Operations Management Japenese (Lean) Production system

75
Compiled by Ramesh Adavi 8. MoM - Lean Production & ToC 1 8. Lean Production Systems - Lean Concepts - The Toyota System (JIT, …) - Synchronous Mfg. & Theory of Constraints

Transcript of Operations Management Japenese (Lean) Production system

Page 1: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 1

8. Lean Production Systems

- Lean Concepts

- The Toyota System (JIT, …) - Synchronous Mfg. & Theory of Constraints

Page 2: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 2

8a. Lean Production

Page 3: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

• Lean Production Defined

• The Toyota Production System

• Lean Implementation Requirements

• Lean Services

OBJECTIVES

Page 4: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Lean Production

• Lean Production can be defined as an integrated set of activities designed to achieve high-volume production using minimal inventories (raw materials, work in process, and finished goods)

• Lean Production also involves the elimination of waste in production effort

• Lean Production also involves the timing of production resources (i.e., parts arrive at the next workstation “just in time”)

Page 5: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Pull System

Customers

Sub

Sub

Fab

Fab

Fab

Fab

Vendor

Vendor

Vendor

Vendor

Final Assembly

Here the customer starts the process, pulling an inventory item from Final Assembly…

Here the customer starts the process, pulling an inventory item from Final Assembly…

Then sub-assembly work is pulled forward by that demand…

Then sub-assembly work is pulled forward by that demand…

The process continues throughout the entire production process and supply chain

The process continues throughout the entire production process and supply chain

Page 6: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Features of Lean Production

• Management philosophy• “Pull” system though the plant

WHAT IT IS

• Employee participation• Industrial engineering/basics• Continuing improvement• Total quality control• Small lot sizes

WHAT IT REQUIRES

• Attacks waste• Exposes problems and bottlenecks• Achieves streamlined production

WHAT IT DOES

• Stable environment

WHAT IT ASSUMES

Page 7: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

The Toyota Production System

• Based on two philosophies:– 1. Elimination of waste

– 2. Respect for people

Page 8: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Elimination of Waste

1. Focused factory networks

2. Group technology

3. Quality at the source

4. JIT production

5. Uniform plant loading

6. Kanban production control system

7. Minimized setup times

Page 9: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Minimizing Waste: Focused Factory

Networks

CoordinationSystem Integration

These are small specialized plants that limit the range of products produced (sometimes only one type of product for an entire facility)

These are small specialized plants that limit the range of products produced (sometimes only one type of product for an entire facility)

Some plants in Japan have as few as 30 and as many as 1000 employees

Some plants in Japan have as few as 30 and as many as 1000 employees

Page 10: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Minimizing Waste: Group Technology (Part 1)

• Using Departmental Specialization for plant layout can cause a lot of

unnecessary material movement • Using Departmental Specialization for plant layout can cause a lot of

unnecessary material movement

Saw Saw

Lathe PressPress

Grinder

LatheLathe

Saw

Press

Heat Treat

Grinder

Note how the flow lines are going back and forthNote how the flow lines are going back and forth

Page 11: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Minimizing Waste: Group Technology (Part 2)

• Revising by using Group Technology Cells can reduce movement and improve product flow

• Revising by using Group Technology Cells can reduce movement and improve product flow

Press

Lathe

Grinder

Grinder

A

2

BSaw

Heat Treat

LatheSaw Lathe

PressLathe

1

Page 12: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Minimizing Waste: Uniform Plant Loading (heijunka)

Not uniform Jan. Units Feb. Units Mar. Units Total

1,200 3,500 4,300 9,000

Uniform Jan. Units Feb. Units Mar. Units Total

3,000 3,000 3,000 9,000

Suppose we operate a production plant that produces a single product. The schedule of production for this product could be accomplished using either of the two plant loading schedules below.

Suppose we operate a production plant that produces a single product. The schedule of production for this product could be accomplished using either of the two plant loading schedules below.

How does the uniform loading help save labor costs?How does the uniform loading help save labor costs?

or

Page 13: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Minimizing Waste: Inventory Hides Problems

Work in

process

queues

(banks)

Change

orders

Engineering design

redundancies

Vendor

delinquencies

Scrap

Design

backlogs

Machine

downtime

Decision

backlogsInspection

backlogs

Paperwork

backlog

Example: By identifying defective items from a vendor early in the production process the downstream work is saved

Example: By identifying defective work by employees upstream, the downstream work is saved

Page 14: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Minimizing Waste: Kanban Production Control Systems

Storage Part A

Storage Part AMachine

Center Assembly Line

Material Flow

Card (signal) Flow

Withdrawal kanban

Once the Production kanban is received, the Machine Center produces a unit to replace the one taken by the Assembly Line people in the first place

This puts the system back were it was before the item was pulled

The process begins by the Assembly Line people pulling Part A from Storage

Production kanban

Page 15: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Determining the Number of Kanbans Needed

• Setting up a kanban system requires determining the number of kanbans cards (or containers) needed

• Each container represents the minimum production lot size

• An accurate estimate of the lead time required to produce a container is key to determining how many kanbans are required

