![Page 1: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/1.jpg)
OSHPD Proposes a New Seismic Design Category: SPC-4D
May 12, 2015CHA Webinar
![Page 2: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/2.jpg)
Welcome
Mary BarkerCalifornia Hospital Association
![Page 3: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/3.jpg)
Continuing Education Offered for this Program
Health Care Executives:CHA is authorized to award 2 hours of preapprovedACHE Qualified Education Credit (non-ACHE) for this program toward advancement or recertification in the American College of Healthcare Executives.
Full attendance, completion of online survey, and attestation of attendance are required to receive CEs for this webinar. CEs are complimentary and available only for the registrant. Post-event survey will be sent to registrant via email.
3
![Page 4: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/4.jpg)
Program Overview and Introductions
Cheri HummelCalifornia Hospital Association
![Page 5: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/5.jpg)
5
Paul A. Coleman is the deputy director for the California Office of Statewide Health Planning and Development (OSHPD), Facilities Development Division (FDD). As deputy director, Mr. Coleman is the chief building official for California’s hospitals —more than 4,000 buildings located at 1,709 healthcare facilities under FDD jurisdiction statewide. Prior to assuming the role of deputy director in 2009, Mr. Coleman served as OSHPD’s southern California deputy division chief in the FDD. There he was responsible for planning and directing work of the program staff, and assisted in the formulation and implementation of policies related to enforcement of the Seismic Safety Act. Mr. Coleman is a licensed architect and general contractor in the state of California.
Faculty
![Page 6: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/6.jpg)
6
Faculty
Roy Lobo, PhD joined OSHPD as senior structural engineer over twelve years ago. He was promoted to supervisor of the Seismic Compliance Unit in 2011 and became principal structural engineer in November 2012. He worked for several reputed firms in the Los Angeles area before joining OSHPD. Mr. Lobo is an active member of the structural engineering community with membership in professional organizations such as the American Society of Civil Engineers (ASCE) and the Structural Engineers Association of California (SEAOC). He is former Chair of the SEAOC Existing Buildings Committee and currently serves as State Chair of the SEAOC Seismology Committee. Mr. Lobo is also a voting member of the ASCE 41 main committee. He holds a doctoral degree in Structural Engineering.
![Page 7: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/7.jpg)
Paul A. Coleman, Architect, Deputy DirectorRoy Lobo, PhD, SE, Principal Structural Engineer
Facilities Development DivisionCalifornia’s Building Department for Hospitals
Seismic Performance Category 4D
7
![Page 8: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/8.jpg)
Existing Hospital Inventory
8
![Page 9: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/9.jpg)
Nature’s Full Scale Shake Table Test
9
![Page 10: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/10.jpg)
Northridge Earthquake: • Impetus for SB 1953
• Brought existing buildings into the HFSSA
The state shall take steps to ensure that the expected earthquake performance of hospital buildings housing inpatients and providing primary basic services is disclosed to public agenciesthat have a need and a right to know
Intent of SB 1953
http://oshpd.ca.gov/FDD/seismic_compliance/SB1953/SPCNPCList.pdf
10
![Page 11: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/11.jpg)
Because the medical industry cannot immediately bring all hospital buildings into compliance with the Alfred E. Alquist Hospital Facilities Seismic Safety Act the state shall encourage structural retrofits or replacements of hospital buildings housing inpatients and providing primary basic services that place lives at risk because of their potential for collapse during an earthquake
Intent of SB 1953
11
![Page 12: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/12.jpg)
The state shall also encourage retrofits and enhancements to critical hospital architecture, equipment, and utility and communications systems to improve the ability of hospitals to remain operational for those hospitals that do not pose risk to life
Intent of SB 1953
12
![Page 13: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/13.jpg)
