Orcst - Variation and Final Acc1

176
OMISSION ADDITIONAL ITEM DESCRIPTION UNIT RATE TOTAL RATE TOTAL CONTRACT SUM $20,854,880.00 REMEASURED WORKS BILL NO. 3 - Pile Caps C 120 M2 $3,600.00 $432,000.00 D 3.6 M2 $13,000.00 $46,800.00 E 1.92 M3 $58,000.00 $111,360.00 QUANTI TY Allow for the replacement of corroded rebar where required with 16mm diameter bars x 1m, bent and welded to existing rebar as per drawing sheet 2a and as instructed by the Engineer and coated with epoxy zinc chromate primer to Supply and install wrought formwork to soffit and sides of pile cap. (for minimum concrete thickness of 150mm) inclusive of supports and bracing and striking on completion Place design concrete mix containing chloride inhibitors and super plastisizers having a 28 day cube strength of 30 Mpa

description

FINAL ACCOUNT

Transcript of Orcst - Variation and Final Acc1

Page 1: Orcst - Variation and Final Acc1

OMISSION ADDITIONAL

ITEM DESCRIPTION UNIT RATE TOTAL RATE TOTAL

CONTRACT SUM $20,854,880.00

REMEASURED WORKS BILL NO. 3 - Pile Caps

C

120 M2 $3,600.00 $432,000.00

D

3.6 M2 $13,000.00 $46,800.00

E

1.92 M3 $58,000.00 $111,360.00

QUANTITY

Allow for the replacement of corroded rebar where required with 16mm diameter bars x 1m, bent and welded to existing rebar as per drawing sheet 2a and as instructed by the Engineer and coated with epoxy zinc chromate primer to exposed surfaces

Supply and install wrought formwork to soffit and sides of pile cap. (for minimum concrete thickness of 150mm) inclusive of supports and bracing and striking on completion

Place design concrete mix containing chloride inhibitors and super plastisizers having a 28 day cube strength of 30 Mpa

Page 2: Orcst - Variation and Final Acc1

OMISSION ADDITIONAL

ITEM DESCRIPTION UNIT RATE TOTAL RATE TOTAL QUANTITY

H

56.929 M $11,000.00 $626,219.00

J

2 $112,000.00 $224,000.00

H

PS $600,000.00

Chase cracks to minimum depth fo 30mm by 60mm wide and repair with approved masonary repair concrete such Phoscrete supplied by PowerGen Limited (or similar product approved by the Engineer)

Clean during low tide exposed concrete and steel reinforcement to 2no. Pile Head supporting Pile Cap D appox 0.4 x 0.45m x 2no at splash zone by water blasting with potable water and apply layers of phoscrete concrete as per manufacturer instruction to ac

BILL NO. 4- Repairs to Deck Support Beams

Include Provisional Sum of $600,000.00 to be used as instructed by the Engineer. To be deducted in whole or part if unused.

Page 3: Orcst - Variation and Final Acc1

OMISSION ADDITIONAL

ITEM DESCRIPTION UNIT RATE TOTAL RATE TOTAL QUANTITY

D

192 M2 $1,000.00

E

PS $300,000.00

BILL NO. 6 = Repairs to T-Pier

K

PS $650,000.00

BILL NO. 7

VARIATION No. 1

Dowel 25mm rebars into existing slab 24 No. $3,271.25 Eng. Estimate @ $2,972.21 $78,510.00

removespalling concrete from additional t-pier cap 0.5 M3 $140,000.00 Rate is as per BQ/6 - ITEM A $70,000.00

BILL NO. 5 - Painting and Protective Coatings

Repaint exterior surfaces (sides and soffit) of 8no. pile caps with approved exterior marine grade paint finish, colour to match existing

Allow Provisional Sum of $300,000.00 to be used as instructed by Engineer. To be removed in whole or part if not used

Include the PROVISIONAL SUM of $650,000.00 for Contingencies to be used as directed by the Engineer and to be deducted in whole or in part if not required:-

Page 4: Orcst - Variation and Final Acc1

OMISSION ADDITIONAL

ITEM DESCRIPTION UNIT RATE TOTAL RATE TOTAL QUANTITY

VARIATION No. 2

replace barrier on T-Pier 5 no. $20,000.00 Eng. Estimate @ $85,000.00 $100,000.00

70 M $7,000.00 $490,000.00

Apply Nitobond to deck support beam item $19,375.00

additional work to widen Gate as Directed Sum Relocation of Gate Posts $20,000.00

VARIATION No. 3

Repair to Stem of Deck Beams

8 item $37,500.00 $300,000.00

A7 M2 $9,250.00 $64,750.00

B

10 M $8,000.00 $80,000.00

Chase crack to a minimum depth of 30mm x 60mm wide and repair with approved masonry repair concrete

( Rendoroc)

Allow for relocating the pantoon between span of pile clusters.

Remove delaminated and spalling concrete to a depth ( > 10 MM) so as to expose reinforcement

and clean with potable water .

Allow for cleaning of rebars with wire brush to remove all corrosion and wash with potable water.

(Corroded portion of rebar exposed to damaged face of stem)

Page 5: Orcst - Variation and Final Acc1

OMISSION ADDITIONAL

ITEM DESCRIPTION UNIT RATE TOTAL RATE TOTAL QUANTITY

C

0.069 M3 $39,600.00 $2,732.40

D

5 M $4,000.00 $20,000.00

E

240 No. $300.00 $72,000.00

Repair to the Soffit of Beams

A

10 No. $1,562.50 $15,625.00

B1 M2 $15,625.00 $15,625.00

C2 M2 $1,375.00 $2,750.00

Place design masonary repair concrete such Renderoc HB (or similar product approved by the

Engineer) to a thickiness no less than 12mm

Chase cracks to minimum depth fo 12mm and 30 mm wide; repair with approved masonary repair

concrete such Renderoc (or similar product approved by the Engineer)

Allow for removing concrete from defective area (0.07 sq. m) of beam stem, clean rebars with wire

brush to remove all corrosion and treat with zinc chromate. Repair using Renderoc HB (Corroded

portion of rebar exposed to damaged face of stem). apply Nitobond SBR as per manufacturer's

specification.

Remove 0.2 m2 delaminated and spalling concrete to a minimum depth of 12mm so as to

expose rebars of the soffit of deck beam.

Wire brush rebars to remove corrosion, wash with potable water and coat with zinc chromate

To apply Nitobond SBR as bonding agent to deck beams

Page 6: Orcst - Variation and Final Acc1

OMISSION ADDITIONAL

ITEM DESCRIPTION UNIT RATE TOTAL RATE TOTAL QUANTITY

D

0.02 M3 $820,000.00 $16,400.00

REPAIR TO PILE CAPS

A

3 M $28,200.00 $84,600.00

B 8 M2 $6,750.00 $54,000.00

C6 item $4,229.00 $25,374.00

D0.2 M2 $41,000.00 $8,200.00

E

0.5 M $70,250.00 $35,125.00

TOTAL OMISSION $2,400,219.00 TOTAL ADDITION $2,165,226.40

NET VARIATION -$234,992.60

CONTRACT SUM $20,854,880.00

Place design masonary repair concrete such Renderoc HB ( similar product approved by the

Engineer) to a thickiness no less than 12mm

Chase cracks to minimum depth fo 30mm by 60mm wide and repair with approved masonary

repair concrete such as Renderoc (or similar product approved by the Engineer)

Remove delaminated and spalling concrete to a minimum depth so as to expose rebars

Allow for cleaning of rebars with wire brush to remove all corrosion and wash with potable water.

Place design masonary repair concrete such Renderoc HB ( similar product approved by the

Engineer) .

Effect repairs to one corner ( 1M X1MX 0.5M) of a a pile cap, remove spalling concrete, clean

corrosion from bars using wire brush , treat with zinc chromate , shuttering and apply apply deisgn concrete with chloride inhibitor of design strength

no less than 30 Mpa.

Page 7: Orcst - Variation and Final Acc1

OMISSION ADDITIONAL

ITEM DESCRIPTION UNIT RATE TOTAL RATE TOTAL QUANTITY

REVISED CONTRACT SUM $20,619,887.40

Page 8: Orcst - Variation and Final Acc1

OMISSION ADDITIONAL

ITEM DESCRIPTION UNIT RATE TOTAL RATE TOTAL

CONTRACT SUM $20,854,880.00

VARIATION No. 4

A

4 Eng. Estimate @ $47,000.00 $55,000.00 $220,000.00

B

4 Rate is as per BQ/6 Item B $8,500.00 $34,000.00

C

5 Kg Rate is as per BQ/6 Item C $3,600.00 $18,000.00

D7.6 Eng. Estimate @ $13,000.00 $10,000.00 $76,000.00

E 1.5 Rate is as per BQ/6 Item E $58,000.00 $87,000.00

F Allow for Nitobond as per Manufacture's Instructions 4 Eng. Estimate @ $1,400.00 $1,375.00 $5,500.00

G 1.5 Eng. Estimate @ $7,700.00 $7,000.00 $10,500.00

H8 Rate is as per BQ/8 Item C $7,100.00 $56,800.00

SUB-TOTAL $507,800.00

OMISSION

BILL NO. 3 - Pile Caps

FPS $120,773.60

BILL NO. 6 - Repairs to T-Pier

HPS $387,026.40

SUB-TOTAL $507,800.00

Summary

CONTRACT SUM $20,854,880.00

VARIATIONS No. 4 $507,800.00

OMISSION ($507,800.00)

GRAND TOTAL $20,854,880.00

QUANTITY

Complete repairs as outlined to Pile Caps and concrete pile muff protection over water depth between 1m

Remove delaminated and spalling concrete to sides and base of pile cap to depth of 100mm below reinforcement and clean with potable water using high pressure water jet equipment during low tide level m2

Allow for cleaning of rebars with wet sand blasting, high pressure potable water jet and mechanical cleaning to White Metal (SSPC-SP5) (NACE1). (Corroded portion of rebar exposed to damaged face of pile caps)

m2

Allow for the replacement of corroded rebar where required with 16mm diameter bars x 1m, bent and welded to existing rebar as per drawing sheet 2a and as instructed by the Engineer and coated with epoxy zinc chromate primer to exposed surfaces

Supply and install wrought formwork to soffit and sides of pile cap. (for minimum concrete thickness of 150mm) inclusive of supports and bracing and striking on completion

m2

Place design concrete mix containing chloride inhibitors and super plastisizers having a 28 day cube strength of 30 Mpa m3

m2

Allow for the application of Renderoc to surface of repaired concrete beam to seal and close any cracks which may appear. m2

Apply two coats of the approved protective coating to match exterior colour. m2

Allow Provisional Sum of $150,000.00 for supply and installation of sacrificial anodes ( to be used as directed by the Engineer and to removed in whole or part if unused)

Include Provisional Sum of $650,000.00 to be used as instructed by the Engineer. To be deducted in whole or part if unused.

