Contents

2

Installation Precautions

1. Product Information

. Specification, Standard Cabinet, Package, Screen Configuration, Fan installation

2. Installation

. Overview, Unboxing, Accessary Assembly, Fan Assembly, Handling Cabinet, Mounting Cabinet,

Y8, Signal B’d Assembly, Cable Connections, Power Connections,

Waterproof/ Bezel Accessary Assembly

3. Accessory Kit

. Tools & Materials

4. Control Room Setting

. System configuration, System Matrix

Page 3: Outdoor LED Installation Manual

Installation Precautions – Important Guidelines to Follow

3

• Precautions prior to Installation

- Ensure that all personnel at the site of installation wear personal protection equipment, such as safety helmets, safety

glasses, safety gloves and other appropriate safety equipment.

- Ensure that at least two persons work together to move or transport the product so as to ensure safety.

- Ensure that the power cord is not close to any heat sources. The cord sheath may melt and cause a fire or electric shock.

- Do not install the product in a confined space with poor ventilation. The internal temperature may increase and cause a

fire.

- Make sure you remove the power cord before transporting the product. Transporting the product with the cord connected

may cause a fire or electric shock.

- Make sure you ground the display screens before connecting the power source. Contacting a display that is not

grounded may result in death or severe injuries.

Page 4: Outdoor LED Installation Manual

Installation Precautions – Important Guidelines to Follow

4

◇ Installation precautions for prevention of damage to LED

Precautions Images

[Be careful to prevent external impact or dropping]

① After removing the Cover-Corner from the product prior to installation, exercise caution to

ensure that the LED surface is not exposed to physical impact and the product is not

dropped onto the floor.

② Do not place the product on a vibrating object. Make sure the LED surface does not face

down onto the floor.

③ Exercise caution to ensure that the corners of the LED module are not damaged due to

contact with external factors.

④ Make sure the number of loaded rows does not exceed two.

① ②

③ ④

[Be careful to prevent LED damage due to electric shock]

▶ Do not touch the LED surface with bare hands without wearing anti-static gloves.

[Be careful to prevent LED damage due to chemicals]

▶ Ensure that the product does not contact water, liquids containing alcohol, solvent or

surfactant, or chemicals such as wax, benzene, thinner, mosquitocide, air freshener,

lubricator or cleaning agent.

Page 5: Outdoor LED Installation Manual

◇ XPR-S Series

. CREE LED

1. Product Information: Specification

5

SPECIFICATIONS XPR-S

Pitch P6 P8 P10 P16TH

Diode CREE CLY6C CREE C4SMM

Max Brightness Nits 8000

Black Uniformity L10 +/- 0.15 (TBD)

Video Processing 24 Bit

Color Capacity 16 Bit

Color Temp 4,500 – 9,000K

Refresh Rate (spec 4,800Hz) 7,680Hz 7,680Hz 7,680Hz 7,680Hz

Horizontal Viewing Angle 160

Vertical Viewing Angle

(Top/Bottom)+20 / -65

Contrast Ratio 8,000:1 ↑

Typ. Weight (Kg/sqm) 40 kg ↓

IP Rating (Front/Rear) IP67 / IP66

EMC Class A

Cabinet Material Aluminum

Service Front & Rear

Page 6: Outdoor LED Installation Manual

◇ XPR-E Series

. NS/XD LED

1. Product Information: Specification

6

SPECIFICATIONS XPR-E

Pitch P6 P8 P10 P16TH P20TH

Diode NS FM2727 XDL-305J

Max Brightness Nits 7000 7500

Black Uniformity L10 +/- 0.15 (TBD)

Video Processing 24 Bit

Color Capacity 16 Bit

Color Temp 4,500 – 9,000K

Refresh Rate (spec 4,800Hz) 7,680Hz 7,680Hz 7,680Hz 7,680Hz 7,680Hz

Horizontal Viewing Angle 160

Vertical Viewing Angle

(Top/Bottom)+20 / -65

Contrast Ratio 8,000:1 ↑

Typ. Weight (Kg/sqm) 40 kg ↓

IP Rating (Front/Rear) IP67 / IP65

EMC Class A

Cabinet Material Aluminum

Service Front & Rear

Page 7: Outdoor LED Installation Manual

◇ Standard Cabinet

- Outside

1. Product Information: Standard Cabinet

7

Front Rear

Page 8: Outdoor LED Installation Manual

◇ Standard Cabinet

- Product Size

1. Product Information: Standard Cabinet

8

Item Spec

Cabinet Size (W x H) 1000 mm x 1000 mm

Module Size (A x B) 250 mm x 250 mm

Set depth (D) 264.3 mm

Weight [kg] 38 kg

Page 9: Outdoor LED Installation Manual

Y8 PDS

SMPS

SMPS

SMPS

SMPS

◇ Standard Cabinet (+ Y8)

- Product Inside

1. Product Information: Standard Cabinet

9

④ ⑤

⑥ ⑥

① PDS

② SMPS

③ AC Filter

④ Power In

⑤ Power Out

⑥ External Fan position

⑦ Y8 (1 Y8 for 1 block)

Page 10: Outdoor LED Installation Manual

1. Product Information: Package

10

1265

12

25

387

◇ Outdoor Cabinet Box

- Read the label to make sure it is the right cabinet.

Read the information in the attached label to check

the Model Code and Project No.

Page 11: Outdoor LED Installation Manual

1. Product Information: Screen configuration

11

◇ Screen configuration (for P8)

The screen is divided by size of the FHD and the size covered by the Y8(T’con) board:

- FHD Zone (15 x 8 Cabinet)

: configuration which is the maximum configuration that can display content with a resolution of FHD or lower

- Y8 Block (3 x 4 Cabinet)

: configuration which is the maximum configuration that can be covered by the Y8 board

FHD ZONEY8 Block

Cabinet

Page 12: Outdoor LED Installation Manual

1. Product Information: Screen configuration

12

S

F

B

: Signal B’d

: Forward Y8 B’d

: Backward Y8 B’d

◇ Note: Zone configuration by screen

Signal B’dForward Y8 B’dBackward Y8 B’d

The location depends on the cabinet configuration you want to install. See LED configurator.

※ This zone configuration differs by pitch. Note that the zone configuration diagram below is applicable to P8.

30m

24m

P8 ZONE1 P8 ZONE2

P8 ZONE3 P8 ZONE4

P8 ZONE5 P8 ZONE6

Page 13: Outdoor LED Installation Manual

1. Product Information: Screen Configuration

13

◇ Note: Zone configuration by screen

The number of cabinets forming the FHD Zone varies depending on the Pitch, and the quantity and location of the

Y8,Signal B'd are also different.

※ Zone is the basic control unit of System

※The location of the Redundancy Signal Board is installed in the cabinet where the data ends.

[ XPR060-S/XPR060-E ]. Cabinet Configuration : 12 x 6. Resolution : 1920 x 960. # of Y8 : 12 (24 for redundancy). # of Signal : 2

[ XPR080-S/XPR080-E ]. Cabinet Configuration : 15 x 8. Resolution : 1800 x 960. # of Y8 : 10 (20 for redundancy). # of Signal : 2

[ XPR100-S/XPR100-E ]. Cabinet Configuration : 20 x 11. Resolution : 1920 x 1056. # of Y8 : 15 (30 for redundancy). # of Signal : 2

Page 14: Outdoor LED Installation Manual

1. Product Information: Screen Configuration

14

◇ Note: Zone configuration by screen

※ Zone is the basic control unit of System

※The location of the Redundancy Signal Board is installed in the cabinet where the data ends.

[ XPR160-S/XPR160-E ]. Cabinet Configuration : 30 x 16. Resolution : 1800 x 960. # of Y8 : 12 (24 for redundancy). # of Signal : 2

[ XPR200-E ]. Cabinet Configuration : 40 x 20. Resolution : 1920 x 960. # of Y8 : 20 (40 for redundancy). # of Signal : 4 (Serial B’d/Box 2 + Serial server only 2)

Page 15: Outdoor LED Installation Manual

1. Product Information: Fan installation location

◇ Fan installation location

- Fan type : 2 External fan (Intake/Exhaust), 1 Internal fan

- Repeat configuration for 5 Cabinet rows as shown below

Intake fan/ Internal fan

Exhaust fan

Exhaust fan

Intake fan/ Internal fan[External Fan]

[Internal Fan]

5Colu

mns

Air inlet

Air outlet

Air inlet

Air outlet

Page 16: Outdoor LED Installation Manual

2. Installation : Overview

16

Unboxing Cabinets & Accessories

Fan Assembly

Handling Cabinets

Mounting Cabinets

Y8/Signal B’d Assembly

Cable Connection

Power Connection

Control Room Setting

Pre-Working Before Cabinet Hang

Accessories Assembly

SW set up

◇ Installation Overview

- The installation follows the below order.

- Prior to the assembly, clearly identify the pre-work.

On-site HW Installation

On-site SW Setup Operation

Page 17: Outdoor LED Installation Manual

3. Installation

17

◇ Accessories that need to be installed separately before and after the Cabinet assembly are as follows.

EXHAUST FANSIGNAL B’d

EXHAUST FAN EXHAUST FAN

Y8

Y8(Redundancy)

INTAKE FANINTERNAL FA

N

INTAKE FANINTERNAL

FAN

INTAKE FANINTERNAL

FAN

◇ Ex) Total Screen 3x4 Cabinet

1) Pre-Cabinet Installation Accessories

. EXHAUST FAN, INTAKE FAN, INTERNAL FAN

2) Installation Accessories After Cabinet installation

. Y8, Y8(Redundancy), SIGNAL B’d,

COVER ACCESSARY, BEZEL

COVER ACCESSATRY, BEZEL

Page 18: Outdoor LED Installation Manual

◇ Pre-Installation Work - All Cabinet

Do the following for all cabinets:.