• H&SC § 130005(b). The office may define earthquake performance categories as it deems necessary to meet the intent of SB 1953 and the Alfred E. Alquist Hospital Facilities Seismic Safety Act (HSSA 83)
Statutory Authority
13
![Page 14: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/14.jpg)
SPC1 SPC2 SPC3 SPC4 SPC5
Reasonably Capable of Providing Services to the Public after a Major EQ
Significant Risk of Collapse in a Major EQ
2008/2013 2030 2030+ 2030+ 2030+
Imminent Threat
Minor Risk to Life
Low Risk of Collapse in a Major EQ
May be Capable of Providing Services to the Public after a Major EQ
Structural Performance Categories
14
![Page 15: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/15.jpg)
• Buildings posing a significant risk of collapse and a danger to the public
• These are pre-1973 code buildings and buildings not originally built under an OSHPD or OSA permit (non-conforming buildings)
• These buildings must be brought up to the SPC 2 or higher level by January 1, 2020 or be removed from General Acute Care (GAC) Service
Structural Performance Category 1 (SPC-1)
15
![Page 16: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/16.jpg)
• These buildings have low risk of collapse in a major earthquake and do not significantly jeopardize life
• These are non-conforming buildings
• These buildings must be brought up to the SPC-4D or SPC-5 by January 1, 2030 or be removed from GAC Service
Structural Performance Category 2 (SPC-2)
16
![Page 17: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/17.jpg)
• Conforming buildings in Near Fault Sites (NFS) with Pre-Northridge Steel Special Moment Resisting Frame (SMRF) connections
• These buildings may experience structural damage, which does not significantly jeopardize life, and may provide service after a major earthquake
• SPC-3 buildings can provide GAC service to 2030 & beyond
• Building is either SPC 3 or not (a finite set of buildings). No building can be upgraded to SPC 3
Seismic Performance Category 3 (SPC-3)
17
![Page 18: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/18.jpg)
• Conforming buildings permitted by OSHPD or OSA prior to 1989 Code
• May experience some structural damage, but still may provide services to the public following major earthquake
• No deadline for these buildings. May be used up to January 1, 2030 and beyond
• Building is either SPC 4 or not (a finite set of buildings). No building can be upgraded to SPC 4
Structural Performance Category 4 (SPC-4)
18
![Page 19: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/19.jpg)
• Conforming buildings permitted to the CBC 1989 or later versions of the Code (except those classified as SPC 3)
• Reasonably capable of providing services to the public following major earthquake
• No deadline for these buildings. May be used up to January 1, 2030 and beyond
Structural Performance Category 5 (SPC-5)
19
![Page 20: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/20.jpg)
Total No. of Hospital Buildings Reported = 2627
Total No. of Hospital Buildings Reported in 2001
20
![Page 21: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/21.jpg)
Initial SB 1953 Major Milestones
21
![Page 22: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/22.jpg)
Major Extensions to SB 1953 Milestones
22
![Page 23: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/23.jpg)
Historical Changes to SPC-1 Building Inventory
23
![Page 24: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/24.jpg)
Compliance Options Today
• Remove acute care services and relocate to SPC-2 or higher building
• Remove acute care services (reduce services)
• Seismic retrofit
• HAZUS Reassessment Program for SPC-1 buildings
• Voluntary seismic improvements (combined with HAZUS)
• Rebuild/Replace
24
![Page 25: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/25.jpg)
What is Next for My SPC-1 Building(s)?
• Rebuild/Replace – must have an OSHPD Certificate of Occupancy by the approved extension date
• Retrofit/VSI – must have an OSHPD Construction Final by the approved extension date
• Remove Acute Care Services – must have an OSHPD Certificate of Occupancy or Construction Final, as applicable, for Remove from Acute Care Services Project
– Buildings from which acute care services have been removed, but do not have an OSHPD Certificate of Occupancy or Construction Final by the approved extension date will not be issued a building permit for any project(s) not related to a remove from acute care services project
25
![Page 26: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/26.jpg)
SPC-2 (PRE 1973) Retrofit to SPC-5
Seis
mic
Com
plia
nce
Dead
line
2030
Beyond 2030
What is Next for My SPC-2 Building(s)?