Page 9: Orcst - Variation and Final Acc1

OMISSION ADDITIONAL

DESCRIPTION UNIT RATE TOTAL RATE TOTAL

CONTRACT SUM $20,854,880.00

REMEASURED WORKS - All rates are as per contract

BILL NO. 3 - Pile Caps

120 M2 $3,600.00 $432,000.00

3.6 M2 $13,000.00 $46,800.00

1.92 M3 $58,000.00 $111,360.00

SUB-TOTAL $590,160.00VARIATIONS

VARIATION No. 1

Dowel 25mm rebars into existing slab

24 No. Eng. Estimate @ $2,900.00 $3,271.25 $78,510.00

removespalling concrete from additional t-pier cap 0.5 M3 Rate is as per BQ/6 - ITEM A $140,000.00 $70,000.00

VARIATION No. 2

replace barrier on T-Pier

5 no. Eng. Estimate @ $18,500.00 $20,000.00 $100,000.00

70 M Eng. Estimate @ $7,700.00 $7,000.00 $490,000.00

Apply Nitobond to deck support beamITEM Eng. Estimate @ $17,000.00 $19,375.00

additional work to widen Gate as Directed Sum Eng. Estimate @ $ 20,000.00 $20,000.00

QUANTITY

Allow for the replacement of corroded rebar where required with 16mm diameter bars x 1m, bent and welded to existing rebar as per drawing sheet 2a and as instructed by the Engineer and coated with epoxy zinc chromate primer to exposed surfaces

Supply and install wrought formwork to soffit and sides of pile cap. (for minimum concrete thickness of 150mm) inclusive of supports and bracing and striking on completion

Place design concrete mix containing chloride inhibitors and super plastisizers having a 28 day cube strength of 30 Mpa

Chase crack to a minimum depth of 30mm x 60mm wide and repair with approved masonry repair concrete ( Rendoroc)

Page 10: Orcst - Variation and Final Acc1

OMISSION ADDITIONAL

DESCRIPTION UNIT RATE TOTAL RATE TOTAL QUANTITY

VARIATION No. 3

Repair to Stem of Deck BeamsAllow for relocating the pantoon between span of pile clusters. 8 item Eng. Estimate @ $ 32,500.00 $37,500.00 $300,000.00

7 M2 Eng. Estimate @ $ 14,000.00 $9,250.00 $64,750.00

10 M Rate in the contract is $8,500. $8,000.00 $80,000.00

0.069 M3 Eng. Estimate @ $ 49,000.00 $39,600.00 $2,732.40

5 M Eng. Estimate @ $2,700.00 $4,000.00 $20,000.00

240 No. Eng. Estimate @ $287.00 $300.00 $72,000.00

Repair to the Soffit of Beams

10 No. Eng. Estimate @ $1,600.00 $1,562.50 $15,625.00

1 M2 Eng. Estimate @ $11,900.00 $15,625.00 $15,625.00

To apply Nitobond SBR as bonding agent to deck beams 2 M2 Eng. Estimate @ $3,500.00 $1,375.00 $2,750.00

Eng. Estimate @ $17,680.00 Item $16,400.00

Remove delaminated and spalling concrete to a depth ( > 10 MM) so as to expose reinforcement and clean with potable

water .

Allow for cleaning of rebars with wire brush to remove all corrosion and wash with potable water. (Corroded portion

of rebar exposed to damaged face of stem)

Place design masonary repair concrete such Renderoc HB (or similar product approved by the Engineer) to a thickiness no

less than 12mm

Chase cracks to minimum depth fo 12mm and 30 mm wide; repair with approved masonary repair concrete such Renderoc

(or similar product approved by the Engineer)

Allow for removing concrete from defective area (0.07 sq. m) of beam stem, clean rebars with wire brush to remove all corrosion

and treat with zinc chromate. Repair using Renderoc HB (Corroded portion of rebar exposed to damaged face of stem).

apply Nitobond SBR as per manufacturer's specification.

Remove 0.2 m2 delaminated and spalling concrete to a minimum depth of 12mm so as to expose rebars of the soffit of deck

beam.

Wire brush rebars to remove corrosion, wash with potable water and coat with zinc chromate

Place design masonary repair concrete such Renderoc HB ( similar product approved by the Engineer) to a thickiness no

less than 12mm

Page 11: Orcst - Variation and Final Acc1

OMISSION ADDITIONAL

DESCRIPTION UNIT RATE TOTAL RATE TOTAL QUANTITY

Repairs to Pile Cap

3 M Eng. Estimate @ $11,000.00 $28,200.00 $84,600.00

8 M2 Eng. Estimate @ $20,000.00 $6,750.00 $54,000.00

6 item Eng. Estimate @ $2,500.00 $4,229.00 $25,374.00

0.2 M2 Eng. Estimate @ $49,000.00 $41,000.00 $8,200.00

0.5 M Eng. Estimate @ $80,000.00 $70,250.00 $35,125.00

VARIATION No. 4

4

Eng. Estimate @ $47,000.00 $55,000.00 $220,000.00

4

Rate is as per BQ/6 Item B $8,500.00 $34,000.00

5 Kg

Rate is as per BQ/6 Item C $3,600.00 $18,000.00

7.6Eng. Estimate @ $13,000.00 $10,000.00 $76,000.00

1.5 Rate is as per BQ/6 Item E $58,000.00 $87,000.00

Allow for Nitobond as per Manufacture's Instructions 4 Eng. Estimate @ $1,400.00 $1,375.00 $5,500.00

1.5 Eng. Estimate @ $7,700.00 $7,000.00 $10,500.00

8Rate is as per BQ/8 Item C $7,100.00 $56,800.00

SUB-TOTAL $2,082,866.40

OMISSION

General & Preliminary Items

PS $50,000.00

BILL NO. 3 - Pile Caps

PS $150,000.00

70 M $11,000.00 $770,000.00

Chase cracks to minimum depth fo 30mm by 60mm wide and repair with approved masonary repair concrete such as

Renderoc (or similar product approved by the Engineer)

Remove delaminated and spalling concrete to a minimum depth so as to expose rebars

Allow for cleaning of rebars with wire brush to remove all corrosion and wash with potable water.

Place design masonary repair concrete such Renderoc HB ( similar product approved by the Engineer) .

Effect repairs to one corner ( 1M X1MX 0.5M) of a a pile cap, remove spalling concrete, clean corrosion from bars using wire

brush , treat with zinc chromate , shuttering and apply apply deisgn concrete with chloride inhibitor of design strength no less

than 30 Mpa.

Complete repairs as outlined to Pile Caps and concrete pile muff protection over water depth between 1m

Remove delaminated and spalling concrete to sides and base of pile cap to depth of 100mm below reinforcement and clean with potable water using high pressure water jet equipment during low tide level

m2

Allow for cleaning of rebars with wet sand blasting, high pressure potable water jet and mechanical cleaning to White Metal (SSPC-SP5) (NACE1). (Corroded portion of rebar exposed to damaged face of pile caps)

m2

Allow for the replacement of corroded rebar where required with 16mm diameter bars x 1m, bent and welded to existing rebar as per drawing sheet 2a and as instructed by the Engineer and coated with epoxy zinc chromate primer to exposed surfaces

Supply and install wrought formwork to soffit and sides of pile cap. (for minimum concrete thickness of 150mm) inclusive of supports and bracing and striking on completion

m2

Place design concrete mix containing chloride inhibitors and super plastisizers having a 28 day cube strength of 30 Mpa

m3

m2

Allow for the application of Renderoc to surface of repaired concrete beam to seal and close any cracks which may appear.

m2

Apply two coats of the approved protective coating to match exterior colour.

m2

Allow Provisional Sum of $50,000.00 for the supply and installation of signs as per Engineers instructions

Allow Provisional Sum of $150,000.00 for supply and installation of sacrificial anodes ( to be used as directed by the Engineer and to removed in whole or part if unused)

Chase cracks to minimum depth fo 30mm by 60mm wide and repair with approved masonary repair concrete such Phoscrete supplied by PowerGen Limited (or similar product approved by the Engineer)

Page 12: Orcst - Variation and Final Acc1

OMISSION ADDITIONAL

DESCRIPTION UNIT RATE TOTAL RATE TOTAL QUANTITY

2 $112,000.00 $224,000.00

BILL NO. 4- Repairs to Deck Support Beams

PS $600,000.00

BILL NO. 5 - Painting and Protective Coatings

192 M2 $1,000.00 $192,000.00

PS $300,000.00

BILL NO. 6 - Repairs to Damaged T-Pier

PS 387,025.20

SUB-TOTAL $2,673,026.40 $2,673,026.40

Summary

CONTRACT SUM $20,854,880.00

REMEASURED WORKS $590,160.00

VARIATIONS $2,082,866.40

OMISSION ($2,165,226.40)

GRAND TOTAL $21,362,680.00

Clean during low tide exposed concrete and steel reinforcement to 2no. Pile Head supporting Pile Cap D appox 0.4 x 0.45m x 2no at splash zone by water blasting with potable water and apply layers of phoscrete concrete as per manufacturer instruction to ac

Include Provisional Sum of $600,000.00 to be used as instructed by the Engineer. To be deducted in whole or part if unused.

Repaint exterior surfaces (sides and soffit) of 8no. pile caps with approved exterior marine grade paint finish, colour to match existing

Allow Provisional Sum of $300,000.00 to be used as instructed by Engineer. To be removed in whole or part if not used

Include Provisional Sum of $600,000.00 to be used as instructed by the Engineer. To be deducted in whole or part if unused.

Page 13: Orcst - Variation and Final Acc1

OCHO RIOS PILE CAP REPAIRS - VARIATION

Page 13 of 147

OMISSION ADDITIONAL

ITEM DESCRIPTION UNIT RATE TOTAL RATE

CONTRACT SUM $20,854,880.00

General & Preliminary ItemsK

PS $50,000.00

BILL NO. 3 - Pile CapsC

120 M2 $3,600.00

D

3.6 M2 $13,000.00

E

1.92 M3 $58,000.00

QUANTITY

Allow Provisional Sum of $50,000.00 for the supply and installation of signs as per Engineers instructions

Allow for the replacement of corroded rebar where required with 16mm diameter bars x 1m, bent and welded to existing rebar as per drawing sheet 2a and as instructed by the Engineer and coated with epoxy zinc chromate primer to exposed surfaces

Supply and install wrought formwork to soffit and sides of pile cap. (for minimum concrete thickness of 150mm) inclusive of supports and bracing and striking on completion

Place design concrete mix containing chloride inhibitors and super plastisizers having a 28 day cube strength of 30 Mpa

Page 14: Orcst - Variation and Final Acc1

OCHO RIOS PILE CAP REPAIRS - VARIATION

Page 14 of 147

OMISSION ADDITIONAL

ITEM DESCRIPTION UNIT RATE TOTAL RATEQUANTITY

F

PS $150,000.00

H

70 M $11,000.00 $770,000.00

J

2 $112,000.00 $224,000.00

H

PS $600,000.00

Allow Provisional Sum of $150,000.00 for supply and installation of sacrificial anodes ( to be used as directed by the Engineer and to removed in whole or part if unused)

Chase cracks to minimum depth fo 30mm by 60mm wide and repair with approved masonary repair concrete such Phoscrete supplied by PowerGen Limited (or similar product approved by the Engineer)

Clean during low tide exposed concrete and steel reinforcement to 2no. Pile Head supporting Pile Cap D appox 0.4 x 0.45m x 2no at splash zone by water blasting with potable water and apply layers of phoscrete concrete as per manufacturer instruction to ac

BILL NO. 4- Repairs to Deck Support Beams

Include Provisional Sum of $600,000.00 to be used as instructed by the Engineer. To be deducted in whole or part if unused.