Ex) FHD Zone Screen : 1 cabinet : Work

2. Installation : Unboxing Cabinets & Accessories

Page 19: Outdoor LED Installation Manual

Open the box and remove the cushions.

Then, with the handles on the left and right sides of the cabinet,

Lift the cabinet out and peel off the pe bag.

◇ Unboxing

②②

2. Installation : Unboxing Cabinets & Accessories

* When unboxing the package or moving the product, do not hold the

handles in the middle of the rear door or the plastic covers on both

corners of the top.

Use Handle when move cabinet

Don’t hold this plastic part when move cabinet

19

Squeeze the winged

handles together

and pull them out.

Page 20: Outdoor LED Installation Manual

Remove the Cover Corner (x4) on the four corners of the cabinet

◇ Unboxing

2. Installation : Accessory Assembly

Attach the Eye Nut (x2) to the brackets at both ends on top of the

cabinet.

Screw point

①①

②③

②③

Bolt

Ring

Ring

Eye Nut

. 1 by 1 installation : Every cabinets

. Section installation : Only Top cabinets of Section block

20

Page 21: Outdoor LED Installation Manual

21

2. Installation

◇ Pre work on ground – lowest cabinets(P38)

Do the following for lowest cabinets.

Ex) FHD Zone Screen : 1 cabinet : to work onBolt (M8,L18)

Attach the Bracket-frame bottom L/R to the bottom of the cabinet

Page 22: Outdoor LED Installation Manual

22

2. Installation

◇ Pre work on ground – Install the fan on every 5th lines (intake, Exhaust)(P23 ~ P24)

Ex) FHD Zone Screen : 1 cabinet : to work on

Intake Fan/Internal Fan

Exhaust Fan

Exhaust Fan

Intake Fan/Internal Fan

※ Install every fifth line, but if the screen is not a multiple of 5, install it at the top of screen ( )

Page 23: Outdoor LED Installation Manual

◇ Intake / External FAN

4.After settling the External Fan on the filter, use a 2mm wrench to

rotate the Wing nut on the left and right sides to secure the Fan.

②③

②③

**** INTAKE vs EXHAUST (Distinguish these two when intallation)

23

2. Installation : Fan Assembly

Open the doors

1.Remove the PC

sheet.

3.Insert the filter.

(Install the fan and the filter without separating it)

2.Remove the view

5. Attach the PC sheet(x4) to the top of

cabinet.

(*Only for cabinets where

Exhaust Fan is assembled)

①①

②② ②

Please distinguish between

Intake and Exhaust fan

through this attached label.

Check the location of the

cabinet to be installed.

intake Exhaust

.

Page 24: Outdoor LED Installation Manual

◇ Internal FAN

②③

②③

24

2. Installation : Fan Assembly

Open the doors

Hook the top of fan on the Bracket-support.

* Rear service site : Screw M4 L6 1point

* Front service site :Screw M4 L20 2point

It depends on whether it is front or rear installation.

Please refer to the image below.

Page 25: Outdoor LED Installation Manual

2. Installation

◇ Installation Guide ① Each Cabinets Gap(seam) spec / (Measurements based on each LED modules)

Pitch A (X) B (Y) C (Z)

P6 0.2~0.7 0.2~0.7 0.4

P8 0.2~0.7 0.4~0.8 0.4

P10 0.2~0.8 0.2~0.8 0.4

P16 0.3~1.0 0.3~1.0 0.4

P20 0.3~1.0 0.3~1.0 0.4P6, P8, P10

P16, P20

② Used tools & Kit box

Combination wrenches13mm, 21mm

Ratchet with deep socket13mm, 21mm

Ratchet with deep socket13mm, 21mm

25

When fixing after hanging the cabinet or making section,

the workers at the front and back of the cabinet should

communicate with each other and install it according to the

seam specifications (Rear installation).

M8 BOLT + NUT

CBN

CBN

M8,L18 BOLT

Page 26: Outdoor LED Installation Manual

2. Installation : Handling Cabinets

26

Make sure you use two wires (connected using Eye Nut) for each cabinet.

• Use side hole for 2nd wire (redundant wire)

• Maximum number of cabinets that can be moved when installing a section: 4x2 cabinets(*spreader bar)

• Remove the Eye Bolt after hang a (cabinet/section) on the frame.

◇ Guide to moving the product using a crane

Installing a single cabinet

Orient the eye bolt in

line with the slings.

Hole for 2nd wire

Installing a section (4X2cabinet )

Page 27: Outdoor LED Installation Manual

2. Installation : Handling Cabinets

27

◇ How to make section (ex 4x2)

①①

M8 L18 BOLTM8 L18 BOLT

①②

Tighten the brackets against the top and bottom of the two cabinets

with bolts.

②③③

CBN

CBN

Z seam

Cabinet to be

extended

Tighten the two cabinets directly from inside the cabinet with bolts.

(doors open) At the same time, adjust the Z-seam based on the

LED modules on the front.

And repeat the 1stpes up to here about lateral extension

M8 L18 BOLT

X seam

Page 28: Outdoor LED Installation Manual

2. Installation : Handling Cabinets

28

④ ④ ⑤⑤

Tighten the bolts between the bottom of the cabinet and the brackets

on the cabinet below.

M8 L18 BOLT

Lowest of section

Y seam

Tighten the two cabinets directly from inside the cabinet with bolts.

(doors open) At the same time, adjust the Z-seam based on the

LED modules on the front.

M8 L18 BOLT

Cabinet to be

extended

Cabinet to be

extended⑤

Repeat steps 1 and 2 for the other three cabinets.

Page 29: Outdoor LED Installation Manual

3. Installation : Mounting Cabinets (Rear installation)

1st cabinet /section

Hang the Brackets of cabinet/section corner on the frame.

Tighten the top every brackets to the L-shaped steel assembled on the H beam.

CBN

CBN

Lateral cabinet / section

Lateral cabinet / section

Hang one more cabinet and attach it to the next cabinet/section

Z seam

Tighten the two cabinets/sections directly from inside the cabinet with bolts.

(doors open) At the same time, adjust the Z-seam based on the

LED modules on the front.

M8 L18 BOLT

X seam

Tighten the brackets against the top and bottom of the two

cabinets/sections with bolts.

M8 L18 BOLTM8 L18 BOLT

M8 BOLT + NUT

M8 BOLT + NUT

Tighten the top every brackets to the L-shaped steel assembled on the H beam.

And repeat this process for lateral extension,

29

M8 BOLT + NUT

M8 BOLT + NUT

①①

③④

Lateral

cabinet / section

Page 30: Outdoor LED Installation Manual

3. Installation : Mounting Cabinets (Rear installation)

Hang one more cabinet/section while adjusting X seam

based on the cabinet/section below.

Tighten the bolts between the bottom of the cabinet and the brackets

on the cabinet below.

M8 L18 BOLT

Upward extension

cabinet/section

cabinet below

M8 BOLT + NUT

M8 BOLT + NUT

Upward extension

cabinet/section

Y seam

Tighten the two cabinets/sections directly from inside the cabinet with bolts.

(doors open) At the same time, adjust the Z-seam based on the

LED modules on the front.

M8 L18 BOLT

30

⑤⑤

Tighten the top every brackets to the L-shaped steel assembled on the H beam.

Page 31: Outdoor LED Installation Manual

3. Installation : Mounting Cabinets (Rear installation)

M8 L18 BOLT

M8 L18 BOLTM8 L18 BOLT

M8 BOLT + NUT

M8 BOLT + NUT

31

Hang one more cabinet/section while adjusting X seam

based on the cabinet below.

Cabinet/Section extending

sideways and upwards

Y seam

M8 L18 BOLT

X seam

M8 L18 BOLT

⑧⑧

⑩⑪

⑦ ⑧

⑨⑩

Tighten the three cabinets directly from inside the cabinet with bolts.

(doors open) At the same time, adjust the Z-seam based on the

LED modules on the front.

Tighten the bolts between the bottom of the cabinet and the brackets

on the cabinet below.

Tighten the brackets against the top and bottom of the two

cabinets/sections with bolts.

Tighten the top every brackets to the L-shaped steel assembled on the H beam.

Cabinet/Section extending

sideways and upwards

cabinet below

Page 32: Outdoor LED Installation Manual

2. Installation : Mounting Cabinets (Front installation)

1st cabinet/section

Hang one more cabinet/section and attach it to the next cabinet/section

And disassemble some LED modules as shown.

CBN

CBN

Z seam

M8 L18 BOLT

X seam

M8 BOLT + NUT

M8 BOLT + NUT

32

M8 BOLT + NUT

M8 BOLT + NUT

Hang the Brackets of cabinet/section corner on the frame.

Tighten the top every brackets to the L-shaped steel assembled on the H beam.

Tighten the two cabinets/sections directly from inside the cabinet with bolts.

(doors open) At the same time, adjust the Z-seam based on the LED modules.

And Reassemble the LED modules

Tighten the top every brackets to the L-shaped steel assembled on the H beam.

Lateral cabinet / section

1st cabinet/section

Page 33: Outdoor LED Installation Manual

2. Installation : Mounting Cabinets (Front installation)

Hang one more cabinet/section while adjusting X seam

based on the cabinet below.

And disassemble some LED modules as shown.