14yrs - 8mo
Remove
Replace
Rebuild
700+ Builds
(Current Code)
26
![Page 27: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/27.jpg)
Vintage of SPC-2 Buildings in 2020
27
![Page 28: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/28.jpg)
SPC-2 Buildings in 2020 by Building Type
28
![Page 29: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/29.jpg)
Expected by Type and Stories in SPC-2 Buildings
29
![Page 30: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/30.jpg)
• Rural and other hospitals in underserved areas have limited resources to upgrade to current code
• The SPC-2 buildings may be landlocked by higher SPC buildings such that removing the SPC-2 building from service could make the hospital inoperable
• The hospital may not have property on which to build a replacement building
• Hospitals could use this option to strategize their master plan and explore various cost effective options
• Upgrade to comparable SPC-4 buildings instead of current code?
• Model codes have changed making upgrading to current code very costly
• Minimizing upgrade reduces disruption to ongoing services
Concerns for 2030 Compliance
30
![Page 31: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/31.jpg)
Example – SPC 2 Land Locked Building
![Page 32: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/32.jpg)
• To make compliance with SB 1953 program cost effective
• To ensure availability of hospitals in rural and medically underserved areas
• Statute requires OSHPD to adopt model code and national standards. The International Existing Building Code, 2015 (IEBC 2015)/ASCE 41-13 adopted damage control structural performance level as a discrete performance category giving FDD the foundation upon which to move forward with a new seismic performance category
• With only 14+ years remaining until 2030, planning, financing, and building a replacement building would be difficult for many hospitals
• To provide hospitals with another option for seismic compliance so they may choose the approach that is most cost effective for them
Why Now?
32
![Page 33: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/33.jpg)
Damage Control Structural Performance
What is it?It is a performance category at a midway point between Life Safety Structural Performance Category (SPC 2) and Immediate Occupancy Structural Performance Category (SPC 5)
Looking for a Solution
33
![Page 34: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/34.jpg)
Looking for a Solution
34
![Page 35: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/35.jpg)
Seismic Evaluation Requirements
• Traditionally seismic evaluation was at approx. 75% of new building code seismic design forces (ASCE 31-03)
• Seismic evaluation requirements in the CAC Chapter 6 are based on FEMA 178– SPC 2: Approx. 75% of Life Safety (I=1.0) based on CBC 1995
• CBC Chapter 34A SPC-2 upgrade requirements are consistent with this philosophy
• SPC 5 :Immediate Occupancy
• Damage Control for Risk Category IV Buildings (Midpoint LS and IO)
35
![Page 36: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/36.jpg)
Looking for Another Approach
36
![Page 37: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/37.jpg)
• Introduce Structural Performance Category SPC-4D (Damage control for existing Risk Category IV Buildings)
• Nonconforming Buildings (Building originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030
The SPC-4D Approach
37
![Page 38: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/38.jpg)
SPC-4 Building Inventory by Year Built
38
![Page 39: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/39.jpg)
SPC-4 Building Inventory by SDC
39
![Page 40: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/40.jpg)
SPC-4 Building Inventory by Number of Stories
40
![Page 41: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/41.jpg)
What Is Damage Control?
DAMAGE CONTROL STRUCTURAL PERFORMANCE CATEGORY is a performance category approximately midway between Life Safety Structural Performance Category (SPC 2) and Immediate Occupancy Structural Performance Category (SPC 5), established by analysis or retrofit, in accordance with the 2016 California Building Code (2016 CBC) Section 3412A.2.3 or equivalent provisions in later editions of the CBC. Buildings satisfying this structural performance standard shall be deemed to satisfy the requirements of the Structural Performance Category SPC-4D.
41
![Page 42: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/42.jpg)
What Is SPC-4D?
STRUCTURAL PERFORMANCE CATEGORY SPC-4D is a performance category assigned to existing nonconforming hospital buildings that have been demonstrated either by analysis or retrofit to be equivalent to the minimum prescriptive requirements of the 1979 Uniform Building Code (UBC 1979) including the California amendments, hereafter called the 1980 CBC, in accordance with the CBC 2016 Section 3412A.2.3.
