OSP iStar Update

13
Office of Research: Sponsored Programs Examples of Key Process Improvement Initiatives March, 2009

Transcript of OSP iStar Update

Page 1: OSP iStar Update

Office of Research: Sponsored Programs

Examples of Key Process Improvement Initiatives

March, 2009

Page 2: OSP iStar Update

Background: A (not so) Short History on the Notice to Establish Account

(NEA) Process• Process established in 1965

• An adaptation of an Army process

• The process was updated in 1987– New printer was purchased – The same printer was in use until Jan 7, 2009

Page 3: OSP iStar Update

Background: The Problem with the NEA process

• Inefficient:– Took up to 1 month to process an award– Had to be hand carried from OSP to GCA– Costly-up to $10,000 in paper alone– Required 7 copies of each award– Required 4 handoffs in OSP alone– Data entered 3 times for each award (2-OSP,

1GCA) – Frequently misplaced files

Page 4: OSP iStar Update

Goals for Replacing the NEA Process

• Improve the efficiency of the process• Combine separate OSP and GCA processes into

one• Increase data integrity, accuracy and improved

distribution of information• Get out of processing paper and move to the

electronic age

• Transparency of award status to campus• Provide accurate, timely status information• Improve speed and consistency of communication

of budget number and other changes

Page 5: OSP iStar Update

Solution: Automation in SAGE Suite

Campus Research Community

Office of Sponsored Programs

Pre-Award Administration

Grant & Contract Accounting Post-Award Administration

Dat

a or

igin

ates

clo

sest

to

sour

ce, b

ut c

an b

e vi

ewed

and

acte

d on

as

appr

opria

te in

oth

er

syst

ems

Page 6: OSP iStar Update

• Reduced time to set up awards (2,3 days)

• Better tracking, no lost files

• Paperless OSP process

• Extensive cost reduction

• Reduced need for Advance Budgets and budget extensions

• Revised staff roles/flow down responsibility

• More Consistent Business Practices

Outcomes: OSP Improvements

Page 7: OSP iStar Update

Result: Researchers get their budget numbers faster!

Page 8: OSP iStar Update

Other Process Improvements

• 21 On-going Initiatives:

• Categories:– Priority Ongoing Process Improvement

Initiatives– Long Term Process Improvement

(SPAERC/SAGE)– Business Practice Modifications (File Mgmt)– Tools and Materials Development (Master

Agreement list)

Page 9: OSP iStar Update

Budget Extensions

• For no-cost and cost extensions or supplements.– Anticipated date, April, 2009– Web-based for easier access and processing– Request will go to OSP for approval– Flow down responsibility– Combines three budget actions into one form

and process.

Page 10: OSP iStar Update

Budget Extension Process: Anticipated Outcomes

– Much faster turn around time for requests for no-cost extensions and supplements

– Paperless: cost saving on materials– Fewer duplicated efforts – Lower workload for dept administrators/GCA

and OSP

Page 11: OSP iStar Update

2. Clinical Trial Process Improvement

• Goal: decrease time to enrollment of subjects to 90 days.

• Led by Richard Meisinger• Exec. Sponsors: Dr. Mary Lidstrom, Dr.

John Slattery and Kathryn Waddell• Completion date: Winter 2010• Cross campus participation (SOM, HSD,

OSP, Health System)

Page 12: OSP iStar Update

Clinical Trials Anticipated Deliverables

• Firm plan to reduce time to enroll patients

• Clinical Research Handbook

• A plan, consistent with the Roadmap, for a tracking system to monitor status/location of a proposal in the pipeline

• Enhanced knowledge of process, timelines and responsibilities

Page 13: OSP iStar Update

What is Next in OSP?

• More Efficiency Improvements in Process– System 2 System proposal submission (Grant

Runner)– Revised award process for clinical trials– VA contracts processing and tracking– Intranet re-design– Extranet re-design– Sub-contract processing– Non-federal Model Documents Reference– Master Agreement tracking and posting– “Expert” list compiled and posted– Review of F&A Waiver Request Process