Y seam

M8 L18 BOLT

33

M8 BOLT + NUT

M8 BOLT + NUT

Tighten the two cabinets/section directly from inside the cabinet with bolts.

(doors open) At the same time, adjust the Z-seam based on the LED modules.

And Reassemble the LED modules

Tighten the top every brackets to the L-shaped steel assembled on the H beam.

Upward extension

cabinet/section

Page 34: Outdoor LED Installation Manual

M8 L18 BOLT

X seam Y seam

M8 L18 BOLT

2. Installation : Mounting Cabinets (Front installation)

34

M8 BOLT + NUT

M8 BOLT + NUT

③④

③ ④

Hang one more cabinet/section while adjusting X seam

based on the cabinet below.

And disassemble some LED modules as shown.

Tighten the three cabinets/sections directly from inside the cabinet with bolts.

(doors open) At the same time, adjust the Z-seam based on the LED modules.

And Reassemble the LED modules

Tighten the top every brackets to the L-shaped steel assembled on the H beam.

Cabinet/Section extending

sideways and upwards

Page 35: Outdoor LED Installation Manual

B’d, Cable install flow

- Install B ’ d and cable in the following order.

2. Installation

35

Y8 Assembly

. Y8 Address Setting

Signal B’d Assembly

Cable Connection

. ① Y8 to Module

. ② Y8 to Y8

. ③ PDS to PDS (B’d ID setting)

. ④ Signal B’d to Y8 , PDS

Power Connection

EXHAUST FANSignal B’d

EXHAUST FAN EXHAUST FAN

Y8

Y8(Redundancy)

INTAKE FANINTERNAL FAN

INTAKE FANINTERNAL FAN

INTAKE FANINTERNAL FAN

Page 36: Outdoor LED Installation Manual

2. Installation : Y8 Assembly

36

9) Open the door on the rear of the cabinet and attach the Y8 board (Fig.9)

Attaching the Y8 board

Fig.9 Y8 Board attachment point Bracket Support assembly

Y8 assembly (sliding Y8 to Bracket, then turn lock)

screw

Page 37: Outdoor LED Installation Manual

2. Installation : Y8 Assembly

Y8 Address Setting

- After installing the Y8 board, give the address so that the system can check the Y8 location.

Refer to the figure below to specify the location by setting the corresponding binary switch.

Screen

Y8 Board

1 Cabinet

Y8 Board

000 001 002 003 004

005006

…….

Ex) Address No. 001 Ex) Address No. 002 Ex) Address No. 015

Page 38: Outdoor LED Installation Manual

2. Installation : Y8 Assembly

38

Y8 Address Setting

Y8 Interface stage Address setting operation

- The power number on the drawing is [decimal digits]

. For address Switch manipulation [Binary] transformation

※ Y8 Address connector is waterproof coating.

- Can be adjusted by pressing precision drive etc.

※ Note that there is no address above 020

Decimalnumber

BinaryAddress Switch operation

1 2 3 4 5 6 7 8

000 00000000 0 0 0 0 0 0 0 0

001 00000001 1 0 0 0 0 0 0 0

002 00000010 0 1 0 0 0 0 0 0

003 00000011 1 1 0 0 0 0 0 0

004 00000100 0 0 1 0 0 0 0 0

005 00000101 1 0 1 0 0 0 0 0

006 00000110 0 1 1 0 0 0 0 0

007 00000111 1 1 1 0 0 0 0 0

008 00001000 0 0 0 1 0 0 0 0

009 00001001 1 0 0 1 0 0 0 0

010 00001010 0 1 0 1 0 0 0 0

011 00001011 1 1 0 1 0 0 0 0

012 00001100 0 0 1 1 0 0 0 0

013 00001101 1 0 1 1 0 0 0 0

014 00001110 0 1 1 1 0 0 0 0

015 00001111 1 1 1 1 0 0 0 0

016 00010000 0 0 0 0 1 0 0 0

017 00010001 1 0 0 0 1 0 0 0

018 00010010 0 1 0 0 1 0 0 0

019 00010011 1 1 0 0 1 0 0 0

※ When connecting to Redundant Y8 board : Choose Dual Interface and change the

Redundant Y8 board DIP Switch DUAL : ON

Page 39: Outdoor LED Installation Manual

2. Installation : Signal B’d Assembly

39

Attaching the Signal Box

Fig.10 Signal Box attachment point

screw

Attach the Bracket Support Attach the Signal Box (sliding Board to Bracket, then turn lock)

Open the door on the rear of the cabinet and attach the Signal Box (Fig.10).

Page 40: Outdoor LED Installation Manual

2. Installation : Signal B’d Assembly

40

Signal Board Assembly

Cap Cable Gland

Snap lock pin

Optical repeater point

Signal Box attachment point Attach the optical repeater

Remove the cap and attach the cable gland to the power cable inlet port.

Fig.11 Connect the power cable

Page 41: Outdoor LED Installation Manual

2. Installation : Cable Connections

41

Disassemble the cover at the back of the cabinet and reassemble the cover after connecting

the data cable. (Fig.13)

* Data cable specifications: It is necessary to add Teflon tape when using a cable with a circular,

Φ7.0 ~ 8.0mm, and Φ7.0mm or less.

Data cable Connection

Fig.12 Power / Data cabling point

Cover disassembleCable insert Cover assembly

Fig.13 Data cable connection

Page 42: Outdoor LED Installation Manual

42

Y8 port

After installing Y8, the data cable connects the following ports.

• P6: Connect 12 ports of the total 16 ports

【 P6 】

1234

5678

9101112

2 x 3 cabinetY8 B’d

2. Installation : Cable Connections ① Y8 to Module

4 ports are not used

1 2 3 4 5 6

7 8 9 10 11 12

Page 43: Outdoor LED Installation Manual

43

Y8 port

After installing Y8, the data cable connects the following ports.

• P8, 10, 16, 20: Connect 16 ports of the total 16 ports

1234

5678

9101112

13141516

2. Installation : Cable Connections ① Y8 to Module

1 2 3 4 5 6

9 10 11 12 13 14

7 8

15 16

【 P8, 10, 16, 20 】

3 x 4 cabinetY8 B’d

Page 44: Outdoor LED Installation Manual

44

Screen, Block Configuration

2. Installation : Cable Connections ① Y8 to Module

• Screen (P8) , Block Configuration - Block : 3 x 4 Cabinet, Y8 Board is able to control upto

12th(3x4) Cabinet

Y8

Y8

Y8

Y8

[XPR100-S/XPR100-E][XPR080-S/XPR080-E]

• Screen (P10) , Block Configuration - Block : 4 x 4 Cabinet is able to control upto

16th(4x4) Cabinet

Forward Backward

(Redundancy) Backward

(Redundancy) Forward

Page 45: Outdoor LED Installation Manual

45

Screen, Block Configuration

2. Installation : Cable Connections ① Y8 to Module

• Screen (P6 ) , Block Configuration - Block : 2 x 4 Cabinet , Y8 Board is able to control

up to 8th(2x4) Cabinet

[XPR160-S/XPR160-E/XPR200-E][XPR060-S/XPR060-E]

• Screen (P16 /P20) , Block Configuration - Block : 10 x 4 Cabinet , Y8 Board is able to control upto

40th(10x4) Cabinet

Forward Backward

(Redundancy) Forward Backward

(Redundancy)

Page 46: Outdoor LED Installation Manual

2. Installation : Cable Connections ① Y8 to Module

46

Y8 Board

Y8 Board

Data cable Connection (3x4 Cabinet)

- 1) As shown in the figure below, the Y8 board (VG-XACMBKIT) for Forward Path is used for the 1 cabinet of the figure below, and the

Y8 board for Redundant Path

Connect the board (VG-XACSBKIT) to Figure 2 below. (Refer to the Accessory Assembly Y8 assembly.)

1

2

Page 47: Outdoor LED Installation Manual

2. Installation : Cable Connections ① Y8 to Module

47

Note: Data cable Connection Diagram (3 x 4 Cabinet)

- Data cable connection diagram of 3x4 cabinet, P1 to P16: Forward connection data cable label

P5

P6

P7

P8

Y8

P1

P2

P3

P4

P9

P10

P11

P12

P13

P14

P15

P16

No. Cable Label

① (P1) (P2) (P3) (P4)

② (P5) (P6) (P7) (P8)

③ (P9) (P10) (P11) (P12)

④ (P13) (P14) (P15) (P16)

⑤ (Row1)800mm+(Row2)500mm

⑥ (Row3)800mm+(Row4)500mm

P1~P16 : Forward connection data cable labelRP1~RP16 : Data cable label for redundancy connection

Connect by matching the cable's label number and Y8's number

Connect as shown in the figure on the right by referring to the label of the cable

Page 48: Outdoor LED Installation Manual

2. Installation : Cable Connections ① Y8 to Module

48

Note: Data cable Connection Diagram (3 x 4 Cabinet)- Data cable connection diagram of 3x4 cabinet, RP1 to PR16: Redundancy connection data cable label

No. Description

⑦ (RP1) (RP2) (RP3) (RP4)

⑧ (RP5) (RP6) (RP7) (RP8)

⑨ (RP9) (RP10) (RP11) (RP12)

⑩ (RP13) (RP14) (RP15) (RP16)

RP1

RP2

RP3

RP4

RP5

RP6

RP7

RP8

RP9

RP11

RP12

RP13

RP14

RP15

RP16

RP10

Connect as shown in the figure on the right by referring to the label of the cable

Page 49: Outdoor LED Installation Manual

2. Installation : Cable Connections ① Y8 to Module

49

• Data cable Connection (3x4 Cabinet)

- 2) Use cables ⑤ and ⑥ to connect data cables between the cabinets.