42
![Page 43: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/43.jpg)
First California Building Code
43
![Page 44: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/44.jpg)
1. Uniform Building Code, 1979 (UBC 1979)
2. California Code of Regulations, Title 24- Building Standards, dated February 2, 1980
3. California Code of Regulations, Title 22 – Social Security, dated October 13, 1979
4. California Code of Regulations, Title 17 – Public Health, dated October 13, 1979
What Constitutes the 1980 CBC?
44
![Page 45: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/45.jpg)
--SPC-1 /SPC-2
SPC2 SPC3 SPC4 SPC5
Collapse Risk or Life Safe
2020/2030
SPC-4D /SPC-5
2030+
Upgrade to SPC-4D or SPC-5
Significant Risk of Collapse
Low Risk of Collapse
SPC-1 and SPC-2 Building Upgrade Options
45
![Page 46: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/46.jpg)
• May control damage to permit return to function similar to SPC-3 or 4 buildings, but not as quickly as SPC-5 buildings
• Performance should be equivalent to existing SPC-3 and SPC-4 buildings
Performance Expectation of SPC-4D Buildings
46
![Page 47: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/47.jpg)
1. Hospital buildings with the potential for surface fault rupture and surface displacement at the building site
2. Unreinforced masonry shear wall buildings
3. Precast concrete buildings
Buildings Not Eligible for SPC-4D
47
![Page 48: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/48.jpg)
• (E) Bldg. detailing may not meet the prescriptive standard
• Buildings have structural irregularities prohibited in current code known to cause collapse– Extreme torsional irregularity– Extreme stiffness of soft story irregularity– Extreme weak story irregularity
• Irregular buildings and tall buildings require a dynamic analysis for distribution of forces
• Archaic materials used in existing buildings do not have design values
Possible Compliance Issues Using CBC 1980
48
![Page 49: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/49.jpg)
Alternate to CBC 1980
49
SPC 4D – ASCE 41 Methodology• ASCE 41 - Seismic Evaluation/Seismic Retrofit Methodology for (E)
Buildings• Permits different levels of targeted seismic performance objectives• SPC-4D requires:
• Two Level Seismic Hazard Analysis/Design (Tier III – dual-earthquake check) • Intended to be used universally regardless of the building configuration, size
or structural system, etc.– Level 1: Damage Control under the Design Level Earthquake
(BSE-1E, 20% in 50-year or 225-year event) – Level 2: Collapse Prevention under an infrequent Level Earthquake
(BSE-2E, 5% in 50-year or 975-year event)• The dual-earthquake check is necessary to ensure sufficient robustness and
margin of safety beyond the design-level earthquake
![Page 50: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/50.jpg)
Analysis Options - ASCE 41-13
Four Analysis Options:
• Linear Static Procedures (LSP) (Simplest, but conservative)
• Linear Dynamic Procedures (LDP) (Simple, but conservative)
• Non Linear Static Procedures (NSP) (Higher order analysis tools and time, less conservative)
• Non Linear Dynamic Procedures (NDP) (Complex analytical tool, but least conservative)
50
![Page 51: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/51.jpg)
CBC 1980• One or two story buildings• Inadequate wall anchorage • Seismicity depends on the
Seismic Zone Factor (not site specific)
• Building has adequate detailing
• Analysis is simpler• . . .
Which option do I use? 1980 CBC or ASCE 41?
ASCE 41*• Buildings with prohibited
irregularities• Tall buildings with
irregularities• Building has inadequate
detailing• Seismicity on site has
changed• Take advantage of existing
material properties• Variety of analysis options
Owner’s choice considering factors such as feasibility, cost, etc.
*Exp
erie
nced
Des
ign
Pro
fess
iona
l in
Retr
ofit
of (E
) Bld
gs
51
![Page 52: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/52.jpg)
• Building characterization required:– Existing construction documents review– Field testing and inspections– Field observation of exposed conditions
• Buildings with/without original construction documents will require comprehensive materials testing and conditions assessment
• Nonconforming buildings didn’t go through OSHPD’s plan review or field tests/inspections
SPC-4D Construction Document Review
52
![Page 53: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/53.jpg)
CBC 2016 Seismic Map
CBC 1980 Seismic Map
SDC F is not comparable to Seismic Zone 4 because of Near Field Effects. SDC D encompass all of Seismic Zone 3 & large part of Seismic Zone 4.
