Draft RE Policy / Regulatorystatement for the State of Orissa
As part of the exercise WISE had the opportunity to study theinstitutional arrangements, policy and regulatory frameworkgoverning the renewable energy sector in the state of Orissa.
The development of renewables in the state is still at anascent stage and the decision taken by Orissa ElectricityRegulatory Commission to initiate the RE tariff fixationprocess will certainly boost the RE development in the state.It has been observed in states like Maharashtra and
Tamilnadu, who did exceptionally well in renewables, that theconducive policy and regulatory framework created by theGovernment and the Regulators had played a major role inspurring the development of renewables in the respectivestates.
As per our understanding of the Orissa power sector andon the basis of our extensive experience in the earlierexecuted National and International Policy researchassignments, the consultant has identified following criticalaspects/ areas the Government of Orissa and the HonCommission may looked into:
Policy AspectsNeed for adding RE capacity : The state which ispower surplus at present will face power shortage during2011-12 ( 10% deficit ) as per 17th Electric Power Surveyof Central Electricity Authority The rapid growth of industries will further increase the power demand in the
state in future. Most of the identified large hydro schemesin the state are already explored , the reliance on fossilfuel based power generation would be not be advisabledue to the increasing concern of Climate Change andGlobal warming . Therefore it is necessary that theGovernment of Orissa and the Commission may take allpossible measures to harness the renewable energypotential in the state (Solar, Wind, SHP, Biomass etc.)RE Policy of GoO : The RE policy issued by the Science
and Technology Department, Govt of Orissa in 2005
A WI SE Report
1
-
8/6/2019 Orissa Draft RE Policy
2/10
Approach paper on RE tariff determination and RPS fixation for the state of
Orissa
requires certain amendments in terms of the sharing of power evacuation infrastructure, banking and wheelingfacilities on concessional open access charges , clearapplication and project clearance procedures.Treatment to fossil fuel based cogenerationproject : The EA 2003, NEP, NTP have certain enablingprovisions for promotion of Renewables and co-generation. While framing the regulation and policies, theCommission / Government needs to make a cleardistinction between Renewables and fossil fuel based co-generation. While promoting these technologies careshould be taken to ensure balance growth of both sectorswithout interfering each others growthMandate for SHP : At present the mandate fordevelopment of SHP is given to the Office of the Engineerin Chief Electricity -CUM- Principal Chief ElectricalInspector, Government of Orissa. For efficient and speedyimplementation of SHP programme the mandate fordevelopment of SHP which is renewable source bydefinition may be given to the state nodal agency OREDAafter the necessary capacity building of OREDA. It is often
seen that the other major departments did not able to payenough attention to SHP programme due to their ownprojects.Solar potential assessment : Preliminary potentialassessment studies indicate good potential for solarenergy in the state. It is necessary to separatelyconsider solar PV / CPV and solar thermal for powergeneration. There are at least eleven configurations of these technologies for power generation. The costs, land
requirements and other requirements like water forcooling in the case of solar thermal power projects have tobe assessed. A detailed resource assessment study isrequired to be commissioned for assessment of solarenergy potential in the state.Capacity building of SNA : For effective implementationof the policy, the key implementer which is OREDA willhave to be strengthened. It would be desirable to preparea policy statement so that enough budgetary and staff provision is made from year-to-year to facilitate such
A WI SE Report
2
-
8/6/2019 Orissa Draft RE Policy
3/10
Approach paper on RE tariff determination and RPS fixation for the state of
Orissa
capacity building. In fact, a master-plan for such capacitybuilding covering financial growth, infrastructuredevelopment (both soft and hard infrastructure), staff deployment, human resource development, etc.. Would benecessary to empower OREDA to achieve the expecteddevelopment in RE.Green Cess : The Government of Orissa may propose agreen cess of 5 paisa / kWh to be levied on the electricityconsumption by industrial and commercial consumers. Itwill be a very welcome move for promotion of renewablesin the state. It would be easier to amend an existinglegislation through an ordinance to impose this levy. Whilelaying down the procedures for utilization of the greencess by creating a Clean Energy Fund, it would helpful tostudy the Maharashtra experience. Maharashtra was thefirst state to impose such cess and their implementationexperience would help in avoiding loopholes. It should beensured that the cess is fully passed on to OREDA andproper norms are laid down to ensure its effectiveutilization for R.E. development only.Renewable Energy Law for Orissa: Policies gather
muscle if they are complemented by legislative measures. The Government of India has already decided to enact aNational Renewable Energy Law. The model law preparedby WISE has been adopted as the basic draft for furtherre-working. Since energy is a concurrent subject, Orissacould have a State R.E. Law suited to its local needs andcircumstances, without contradicting the nationallegislation. In the United States, many states have suchprovincial laws, besides federal laws.