Run cables through the waterproof tunnel next to each cabinet.

Y8

⑤①

Out in

As shown in the picture, there is a cabinet in the middle align and connect to Wire Holder.

The left cabinet is OUT, The right cabinet side connects to IN.

Out in

Page 50: Outdoor LED Installation Manual

2. Installation : Cable Connections ① Y8 to Module

50

• Data cable Connection (3x4 Cabinet)

- 3) Caution: When securing cables, exercise caution to ensure that AC lines do not come into contact with data/power cables

P5

P6

P7

P8

Y8

P1

P2

P3

P4

P9

P10

P11

P12

P13

P14

P15

P16

Page 51: Outdoor LED Installation Manual

2. Installation : Cable Connections ① Y8 to Module

51

⑤ ⑦

RP1

RP2

RP3

RP4

RP5

RP6

RP7

RP8

RP9

RP11

RP12

RP13

RP14

RP15

RP16

RP10

P5

P6

P7

P8

Y8

P1

P2

P3

P4

P9

P10

P11

P12

P13

P14

P15

P16

• Data cable Connection (3x4 Cabinet)

- 4) Use cables ⑦ to ⑩ to connect Y8 boards to cabinets (redundant path connection).

Connect the cables to OUT on the cabinet modules.

Page 52: Outdoor LED Installation Manual

2. Installation : Cable Connections ① Y8 to Module

52

Ex) If 4 x 2 is left Ex) If 3 x 2 is left

• Note

- If the layout of connected cabinets is not 3x4, connect cables based on the condition with the bottommost cabinets excluded.

Page 53: Outdoor LED Installation Manual

2. Installation : Cable Connections ② Y8 to Y8

53

• Y8 Board to Y8 Board (Forward Connection)

- ① TMDS Cable Connection (VG-XACMBKIT/ENCM)

: For Y8 boards that send data, connect the cables to OUT on the boards. For Y8 boards that receive data,

connect the cables to IN on the boards, as shown below.

<TMDS cable>

OUT

IN

IN OUT IN OUT IN OUT IN

OU

TIN

OUTINOUTINOUTINOUTIN

Install the TMDS holder after connecting to the input port to prevent damage.

S

S

OUT

Page 54: Outdoor LED Installation Manual

S

2. Installation : Cable Connections ② Y8 to Y8

54

• Y8 Board to Y8 Board (Forward Connection)

- ② Serial connection (RJ45, LAN cable) (VG-XACMBKIT/ENCM)

: For Y8 boards that send data, connect the cables to TX on the boards.

For Y8 boards that receive data, connect the cables to RX on the boards, as shown below.

<LAN cable>RX TX RX TX RX TX RX

TXR

X

TX

RX

TXRXTXRXTXRXTXRX

TX

S

Page 55: Outdoor LED Installation Manual

INOUTINOUTINOUTINOUT

IN

OUT

2. Installation : Cable Connections ② Y8 to Y8

55

• Y8 Board to Y8 Board (Backward Connection)

- ① TMDS Cable Connection (VG-XACMBKIT/ENCM)

: For Y8 boards that send data, connect the cables to OUT on the boards. For Y8 boards that receive data,

connect the cables to IN on the boards, as shown below.

<TMDS cable>

IN OUT IN OUT IN OUT IN OUT

OU

TIN

Install the TMDS holder after connecting to the input port to prevent damage.

S

S

Page 56: Outdoor LED Installation Manual

RX

TX

2. Installation : Cable Connections ② Y8 to Y8

56

• Y8 Board to Y8 Board (Backward Connection)

- ② Serial connection (RJ45, LAN cable) (VG-XACMBKIT/ENCM)

: For Y8 boards that send data, connect the cables to TX on the boards. For Y8 boards that receive data, connect the

cables to RX on the boards, as shown below.

<LAN cable>

TX RX TX RX TX RX TX RX

TXR

X

TXRXTXRXTXRXTXRX

S

S

Page 57: Outdoor LED Installation Manual

2. Installation : Cable Connections ③ PDS to PDS

57

• Note: PDS data connection signal flow

- When forward data signals are delivered in a single zone, the PDS boards connected to the forward-specific signal bracket are

connected to half of the cabinets (Group1) and the PDS boards connected to the backward-specific signal bracket are connected to the

other half (Group2).

ZONEUnit

Group1

Group2

Start

Start

Page 58: Outdoor LED Installation Manual

2. Installation : Cable Connections ③ PDS to PDS

58

• PDS Board to PDS Board (Group1)

- ① Serial connection (RJ45, LAN Cable connection) (VG-XACP8KIT/ENCP)

: For PDS boards that send data, connect the cables to OUT on the boards.

For PDS boards that receive data, connect the cables to IN on the boards, as shown below.

1 cabinet

OUT INPDS 1 PDS 2

PDS 1 PDS 2

RJ45,LAN cable

Page 59: Outdoor LED Installation Manual

2. Installation : Cable Connections ③ PDS to PDS

59

• PDS Board to PDS Board (Group1)

- ② Serial connection (RJ45, LAN Cable connection)

: For cabinets connected to Group1, connect LAN cables to OUT on the PDS boards that send data and to

IN on the PDS boards that receive data, as shown in ①.

ZONE

Group1

OUT IN

OUT IN

OUT IN

OUTIN

OUTIN

OUTIN

Start

End

Page 60: Outdoor LED Installation Manual

2. Installation : Cable Connections ③ PDS to PDS

• PDS Board to PDS Board (Group1)

- ③ Board ID Setting

: To set IDs for the PDS boards connected to Group1, press the ID switches on the first and last PDS boards and

specify the MODEZONE

TACT

LED

• On the first PDS board, press the Tact switch once to change the state to RED.

• On the last PDS board, press the Tact switch twice to change the state to GREEN.

• The middle PDS boards do not require separate setting.

(Middle PDS boards: BLUE state by default)

Start Point Middle End Point

* PDS Address check

Start

End

Page 61: Outdoor LED Installation Manual

2. Installation : Cable Connections ③ PDS to PDS

61

• PDS Board to PDS Board (Group2)

- ① Serial connection (RJ45, LAN cable connection) (VG-XACP8KIT/ENCP)

: For PDS boards that send data, connect the cables to OUT on the boards.

For PDS boards that receive data, connect the cables to IN on the boards, as shown below.

.1 cabinet

OUTINPDS 2 PDS 1

RJ45,LAN cable

PDS 2 PDS 1

Page 62: Outdoor LED Installation Manual

2. Installation : Cable Connections ③ PDS to PDS

62

• PDS Board to PDS Board (Group2)

- ② Serial connection (RJ45, LAN cable connection)

: For cabinets connected to Group1, connect LAN cables to OUT on the PDS boards that send data and to IN on the PDS boards

that receive data, as shown in ①.

ZONE

Group2

…OUTIN

OUTIN

OUTIN

Start

End

OUT IN

OUT IN

OUT IN

Page 63: Outdoor LED Installation Manual

2. Installation : Cable Connections ③ PDS to PDS

• PDS Board to PDS Board (Group2)

- ③ Board ID Setting

: To set IDs for the PDS boards connected to Group1, press the ID switches on the first and last PDS boards and

specify the MODE.ZONE

TACT

LED

• On the first PDS board, press the Tact switch once to change the state to RED.

• On the last PDS board, press the Tact switch twice to change the state to GREEN.

• The middle PDS boards do not require separate setting.

(Middle PDS boards: BLUE state by default)

Start Point Middle End Point

* PDS Address check

Start

End

Page 64: Outdoor LED Installation Manual

2. Installation : Cable Connections ④ PC Box - Y8, PDS, Light Sensor

64

• PC box to Y8 Board (Connecting directly PC box Without Signal B’d)

- If you do not install Signal B’d, connect directly from PC box as follows.

TMDS Cable

LAN Cable

1st Y8 Board

[Notes] Serial Server Port

• Port 1 : Y8 connection

• Port 2 : Light Sensor connection

• Port 3 : PDS connection

Port 1

Port 2

Port 3 Port 4

IN 1st PDS Board

LAN Cable

Power Injector

INPUT OUTPUT

Page 65: Outdoor LED Installation Manual

65

• Signal Board to Y8 Board (Connecting using Signal B’d)

- Using the Serial Server in Signal Bracket, Connect the CAT5-to-Serial adapter + LAN cable to Serial IN [RX] and TMDS cable

to primary TMDS [IN] port of the first.

Serial Server

TMDS Cable

LAN Cable

CAT5 to Serial Adapter

1st Y8 Board

1st Y8 Board

Signal BoardtSignal Board

AC/DCConverter

Fiber toLAN

Power Injector

AC/DCConverter

AC JunctionPhoenix

P1

[Notes] Serial Server Port

Port 1 : Y8 connection

Port 2 : Light Sensor connection

Port 3 : PDS connection

DSUB9to RJ45

Fiber toHDMI

2. Installation : Cable Connections ④ Signal B’d - Y8, PDS, Light Sensor

Page 66: Outdoor LED Installation Manual

66

Signal Board

1st PDS Board

IN

1st PDS Board

• Signal Board to PDS Board

- Using the Serial Server in Signal Bracket, Connect the CAT5-to-Serial adapter + LAN cable to the [IN] port of the first PDS board.