CBC 2016 SDC F vs. CBC Seismic Zone 4
53
![Page 54: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/54.jpg)
2014-2008 Ground Motion Differences
54
![Page 55: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/55.jpg)
Seismic Design Category of Buildings
55
Projected SPC-2 Buildings in 2020
![Page 56: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/56.jpg)
Long-Period Design Accelerations (SD1)Southern CA
56
![Page 57: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/57.jpg)
Long-Period Design Accelerations (SD1)Northern CA
57
![Page 58: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/58.jpg)
Design Demands for BSE-1E and BSE-2E
Period
Spe
ctra
l Acc
eler
atio
n (g
)
CPLS
IO
58
![Page 59: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/59.jpg)
Acceptance Criteria for Different Damage States
Lateral Displacement -
Late
ral F
orce
-V
CPLS
ImmediateOccupancy
LS CPSanta hjklh
Santa hjklh
IO
DamageControl
Santa hjklh
CollapsePrevention
Life Safety
Demand Spectrum at BSE-2E
Demand Spectrum at BSE-1E
59
![Page 60: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/60.jpg)
Example: Five-Story Concrete Shear Wall Building
60
![Page 61: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/61.jpg)
Building Description
• Location: Bay Area
• Building Type: Reinforced Concrete Shear Wall Box system
• Number of Stories: 5• Building Height: 67.5 ft
• Foundation: Spread footing
• Diaphragm: Rigid
• Seismic Detailing: No special boundary detailing
61
![Page 62: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/62.jpg)
Material Strengths
• Material Properties
Concrete Strength:
Specified Testedf’c = 4000 psi f’c = 5143 psi
Steel Strength:
Specified Testedfy = 60,000 psi fy = 67,752 psiPermitted to use only 60,000 psi (1980 CBC)
62
![Page 63: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/63.jpg)
Design Criteria Using 1980 - CBC
• Design Base Shear• V = ZIKCSW• Z = 1 (Zone 4)• I = 1.5 (Essential Facility)
• C = √• T = . √ ; = 0.377 sec (Trans.) and 0.23 sec (Long.)
• S = 1.5• Use CS = 0.14• K = 1.33 (Table 23-I, buildings with a box system)• V = (1)(1.5)(1.33)(0.14) W = 0.279 W (Working Stress)
63
![Page 64: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/64.jpg)
Design Criteria Using 1980 - CBC
• Load Combination for Concrete DesignU = 1.4(D + L) + 1.4EAnd U = 0.9D + 1.4E
• For shear and diagonal tensionU = 1.4(D + L) + 2.0EAnd U = 0.9D + 2.0E
64
![Page 65: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/65.jpg)
ASCE 41-13 - Ground Motions
65
![Page 66: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/66.jpg)
Analysis Using ASCE 41-13
• Pseudo Seismic Force for LSP:
V = (1.1)(0.8)(0.975)W = 0.86 W
66
WSCCCV am21
![Page 67: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/67.jpg)
Limitations
• Limitations on Use of LSP:
Largest computed DCR is critical component for the element at that story
If a component DCR exceeds the lesser of 3.0 and the m-factor for the component and a weak story or torsion irregularity exists per 7.3.1.1.3 or 7.3.1.1.4 linear procedures are not permitted
67
CE
UD
QQDCR
![Page 68: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/68.jpg)
Piers Exceeding Acceptance Criteria 1980 CBC
68
Wall Piers demands exceeding capacityMax DCR = 1.3
Elevation Line U
![Page 69: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/69.jpg)
Piers Exceeding Acceptance Criteria ASCE 41
69
Wall Piers demands exceeding capacity,BSE 1E, and BSE 2ENone; Max DCR .86
Elevation Line U
![Page 70: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/70.jpg)
Spandrels Exceeding Acceptance Criteria 1980 CBC
70
Spandrel demands exceeding capacityMax. DCR = 1.54
Elevation Line U
![Page 71: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/71.jpg)
Spandrels Exceeding Acceptance Criteria ASCE 41
71
Spandrel demands exceeding capacityMax. DCR = 1.03
Elevation Line U
![Page 72: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/72.jpg)
Design of Foundations
• Load Combination for Foundations Design 1980 CBCU = 1.4(D + L) + EAnd U = 0.9D + E
• Load Combination for Foundations Design ASCE 41, Linear Procedures
MST > MOT / (C1C2 J); J max = 2Alternatively 0.9MST = MOT / (C1C2OT), OT = 6 (BSE-1E); 10 (BSE-2E)