Assessment of Future of Conventional Power:Business-as-usual in conventional power is pass.Renewables are not just add-ons to the power sector, butthey are the future of the power sector. So such anambitious policy for development of renewables would bestrengthened if the risks, uncertainties and volatilities inthe conventional sector are highlighted. For example thereare fossil fuel supply chain risks, price volatilities etc.. inrespect of conventional thermal projects. A realistic anddown-to-earth assessment of the problems confronting the
A WI SE Report
3
-
8/6/2019 Orissa Draft RE Policy
4/10
Approach paper on RE tariff determination and RPS fixation for the state of
Orissa
conventional sector would be necessary as we plan for atransition to renewable power.
Regulatory AspectsPreferential RE tariff : The RE resource assessmentstudy conducted for the state indicates a moderateresource intensity for wind, SHP and biomass resources inthe state. Therefore the levellised tariff (Rs/kWh) arrivedat appears on higher side compared to other states. Butconsidering the environmentally benign nature of RE andthe fact that the tariff will remain constant over 25-35years , it will prove comparable with the conventionalsources on life cycle basis. Therefore the Commission mayallow the suggested preferential tariff for RE.Tariff Regulation : Before starting the RE tariff initiationprocess the existing Orissa Electricity RegulatoryCommission (Terms and conditions for determination of tariff) Regulation 2004 needs to be amendedappropriately. The present Tariff regulation doesnt haveany specific provisions for RE as envisaged in Section 61(h) of the EA 2003. In absence of RE specific provision in
the Tariff Regulation it would be difficult for theCommission to give Preferential treatment toRenewables while awarding the tariff. The Commission cannotify a separate Tariff regulation for determination of REtariff or can also notify RE power procurement Regulationspecifying norms for RE tariff determinationControl Period : The Commission may specify a 3 yearcontrol period from 2010-11 to 2012-13 (review period).For greater regulatory certainty the Commission may
specify the RPS percentage obligation cohesive with theproposed tariff regime (2010-11 to 2012-13). Afteracquiring the operational experience of RE power projectsin the proposed control period, the Commission maydetermine the tariff for next control period under the MYTregime.Project specific tariff : For utility scale solar power andMunicipal Solid Waste power projects the Commission mayallow the developer to file a petition for Project specifictariff determination on case to case basis in view of
A WI SE Report
4
-
8/6/2019 Orissa Draft RE Policy
5/10
Approach paper on RE tariff determination and RPS fixation for the state of
Orissa
possibility of multiple technological options with differentconfiguration. In the next control period based onoperational experience the Commission may think of giving a generic tariff if required.Subsidies and incentives are essential for promotion of renewables in the early stages. As a precedent followed byother states in the initial stages of RE development, theCommission may not internalise the subsidies/ incentivesavailable to RE investors from the Central / stateGovernment while determining the RE tariff in Orissa.Long Term Implementation of RPS Framework :OREDA should set up a separate cell to monitor thecompliance of RPS orders. The NAPCC advocates theintroduction of Tradable Renewable Energy Certificatemechanism for meeting the Renewable PurchaseObligations at national level, the scheme is expected to beimplemented in April 2010. In this context, OREDA shouldtake the necessary steps to develop the capabilities withinOREDA for effective implementation of RPS in the state.