Page 15: Orcst - Variation and Final Acc1

OCHO RIOS PILE CAP REPAIRS - VARIATION

Page 15 of 147

OMISSION ADDITIONAL

ITEM DESCRIPTION UNIT RATE TOTAL RATEQUANTITY

D

192 M2 $1,000.00 $192,000.00

E

PS $300,000.00

BILL NO. 6 = Repairs to T-Pier

K

PS $650,000.00

F 16 mm diameter high tensile rod reinforced 212 KG $300.00 $63,600.00

G 25 mm diameter high tensile rod reinforced 364 KG $350.00 $127,400.00

BILL NO. 7

F 10 mm diameter mild steel rod reinforced 450.00 KG $260.00 $117,000.00

VARIATION No. 1

Dowel 25mm rebars into existing slab

removespalling concrete from additional t-pier cap

BILL NO. 5 - Painting and Protective Coatings

Repaint exterior surfaces (sides and soffit) of 8no. pile caps with approved exterior marine grade paint finish, colour to match existing

Allow Provisional Sum of $300,000.00 to be used as instructed by Engineer. To be removed in whole or part if not used

Include the PROVISIONAL SUM of $650,000.00 for Contingencies to be used as directed by the Engineer and to be deducted in whole or in part if not required:-

Page 16: Orcst - Variation and Final Acc1

OCHO RIOS PILE CAP REPAIRS - VARIATION

Page 16 of 147

OMISSION ADDITIONAL

ITEM DESCRIPTION UNIT RATE TOTAL RATEQUANTITY

VARIATION No. 2

replace barrier on T-Pier

70 M $7,000.00

Apply Nitobond to deck support beam

additional work to widen Gate as Directed

VARIATION No. 3

Repair to Stem of Deck Beams

8 item $37,500.00

A7 M2 $9,250.00

B

10 M $8,000.00

Chase crack to a minimum depth of 30mm x 60mm wide and repair with approved masonry repair concrete

( Rendoroc)

Allow for relocating the pantoon between span of pile clusters.

Remove delaminated and spalling concrete to a depth ( > 10 MM) so as to expose reinforcement

and clean with potable water .

Allow for cleaning of rebars with wire brush to remove all corrosion and wash with potable water.

(Corroded portion of rebar exposed to damaged face of stem)

Page 17: Orcst - Variation and Final Acc1

OCHO RIOS PILE CAP REPAIRS - VARIATION

Page 17 of 147

OMISSION ADDITIONAL

ITEM DESCRIPTION UNIT RATE TOTAL RATEQUANTITY

C

0.069 M3 $39,600.00

D

5 M $4,000.00

E

240 No. $300.00

Repair to the Soffit of Beams

A

10 No. $1,562.50

B1 M2 $15,625.00

C2 M2 $1,375.00

Place design masonary repair concrete such Renderoc HB (or similar product approved by the

Engineer) to a thickiness no less than 12mm

Chase cracks to minimum depth fo 12mm and 30 mm wide; repair with approved masonary repair

concrete such Renderoc (or similar product approved by the Engineer)

Allow for removing concrete from defective area (0.07 sq. m) of beam stem, clean rebars with wire

brush to remove all corrosion and treat with zinc chromate. Repair using Renderoc HB (Corroded

portion of rebar exposed to damaged face of stem). apply Nitobond SBR as per manufacturer's

specification.

Remove 0.2 m2 delaminated and spalling concrete to a minimum depth of 12mm so as to

expose rebars of the soffit of deck beam.

Wire brush rebars to remove corrosion, wash with potable water and coat with zinc chromate

To apply Nitobond SBR as bonding agent to deck beams

Page 18: Orcst - Variation and Final Acc1

OCHO RIOS PILE CAP REPAIRS - VARIATION

Page 18 of 147

OMISSION ADDITIONAL

ITEM DESCRIPTION UNIT RATE TOTAL RATEQUANTITY

D

0.02 M3 $820,000.00

REPAIR TO PILE CAPS

A

3 M $28,200.00

B 8 M2 $6,750.00

C6 item $4,229.00

D0.2 M2 $41,000.00

E

0.5 M $70,250.00

TOTAL OMISSION $3,244,000.00 TOTAL ADDITION

NET VARIATION -$1,078,773.60

CONTRACT SUM $20,854,880.00

Place design masonary repair concrete such Renderoc HB ( similar product approved by the

Engineer) to a thickiness no less than 12mm

Chase cracks to minimum depth fo 30mm by 60mm wide and repair with approved masonary

repair concrete such as Renderoc (or similar product approved by the Engineer)

Remove delaminated and spalling concrete to a minimum depth so as to expose rebars

Allow for cleaning of rebars with wire brush to remove all corrosion and wash with potable water.

Place design masonary repair concrete such Renderoc HB ( similar product approved by the

Engineer) .

Effect repairs to one corner ( 1M X1MX 0.5M) of a a pile cap, remove spalling concrete, clean

corrosion from bars using wire brush , treat with zinc chromate , shuttering and apply apply deisgn concrete with chloride inhibitor of design strength

no less than 30 Mpa.

Page 19: Orcst - Variation and Final Acc1

OCHO RIOS PILE CAP REPAIRS - VARIATION

Page 19 of 147

OMISSION ADDITIONAL

ITEM DESCRIPTION UNIT RATE TOTAL RATEQUANTITY

REVISED CONTRACT SUM $19,776,106.40

Page 20: Orcst - Variation and Final Acc1

OCHO RIOS PILE CAP REPAIRS - VARIATION

Page 20 of 147

ADDITIONAL

TOTAL

$20,854,880.00

$432,000.00

$46,800.00

$111,360.00

Page 21: Orcst - Variation and Final Acc1

OCHO RIOS PILE CAP REPAIRS - VARIATION

Page 21 of 147

ADDITIONAL

TOTAL

Page 22: Orcst - Variation and Final Acc1

OCHO RIOS PILE CAP REPAIRS - VARIATION

Page 22 of 147

ADDITIONAL

TOTAL

$78,510.00

$70,000.00

Page 23: Orcst - Variation and Final Acc1

OCHO RIOS PILE CAP REPAIRS - VARIATION

Page 23 of 147

ADDITIONAL

TOTAL

$100,000.00

$490,000.00

$19,375.00

$20,000.00

$300,000.00

$64,750.00

$80,000.00

Page 24: Orcst - Variation and Final Acc1

OCHO RIOS PILE CAP REPAIRS - VARIATION

Page 24 of 147

ADDITIONAL

TOTAL

$2,732.40

$20,000.00

$72,000.00

$15,625.00

$15,625.00

$2,750.00

Page 25: Orcst - Variation and Final Acc1

OCHO RIOS PILE CAP REPAIRS - VARIATION

Page 25 of 147

ADDITIONAL

TOTAL

$16,400.00

$84,600.00

$54,000.00

$25,374.00

$8,200.00

$35,125.00

$2,165,226.40

Page 26: Orcst - Variation and Final Acc1

PORT AUTHORITY OF JAMAICA

ITEM DESCRIPTION CONTRACT

QUANTITY

General & Preliminary Items

A a) Contractors All Risk

B b) Public LiabilityC c) Employers Liability

D

E

F Allow for mobilisation of equipment and site personnel

G Programme

H Setting Out

Listed under this bill are items for which, in opinion of the Engineer, a separate charge is appropriate and becomes due at the times stated. The sums are entered against these items shall be fixed lumps sums not subject to works. All extra costs requir

Allow for the provision of the following insurances for the works in accordance with the Condition of Contracts

Allow for provisons of Performance Bond of 10% for duration of construction of the works

Allow for mobilisation of all necessary tools, equipment and personnel site, inclusive of working platform or pontoon barge and necessary mooring or anchoring equipment for safe operation

Page 27: Orcst - Variation and Final Acc1

J

K

L

M

N

O

BILL NO. 1 Cont'd

A

B Allow for the working, curing and testing of concrete test cubes.

C

Allow for all safety and Personal Protective Equipment required for the workforce including that required for working over water

Allow Provisional Sum of $50,000.00 for the supply and installation of signs as per Engineers instructions

Welfare and sanitary facilities, installation of temporary services, false work, platforms, boat, tenting for protection of works and removal on completion of contract.

Allow for modification to property fence and entrance canopy so as to create access for equipment & make good on completion

Allow for taking all precaution to avoid any damage whatsoever to existing infrastructures services.

Allow for providing samples of material proposed to be used in the Contract which when requested by the Engineer shall be furnished without delay.

TOTAL BILL NO. 1 - FIXED PRELIMINARIES Add#3 - BQ/2 carried forward

Allow for providing and erecting in approved locations proper sheds for use of the workmen, storage and protection of materials (those for cement having floor raised at least 12" from the ground) and for clearing same away upon completion of construction.

The Contractor shall enter in the spaces below the clause numbers of the conditions of Contract or Specification against which to cover any special risk, liabilities and obligations not described above and which cannot be included in the rates. The amoun

Page 28: Orcst - Variation and Final Acc1

BILL NO. 2

Time Dependent Preliminaries

A Temporary Services (eg. water, power, phone etc) 10

B Lighting, site security and keeping site clean at all times 10

Site Supervsion and management.

C List made up of total figure below: 10

Item Amt/Week

EngineerSupervisor

REPAIR TO PILE CAPS

BILL NO. 3 Pile Caps

Repair to Pile Caps on Grid Lines B, C and E

A 4

B 4

TOTAL BILL NO. 1 - FIXED PRELIMINARIES Add#3 - BQ/2 - brought forward

TOTAL BILL NO. 1 - FIXED PRELIMINARIES carried to summary

TOTAL BILL NO. 2 - TIME DEPENDENT PRELIMINARIES

Complete repairs as outlined to Pile Caps and concrete pile muff protection over water depth between 1m and 6m

Remove delaminated and spalling concrete to sides of pile cap to depth of 100mm below reinforcement and clean with potable water using high pressure water jet equipment during low tide level

Allow for cleaning of rebars with wet sand blasting, high pressure potable water jet and mechanical cleaning to White Metal (SSPC-SP5) (NACE1). (Corroded portion of rebar exposed to damaged face of pile caps)

Page 29: Orcst - Variation and Final Acc1

C 30

D 4

E 0.6

F

G 4

Repair to Pile Caps on Grid Lines B, CD, , E, N, P and V

H 100

J 2

REPAIR TO PILE CAPSBILL NO. 4

Allow for the replacement of corroded rebar where required with 16mm diameter bars x 1m, bent and welded to existing rebar as per drawing sheet 2a and as instructed by the Engineer and coated with epoxy zinc chromate primer to exposed surfaces

Supply and install wrought formwork to soffit and sides of pile cap. (for minimum concrete thickness of 150mm) inclusive of supports and bracing and striking on completion

Place design concrete mix containing chloride inhibitors and super plastisizers having a 28 day cube strength of 30 Mpa

Allow Provisional Sum of $150,000.00 for supply and installation of sacrificial anodes ( to be used as directed by the Engineer and to removed in whole or part if unused)

Allow for the application of repair mortor to surface of repaired concrete beam to seal and close any cracks which may appear.