[Notes] Serial Server Port

Port 1 : Y8 connection

Port 2 : Light Sensor connection

Port 3 : PDS connection

Serial Server

Signal Board

AC/DCConverter

Fiber toLAN

Power Injector

AC/DCConverter

AC JunctionPhoenix

P3

DSUB9to RJ45

Fiber toHDMI

CAT5 to Serial Adapter

2. Installation : Cable Connections ④ Signal B’d - Y8, PDS, Light Sensor

Page 67: Outdoor LED Installation Manual

67

• Signal Board to Light Sensor

- Using the Serial Server in Signal Bracket, Connect the CAT5-to-Serial adapter(Port2) + LAN cable to [INPUT] port of Power Injector

and connect Light Sensor to [OUTPUT] port of Power Injector using LAN cables.

1st Y8 Board

Light Sensor

Signal Board

[Notes] Serial Server Port

Port 1 : Y8 connection

Port 2 : Light Sensor connection

Port 3 : PDS connection

Power Injector

LAN Cable

INPUT OUTPUT

Serial Server

CAT5 to Serial Adapter

Signal Board

AC/DCConverter

Fiber toLAN

Power Injector

AC/DCConverter

AC JunctionPhoenix

P2

DSUB9to RJ45

Fiber toHDMI

2. Installation : Cable Connections ④ Signal B’d - Y8, PDS, Light Sensor

Page 68: Outdoor LED Installation Manual

68

• Precautions for connecting the power cables

- When using 110V / 220V, the XPR product has a different number of power connections for each model,

so the number of power connections corresponding to the installation model must be observed.

- When connecting more than the allowed number of power connections, the power breaker may be lowered or

the product may be damaged due to overcurrent

- The connection must be below the quantity, and we are not responsible for any problems that occur in excess of

the number of connections.

- Use the label information attached to the back of the product to check the rated power of the product and the

rated current value of the OUTLET.

2. Installation : Power Connections

Page 69: Outdoor LED Installation Manual

69

• Rating Cautions

- When connecting AC Junction Box in the distributor, check whether there is an error on the third phase.

AC Junction Box

※ Please note that the color of each country may be different.

※ AC Junction BOX is not provided by Samsung, so separate purchase is required, SI needs to purchase Junction BOX which can IP68, AWG 12.

LiveNeutral

GND

Purchase example site : Amazon ‘FX electrical connection box waterproof IP68 two-way plug’

https://www.amazon.com/FX-Junction-Waterproof-Connector-External/dp/B07FDKH4G3/ref=pd_sbs_60_1/130-6739139-1804662?_encoding=UTF8&pd_rd_i=B07FDKH4G3&pd_rd_r=93be4196-88a4-49eb-b52f-54fa7efd6831&pd_rd_w=5NOWk&pd_rd_wg=L8FcV&pf_rd_p=d66372fe-68a6-48a3-90ec-41d7f64212be&pf_rd_r=XVQ699PGPQJBZXDGMMNW&psc=1&refRID=XVQ699PGPQJBZXDGMMNW

Not Provided by Samsung

※ AC Junction BOX makes it possible to be located inside the cabinet.

2. Installation : Power Connections

Junction BOX needs one per 4 Cabinets and must be purchaged according to quantity. – Installation is not possible when not purchased

Page 70: Outdoor LED Installation Manual

2. Installation : Power Connections

70

7) Remove the cap at the bottom of the back of the cabinet and assemble the cable gland

between the power cable connections. (Fig.7)

Power connection

Fig.7 Power / Data cabling position

Cap detachment Cable Gland 조립

Fig.8 Power cable connection Example

Page 71: Outdoor LED Installation Manual

71

• Precautions When Connecting Cable

- When connecting AC power, connect as follows.

- When connecting the cable, the closed surface of the cable handle must be assembled in accordance with the connector pin direction.

In the direction of the arrow on the connector when connecting AC power, You have to fit it in (You have to push it until it clicks)

Rotate and disconnect the AC power in the direction indicated by the cable.

2. Installation : Power Connections

Page 72: Outdoor LED Installation Manual

2. Installation : Power Connections

72

• Power cable connection guide (for P8, 220 V) (VG-XACP8KIT/ENCP)

- 1) Use an AC junction board to connect the power connection line on the distribution board to the supplied power cable. Next,

connect the power cable to cabinet #1.

.AC Junction Box

No.Component type

Item type

Item name Description

① Accessory -Power cable

(AC Junction BOX to Cabinet)

600mm, 3pin, 20A

※ AC IN only

② Accessory -Power cable

(Cabinet to Cabinet)1100mm, 3pin, 20A※ Both AC IN/OUT

※ Note that AC Junction Board is a separate item, using IP68 / AWG12

#5 #6 #7 #8

※ The connections #1 and #5 in the distribution unit are located outside the cabinet connecting to inside cabinet

#1 #2 #3 #4

AC IN

AC OUT

Breaker Specification:30A, D-Type

Page 73: Outdoor LED Installation Manual

2. Installation : Power Connections

73

• Power cable connection guide (for P8, 220 V) (VG-XACP8KIT/ENCP)

- 2) Connect the supplied power cables between cabinets #1 and #2, #2 and #3, and #3 and #4.

Make sure the total number of connected cabinets does not exceed four.

#1 #2 #3 #4

※ The connections #1 and #5 in the distribution unit are located outside the cabinet connecting to inside cabinet

#5 #6 #7 #8

Breaker Specification :30A, D-Type

No. Component type Item name Description

① AccessoryPower cable

(AC Junction Box to Cabinet)

600mm, 3pin, 20A

※ AC IN only

② AccessoryPower cable

(Cabinet to Cabinet)1100mm, 3pin, 20A※ Both AC IN/OUT

Unconnected the AC port must be Shield with caps

Page 74: Outdoor LED Installation Manual

2. Installation : Power Connections

74

• Power cable connection guide (for P8, 220 V)

- 3) Follow steps 1) and 2) above to connect cabinets #5 to #8 together. When connecting the power supply,

make sure the power size tolerable by the distribution board is not exceeded. (Single cabinet power for P8: 1000 W)

#1 #2 #3 #4

#5 #6 #7 #8

Breaker Specification :30A, D-Type

No. Component type Item name Description

① AccessoryPower cable

(AC Junction Box to Cabinet)

600mm, 3pin, 20A

※ AC IN only

② AccessoryPower cable

(Cabinet to Cabinet)1100mm, 3pin, 20A※ Both AC IN/OUT

※ The connections #1 and #5 in the distribution unit are located outside the cabinet connecting to inside cabinet

Unconnected the AC port must be Shield with caps

Page 75: Outdoor LED Installation Manual

2. Installation : Power Connections

75

• Power cable connection guide (for P8, 220 V)

- 4) Follow steps 1) to 3) above to connect cabinets #9 to #16 together.

#1 #2 #3 #4

#5 #6 #7 #8

#9 #10 #11 #12

#13 #14 #15 #16

No.Component

typeItem name Description

① AccessoryPower cable

(AC Junction Box to Cabinet)

600mm, 3pin, 20A

※ AC IN only

② AccessoryPower cable

(Cabinet to Cabinet)1100mm, 3pin, 20A※ Both AC IN/OUT

※ The connection between cabinets #1 and #5, #9

and #13 through the distribution board should be

made from the outside of one cabinet to the inside

of the other.

Breaker type:

30 A, D-Type

Page 76: Outdoor LED Installation Manual

*Connect to the PDS board in the cabinet just above.

(Use a FAN kit Accessory Internal Fan cable)

◇ Internal FAN

②③

②③

76

2. Installation : Power Connections (Internal Fan)

Open the doors

② PDS board

(Rear of caninet view)

① Internal Fan

Connect the Fan cable in the KIT BOX like these pictures.

Intake Fan

Exhaust Fan

Internal Fan

Power is from upper cabinet PDS

In the case of a cabinet to which internal fan is connected,

Internal fan power must be connected to the upper cabinet.

Please refer to the figure below and connect the power.

Power Connection

Page 77: Outdoor LED Installation Manual

2. Installation : Waterproof Accessories Assembly

Cover Cap(rubber)

Cover Cap(plastic)

Cover FanTop

Cover Fan Bottom

PC Cap Sheet

PC Bot Sheet

PC HandleSheet

Waterproof Accessories Assembly

This is the last step in the cabinet installation and install the following accessories on the outermost face of the screen..

Page 78: Outdoor LED Installation Manual

분해

분해

78

Cover Cap(rubber)

Cover Cap(plastic)

Cover FanTop

Cover Fan Bottom

PC Cap Sheet

PC Bot Sheet

PC HandleSheet

2. Installation : Waterproof Accessories Assembly

Top Row

Left Column

Right Column

Bottom Row

32 32 32 + 8 3240 + 4 32 + 8 4

- Assembly quantity by cabinet installation location(Add accessory quantities to the corner cabinet.)

Waterproof Accessories Assembly

This is the last step in the cabinet installation and install the following accessories on the outermost face of the screen..

- Quantity of Materials per 1 Box

Assembly of waterproof accessories on the outsideof the cabinet located on the outer line of thescreen.

After the cabinet installation (hanging), differentaccessories must be assembled depending on thelocation on the screen are installed.

Page 79: Outdoor LED Installation Manual

2. Installation : Waterproof Accessories Assembly

Cover Fan Bottom

Attach the cover fan bottom to the holes of cabinet

From outside, and Hit(or push hard)

the covers and put it in.

Cover Cap(rubber)

Cover Cap(plastic)

Cover FanTop

Cover Fan Bottom

PC Cap Sheet

PC Bot Sheet

PC Bot Sheet

Attach sheets to the cabinet from inside.

※ The 4 snaps should be assembled.

