access Statement
The Design of New Proposals and the Approved Planning Permission
The extant planning permission is important in that it approved the principle of development on site.
The character of the proposed development is considered much more appropriate and in-keeping
with the character of Towyn than the previously approved log-cabin scheme. Towyn is known for
Park Homes and static Caravans and it is not known for Log Cabins. The analysis of the character of
the town provides the foundations for concluding Park Homes are a familiar part of the settlement
and an appropriate development for this site.
The number of individual dwellings is noteworthy also. The approved scheme includes 20 log cabins.
These are dispersed widely across the site. The new proposal sees just 13 park homes developed
and these are in a more compact manner to reduce visual impact. The orientation of the Park
Homes is also rectilinear to reflect the character of the town where gable ends of static caravans
typically address the street.
In terms of scale, the approved log cabins, based on marketing information for the original scheme,
was based on one and a half storey development. Most of the proposed buildings are single storey,
which is much more appropriate for this location. The scale of other uses, motel and restaurant
would have been substantial and it is not clear how the design of these commercial buildings would
have been developed. Two things are clear however, their scale was significant in terms of plan and
elevation and they would have had a contrasting appearance to both residential and agricultural
buildings nearby. The maintenance and storage buildings are smaller in scale – both plan and
elevation and will relate well to the agricultural buildings nearby.
Typical Park Home – Plinth to be brick construction. Level access to front door to be confirmed
20
Land at Gors Farm, Gors Road Towyn Design and Access Statement
Layout of previously approved scheme including landscape design considerations
Marketing image of the approved
scheme showing the one-and-a-half
storey log cabins. These are taller than
the new development proposed and
the log cabins would be out of
character with the wider context.
21
Land at Gors Farm, Gors Road Towyn Design and Access Statement
Residential Layout Design Considerations and Parameters
The residential parts of the site include the 13 park homes plus the manager’s accommodation. The
design of the residential development will reflect principles of good design. Notwithstanding that
the majority of the dwellings will be park homes, where the architecture will be of a system built
nature, the layout of the scheme will need to create an attractive and well-mannered scheme. The
layout therefore accommodates the design requirements of any other residential development.
The following considerations have directed the illustrative layout and should guide subsequent
reserved matters applications:
Interface distances and spacing of dwellings – Adequate privacy and interface distances are
accommodated for all dwellings on site, to preserve residential amenity for families.
Residential Density – Local policies target 30 dwellings per hectare of schemes of this scale.
The design requirements for park homes.
Overlooking and natural surveillance – Front doors and windows will be well related to
public areas to provide eyes on the street and natural surveillance.
Integration of car parking and touring caravans – Parking will be to the side of park homes
away from the main internal street. Two parking spaces are provided per dwelling. Touring
caravans are not stored with the dwelling as this would create an untidy street scene. The
touring caravans needed for overnight accommodation away from home are stored in the
dedicated and secured compound.
Safe Residential Streets – The internal street within the scheme will be designed and
constructed to encourage slow vehicle speeds. The design speed of roads will be 10mph
throughout maximum.
Legibility - Much of Towyn is given over to static caravan parks and park homes. The scale of
many of these areas is vast and the repetitive nature of the developments can be
disorientating. The small scale of this development will ensure legibility is maintained.
Pedestrian Permeability - A pedestrian link to Gors Road is provided from the northern part
of the site to create a more direct link into the existing built-up area. This will be an
alternative access to the principal southerly access junction.
Gateway - The location of the manager’s house is important and this directly overlooks the
entrance to the development. This gateway building will be visible set-back from Gors Road.
It will be a high-quality building which provides an attractive elevation to signal a sense of
arrival in the development. Whilst the design of this building is not confirmed at this stage
the need for a good quality building with a sense of character is underlined as a key
principle. The private gardens for this house will be to the rear. Parking and garaging such
that there may be should not interfere with the vista to the building from the entrance /
junction.
22
Land at Gors Farm, Gors Road Towyn Design and Access Statement
Street-scene - The scheme design creates a series of regularly spaces plots for the park
homes. These are of similar proportions and orientation. Orientated is typically east-west.
This provides several benefits for the scheme and home. For the scheme the narrow face of
homes address the internal street. These create interest and varied street edge and avoid
individual wide elevations dominating the street-scene. There will be limited visibility of the
park homes from Gors Road with the retained hedgerow and walls, but any views which may
be possible will similarly be of the ‘ends’ of the homes, not the wide façade. For the home
this orientation ensures morning and evening sun for the narrow elevations of the home and
the broader side elevation receiving sunlight throughout the day. The selection of the
specific park home and its internal configuration and fenestration should be tailored to the
individual plot. This selection goes beyond the scope of this outline planning application.
Garden space - Private gardens are provided for all homes and the illustrative layout
suggests spaces of typically rectilinear proportions of 8mx9m. In practice these may be set-
out larger. Where possible gardens are to the south side / face of the home to maximise the
sunny orientation. Given the scale of both homes and gardens care will be taken to avoid
over-shading these garden areas. At this stage garden boundaries are not confirmed but
these will be robust and visually attractive. Space for storage of garden equipment etc. will
be provided.
