Oriented Project C5 Pedestrian
Transcript of Oriented Project C5 Pedestrian
![Page 1: Oriented Project C5 Pedestrian](https://reader033.fdocuments.in/reader033/viewer/2022052722/628efc09a0924b6be94cfa83/html5/thumbnails/1.jpg)
C5 Pedestrian Oriented Project
Presented bySiochi Group | 4AR1
Re-focusing the existing urban fabric for pedestrians and commuters
![Page 2: Oriented Project C5 Pedestrian](https://reader033.fdocuments.in/reader033/viewer/2022052722/628efc09a0924b6be94cfa83/html5/thumbnails/2.jpg)
Circumferential Road 5
A network of roads and bridges
transversing through Quezon City,
Makati, Parañaque, Taguig, Pasig,
Marikina, Valenzuela
![Page 3: Oriented Project C5 Pedestrian](https://reader033.fdocuments.in/reader033/viewer/2022052722/628efc09a0924b6be94cfa83/html5/thumbnails/3.jpg)
On Walkability and the Need For Such Proposal
● Vehicles have become a primary need● Commuting and Walking is a hassle due to conditions of infrastructures and sidewalks● Inaccessible to some members of the community due to different social class● Inadequate sidewalks due to being too narrow, and too vendor populated● People risking danger instead of using infrastructures● Motorists not giving way in crossings● Large cases of jaywalking due to arrogance
![Page 4: Oriented Project C5 Pedestrian](https://reader033.fdocuments.in/reader033/viewer/2022052722/628efc09a0924b6be94cfa83/html5/thumbnails/4.jpg)
Approach and Context
● Guidelines for sidewalk design to be reconsidered and highlight its importance● Need for clearer incentive for the user to utilize the sidewalk for its intended purpose● Walking has been undervalued, prioritized less, and overlooked ● There is a need to understand the behaviour of the pedestrians in order to know what
would discourage or encourage them
![Page 5: Oriented Project C5 Pedestrian](https://reader033.fdocuments.in/reader033/viewer/2022052722/628efc09a0924b6be94cfa83/html5/thumbnails/5.jpg)
Statement of the Problem
● One of the worst road stretches
● Pedestrian Structures are made just for their sake of purpose
● Waiting sheds invite informal settlers
● Large cases of jaywalking
● Insufficient waiting sheds
● Insufficient pedestrian overpass
- Steep steps - Vandalized - Of metal material which becomes slippery when wet- No roofing
● Heavy traffic
![Page 6: Oriented Project C5 Pedestrian](https://reader033.fdocuments.in/reader033/viewer/2022052722/628efc09a0924b6be94cfa83/html5/thumbnails/6.jpg)
Considerations
● Physical Distancing brought on by the Covid-19 pandemic● Safety and Security● Comfortability and convenience when commuting● Sense of Place
![Page 7: Oriented Project C5 Pedestrian](https://reader033.fdocuments.in/reader033/viewer/2022052722/628efc09a0924b6be94cfa83/html5/thumbnails/7.jpg)
Proposal and Strategies
Solutions:
● To provide more spaces for pedestrians to walk.
● To make pedestrian infrastructures more PWD friendly.● To encourage the use of bikes.● To provide sufficient amount of waiting sheds for commuters.● To prevent vandalism on waiting shed and increase security at night.● To convert pedestrian movement into sustainable energy.● To provide a safer pedestrian crossing.
![Page 8: Oriented Project C5 Pedestrian](https://reader033.fdocuments.in/reader033/viewer/2022052722/628efc09a0924b6be94cfa83/html5/thumbnails/8.jpg)
Proposal and Strategies
Solutions with consideration for COVID-19:
● Widening of pedestrian bridges of up to 3-4 meters.● Closing of narrow pedestrian bridges.● To establish suitable spacing between seatings for waiting sheds
![Page 9: Oriented Project C5 Pedestrian](https://reader033.fdocuments.in/reader033/viewer/2022052722/628efc09a0924b6be94cfa83/html5/thumbnails/9.jpg)
Multi-Modal Street Design along C-5
Wider Sidewalks
Allocation of Bike Lanes
Dedicated Drop-Off Points For
Commuters
![Page 10: Oriented Project C5 Pedestrian](https://reader033.fdocuments.in/reader033/viewer/2022052722/628efc09a0924b6be94cfa83/html5/thumbnails/10.jpg)
Overpass Design along C-5
Low E-GlassPanels
Elevator for PWD & Elderly
Concrete
Wood Panels
Concrete
Wood Panels
![Page 11: Oriented Project C5 Pedestrian](https://reader033.fdocuments.in/reader033/viewer/2022052722/628efc09a0924b6be94cfa83/html5/thumbnails/11.jpg)
Waiting Shed Design Along C-5
CCTV for Security
Less Use of Walls to Prevent Vandalism
Distanced and leaning stands
Solar Panels on top for Late-Night Commuters
![Page 12: Oriented Project C5 Pedestrian](https://reader033.fdocuments.in/reader033/viewer/2022052722/628efc09a0924b6be94cfa83/html5/thumbnails/12.jpg)
Other Strategies
Kinetic Tiles
● Converts kinetic energy from pedestrian movement into sustainable energy to power up street infrastructures.
Laser Aided Crosswalks
● The laser system will provide as visual aid for pedestrians and drivers for when to cross or stop.