Remove sheet

Attach the sheet to the location where the cover fan bottom is assembled.

- Rear service : Open the doors

- Front service : Disassemble the LED modules for front

- Rear service : Open the doors

- Front service : Disassemble the LED modules for front

Page 80: Outdoor LED Installation Manual

PC Cap sheet

2. Installation : Waterproof Accessories Assembly

Cover Cap (Plastic)

Attach the cover to the cabinet, then rotate and assemble it

From inside, and disassemble if other caps are assembled.

※ Stick it completely

45°

45°

Disassemble

- Rear service : Open the doors

- Front service : Disassemble the LED modules for front

80

Attach its from the outside

Remove sheets

Cover Cap(rubber)

Cover Cap(plastic)

Cover FanTop

Cover Fan Bottom

PC Cap Sheet

PC Bot Sheet

PC handleSheet

Disassemble if other caps are assembled.

Page 81: Outdoor LED Installation Manual

81

Cover Cap (Rubber)

Insert into cabinet holes from outside.

※ Stick it completely

Cover Fan Top

- Right side of cabinet : Two holes

- lower side of cabinet : Five holes

2. Installation : Waterproof Accessories Assembly

SCREW(M4,L12, rubber)BN81-19153A

Place it on top of the cabinet from outside to fit the left and right

The dug side is left and right.

Cover Cap(rubber)

Cover Cap(plastic)

Cover FanTop

Cover Fan Bottom

PC Cap Sheet

PC Bot Sheet

PC handleSheet

#2 Phillips screw driver

sides of cover, then tighten the screws.

Page 82: Outdoor LED Installation Manual

Cover Cap(rubber)

Cover Cap(plastic)

Cover FanTop

Cover Fan Bottom

PC Cap Sheet

PC Bot Sheet

PC handleSheet

82

PC Handle Sheet

Attach it to the cabinet handle from the outside.

2. Installation : Waterproof Accessories Assembly

Remove sheet

Page 83: Outdoor LED Installation Manual

On the outer surface of the cabinet located on theouter line of the screen.This is the task of assembling a waterproof frame.

The materials that need to be assembled on eachside of the cabinet are:See illustration on right as different

83

Attaching protection frames for the outer cabinets on the screen

2. Installation : Protect Frame Assembly(Optional)

Aluminum, Black anodizing

Frame Top

Frame Bottom

Frame Left

Frame Right

Corner Top L

Corner Bot L

Corner Top R

Corner Bot R

#2 Phillips screw driver

Tool & Kit Box

x 1 = 4 Cabinet

x 1 = 4 Cabinet

Page 84: Outdoor LED Installation Manual

84

Top/Bottom Protection Frame

Push

1. Locate the Cabinet that needed to install Frame Bottom2. Open Cover Rear of that Cabinet3. Attached Frame Bottom to bottom face of cabinet, align it along front surface.4. Keep Frame Bottom flat by pushing up the center area.5. Assembly Frame Bottom to cabinets by 2EA M8L12 Bolt

6. Locate the Cabinet that needed to install Frame Top7. Attached Frame Top to Top face of cabinet, align it along front surface.8. Assembly Frame Bottom to cabinets by 2EA M8L35 Bolt

M8L12

M8L35

2. Installation : Protect Frame Assembly(Optional)

Page 85: Outdoor LED Installation Manual

85

Left/ Right Protection Frame

1. Locate the Cabinet that needed to install Frame Left or Right2. Assemble Stud-pem to that cabinet3. Attached Frame Left/Right to cabinet, align it along front surface.4. Assembly Frame Bottom to cabinets by 2EA M4L12 screw

2. Installation : Protect Frame Assembly(Optional)

Page 86: Outdoor LED Installation Manual

86

Protection Frame extension

Ex: 2x2 cabinet

M4L6

1. Install Cover Frame Top/Bottom from left to right2. Install Cover Frame Left/Right from bottom to top3. Use 2EA M4L6 screw to connect between Cover Frame

2. Installation : Protect Frame Assembly(Optional)

Page 87: Outdoor LED Installation Manual

87

Protection Frame

Bracket Link

Release these screws

M4L6 screw M4L12 screw

M4 screw

1. Remove Bracket Link from Cover Rear at corner point by release M4 screw: Frame Top/Bottom at right end, Frame Left/ Right at top end.

2. Assemble Bracket Corner to it designed position.3. Fasten M4L6 screw between Bracket Corner and Frame Left/Right4. Fasten M4L12 screw between Bracket Corner and Frame Top/Bottom

* Caution: Using incorrect screw may made damage to cabinet.

2. Installation : Protect Frame Assembly(Optional)

Page 88: Outdoor LED Installation Manual

3. Accessory Kit : Tools & Materials

88

Samsung supply tool (Frame Kit accessory VG-XABS8KIT/EN )

◇ The tool that the SI needs to prepare

T-HANDLE HEX TOOL HEX KEY

M12 L30 washer bolt

M12 Nut

Installation material Mechanical installation tool Electronic installation tool

Combination wrenches13mm, 21mm

Ratchet with deep socket13mm, 21mm

Level Cordless DrillWith #2 Phillips bit

#2 Phillips screw driver

Flat Head screw driver

10~25mm Adjustable wrench

Parts Tether Teflon (PTFE) tape

Gap gauge

Wire Strippers Wire Crimpers RJ45 Crimping Tool Wire Cutters

Electrical Tape Fish Tape UV Wire Ties AC/DC Amp Meter

Painter’s Tape Channel Lock Pliers

AC Junction Box

Quantity: 10EA/ Cabinet

Quantity: 1EA/ 4Cabinet

Page 89: Outdoor LED Installation Manual

Accessory BOX (Separate purchase item)

. Accessory components vary depending on the installation model's environment, refer to the separate VPS accessory box manual.

. The selection of the Accessory Box also depends on whether you want to install it or not.

3. Accessory Kit

Image Label Accessary

VG-XACMBKIT/EN Control Main (P6, 8,10)Essential(choose one)

VG-XACNBKIT/EN Control Main (P16,20)

VG-XABS8KIT/EN BRACKET (Frame Kit) Essential

VG-XAFN8KIT/EN FAN ASSY(plastic+filter+fan) Essential

VG-XACP8KIT/EN Power Cable & Misc Essential

VG-XACSBKIT/EN Control Redundant (P16, 20)Optional(choose one)

VG-XACRBKIT/EN Control Redundant (P6, 8,10)

VG-XAPCZKIT/EN PC Box Optional

VG-XALSSKIT/EN Light Sensor Optional

VG-XASBZKIT/EN Signal Board Optional

VG-XASCZKIT/EN Signal Box Optional

VG-XAFH4KIT/EN Protection Frame _ Horizontal Optional

VG-XAFV4KIT/EN Protection Frame _ Vertical Optional

Label

Page 90: Outdoor LED Installation Manual

Accessory information (Separate purchase item)

3. Accessory Kit

90

. Frame Kit accessory (VG-XABS8KIT) (per 1 set)

SCREW(M4,L12, rubber)32EA

BN81-19153A

SCREW(M4,L12)16EA

BN81-19154A

EYE NUT20EA

BN81-19156A

HOLDER RING40EA

BN81-19517A

BRACKET FRAME BOTTOM LEFT

8EABN61-16554A

BRACKET FRAME BOTTOM RIGHT

8EABN61-16555A

COVER BOTTOM32EA

BN81-19514A

COVER TOP32EA

BN81-19513A

Bolt (M8,L18)32EA

BN81-19153A

Hex Bolt (M8,L30)20EA

BN81-19157A

T HANDLE HEX TOOL1EA

HEX KEY1EA

CAP PC SHEET32EA

BN81-19162A

COVER CAP32EA

BN81-19515A

BOTTOM PC SHEET32EA

BN81-19163A

COVER CAP (RUBBER)40EA

BN63-18387A

L BRACKET 9EA

BN81-19518A

M8 BOLT + NUT16EA

BN81-19158A

Page 91: Outdoor LED Installation Manual

Accessory information (Separate purchase item)

3. Accessory Kit

91

. Fan Kit accessory (VG-XAFAHKIT) (per 1 set)

INTAKE FAN2EA

BN81-19505A

SCREW(M4,L6)4EA

BN81-19151A

SCREW(M4,L20)4EA

BN81-19152A

EXTERNAL FAN CABLE1EA

BN39-02521A

EXHAUST FAN2EA

BN81-19506A

FILTER4EA

BN63-19239A

INTENAL FAN CABLE1EA

BN81-18715A

INTERNAL FAN2EA

BN81-19507A

PC SHEET4EA

BN81-19161A

Page 92: Outdoor LED Installation Manual

Accessory information (Separate purchase item)

3. Accessory Kit

92

. Control Main accessory (VG-XACMBKIT) (per 1 set)

SCREW(M4,L6)3EA

BN81-19151A

Y8 CONTROL BOARD1EA

BN41-02796A

BRACKET SUPPORT1EA

BN61-16680A

TMDS HOLDER1EA

BN81-19168A

TMDS CABLE 5M1EA

BN81-19536A

Assy DATA CABLE 5EA (per code, 4 Cables)

BN82-02546ABN82-02547ABN82-02548ABN82-02552ABN82-02553A

LAN CABLE 5M1EA

BN81-19537A

Power CABLE1EA

BN39-02504A

Page 93: Outdoor LED Installation Manual

Accessory information (Separate purchase item)