Chase cracks to minimum depth fo 30mm by 60mm wide and repair with approved masonary repair concrete such Phoscrete supplied by PowerGen Limited (or similar product approved by the Engineer)

Clean during low tide exposed concrete and steel reinforcement to 2no. Pile Head supporting Pile Cap D appox 0.4 x 0.45m x 2no at splash zone by water blasting with potable water and apply layers of phoscrete concrete as per manufacturer instruction to ac

TOTAL BILL NO. 3 - REPAIRS TO PILE CAP carried to summary

Page 30: Orcst - Variation and Final Acc1

Repairs to Deck Support Beams

A 8

B 8

C 36

D Supply and install wrought fromwork to soffit and side of beam. 84

E 3

F 42

G 8

H

3

REPAIR TO PILE CAPS

Repair/Reinstatement of damage to Precast Double Tees on Grid Lines 5, 6, 7 & 8

Allow for temporary support and work access to each Double Tee sections (approx. 14m length) in water depth varing between 1m and 6m deep, during beam repairs

Remove 0.5 m2 delaminated and spalling concrete to expose at least 150mm of tendon on either side of damaged double Tee beam

Sandblast reinforcement tendons to remove corrosion and apply zinc chromate primer to exposed tendons

Place design concrete mix containing chloride inhibitors etc having a 28 day cube strength of 30 Mpa

Allow for the application of repair mortor to surface of repaired concrete beam to complete repairs and seal any cracks which may appear on surface of ccncrete.

Allow for the temporary work access platform to complete repairs to cracks in Double Tee beams in water depths 1m to 6m

Include Provisional Sum of $600,000.00 to be used as instructed by the Engineer. To be deducted in whole or part if unused.

Alternative (Rate Only)

Apply shot crete or build up concrete having a 28 day cube strength of 30 Mpa to complete beam repair around reinforcement tendons inclusive of final surface render finish.

TOTAL BILL NO. 4 - REPAIRS TO DECK SUPPORT BEAMS

Page 31: Orcst - Variation and Final Acc1

BILL NO. 5

Painting and Protective Coatings

A

B 192

C 192

D 192

.E

REPAIR TO DAMAGED T PIERBILL NO. 6

DEMOLITION AND ALTERATION

Allow for the installation of protective drop cloth or equivalent method to facilitate the collection of sand and debris at each location resulting from the sandblasting of the concrete surface (measured seperately)

Remove existing paint finish to to sides and soffit of 8 no. pile caps by wet sand blasting or water blasting as required

Apply approved corrosion inhibiting coating to the previously prepared and new concrete surfaces of 8no. Pile caps as per manufacturers instruction

Repaint exterior surfaces (sides and soffit) of 8no. pile caps with approved exterior marine grade paint finish, colour to match existing

Allow Provisional Sum of $300,000.00 to be used as instructed by Engineer. To be removed in whole or part if not used

TOTAL BILL NO. 5 - PAINTING & PROTECTIVE COATINGS carried to summary

The demolition of existing in-situ slab between centre lines 3-4 and A-B . The removal and replacement of two "L" -shaped beams and repair one pile cap at 3B.

Carefully remove following damaged concrete section of pier inclusive of all false work and safety measures

Page 32: Orcst - Variation and Final Acc1

A 25.00

B 13.50

C Cart away spoil

PRE-CAST REINFORCED CONCRETE

Reinforced Concrete 4500 PSI in:

D 3.00

Steel Reinforcement

E 10 mm diameter Mild steel rod reinforced 415.00

F 16 mm diameter high tensile rod reinforced 322.00

G 25 mm diameter high tensile rod reinforced 660.00

Formwork and support to:-

H Side of beam 23.00

J Ditto bottom of beam 6.00

K

22'-0" x 12'-0" x 8" section of reinforced concrete slab supported on 8" thick precast concrete slabs (to be reused) mounted on damaged reinforced concrete beams (measured seperately)

Damaged 18"x16"x22' reinforced concrete beams mounted on pile caps as supports to precast slab and insitu slab. Insitu slab to be removed and measured seprately.

This section covers the replacement of 2 No. Pre-cast reinforced concrete beam and in-situ 200mm concrete slab. Prices should include for all costs involved in order to fulfill every requirement of the design specification and any particular site conditio

Precast Reinforced Concrete Beam fixed to top of piles as per drawing

Include the PROVISIONAL SUM of $650,000.00 for Contingencies to be used as directed by the Engineer and to be deducted in whole or in part if not required:-

Page 33: Orcst - Variation and Final Acc1

REPAIR TO DAMAGED T PIER

BILL NO. 7

IN-SITU REINFORCED CONCRETE

Reinforced Concrete Pile Cap

A Pile Cap - Concrete 431 M.Pa 0.30

B 12 mm diameter mild steel rod reinforced 21.00

C 16 mm diameter high tensile rod reinforced 97.00

D Sides of pile cap 2.00

In-situ Reinforced Concrete Slab

E 8.00

F 10 mm diameter mild steel rod reinforced 514.00

REPAIR TO DAMAGED T PIER

BILL NO. 8

SHORE PROTECTION - BOULDERS

A 600

B Ditto with boulder 0.3m - 0.8m diameter ( Provisional) 40

TOTAL BILL NO. 6 - REPAIR TO DAMAGED T PIER carried to summary

200 mm thick slab laid on Pre-Cast slab (measured seperately) finished with broom finish.

TOTAL BILL NO. 7 - IN-SITU REINFORCED CONCRETE carried to summary

To supply material , labour to place boulders 0.9m and 1.2m in diameter as rock armouring to shoreline in accordance with specifications (Provisional)

Page 34: Orcst - Variation and Final Acc1

C 80

VARIATION

1 VARIATION No. 12

Dowel 25mm rebars into existing slab34 Remove spalling concrete from additional t-pier cap5

6 VARIATION No. 278 replace barrier on T-Pier

Apply Nitobond to deck support beam

additional work to widen Gate as Directed

VARIATION No. 3

Repair to Stem of Deck BeamsAllow for relocating the pantoon between span of pile clusters.

Carefully reclaim boulders(0.9m and 1.2m in diameter) from seabed in a depth of water not exceeding 1.5m for repacking in rock armouring (Provisional)

TOTAL BILL NO. 8 - SHORE PROTECTION - BOULDERS carried to summary

Chase crack to a minimum depth of 30mm x 60mm wide and repair with approved masonry repair concrete ( Rendoroc)

Remove delaminated and spalling concrete to a depth ( > 10 MM) so as to expose reinforcement and clean with potable water .

Page 35: Orcst - Variation and Final Acc1

Repair to the Soffit of Beams

To apply Nitobond SBR as bonding agent to deck beams

REPAIR TO PILE CAPS

Allow for cleaning of rebars with wire brush to remove all corrosion and wash with potable water. (Corroded portion of rebar exposed to damaged face of stem)

Place design masonary repair concrete such Renderoc HB (or similar product approved by the Engineer) to a thickiness no less than 12mm

Chase cracks to minimum depth fo 12mm and 30 mm wide; repair with approved masonary repair concrete such Renderoc (or similar product approved by the Engineer)

Allow for removing concrete from defective area (0.07 sq. m) of beam stem, clean rebars with wire brush to remove all corrosion and treat with zinc chromate. Repair using Renderoc HB (Corroded portion of rebar exposed to damaged face of stem). apply Nitobond SBR as per manufacturer's specification.

Remove 0.2 m2 delaminated and spalling concrete to a minimum depth of 12mm so as to expose rebars of the soffit of deck beam.

Wire brush rebars to remove corrosion, wash with potable water and coat with zinc chromate

Place design masonary repair concrete such Renderoc HB ( similar product approved by the Engineer) to a thickiness no less than 12mm

Chase cracks to minimum depth fo 30mm by 60mm wide and repair with approved masonary repair concrete such as Renderoc (or similar product approved by the Engineer)

Page 36: Orcst - Variation and Final Acc1

VARIATION No. 4

Remove delaminated and spalling concrete to a minimum depth so as to expose rebars

Allow for cleaning of rebars with wire brush to remove all corrosion and wash with potable water.

Place design masonary repair concrete such Renderoc HB ( similar product approved by the Engineer) .

Effect repairs to one corner ( 1M X1MX 0.5M) of a a pile cap, remove spalling concrete, clean corrosion from bars using wire brush , treat with zinc chromate , shuttering and apply apply deisgn concrete with chloride inhibitor of design strength no less than 30 Mpa.

Complete repairs as outlined to Pile Caps and concrete pile muff protection over water depth between 1m

Remove delaminated and spalling concrete to sides and base of pile cap to depth of 100mm below reinforcement and clean with potable water using high pressure water jet equipment during low tide level

Allow for cleaning of rebars with wet sand blasting, high pressure potable water jet and mechanical cleaning to White Metal (SSPC-SP5) (NACE1). (Corroded portion of rebar exposed to damaged face of pile caps)

Allow for the replacement of corroded rebar where required with 16mm diameter bars x 1m, bent and welded to existing rebar as per drawing sheet 2a and as instructed by the Engineer and coated with epoxy zinc chromate primer to exposed surfaces

Page 37: Orcst - Variation and Final Acc1

Allow for Nitobond as per Manufacture's Instructions

Supply and install wrought formwork to soffit and sides of pile cap. (for minimum concrete thickness of 150mm) inclusive of supports and bracing and striking on completion

Place design concrete mix containing chloride inhibitors and super plastisizers having a 28 day cube strength of 30 Mpa

Allow for the application of Renderoc to surface of repaired concrete beam to seal and close any cracks which may appear.

Apply two coats of the approved protective coating to match exterior colour.