72
![Page 73: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/73.jpg)
Summary of Findings
The current study is limited to only the shear check acceptance criteria in the shear walls
Other checks such as Shear wall flexural checks, Foundations, and Diaphragms need to be performed to give overall impact
The location of the building and the ground motion at the site is a key factor in deciding which analysis/design option to use
73
![Page 74: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/74.jpg)
• Nonconforming buildings can be upgraded to SPC-4D to provide services beyond 2030
• The CBC 1980 may be used to upgrade some SPC-2 buildings to SPC-4D
• ASCE 41-13 Damage Control Structural Performance level as defined in OSHPD regulations for existing Category IV buildings may be used for SPC-4D analysis and/or retrofit
• No Seismic Evaluation Checklist
Summary of SPC-4D Provisions
74
![Page 75: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/75.jpg)
As with any other structural upgrade or VSI project, the hospital must consider the following:
• Accessibility requirements in area(s) of work and path of travel
• Nonstructural work to comply with NPC 3 through 5 based on any approved extensions or exemptions
• Move management to allow work in specific areas of the hospital building
What Other Costs May Apply?
75
![Page 76: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/76.jpg)
No seismic evaluation (check list) will be required to change SPC-1/SPC-2 buildings to SPC-4D
– Submit analysis to Seismic Compliance Unit– Submit retrofit projects to OSHPD regions– SPC rating will be changed by a process equivalent to those
for SPC-5– Reconciliation on construction work consistent with SPC-4D
requirements is necessary
Streamline and Simplify Compliance
76
![Page 77: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/77.jpg)
What is the Submittal/Review Process?
77
![Page 78: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/78.jpg)
What is the Submittal/Review Process?
78
![Page 79: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/79.jpg)
Who can assist hospitals in determining if SPC-4D is right for them?
• Designers should have a proven track record of working with OSHPD on major retrofit projects
• Must have experience with existing buildings and material and familiarity with the national standard ASCE 41
• Must be a California licensed Structural Engineer
Who Should Hospitals Hire?
79
![Page 80: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/80.jpg)
2015 Triennial Code Adoption Cycle
• Triennial update of CBSC to match 2015 IBC and revised standards
• The CBSC 2016 effective date 1/1/2017
80
![Page 81: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/81.jpg)
2015 Triennial Code Adoption Cycle
81
![Page 82: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/82.jpg)
PIN 54 may be used for early adoption if SPC-4D is approved by the Building Standards Commission
Use of SPC-4D Prior to January 1, 2017
82
![Page 84: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/84.jpg)
Questions
Online questions:Type your question in the Q & A box, hit enter
Phone questions:To enter the queue hit *1 To remove yourself from the queue hit *2
![Page 85: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/85.jpg)
85
Upcoming Programs
Disaster Planning for California HospitalsSeptember 28 – 30, 2015Sacramento
Join your colleagues, community partners, suppliers, and state officials at the only disaster conference developed by and for California hospitals. Find out how you can take your plans, ideas and teams to the next level.
![Page 86: OSHPD Proposes a New Seismic Design Category: SPC-4D · originally built to pre-1973 Code) can be upgraded to SPC-4D (Instead of SPC-5) to provide service beyond 2030 The SPC-4D Approach](https://reader030.fdocuments.in/reader030/viewer/2022041218/5e07ee539635306947207558/html5/thumbnails/86.jpg)
Thank You and Evaluation
Thank you for participating in today’s program. An online evaluation will be sent to you shortly.
For education questions, contact Mary Barker at (916) 552-7514 or [email protected].