3. Accessory Kit

93

SCREW(M4,L6)3EA

BN81-19151A

Y8 CONTROL BOARD1EA

BN41-02796A

BRACKET SUPPORT1EA

BN61-16680A

TMDS HOLDER1EA

BN81-19168A

TMDS CABLE 11M1EA

BN81-18713A

Assy DATA CABLE 5EA (per code, 4 Cables)

BN82-02546ABN82-02547ABN82-02548ABN82-02552ABN82-02553A

LAN CABLE 11M1EA

BN81-18714A

Power CABLE1EA

BN39-02504A

. Control Main accessory (VG-XACNBKIT) (per 1 set)

Page 94: Outdoor LED Installation Manual

Accessory information (Separate purchase item)

3. Accessory Kit

94

SCREW(M4,L6)3EA

BN81-19151A

Y8 CONTROL BOARD1EA

BN41-02796A

BRACKET SUPPORT1EA

BN61-16680A

TMDS HOLDER1EA

BN81-19168A

TMDS CABLE 5M1EA

BN81-19536A

Assy DATA CABLE 5EA(per code, 4 Cables)

BN82-02549ABN82-02550ABN82-02551ABN82-02554ABN82-02555A

LAN CABLE 5M1EA

BN81-19537A

Power CABLE1EA

BN39-02504A

. Control Redundant accessory (VG-XACSBKIT) (per 1 set)

Page 95: Outdoor LED Installation Manual

Accessory information (Separate purchase item)

3. Accessory Kit

95

SCREW(M4,L6)3EA

BN81-19151A

Y8 CONTROL BOARD1EA

BN41-02796A

BRACKET SUPPORT1EA

BN61-16680A

TMDS HOLDER1EA

BN81-19168A

TMDS CABLE 11M1EA

BN81-18713A

Assy DATA CABLE 5EA(per code, 4 Cables)

BN82-02549ABN82-02550ABN82-02551ABN82-02554ABN82-02555A

LAN CABLE 11M1EA

BN81-18714A

Power CABLE1EA

BN39-02504A

. Control Redundant accessory (VG-XACRBKIT) (per 1 set)

Page 96: Outdoor LED Installation Manual

Accessory information (Separate purchase item)

3. Accessory Kit

96

. Power Cable & Misc. accessory (VG-XACP8KIT) (per 1 set)

POWER CABLE6EA

BN39-02537A

MASTER POWER CABLE2EA

BN39-02536A

LAN CABLE8EA

BN81-18712A

DATA CABLE8+8EA

BN82-02556ABN82-02557A

CAP PC SHEET8EA

BN81-19162A

COVER CAP8EA

BN63-18341ABN63-18398A

HANDLE PC SHEET4EA

BN81-19164A

Bolt (M8,L18)32EA

BN81-19153A

COVER CAP (RUBBER)4EA

BN63-18387A

L BRACKET 10EA

BN81-19167A

M8 BOLT + NUT16EA

BN81-19158A

END CAP2EA

BN81-19336A

Page 97: Outdoor LED Installation Manual

Accessory information (Separate purchase item)

3. Accessory Kit

97

. Protection Frame (VG-XAFV4KIT) (per 1 set)

COVER-FRAME LEFT4EA

BN81-19508A

COVER-FRAME RIGHT4EA

BN81-19509A

GUIDE PIN8EA

BN81-19171A

L BRACKET 10EA

BN81-19522A

M8 BOLT + NUT16EA

BN81-19158A

BACKET CORNER BOT LEFT

1EABN81-19512A

BACKET CORNER BOT RIGHT

1EABN81-19512A

BACKET CORNER TOP LEFT

1EABN81-19512A

BACKET CORNER TOP RIGHT

1EABN81-19512A

SCREW(M4,L6)20EA

BN81-19169A

SCREW(M4,L12)22EA

BN81-19170A

Page 98: Outdoor LED Installation Manual

Accessory information (Separate purchase item)

3. Accessory Kit

98

. Protection Frame (VG-XAFH4KIT) (per 1 set)

COVER-FRAME BOT4EA

BN81-19511A

COVER-FRAME TOP4EA

BN81-19510A

Bolt (M8,L35)8EA

BN81-19172A

Bolt (M8,L12)8EA

BN81-19173A

SCREW (M4,L6)20EA

BN81-19169A

Page 99: Outdoor LED Installation Manual

3. Accessory Kit

99

Accessory information (Separate purchase item)

. Signal Board accessory (VG-XASBKIT) (per 1 set)

5 volt PSUBN81-17909A

12 volt PSUBN81-17910A

LAN Cable

Serial Server1EA

BN81-19180A

3M Fiber Jumper2EA

BN81-13643A

Serial Adapter4EA

BN81-13912A

HDMI Fiber Receiver1EA

BN81-17558A

1M Fiber Jumper2EA

BN81-13642A

Ethernet Media Converter2EA

BN81-15094A

Page 100: Outdoor LED Installation Manual

3. Accessory Kit

100

Accessory information (Separate purchase item)

. Signal Box accessory (VG-XACBKIT) (per 1 set)

Serial Server1EA

BN81-19180A

3M Fiber Jumper2EA

BN81-13643A

5 volt PSU1EA

BN81-17909A

Serial Adapter4EA

BN81-13912A

12 volt PSU1EA

BN81-17910A

LAN Cable

1M Fiber Jumper2EA

BN81-13642A

Fiber Enclosure

L-Com enclosureEthernet Media Converter2EA

BN81-15094A

HDMI Fiber Receiver1EA

BN81-17558A

<Final assembly>

Page 101: Outdoor LED Installation Manual

3. Accessory Kit

101

Accessory information (Separate purchase item)

. PC BOX accessory (VG-PCZBKIT) (per 1 set)

iBase AGS PC1EA

BN81-17540A

DisplayPort to VGA1EA

BN81-13793A

Monitor, 7”1EA

BN81-13838A

Windows 10 LTSB1EA

BN81-15702A

Power Injector1EA

BN94-13069A

12 volt PSUBN81-17910A

LAN Cable

RJ45 to DB9 Serial adapter

4EABN81-13912A

Fiber Enclosure

L-Com enclosure12 volt PSU1EA

BN81-17910A

<Final assembly>

Page 102: Outdoor LED Installation Manual

4. Control Room Setting : System Configuration

Using Signal box (control room exist) : Signal Box required

Using PC box (control room not exist) : Signal Box not required

※ Note : Control room

- This refers to a room where you can control and monitor the screen when installing a sports space or a large outdoor screen.

- If control room is provided, installation can be done using Signal Box.

- If the control room is not available, such as on the highway, install it using the PC Box.

(However, only screens with resolution below FHD can be installed)

102

Page 103: Outdoor LED Installation Manual

4. Control Room Setting : System Configuration (With Control Room)

103

Total system configuration (※ With Control Room)

LED Control PC

Inte

rnet

4k Media Player

Data P

ath

Y8 Board

Power Distribution

LED SCREENControl Room

TMDS MC

Fiber MC

TMDS MC

Fiber MC

Signal Bd

TMDS MC

Fiber MC

TMDS MC

Fiber MC

TMDS Cable

LAN Cable

Optical Cable

Power Cable

ETH1 ETH2

ETH1 ETH2

……

……

Ethernet Switch

PDS Board

FBR : FiberMC : Media Converter

Optical

Signal Bd

Page 104: Outdoor LED Installation Manual

4. Control Room Setting : System Configuration (Without Control room)

104

Total system configuration (Without Control room)

LED Control

PC

Inte

rnet

Y8 Board

LED SCREEN

PC BOX

TMDS Cable

LAN Cable

Power Cable

……

Serial Server

Power Distribution

Page 105: Outdoor LED Installation Manual

4. Control Room Setting : System Configuration (Without Control room)

105

Total system configuration (Without Control room)

LED SCREEN

LED Control

PC

Inte

rne

t

Y8 Board

LED SCREENPC BOX

TMDS Cable

LAN Cable

Power Cable Power Distribution

LED Control PC

LCD Monotor

PDS Board

Y8 Board

PDS Board

……HDMI

Distributor

LAN Cable(Backward)

LAN Cable(Backward)

HDMI Cable(Forward)

LAN Cable(Forward)

LAN Cable(Forward)

HDMI Cable(Backward)

Page 106: Outdoor LED Installation Manual

106

Control Room

- On the LED Control PC, install the System Matrix, PV System and Processor.※ Please contact SI for further information regarding use and. connection

LED

Control PC

Inte

rne

t

4k

Media Player

Data

Path

TMDS MC

FBR MC

TMDS MC

FBR MC

ETH1 ETH2

ETH1 ETH2

Control Room

4. Control Room Setting

Page 107: Outdoor LED Installation Manual

4. Control Room Setting

107

LED Control PC

Serial Server

RJ45

CAT5 to Serial Adapter

Ethernet

- ① Serial Server Setting

: Set the IP address for the Control PC to enable a connection with the Serial Server. Next, in the Internet Explorer address

bar, enter the Serial Server IP address to access the settings screen. (→ Click the Login button. You do not need to enter

a password.)

※ Control PC IP settings screen (example)

※ The default static IP address for the Serial Server can be found in the

label on the rear.

Page 108: Outdoor LED Installation Manual

4. Control Room Setting

108

- ② Serial Server Setting

: Configure settings for each port (ports 1 to 4), as shown below. (Mode: RS-422 (4-wire) / Baud Rate: 115200)

Press “Save.” The Serial Server automatically reboots. (The reboot process takes about 15 seconds to complete.)

Page 109: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

109

Overview of System Matrix software

- The System Matrix software is designed to control multiple LED displays. With this software, you can control multiple

displays of different sizes and pixel pitches.