Page 38: Orcst - Variation and Final Acc1

CONTRACT ADDITION

UNIT RATE TOTAL QUNTITY RATE

Sum -

SumSum $600,000.00

Sum $100,000.00 -

Sum $550,000.00 -

Sum $400,000.00 -

Sum $40,000.00 -

Sum $10,000.00 -

Page 39: Orcst - Variation and Final Acc1

Sum $250,000.00 -

PS $50,000.00

Sum $250,000.00 -

Sum $200,000.00 -

Sum $80,000.00 -

Sum $50,000.00 -

-

Sum $200,000.00

Sum $80,000.00

Page 40: Orcst - Variation and Final Acc1

Week 6,000.00 $60,000.00

Week 6,000.00 $60,000.00

Week 50,000.00 $500,000.00

140,000.00 $560,000.00

8,500.00 $34,000.00

m2

m2

Page 41: Orcst - Variation and Final Acc1

Kg 3,600.00 $108,000.00 120.00 3600.00

13,000.00 $52,000.00 3.60 13000.00

58,000.00 $34,800.00 1.92 58000.00

PS $150,000.00

2,000.00 $8,000.00

m 11,000.00 $1,100,000.00

no. 112,000.00 $224,000.00

m2

m3

m2

Page 42: Orcst - Variation and Final Acc1

no. 235000 $1,880,000.00

no. 31,500.00 $252,000.00

8,500.00 $306,000.00

13,000.00 $1,092,000.00

58,000.00 $174,000.00

2,000.00 $84,000.00

no. 50,000.00 $400,000.00

PS $600,000.00

m2

m2

m3

m2

m3

Page 43: Orcst - Variation and Final Acc1

item $100,000.00

8,500.00 $1,632,000.00

7,100.00 $1,363,200.00

1,000.00 $192,000.00

PS $300,000.00

m2

m2

m2

Page 44: Orcst - Variation and Final Acc1

4000 $100,000.00

m 46000 $621,000.00

SUM $100,000.00

Cub. M 240,000.00 $720,000.00

Kg. 260.00 $107,900.00

Kg. 300.00 $96,600.00

Kg. 350.00 $231,000.00

Sq. M 4,000.00 $92,000.00

Sq. M 3,000.00 $18,000.00

PS $650,000.00

m2

Page 45: Orcst - Variation and Final Acc1

Cub. M 38,000.00 $11,400.00

Kg. 300.00 $6,300.00

Kg. 320.00 $31,040.00

Sq. M 13,000.00 $26,000.00

Cub. M 33,000.00 $264,000.00

Kg. 260.00 $133,640.00

Cub. M 5,000.00 $3,000,000.00

Cub. M 5,000.00 $200,000.00

Page 46: Orcst - Variation and Final Acc1

Cub. M 4,000.00 $320,000.00

No. 24 $3,271.25

M3 0.5 $140,000.00

no. 5 $20,000.00

M 70 $7,000.00

ITEM

Sum

item 8 $37,500.00

M2 7 $9,250.00

Page 47: Orcst - Variation and Final Acc1

M 10 $8,000.00

M3 0.069 $39,600.00

M 5 $4,000.00

No. 240 $300.00

No. 10 $1,562.50

M2 1 $15,625.00

M2 2 $1,375.00

Item

M 3 $28,200.00

Page 48: Orcst - Variation and Final Acc1

M2 8 $6,750.00

item 6 $4,229.00

M2 0.2 $41,000.00

M 0.5 $70,250.00

4 $55,000.00

4 $8,500.00

Kg 5 $3,600.00

m2

m2

Page 49: Orcst - Variation and Final Acc1

7.6 $10,000.00

1.5 $58,000.00

4 $1,375.00

1.5 $7,000.00

8 $7,100.00

$20,854,880.00

m2

m3

m2

m2

m2

Page 50: Orcst - Variation and Final Acc1
Page 51: Orcst - Variation and Final Acc1

ADDITION OMISSION

TOTAL QUNTITY RATE TOTAL

-

-

-

-

-

-

Page 52: Orcst - Variation and Final Acc1

-

$50,000.00

Page 53: Orcst - Variation and Final Acc1
Page 54: Orcst - Variation and Final Acc1

432000.00

46800.00

111360.00

$150,000.00

70.00 11000 $770,000.00

Page 55: Orcst - Variation and Final Acc1

$600,000.00

Page 56: Orcst - Variation and Final Acc1

192.00 1000.00 $192,000.00

$300,000.00

Page 57: Orcst - Variation and Final Acc1

$650,000.00

Page 58: Orcst - Variation and Final Acc1
Page 59: Orcst - Variation and Final Acc1

78510.00

70000.00

100000.00

490000.00

$19,375.00

$20,000.00

$ 300,000.00

$ 64,750.00

Page 60: Orcst - Variation and Final Acc1

$ 80,000.00

$ 2,732.40

$ 20,000.00

$ 72,000.00

$ 15,625.00

$ 15,625.00

$ 2,750.00

$ 84,600.00

Page 61: Orcst - Variation and Final Acc1

$ 54,000.00

$ 25,374.00

$ 8,200.00

$ 35,125.00

$ 220,000.00

$ 34,000.00

$ 18,000.00

Page 62: Orcst - Variation and Final Acc1

$ 76,000.00

$ 87,000.00

$ 5,500.00

$ 10,500.00

$ 56,800.00

$2,656,626.40 $2,712,000.00

Page 63: Orcst - Variation and Final Acc1
Page 64: Orcst - Variation and Final Acc1
Page 65: Orcst - Variation and Final Acc1
Page 66: Orcst - Variation and Final Acc1
Page 67: Orcst - Variation and Final Acc1
Page 68: Orcst - Variation and Final Acc1
Page 69: Orcst - Variation and Final Acc1
Page 70: Orcst - Variation and Final Acc1
Page 71: Orcst - Variation and Final Acc1
Page 72: Orcst - Variation and Final Acc1
Page 73: Orcst - Variation and Final Acc1
Page 74: Orcst - Variation and Final Acc1
Page 75: Orcst - Variation and Final Acc1
Page 76: Orcst - Variation and Final Acc1
Page 77: Orcst - Variation and Final Acc1
Page 78: Orcst - Variation and Final Acc1

A

B

C

D

E

F

G

H

J

Page 79: Orcst - Variation and Final Acc1

A

B

C

D

E

F

G

H

Page 80: Orcst - Variation and Final Acc1

A

B

C

D

E

A

B

C

D

Page 81: Orcst - Variation and Final Acc1

E

F

G

Page 82: Orcst - Variation and Final Acc1

H

J

K

Page 83: Orcst - Variation and Final Acc1

A

B

C

Page 84: Orcst - Variation and Final Acc1

D

E

F

Page 85: Orcst - Variation and Final Acc1

A

B

C

Page 86: Orcst - Variation and Final Acc1

1

2

Page 87: Orcst - Variation and Final Acc1

3

4

5

6

7

8

Page 88: Orcst - Variation and Final Acc1
Page 89: Orcst - Variation and Final Acc1
Page 90: Orcst - Variation and Final Acc1
Page 91: Orcst - Variation and Final Acc1

REPAIR TO PILE CAPS

BILL NO. 3

Pile Caps

Repair to Pile Caps on Grid Lines B, C and E

Kg

PS

Repair to Pile Caps on Grid Lines B, CD, , E, N, P and V

m

no.

Complete repairs as outlined to Pile Caps and concrete pile muff protection over water depth between 1m and 6m

Remove delaminated and spalling concrete to sides of pile cap to depth of 100mm below reinforcement and clean with potable water using high pressure water jet equipment during low tide level

m2

Allow for cleaning of rebars with wet sand blasting, high pressure potable water jet and mechanical cleaning to White Metal (SSPC-SP5) (NACE1). (Corroded portion of rebar exposed to damaged face of pile caps)

m2

Allow for the replacement of corroded rebar where required with 16mm diameter bars x 1m, bent and welded to existing rebar as per drawing sheet 2a and as instructed by the Engineer and coated with epoxy zinc chromate primer to exposed surfaces

Supply and install wrought formwork to soffit and sides of pile cap. (for minimum concrete thickness of 150mm) inclusive of supports and bracing and striking on completion

m2

Place design concrete mix containing chloride inhibitors and super plastisizers having a 28 day cube strength of 30 Mpa

m3

Allow Provisional Sum of $150,000.00 for supply and installation of sacrificial anodes ( to be used as directed by the Engineer and to removed in whole or part if unused)

Allow for the application of repair mortor to surface of repaired concrete beam to seal and close any cracks which may appear.

m2

Chase cracks to minimum depth fo 30mm by 60mm wide and repair with approved masonary repair concrete such Phoscrete supplied by PowerGen Limited (or similar product approved by the Engineer)

Clean during low tide exposed concrete and steel reinforcement to 2no. Pile Head supporting Pile Cap D appox 0.4 x 0.45m x 2no at splash zone by water blasting with potable water and apply layers of phoscrete concrete as per manufacturer instruction to ac

Page 92: Orcst - Variation and Final Acc1

REPAIR TO PILE CAPSBILL NO. 4

Repairs to Deck Support Beams

no.

no.

Supply and install wrought fromwork to soffit and side of beam.

no.

PS

TOTAL BILL NO. 4 - REPAIRS TO DECK SUPPORT BEAMS

REPAIR TO PILE CAPS

BILL NO. 5

Painting and Protective Coatings

TOTAL BILL NO. 3 - REPAIRS TO PILE CAP carried to summary

Repair/Reinstatement of damage to Precast Double Tees on Grid Lines 5, 6, 7 & 8

Allow for temporary support and work access to each Double Tee sections (approx. 14m length) in water depth varing between 1m and 6m deep, during beam repairs

Remove 0.5 m2 delaminated and spalling concrete to expose at least 150mm of tendon on either side of damaged double Tee beam

Sandblast reinforcement tendons to remove corrosion and apply zinc chromate primer to exposed tendons

m2

m2

Place design concrete mix containing chloride inhibitors etc having a 28 day cube strength of 30 Mpa

m3

Allow for the application of repair mortor to surface of repaired concrete beam to complete repairs and seal any cracks which may appear on surface of ccncrete.

m2

Allow for the temporary work access platform to complete repairs to cracks in Double Tee beams in water depths 1m to 6m

Include Provisional Sum of $600,000.00 to be used as instructed by the Engineer. To be deducted in whole or part if unused.

Alternative (Rate Only)

Apply shot crete or build up concrete having a 28 day cube strength of 30 Mpa to complete beam repair around reinforcement tendons inclusive of final surface render finish.

m3

Page 93: Orcst - Variation and Final Acc1

item

PS

REPAIR TO DAMAGED T PIER

BILL NO. 6DEMOLITION AND ALTERATION

m

Cart away spoil SUM

PRE-CAST REINFORCED CONCRETE

Reinforced Concrete 4500 PSI in:

Precast Reinforced Concrete Beam fixed to top of piles as per drawing Cub. M

Allow for the installation of protective drop cloth or equivalent method to facilitate the collection of sand and debris at each location resulting from the sandblasting of the concrete surface (measured seperately)

Remove existing paint finish to to sides and soffit of 8 no. pile caps by wet sand blasting or water blasting as required

m2

Apply approved corrosion inhibiting coating to the previously prepared and new concrete surfaces of 8no. Pile caps as per manufacturers instruction

m2

Repaint exterior surfaces (sides and soffit) of 8no. pile caps with approved exterior marine grade paint finish, colour to match existing

m2

Allow Provisional Sum of $300,000.00 to be used as instructed by Engineer. To be removed in whole or part if not used

TOTAL BILL NO. 5 - PAINTING & PROTECTIVE COATINGS carried to summary

The demolition of existing in-situ slab between centre lines 3-4 and A-B . The removal and replacement of two "L" -shaped beams and repair one pile cap at 3B.