A WI SE Report
5
-
8/6/2019 Orissa Draft RE Policy
6/10
Approach paper on RE tariff determination and RPS fixation for the state of
Orissa
Annexure-1
A WI SE Report
177
-
8/6/2019 Orissa Draft RE Policy
7/10
Approach paper on RE tariff determination and RPS fixation for the state of
Orissa
A WI SE Report
178
-
8/6/2019 Orissa Draft RE Policy
8/10
Approach paper on RE tariff determination and RPS fixation for the state of
Orissa
Policy Framework and Key Incentives for RETechnologies from Central/State Government
Technolo
gy
Policy Framework Key Incentives
Wind
Power
Fiscal and financial
incentives
Wheeling, banking,
Third party sale, Buy-
back facility by states
Capital subsidies and
sales tax incentives in
certain states
Concessional import
duty on specified wind
turbine parts
80% accelerated
depreciation
Customs and Excise
duty relief
Loans through IREDA
Tax holiday for power
generation projects
Small
Hydro
Power
Fiscal and financial
incentives
Wheeling, banking,
Third party sale, Buy-
back facility by states
Capital subsidies andsales tax incentives in
certain states
Detailed project report
preparation at
discounted price
Capital grant for setting
up projects in North
Eastern statesFinancial support for
renovation,
modernization and
capacity up-rating of old
SHP stations
Financial support for
development/upgradatio
n of water mills
Soft loans from IREDAfor setting up of SHP
projects upto 25 MW
capacity
Biomass
Power
Enactment of favorable
policy regimes at the
state as well as the
Central levels
Interest subsidy for
commercial biomass
power projects
Upto 3% interest
A WI SE Report
177
-
8/6/2019 Orissa Draft RE Policy
9/10
Approach paper on RE tariff determination and RPS fixation for the state of
Orissa
Buy-back / Wheeling /
Banking of generated
electricity by the SEBs
Incentives in the form
of sales tax
exemptions, equity and
grants, etc.
subsidy for bio-
mass/bagasse
cogeneration
(commercial projects)
Capital subsidy for
cogeneration projects in
Joint Venture model/IPP
mode in
cooperative/public
sector sugar mills
Financial assistance
under the National
Biomass Resource
Assessment Program
(NBRAP)
Energy
from
Waste
Easy allotment of land,
supply of garbage and
facilities for
evacuation, sale and
purchase of power to
encourage setting up
of waste-to-energyprojects
Commercial Projects:
Financial assistance as
interest subsidy for
reducing rates of
interest
Demonstration Project:
Financial assistance oncapital cost of the
project
Power Generation at
Sewage Treatment
Plants:
Financial assistance on
incremental cost for
generation of power
from bio-gas.Solar
Photovoltai
cs
No specific conditions
for JV formation
100% EOU to set up a
manufacturing plant
Technology transfer for
the manufacture of
silicon solar cells and
PV systems
MNES financial
incentives for solar PV
grid connected power
projects
IREDA financial package
for solar photovoltaic
(power generation
systems)
MNES Financial
A WI SE Report
178
-
8/6/2019 Orissa Draft RE Policy
10/10
Approach paper on RE tariff determination and RPS fixation for the state of
Orissa
Incentives for Solar
Photovoltaic Systems.
Biogas Central subsidy to
users
Remuneration to SEWs
Dealership support to
Fair Price Shops
Organizational and
infrastructure support
to implementing
agencies
Technical and training
support
Special incentives are
available for turnkey
entrepreneurs in rural
areas.
Loans from commercial
and cooperative banks
for setting up of biogas
plants under Agricultural
Priority Area
Automatic refinancing
by NABARDSource Ministry of New and Renewable Energy, India.
State Specific Incentives:A number of states have announced policy packagesincluding banking, third party sale and buy-back. Moststates have de-clared buyback rates with some escalationfor each subsequent year.Some states are providing concessions or exemption instate sales tax. These rates vary widely from state to stateand be-tween different technologies.
Fourteen states have so far announced policies for thepurchase and support of electrical energy generated fromvarious RE sources.Maharashtra has set up a green energy fund forpromoting re-newable projects.Eleven state regulators have under the National Tariff Policy 2006 passed orders for a minimum offtake of renewable power by distribution licencees (called RPOs;renewable energy purchase obligations).