- Use the “Setup System Matrix (20-04-0802x64).msi” file to install the System Matrix software.

After the software is installed, the software shortcut appears on the Start menu.

- To launch the software, select Start > All Programs > Prismview > System Matrix.

Page 110: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

110

System Matrix program setting

- Set the value for the XPR model on the Settings – Output Settings screen of the main screen.

※ When connecting to Redundant Y8 board : Choose Dual Interface and change the Redundant Y8 boardDIP Switch DUAL : ON

Page 111: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

111

System Matrix Program setting

- From the top menu of the main screen [Location], set Country / Region / City to suit the installation location.

*Normally, set to automatically adjust the brightness according to the Sunrise / Sunset time.

※ Latitude/Longitude is automatically specified according to the selected region

※ Ramp time allows gradual change in brightness adjustment according to Sunrise/Sunset.

Page 112: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

112

System Matrix program setting

- Add the Controllers and Displays you want to control from the menu [Manage Systems] at the top of the main screen.

Page 113: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

113

System Matrix program setting

- Connect the added controller and display to each other.

Click and drag the mouse over the Display Area while you click on the appropriate Controller Area.

After confirmation of link, click Save & Exit.

※ Controller ↔ Display non-connection, the pop-up window below appears.

linked

Page 114: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

System Matrix program setting

- The Controller window appears, and for detailed setup, click the Setting button.

114

Page 115: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

115

System Matrix program setting

- Click the ‘configure output layout’ button the Layout button to set the value for the associated screen layout.

(example) Configure 2x2 Cabinet screens with 2 Y8

Page 116: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

116

Number of connected PDS

Master Y8 Redundant Y8

Light Sensor

PDS

System Matrix program setting

- On the Communications Settings screen, enter the Serial Server connection information.

(Connected Serial Server IP address : insert Port)

Page 117: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

117

System Matrix basic functions overview

Manually control display brightness/Set brightness automatic control via Light Sensor

Screen output control, simple screen brightness control.

Use for troubleshooting purposes such as print test pattern and video signal, color uniformity, etc.

Schedule the video contents

Power supply status, check Pixel/Module/Y8 status, monitor product temperature

PDS diagnostics, control settings

Dimming

Global Control

Serial Colors

Global Setting

Diagnostics

Power Status

Page 118: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

118

System Matrix basic function

◎ Dimming

This feature allows you to control display brightness manually, or 50 automatically through the Light Sensor.

- General Output

: Display brightness is always maintained at the value set by this function.

(2) Dimming menu

Select 'Dimming' from the drop-down menu in the upper left corner of the

Setting window.

(3) General Output

- Output : Enter the desired default brightness value as a percentage in the General

Output field at the top center of the window. The display brightness is set to this

setting when the program reboots.

- Use Ramping : function Dynamic brightness adjustment activated.

If you check this function, the brightness will be automatically adjusted based on the

criteria below:

• Value of Minimum / Maximum Output (%)

• Information of the current time and date settings

• Information of Location Sunrise / Sunset

(1) Open Setting window

Click the 'Settings' button in the main window of the program.

Page 119: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

119

System Matrix basic function

- Light Sensor

: The light sensor automatically adjusts the brightness to match the lighting conditions around the display.

(2) Dimming menu

Select 'Dimming' from the drop-down menu in the upper left corner of

the Setting window.

.

(1) Open Setting window

Click the 'Settings' button in the main window of the program.

(3) Setting the Light Sensor brightness Thresholds

You can specify brightness Thresholds by enabling the Light Sensor and entering the

Day Lumens / Night Lumens value.

• When enabled, the light sensor automatically controls the brightness.

• Use Global Sensor : If you check this function, you can adjust the brightness of all

displays connected to System Matrix with one light sensor at a time.

• Day Lumens : Specify the brightness Threshold value or Max output % value for

the daytime zone. If the Light Sensor value is greater than the Max output %

value, the display outputs Max brightness.

• Night Lumens : Specify the brightness Threshold value or Min output % value for

the night time zone. If the Light Sensor value is lower than the Min output %

value, the display outputs Min brightness.

Page 120: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

120

System Matrix basic function

- Output %

: The function sets the display brightness minimum / maximum.

(3) Maximum and Minimum Output %

Max % : Set the maximum brightness value of the desired display to %.

Min % : Set the minimum brightness value for the desired display to %.

If you want to use Dynamic brightness mini / max level,

you should check ‘Use ramping’ box.

(2) Dimming menu

Select 'Dimming' from the drop-down menu in the upper left corner of

the Setting window.

(1) Open Setting window

Click the 'Settings' button in the main window of the program.

Page 121: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

121

System Matrix basic function

- Dimming Schedule

: When using this function, System Matrix adjusts brightness according to the dimming schedule set.

(3) Dimming Schedule

After checking Enable, press the right button to modify the Dimming Schedule file.

The Dimming Schedule is created as a text file based on HTML code.

After modification, the Save & Exit button must be pressed to reflect.

(example)

(2) Dimming menu

Select 'Dimming' from the drop-down menu in the upper left corner of

the Setting window.

(1) Open Setting window

Click the 'Settings' button in the main window of the program.

Page 122: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

122

1 2 3

System Matrix basic function

◎ Global Control / Serial Colors / Global Settings / Diagnostics

4

Page 123: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

123

System Matrix basic function

◎ Global Control

(1) Open Global Control

Click the 'Global Control' button in the toolbar at the top of the program window.

(2) Blank Output

Click the 'Disable Output' button in the Global Control window to stop the image output

signal. To print the image again, click the 'Enable Output' button.

- Blanking

: This function allows you to stop the display's screen output without turning off the set power.

This means that the user can temporarily dim all displays and output them again while power is being applied..

Page 124: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

124

System Matrix basic function

- All On / All Off

: The function allows you to turn off and turn on the display. (LED Module Power on/off)

(3) Toggle Power

Click the 'All Off' button in the Global Control window.

Click the 'All On' button to turn on Module power again.

Note: For XPR, only the LED modules power is on/off.

- Set Brightness

: The function allows you to manually adjust the brightness of the display to the desired value.

※ When the program restarts, the Display will return to the default brightness setting.

(4) Brightness Adjustment

Use the Brightness slider bar to control global brightness.

Each mark on the slider bar represents a 5% change in display brightness.

The left side of the bar is 0% and the right side is 100%.

The Set Brightness XX% button applies the slider bar values to all displays.

Note: The value displayed on the Set Brightness XX% button changes depending on the

slider bar position.

if you press the Set Default button, brightness value turns back to its default setting.

Page 125: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

125

System Matrix basic function

◎ Serial Color Test Patterns

: The Test Pattern setup feature sends a specific color or test pattern to the Display over a serial connection.

It is mainly used for troubleshooting purposes, and color uniformity can be checked.

※ All video signals are bypassed when the function is executed, and the existing content will not be played until the pattern is terminated.

(1) Open Serial Colors window

Click the 'Global Control' button in the toolbar at the top of the program window.

(2) Serial Color Test Patterns output

The left side of the Serial Color Control window displays a list of connected devices.

The checkbox allows you to output a specific pattern on the selected device.

The 'Output percentage' setting allows you to adjust the brightness of the selected

display test pattern. This setting is output independent of individual or full brightness

setting values, interrupting the content that was being output and playing the pattern.

Note: A warning window will appear on the left side picture before content that was

currently playing is interrupted. Pressing the 'Stop' button in the lower right corner

stops the Serial Color Test Pattern output and returns to previously played content.

Page 126: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

126

System Matrix basic function

◎ Global Setting

- Blanking Schedule

: The function allows you to stop the display output at the specified time zone. (→between the first and second designated time)

This feature stops display output at any time of night.

Page 127: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

127

System Matrix basic function

◎ Diagnostics

: These features enable monitoring and diagnosis of product status.

Data about the power supply status, each pixel, module/Y8 status, and PDS diagnostic functions are displayed, and the

temperature of the product can also be monitored.

(1) Open Diagnostics window

Click the ‘Diagnostics’ button on the System Matrix main window .

Page 128: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

128

System Matrix basic function

◎ Diagnostics

Module 진단상태확인

Page 129: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

129

System Matrix basic function

◎ Diagnostics

Check the Module F/W Version Check the Y8 F/WVersion

Check the Module Temperature

→ When you check Show problems, detail information are appear.

Page 130: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

130

System Matrix basic function

◎ Power Status - PDS diagnostics

(1) PDS Diagnostics function

Double-click on the Power Status area of the System Matrix main window.

Page 131: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

131

System Matrix basic function

◎ Power Status - PDS Diagnostics

You can monitor ID, F/W version, FAN status, temperature, Y8/module status of PDS, and perform FAN on/off, Y8 on/off,

module on/off, and F/W update functions through Commands function.

Page 132: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

132

System Matrix basic function

◎ Power Status – PDS Control

(2) PDS Control function

Commands – You can select Fan Control to adjust Top/Rear Fan On/Off and Speed. (Stage 2 Fan Speed Adjustment – Low / High)

Page 133: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

133

System Matrix basic function

◎ Power Status – PDS Control

(2) PDS Control function

Commands – You can select Auto / Manual mode by selecting Control Mode.

• Auto : Mode for automatically adjusting Fan speed according to reference temperature

• Manual : Manually adjust the Fan speed to a user-specified speed.

Page 134: Outdoor LED Installation Manual

4. Control Room Setting : System Matrix

134

System Matrix basic function

◎ Power Status – PDS Control

(2) PDS Control Function

Commands – You can update the PDS firmware by selecting Update Firmware. (L-XPRMWWAC-****.*.srec)