Scheme coherence – All residential developments should present a coherent sense of place.
These bring a sense of unity to the street-scene. The park homes present an important
opportunity to create a distinctive and coherent scheme. Design parameters for park homes
will help guide the choice of individual homes, the appearance of which may vary across the
development. Parameters are provided as follows for; typical footprint configuration, typical
dimensions, typical height and typical roof profile / construction. Providing these ‘broad’
parameters will to ensure a degree of coherence is achieved.
1. Typical footprint configuration: These will be rectilinear (as suggested in the
indicative layout).
2. Typical dimensions: 12-15m x 6-8m (this may be subject to variation at Reserved
Matters stage)
3. Typical height: single storey plus roof construction up to 6m from finished floor
level.
4. Typical roof profile: Pitched roof profile typically and symmetrical.
Interest & variety - It is envisaged that individual park homes will vary in design and
appearance. This will add variety and interest within the controls described above. Colours
for park homes are not prescribed above but vivid colours are to be avoided. Brick plinths
will be typically brick built / faced with either red or blue engineering brick to suite the
specific park home.
Play space well Integrated - Landscape proposals include the provision of a Local Play Area
within the heart of the scheme. This play space will be safe and will be well-overlooked
from nearby dwellings. It will be separated from the maintenance and storage areas of the
site by fencing / gates to ensure children do not wander from the play area into operational
areas of the site. The details of the equipment in the play space will be confirmed in due
course.
23
Land at Gors Farm, Gors Road Towyn Design and Access Statement
Domestic Refuse and recycling storage / collection – The development will be served by the
refuse and recycling team at Conwy Council and reflecting this the scheme will be designed
in terms of details at Reserved Matters Stage to ensure adequate and appropriate areas for
external storage of bins (on plot) and recycling receptacles in line with Council requirements.
It is envisaged that bins / receptacles will be presented to the road-side at Gors Road for
collection.
The Non-Residential Components of the development
The ‘working’ areas of the site are equally important to the Travelling Showmen’s way of life.
The Granary – Garden Store: This building is to be retained and refurbished. A separate
structural report has been prepared as a starting-point for this work. The renovation work
will be undertaken in a sensitive fashion, following traditional methods and using traditional
locally relevant materials.
The Dry Storage / Maintenance Barn - This building will be divided into different areas for
maintanance. The location adjacent to a similarly scaled existing modern agricultural
building is sensible. The design of this barn is not determined at this time and will be
confirmed in due course. It is envisaged that this will be a modern functional design within a
typically agricultural style. Materials for walling and roofing will need to be recessive in
nature to avoid the building standing out. The broad footprint of the building is indicated in
the illustrative plan. In terms of scale and height the building will be single storey with a
clear working area of 5 metres. Taking into consideration the roof design it is envisaged that
this building will be of similar height to the adjacent building and in the region of 8-9 metres
to ridge. This will be confirmed at the reserved matters stage.
External Storage / Layout Areas - These areas are important to be able to store equipment
in a tidy fashion but to also unpack and lay-out equipment for checking and assessment as
part of the safety regime for rides and attractions as well as for cleansing.
Touring Caravan Storage - Touring caravans will be stored in this area which will be secured
by tall fencing and a lockable gate. The detail of this boundary treatment will be confirmed
by Reserved Matters Applications. The location of this area is away from ready public view
behind the residential area and the managers house.
24
Land at Gors Farm, Gors Road Towyn Design and Access Statement
4. Summary
The Welsh Government and Conwy County Borough Council are committed to high standards of
Design. This document explains how the proposed development constitutes good design and the
concepts and principles behind the scheme. Careful consideration has been given to the design of
the development in the context of both landscape and townscape setting. The special character of
the site and of Towyn has informed the design process and final solution.
The development itself will provide much needed family accommodation and operational facilities
for the Travelling Showmen Community allowing them to carry on sustainable businesses and their
hard-working way of life. The development will allow families to contribute to and benefit from the
local community and community infrastructure.
The social, economic and environmental sustainability of the development is important and
proposals include sustainable solutions for environmental aspects of the scheme such as drainage
and native planting. The landscape character and quality of the scheme will be enhanced and the
site significantly enhanced from its present condition.
The development once completed will be unsurprising in its context and entirely appropriate for
Towyn. The character of this new development will be much more locally familiar and distinctive
when compared with the previously approved development for the site. The reduced scale and
reduced quantum of these new proposals compared with the extant planning permission is also
more appropriate for the site.
The planning application provides a sustainable development, which is of quality design and which is
appropriate for the location and an improvement on early designs for the site. It will provide a
special place for the Travelling Showmen community which they can call home. On this basis and in
conclusion it is recommended that this proposal be granted outline planning permission. Thereafter
further detailed design work will be required to confirm all aspects of the development through
Reserved Matters Applications.