Carefully remove following damaged concrete section of pier inclusive of all false work and safety measures

22'-0" x 12'-0" x 8" section of reinforced concrete slab supported on 8" thick precast concrete slabs (to be reused) mounted on damaged reinforced concrete beams (measured seperately)

m2

Damaged 18"x16"x22' reinforced concrete beams mounted on pile caps as supports to precast slab and insitu slab. Insitu slab to be removed and measured seprately.

This section covers the replacement of 2 No. Pre-cast reinforced concrete beam and in-situ 200mm concrete slab. Prices should include for all costs involved in order to fulfill every requirement of the design specification and any particular site conditio

Page 94: Orcst - Variation and Final Acc1

Steel Reinforcement

10 mm diameter Mild steel rod reinforced Kg.

16 mm diameter high tensile rod reinforced Kg.

25 mm diameter high tensile rod reinforced Kg.

Formwork and support to:-

Page 95: Orcst - Variation and Final Acc1

Side of beam Sq. M

Ditto bottom of beam Sq. M

PS

REPAIR TO DAMAGED T PIER

BILL NO. 7

Include the PROVISIONAL SUM of $650,000.00 for Contingencies to be used

as directed by the Engineer and to be deducted in whole or in part if not

required:-

TOTAL BILL NO. 6 - REPAIR TO DAMAGED T PIER carried to summary

Page 96: Orcst - Variation and Final Acc1

IN-SITU REINFORCED CONCRETE

Reinforced Concrete Pile Cap

Pile Cap - Concrete 431 M.Pa Cub. M

12 mm diameter mild steel rod reinforced Kg.

16 mm diameter high tensile rod reinforced Kg.

Page 97: Orcst - Variation and Final Acc1

Sides of pile cap Sq. M

In-situ Reinforced Concrete Slab

Cub. M

10 mm diameter mild steel rod reinforced Kg.

200 mm thick slab laid on Pre-Cast slab (measured seperately) finished with broom finish.

TOTAL BILL NO. 7 - IN-SITU REINFORCED CONCRETE carried to summary

Page 98: Orcst - Variation and Final Acc1

REPAIR TO DAMAGED T PIER

BILL NO. 8

SHORE PROTECTION - BOULDERS

Cub. M

Ditto with boulder 0.3m - 0.8m diameter ( Provisional) Cub. M

Cub. M

To supply material , labour to place boulders 0.9m and 1.2m in diameter as rock armouring to shoreline in accordance with specifications (Provisional)

Carefully reclaim boulders(0.9m and 1.2m in diameter) from seabed in a depth of water not exceeding 1.5m for repacking in rock armouring (Provisional)

Page 99: Orcst - Variation and Final Acc1

SUMMARY

PRELIMINARIES

Bill No.1 - FIXED PRELIMINARIES

Bill No.2 - TIME DEPENDENT PRELIMINARIES

TOTAL BILL NO. 8 - SHORE PROTECTION - BOULDERS carried to summary

Page 100: Orcst - Variation and Final Acc1

REPAIRS TO PILE CAPS

Bill No.3 - REPAIRS TO PILE CAPS

Bill No.4 - REPAIRS TO DECK SUPPORT BEAMS

Bill No.5 - PAINTING & PROTECTIVE COATINGS

REPAIR TO DAMAGED T PIER

Bill No.6 - DEMOLITION AND ALTERATION

Bill No.7 - IN-SITU REINFORCED CONCRETE

Bill No.8 - SHORE PROTECTION - BOULDERS

GRAND TOTAL

Page 101: Orcst - Variation and Final Acc1

PRELIMINARIES

REPAIRS TO PILE CAPS

REPAIR TO DAMAGED T PIER

Page 102: Orcst - Variation and Final Acc1
Page 103: Orcst - Variation and Final Acc1

GRAND TOTAL - TO STANDARD FORM: CONTRACTORS BID

Page 104: Orcst - Variation and Final Acc1

D&S

20,500.00 82,000.00 130,600.00 560,000.00 48600.00

15,900.00 63,600.00 18,500.00 34,000.00 (45100.00)

16,000.00 480,000.00 18,750.00 108,000.00 (461250.00)

15,000.00 60,000.00 58,000.00 52,000.00 (2000.00)

48,000.00 28,800.00 25,500.00 34,800.00 (3300.00)

150,000.00 150,000.00 150,000.00 0.00

15,500.00 62,000.00 136,840.00 8,000.00 74840.00

3,500.00 350,000.00 155,000.00 1,100,000.00 (195000.00)

120,000.00 240,000.00 125,040.00 224,000.00 (114960.00)

Page 105: Orcst - Variation and Final Acc1

1,516,400.00 818,230.00 2,270,800.00 (698170.00)

100000 800,000.00 494,560.00 1,880,000.00 (305440.00)

15,500.00 124,000.00 386,600.00 252,000.00 262600.00

10,900.00 392,400.00 189,540.00 306,000.00 (202860.00)

15,000.00 1,260,000.00 1,218,000.00 1,092,000.00 (42000.00)

48,000.00 144,000.00 127,500.00 174,000.00 (16500.00)

15,500.00 651,000.00 1,436,820.00 84,000.00 785820.00

60,000.00 480,000.00 494,560.00 400,000.00 14560.00

600,000.00 600,000.00 600,000.00

- 750,000.00 750000.00

4,451,400.00 5,697,580.00 4,788,000.00 1246180.00

Page 106: Orcst - Variation and Final Acc1

350,000.00 550,000.00 100,000.00 200000.00

8,900.00 1,708,800.00 630,720.00 1,632,000.00 (1078080.00)

3,500.00 672,000.00 680,064.00 1,363,200.00 8064.00

2,500.00 480,000.00 893,760.00 192,000.00 413760.00

300,000.00 300,000.00 300,000.00

3,510,800.00 3,054,544.00 3,587,200.00 (456256.00)

80,000.00 1,850,000.00 100,000.00 1770000.00

53,000.00 587,250.00 621,000.00 534250.00

10,000.00 245,000.00 100,000.00 235000.00

31,250.00 93,750.00 165,000.00 720,000.00 71250.00

Page 107: Orcst - Variation and Final Acc1

82.00 34,030.00 134,875.00 107,900.00 100845.00

82.00 26,404.00 123,970.00 96,600.00 97566.00

82.00 54,120.00 254,100.00 231,000.00 199980.00

Page 108: Orcst - Variation and Final Acc1

300.00 6,900.00 241,500.00 92,000.00 234600.00

300.00 1,800.00 87,000.00 18,000.00 85200.00

650,000.00 650,000.00 650,000.00

1,010,004.00 4,338,695.00 2,736,500.00 3328691.00

Page 109: Orcst - Variation and Final Acc1

26,500.00 7,950.00 16,500.00 11,400.00 8550.00

82.00 1,722.00 6,825.00 6,300.00 5103.00

82.00 7,954.00 37,345.00 31,040.00 29391.00

Page 110: Orcst - Variation and Final Acc1

3,300.00 6,600.00 21,000.00 26,000.00 14400.00

26,500.00 212,000.00 440,000.00 264,000.00 228000.00

82.00 42,148.00 167,050.00 133,640.00 124902.00

278,374.00 688,720.00 472,380.00 410346.00

Page 111: Orcst - Variation and Final Acc1

4,000.00 2,400,000.00 6,900,000.00 3,000,000.00 4500000.00

3,800.00 152,000.00 460,000.00 200,000.00 308000.00

1,500.00 120,000.00 600,000.00 320,000.00 480000.00

Page 112: Orcst - Variation and Final Acc1

2,672,000.00 7,960,000.00 3,520,000.00 5288000.00

3,900,000.00 15,056,100.00 2,810,000.00 11156100.00

1,942,500.00 6,306,300.00 620,000.00 4363800.00

Page 113: Orcst - Variation and Final Acc1

1,516,400.00 818,230.00 2,270,800.00 (698170.00)

4,451,400.00 5,697,580.00 4,788,000.00 1246180.00

3,510,800.00 3,054,544.00 3,587,200.00 (456256.00)

1,010,004.00 4,338,695.00 2,736,500.00 3328691.00

278,374.00 688,720.00 472,380.00 410346.00

2,672,000.00 7,960,000.00 3,520,000.00 5288000.00

19,281,478.00 43,920,169.00 20,804,880.00 24638691.00

Page 114: Orcst - Variation and Final Acc1

5,842,500.00 21,362,400.00 3,430,000.00 15519900.00

9,478,600.00 9,570,354.00 10,646,000.00 91754.00

3,960,378.00 12,987,415.00 6,728,880.00 9027037.00

19,281,478.00 43,920,169.00 20,804,880.00 24638691.00

Page 115: Orcst - Variation and Final Acc1
Page 116: Orcst - Variation and Final Acc1
Page 117: Orcst - Variation and Final Acc1

P&S

478000.00

(29600.00)

(372000.00)

(8000.00)

6000.00

0.00

(54000.00)

750000.00

(16000.00)

Page 118: Orcst - Variation and Final Acc1

754400.00

1080000.00

128000.00

(86400.00)

(168000.00)

30000.00

(567000.00)

(80000.00)

336600.00

Page 119: Orcst - Variation and Final Acc1

(250000.00)

(76800.00)

691200.00

(288000.00)

76400.00

20000.00

568000.00

90000.00

626250.00

Page 120: Orcst - Variation and Final Acc1

73870.00

70196.00

176880.00

Page 121: Orcst - Variation and Final Acc1

85100.00

16200.00

1726496.00

Page 122: Orcst - Variation and Final Acc1

3450.00

4578.00

23086.00

Page 123: Orcst - Variation and Final Acc1

19400.00

52000.00

91492.00

194006.00

Page 124: Orcst - Variation and Final Acc1

600000.00

48000.00

200000.00

Page 125: Orcst - Variation and Final Acc1

848000.00

(1090000.00)

(1322500.00)

Page 126: Orcst - Variation and Final Acc1

754400.00

336600.00

76400.00

1726496.00

194006.00

848000.00

1523402.00

Page 127: Orcst - Variation and Final Acc1

(2412500.00)

1167400.00

2768502.00

1523402.00

Page 128: Orcst - Variation and Final Acc1

SELECTED RATES- T-PIER REPAIRS

Description unit Engineer's Est Diving & Salvage

m² 3200 74,000.0 4,000.0

m 3926 43,500.0 46,000.0

10 mm diameter Mild steel rod reinforced kg 220 325.0 260.0

16 mm diameter high tensile rod reinforced kg 220 385.0 300.0

25 mm diameter high tensile rod reinforced kg 220 385.0 350.0

Formwork and support

Side of beam Sq. M 3000 10,500.0 4,000.0

Bottom of beam Sq. M 3000 14,500.0 3,000.0

200 mm thick slab laid on Pre-Cast slab (measured seperately) finished with broom finish. m³ 26500 55,000.0 33,000.0

PERCENTAGE DIFFERENCE BETWEEN THE TENDERED RATES AND THE ENG.'S ESTIMATE

Description unit Engineer's Est Diving & Salvage

m² 3200 2212.5% 25.0%

m 3926 1008.0% 1071.7%

10 mm diameter Mild steel rod reinforced kg 220 47.7% 18.2%

16 mm diameter high tensile rod reinforced kg 220 75.0% 36.4%

25 mm diameter high tensile rod reinforced kg 220 75.0% 59.1%

Formwork and support

Side of beam Sq. M 3000 250.0% 33.3%

Bottom of beam Sq. M 3000 383.3% 0.0%

200 mm thick slab laid on Pre-Cast slab (measured seperately) finished with broom finish. m³ 26500 107.5% 24.5%

TENDERED AMOUNT COMPARED WITH THE ENG.'S ESTIMATE FOR SELECTED ITEMS.

Description unit Engineer's Est Diving & Salvage

m² 80,000.00 $1,850,000.0 $100,000.0

m 53,000.00 $5,872.5 $621,000.00

10 mm diameter Mild steel rod reinforced kg 91,300.00 $134,875.0 $107,900.0

16 mm diameter high tensile rod reinforced kg 70,840.00 $123,970.0 $96,000.0

25 mm diameter high tensile rod reinforcedkg 145,200.00 $254,100.0 $231,000.0

Formwork and support

Side of beam Sq. M 69,000.00 $241,500.0 $92,000.0

Bottom of beam Sq. M 18,000.00 $87,000.0 $18,000.0

200 mm thick slab laid on Pre-Cast slab (measured seperately) finished with broom finish. m³ 256,000.00 $440,000.0 $264,000.0

Pavement & Structures

22'-0" x 12'-0" x 8" section of reinforced concrete slab supported on 8" thick precast concrete slabs (to be reused) mounted on damaged reinforced concrete beams (measured seperately)

Damaged 18"x16"x22' reinforced concrete beams mounted on pile caps as supports to precast slab and insitu slab. Insitu slab to be removed and measured seprately.

Pavement & Structures

22'-0" x 12'-0" x 8" section of reinforced concrete slab supported on 8" thick precast concrete slabs (to be reused) mounted on damaged reinforced concrete beams (measured seperately)

Damaged 18"x16"x22' reinforced concrete beams mounted on pile caps as supports to precast slab and insitu slab. Insitu slab to be removed and measured seprately.

Pavement & Structures

22'-0" x 12'-0" x 8" section of reinforced concrete slab supported on 8" thick precast concrete slabs (to be reused) mounted on damaged reinforced concrete beams (measured seperately)

Damaged 18"x16"x22' reinforced concrete beams mounted on pile caps as supports to precast slab and insitu slab. Insitu slab to be removed and measured seprately.

Page 129: Orcst - Variation and Final Acc1

SELECTED TASKS- %DIFF. BETWEEN ENG.'S EST. AND BID AMOUNT

Description unit

20,500.00 32,650.00 140,000.00

15,900.00 4,625.00 8,500.00

kg 16,000.00 625.00 3,600.00

15,000.00 14,500.00 13,000.00

48,000.00 42,500.00 58,000.00

15,500.00 34,210.00 2,000.00

m 3,500.00 1,550.00 11,000.00

no 120,000.00 62,520.00 112,000.00

no 100,000.00 61,820.00 235,000.00

no 15,500.00 48,325.00 31,500.00

10,900.00 5,265.00 8,500.00

Supply and install wrought fromwork to soffit and side of beam. 15,000.00 14,500.00 13,000.00

48,000.00 42,500.00 58,000.00

15,500.00 34,210.00 2,000.00

no 60,000.00 61,820.00 50,000.00

Item 350,000.00 550,000.00 100,000.00

8,900.00 3,285.00 8,500.00

3,500.00 3,542.00 7,100.00

2,500.00 4,655.00 1,000.00

Engineer's Est

Diving & Salvage

Pavement & Structures

Remove delaminated and spalling concrete to sides of pile cap to depth of 100mm below reinforcement and clean with potable water using high pressure water jet equipment during low tide level

Allow for cleaning of rebars with wet sand blasting, high pressure potable water jet and mechanical cleaning to White Metal (SSPC-SP5) (NACE1). (Corroded portion of rebar exposed to damaged face of pile caps) m²

Allow for the replacement of corroded rebar where required with 16mm diameter bars x 1m, bent and welded to existing rebar as per drawing sheet 2a and as instructed by the Engineer and coated with epoxy zinc chromate primer to exposed surfaces

Supply and install wrought formwork to soffit and sides of pile cap. (for minimum concrete thickness of 150mm) inclusive of supports and bracing and striking on completion m²

Place design concrete mix containing chloride inhibitors and super plastisizers having a 28 day cube strength of 30 Mpa m³

Allow for the application of repair mortor to surface of repaired concrete beam to seal and close any cracks which may appear. m²

Chase cracks to minimum depth fo 30mm by 60mm wide and repair with approved masonary repair concrete such Phoscrete supplied by PowerGen Limited (or similar product approved by the Engineer)

Clean during low tide exposed concrete and steel reinforcement to 2no. Pile Head supporting Pile Cap D appox 0.4 x 0.45m x 2no at splash zone by water blasting with potable water and apply layers of phoscrete concrete as per manufacturer instruction to ac

Allow for temporary support and work access to each Double Tee sections (approx. 14m length) in water depth varing between 1m and 6m deep, during beam repairs

Remove 0.5 m2 delaminated and spalling concrete to expose at least 150mm of tendon on either side of damaged double Tee beam

Sandblast reinforcement tendons to remove corrosion and apply zinc chromate primer to exposed tendons

Place design concrete mix containing chloride inhibitors etc having a 28 day cube strength of 30 Mpa

Allow for the application of repair mortor to surface of repaired concrete beam to complete repairs and seal any cracks which may appear on surface of ccncrete.

Allow for the temporary work access platform to complete repairs to cracks in Double Tee beams in water depths 1m to 6m

Allow for the installation of protective drop cloth or equivalent method to facilitate the collection of sand and debris at each location resulting from the sandblasting of the concrete surface

Remove existing paint finish to to sides and soffit of 8 no. pile caps by wet sand blasting or water blasting as required

Apply approved corrosion inhibiting coating to the previously prepared and new concrete surfaces of 8no. Pile caps as per manufacturers instruction

Repaint exterior surfaces (sides and soffit) of 8no. pile caps with approved exterior marine grade paint finish, colour to match existing

Page 130: Orcst - Variation and Final Acc1

Description unit

82,000.00 59.27%

m² 63,600.00 -70.91%

kg 480,000.00 -96.09%

m³ 28,800.00 -11.46%

m² 62,000.00 120.71%

m 350,000.00 -55.71%

no 240,000.00 -47.90%

no 800,000.00 -38.18%

no 124,000.00 211.77%

m² 392,400.00 -51.70%

Item 350,000.00 57.14%

m² 1,708,800.00 -63.09%

m² 480,000.00 86.20%

Engineer's Est

Diving & Salvage

% DIFF. BETWEEN ENGINEER'S EST. & BID SUM

Remove delaminated and spalling concrete to sides of pile cap to depth of 100mm below reinforcement and clean with potable water using high pressure water jet equipment during low tide level

m²Allow for cleaning of rebars with wet sand blasting, high pressure potable water jet and mechanical cleaning to White Metal (SSPC-SP5) (NACE1). (Corroded portion of rebar exposed to damaged face of pile caps)

Allow for the replacement of corroded rebar where required with 16mm diameter bars x 1m, bent and welded to existing rebar as per drawing sheet 2a and as instructed by the Engineer and coated with epoxy zinc chromate primer to exposed surfaces

Place design concrete mix containing chloride inhibitors and super plastisizers having a 28 day cube strength of 30 Mpa

Allow for the application of repair mortor to surface of repaired concrete beam to seal and close any cracks which may appear.

Chase cracks to minimum depth fo 30mm by 60mm wide and repair with approved masonary repair concrete such Phoscrete supplied by PowerGen Limited (or similar product approved by the Engineer)

Clean during low tide exposed concrete and steel reinforcement to 2no. Pile Head supporting Pile Cap D appox 0.4 x 0.45m x 2no at splash zone by water blasting with potable water and apply layers of phoscrete concrete as per manufacturer instruction to ac

Allow for temporary support and work access to each Double Tee sections (approx. 14m length) in water depth varing between 1m and 6m deep, during beam repairs

Remove 0.5 m2 delaminated and spalling concrete to expose at least 150mm of tendon on either side of damaged double Tee beam

Sandblast reinforcement tendons to remove corrosion and apply zinc chromate primer to exposed tendons

Allow for the installation of protective drop cloth or equivalent method to facilitate the collection of sand and debris at each location resulting from the sandblasting of the concrete surface

Remove existing paint finish to to sides and soffit of 8 no. pile caps by wet sand blasting or water blasting as required

Repaint exterior surfaces (sides and soffit) of 8no. pile caps with approved exterior marine grade paint finish, colour to match existing

Page 131: Orcst - Variation and Final Acc1

CONTRACT

ITEM DESCRIPTION QUANTITY UNIT

CONTRACT SUM

REMEASURED WORKS - All rates are as per contract

BILL NO. 3 - Pile CapsC

30 KG

D

4 M2

E0.8 M3

VARIATIONS

VARIATION No. 1

Dowel 25mm rebars into existing slab

24 No.

removespalling concrete from additional t-pier cap 0.5 M3

VARIATION No. 2

replace barrier on T-Pier

5 no.

70 M

Apply Nitobond to deck support beamITEM

Allow for the replacement of corroded rebar where required with 16mm diameter bars x 1m, bent and welded to existing rebar as per drawing sheet 2a and as instructed by the Engineer and coated with epoxy zinc chromate primer to exposed surfaces

Supply and install wrought formwork to soffit and sides of pile cap. (for minimum concrete thickness of 150mm) inclusive of supports and bracing and striking on completion

Place design concrete mix containing chloride inhibitors and super plastisizers having a 28 day cube strength of 30 Mpa

Chase crack to a minimum depth of 30mm x 60mm wide and repair with approved masonry repair concrete ( Rendoroc)

Page 132: Orcst - Variation and Final Acc1

additional work to widen Gate as Directed Sum

VARIATION No. 3

Repair to Stem of Deck BeamsAllow for relocating the pantoon between span of pile clusters. 8 item

A7 M2

B10 M

C0.069 M3

D5 M

E

240 No.

Repair to the Soffit of Beams

A10 No.

B 1 M2

C To apply Nitobond SBR as bonding agent to deck beams 2 M2

D

Remove delaminated and spalling concrete to a depth ( > 10 MM) so as to expose reinforcement and clean with potable

water .

Allow for cleaning of rebars with wire brush to remove all corrosion and wash with potable water. (Corroded portion

of rebar exposed to damaged face of stem)

Place design masonary repair concrete such Renderoc HB (or similar product approved by the Engineer) to a thickiness no

less than 12mm

Chase cracks to minimum depth fo 12mm and 30 mm wide; repair with approved masonary repair concrete such Renderoc

(or similar product approved by the Engineer)

Allow for removing concrete from defective area (0.07 sq. m) of beam stem, clean rebars with wire brush to remove all corrosion

and treat with zinc chromate. Repair using Renderoc HB (Corroded portion of rebar exposed to damaged face of stem).

apply Nitobond SBR as per manufacturer's specification.

Remove 0.2 m2 delaminated and spalling concrete to a minimum depth of 12mm so as to expose rebars of the soffit of deck

beam.

Wire brush rebars to remove corrosion, wash with potable water and coat with zinc chromate

Place design masonary repair concrete such Renderoc HB ( similar product approved by the Engineer) to a thickiness no

less than 12mm

Page 133: Orcst - Variation and Final Acc1

Repairs to Pile Cap

A3 M

B 8 M2

C 6 item

D 0.2 M2

E

0.5 M

VARIATION No. 4

A 4

B 4

C 5 Kg

D 7.6

Chase cracks to minimum depth fo 30mm by 60mm wide and repair with approved masonary repair concrete such as

Renderoc (or similar product approved by the Engineer)

Remove delaminated and spalling concrete to a minimum depth so as to expose rebars

Allow for cleaning of rebars with wire brush to remove all corrosion and wash with potable water.

Place design masonary repair concrete such Renderoc HB ( similar product approved by the Engineer) .

Effect repairs to one corner ( 1M X1MX 0.5M) of a a pile cap, remove spalling concrete, clean corrosion from bars using wire

brush , treat with zinc chromate , shuttering and apply apply deisgn concrete with chloride inhibitor of design strength no less

than 30 Mpa.

Complete repairs as outlined to Pile Caps and concrete pile muff protection over water depth between 1m

Remove delaminated and spalling concrete to sides and base of pile cap to depth of 100mm below reinforcement and clean with potable water using high pressure water jet equipment during low tide level

m2

Allow for cleaning of rebars with wet sand blasting, high pressure potable water jet and mechanical cleaning to White Metal (SSPC-SP5) (NACE1). (Corroded portion of rebar exposed to damaged face of pile caps)

m2

Allow for the replacement of corroded rebar where required with 16mm diameter bars x 1m, bent and welded to existing rebar as per drawing sheet 2a and as instructed by the Engineer and coated with epoxy zinc chromate primer to exposed surfaces

Supply and install wrought formwork to soffit and sides of pile cap. (for minimum concrete thickness of 150mm) inclusive of supports and bracing and striking on completion

m2

Page 134: Orcst - Variation and Final Acc1

E 1.5

F Allow for Nitobond as per Manufacture's Instructions 4

G 1.5

H 8

OMISSION

General & Preliminary Items

K PS

BILL NO. 3 - Pile Caps

FPS

H 100 M

J

2

BILL NO. 4- Repairs to Deck Support Beams

H PS

BILL NO. 5 - Painting and Protective Coatings

D192 M2

E PS

BILL NO. 6 - Repairs to Damaged T-Pier

Place design concrete mix containing chloride inhibitors and super plastisizers having a 28 day cube strength of 30 Mpa

m3

m2

Allow for the application of Renderoc to surface of repaired concrete beam to seal and close any cracks which may appear.

m2

Apply two coats of the approved protective coating to match exterior colour.

m2

Allow Provisional Sum of $50,000.00 for the supply and installation of signs as per Engineers instructions

Allow Provisional Sum of $150,000.00 for supply and installation of sacrificial anodes ( to be used as directed by the Engineer and to removed in whole or part if unused)

Chase cracks to minimum depth fo 30mm by 60mm wide and repair with approved masonary repair concrete such Phoscrete supplied by PowerGen Limited (or similar product approved by the Engineer)Clean during low tide exposed concrete and steel reinforcement to 2no. Pile Head supporting Pile Cap D appox 0.4 x 0.45m x 2no at splash zone by water blasting with potable water and apply layers of phoscrete concrete as per manufacturer instruction to ac

Include Provisional Sum of $600,000.00 to be used as instructed by the Engineer. To be deducted in whole or part if unused.

Repaint exterior surfaces (sides and soffit) of 8no. pile caps with approved exterior marine grade paint finish, colour to match existing

Allow Provisional Sum of $300,000.00 to be used as instructed by Engineer. To be removed in whole or part if not used

Page 135: Orcst - Variation and Final Acc1

H PS

Summary

CONTRACT SUM $20,854,880.00

REMEASURED WORKS $590,160.00

VARIATIONS $2,082,866.40

OMISSION ($2,886,001.20)

GRAND TOTAL $20,641,905.20

Include Provisional Sum of $600,000.00 to be used as instructed by the Engineer. To be deducted in whole or part if unused.

Page 136: Orcst - Variation and Final Acc1

OMISSION ADDITIONAL

RATE QUANTITY TOTAL RATE QUANTITY TOTAL

$20,854,880.00

$3,600.00 $120.00 $432,000.00

$13,000.00 $3.60 $46,800.00

$58,000.00 $1.92 $111,360.00

SUB-TOTAL $590,160.00

Eng. Estimate @ $2,900.00 $3,271.25 $78,510.00

Rate is as per BQ/6 - ITEM A $140,000.00 $70,000.00

Eng. Estimate @ $18,500.00 $20,000.00 $100,000.00

Eng. Estimate @ $7,700.00 $7,000.00 $490,000.00

Eng. Estimate @ $17,000.00 $19,375.00

Page 137: Orcst - Variation and Final Acc1

Eng. Estimate @ $ 20,000.00 $20,000.00

Eng. Estimate @ $ 32,500.00 $37,500.00 $300,000.00

Eng. Estimate @ $ 14,000.00 $9,250.00 $64,750.00

Rate in the contract is $8,500.00 $8,000.00 $80,000.00

Eng. Estimate @ $ 49,000.00 $39,600.00 $2,732.40

Eng. Estimate @ $2,700.00 $4,000.00 $20,000.00

Eng. Estimate @ $287.00 $300.00 $72,000.00

Eng. Estimate @ $1,600.00 $1,562.50 $15,625.00

Eng. Estimate @ $11,900.00 $15,625.00 $15,625.00

Eng. Estimate @ $3,500.00 $1,375.00 $2,750.00

Eng. Estimate @ $17,680.00 Item $16,400.00

Page 138: Orcst - Variation and Final Acc1

Eng. Estimate @ $11,000.00 $28,200.00 $84,600.00

Eng. Estimate @ $20,000.00 $6,750.00 $54,000.00

Eng. Estimate @ $2,500.00 $4,229.00 $25,374.00

Eng. Estimate @ $49,000.00 $41,000.00 $8,200.00

Eng. Estimate @ $80,000.00 $70,250.00 $35,125.00

Eng. Estimate @ $47,000.00 $55,000.00 $220,000.00

Rate is as per BQ/6 Item B $8,500.00 $34,000.00

Rate is as per BQ/6 Item C $3,600.00 $18,000.00

Eng. Estimate @ $13,000.00 $10,000.00 $76,000.00

Page 139: Orcst - Variation and Final Acc1

Rate is as per BQ/6 Item E $58,000.00 $87,000.00

Eng. Estimate @ $1,400.00 $1,375.00 $5,500.00

Eng. Estimate @ $7,700.00 $7,000.00 $10,500.00

Rate is as per BQ/8 Item C $7,100.00 $56,800.00

SUB-TOTAL $2,082,866.40

$50,000.00

$150,000.00

$11,000.00 70.00 $770,000.00

$112,000.00 2.00 $224,000.00

$600,000.00

$1,000.00 192.00 $192,000.00

$300,000.00

Page 140: Orcst - Variation and Final Acc1

600,000.00

SUB-TOTAL $2,886,001.20 $2,673,026.40

Page 141: Orcst - Variation and Final Acc1

COMMENT

Discrepancies were identified and rate negotiate down

Discrepancies were identified and rate negotiated down

Item not originally included in the contract but revised spec related new rate.

Rate was negotiate down and agreed on

Page 142: Orcst - Variation and Final Acc1
Page 143: Orcst - Variation and Final Acc1

$2,165,226.40$5,772,001.20

The Eng. Est. is based on a figure in the contract, however the contractor revised the rate up.

The Eng. Est. is based on a Pro-rated figure already in the contract, however the contractor revised the rate down.

Page 144: Orcst - Variation and Final Acc1

-$3,606,774.80

-$212,974.80

Page 145: Orcst - Variation and Final Acc1

-$2,956,774.80

-$212,974.80

Page 146: Orcst - Variation and Final Acc1

VARIATION 1

TASK PAJ PSLSTEEL $9,500.00 $11,185.00DRILL BIT $28,000.00 $28,000.00EPOXY $10,668.28 $12,000.00HAMMER DRILL $3,088.09 $4,000.00GENERATOR $4,019.81 $5,000.00CHOP SAW $1,828.05 $2,000.00MASON $4,500.00 $5,000.00LABOURER $3,125.00 $3,125.00DISPENSING KIT $5,054.14 $6,000.00TRANSPORTATION $2,000.00 $2,200.00

$71,783.38 $78,510.00rate for each dowel $2,990.97 $3,271.25

TO REMOVE DAMAGED WEDGES OF FOUR PILE CAPS OF THE T-PIER AND MAKE GOOD

TASK PAJ PSLBOAT $50,000.00HILTI HAMMER $10,000.00GENERATOR $10,000.00FALSEWORK $10,000.00LABOURER $10,000.00

$90,000.00

VARIATION 2

TO APPLY BONDING AGENT (NITOBOND SBR) TO MAIN PIER DECK

TASK PAJ PSLLABOURERS $12,500.00 $25,000.00BRUSHES $1,875.00 $1,875.00CEMENT $3,000.00 $3,000.00TRANSPORT $2,000.00 $2,000.00

$19,375.00 $31,875.00

DOWELLING INTO EXISTING IN-SITU SLAB USING 1" HT REBARS 2'-0 IN LENGTH AND AFFIXED WITH E22 EPOXY

The BQ rate was used as a

basis.

Page 147: Orcst - Variation and Final Acc1

TO REPLACE DISPLACE BARRIER OF THE T-PIER

TASK PAJ PSLGENERATOR $4,600.00 $5,000.00HILTI HAMMER $4,600.00 $5,000.00CHOP SAW $1,725.00 $2,000.00EPOSY $3,450.00 $5,250.006" PVC $23,032.50 $22,023.405/8" REBAR $3,277.50 $3,343.202"X8"X14' LUMBER $10,120.00 $17,913.00BOLTSAND NUTS $4,370.00 $6,596.80PAINT & PAINTER $19,550.00 $19,123.60TRANSPORTATION $4,025.00 $7,500.00LABOURERS $6,250.00 $6,250.00

$85,000.00 $100,000.00