Page 16: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

The Number of Kanban Card Sets

C

SDL

k

)(1

container theof Size

stockSafety timelead during demand Expected

C

SDL

k

)(1

container theof Size

stockSafety timelead during demand Expected

k = Number of kanban card sets (a set is a card)D = Average number of units demanded over some time periodL = lead time to replenish an order (same units of time as demand)S = Safety stock expressed as a percentage of demand during leadtimeC = Container size

Page 17: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Example of Kanban Card Determination: Problem Data

• A switch assembly is assembled in batches of 4 units from an “upstream” assembly area and delivered in a special container to a “downstream” control-panel assembly operation

• The control-panel assembly area requires 5 switch assemblies per hour

• The switch assembly area can produce a container of switch assemblies in 2 hours

• Safety stock has been set at 10% of needed inventory

Page 18: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Example of Kanban Card Determination: Calculations

3or ,75.24

5(2)(1.1))(1

container theof Size

stockSafety timelead during demand Expected

C

SDL

k

3or ,75.24

5(2)(1.1))(1

container theof Size

stockSafety timelead during demand Expected

C

SDL

k

Always round up!

Page 19: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Respect for People

• Level payrolls

• Cooperative employee unions

• Subcontractor networks

• Bottom-round management style

• Quality circles (Small Group Involvement Activities or SGIA’s)

Page 20: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Toyota Production System’s Four Rules

1. All work shall be highly specified as to content, sequence, timing, and outcome

2. Every customer-supplier connection must be direct, and there must be an unambiguous yes-or-no way to send requests and receive responses

3. The pathway for every product and service must be simple and direct

4. Any improvement must be made in accordance with the scientific method, under the guidance of a teacher, at the lowest possible level in the organization

Page 21: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Lean Implementation Requirements: Design Flow Process

• Link operations

• Balance workstation capacities

• Redesign layout for flow

• Emphasize preventive maintenance

• Reduce lot sizes

• Reduce setup/changeover time

Page 22: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Lean Implementation Requirements: Total Quality Control

• Worker responsibility

• Measure SQC

• Enforce compliance

• Fail-safe methods

• Automatic inspection

Page 23: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Lean Implementation Requirements: Stabilize Schedule

• Level schedule

• Underutilize capacity

• Establish freeze windows

Page 24: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Lean Implementation Requirements: Kanban-Pull

• Demand pull

• Backflush

• Reduce lot sizes

Page 25: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Lean Implementation Requirements: Work with Vendors

• Reduce lead times

• Frequent deliveries

• Project usage requirements

• Quality expectations

Page 26: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Lean Implementation Requirements: Reduce Inventory More

• Look for other areas

• Stores

• Transit

• Carousels

• Conveyors

Page 27: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Lean Implementation Requirements: Improve Product Design

• Standard product configuration

• Standardize and reduce number of parts

• Process design with product design

• Quality expectations

Page 28: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Lean Implementation Requirements: Concurrently Solve Problems

• Root cause • Solve permanently

• Team approach

• Line and specialist responsibility

• Continual education

Page 29: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Lean Implementation Requirements: Measure Performance

• Emphasize improvement

• Track trends

Page 30: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Lean in Services (Examples)

• Organize Problem-Solving Groups

• Upgrade Housekeeping

• Upgrade Quality

• Clarify Process Flows

• Revise Equipment and Process Technologies

Page 31: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Lean in Services (Examples)

• Level the Facility Load

• Eliminate Unnecessary Activities

• Reorganize Physical Configuration

• Introduce Demand-Pull Scheduling

• Develop Supplier Networks

Page 32: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 32

Question Bowl

Lean Production seeks to achieve high volume

production using which of the following?

a. Minimal inventory of raw materials

b. Minimal inventory of work-in-process

c. Minimal inventory of finished goods

d. All of the above

e. None of the aboveAnswer: d. All of the above

Page 33: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 33

Question Bowl

In the Toyota Production System, the

“elimination of waste” involves which of the following?

a. Overproduction

b. Waiting time

c. Transportation

d. All of the above

e. None of the above

Answer: d. All of the above

Page 34: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 34

Question Bowl

In the Pull System the partner that begins the

process of “pulling” is which of the following?

a. Customers

b. Vendors

c. Fabrication personnel

d. CEO

e. All of the aboveAnswer: a. Customer

Page 35: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 35

Question Bowl

A Lean Production program requires which of

the following?

a. Employee participation

b. Total quality control

c. Small lot sizes

d. Continuing improvement

e. All of the above

Answer: e. All of the above (Also included in Industrial engineering/basics)

Page 36: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 36

Question Bowl

Inventory has been known to hide which of the

following production problems?

a. Scrap

b. Vendor delinquencies

c. Decision backlogs

d. All of the above

e. None of the above

Answer: d. All of the above

Page 37: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 37

Question Bowl

You want to determine how many kanban card sets you need for an

operation. You find that average number of units demanded is

1,000 per hour, the lead time to replenish the order for this item is

10 hours, the container size is 10 units, and the safety stock is

estimated to be 5% of the expected demand. Which of the

following is the desired number of kanban card sets?

a. 1050

b. 1000

c. 605

d. 500

e. None of the above

Answer: a. 1050 ([1000x10](1+0.05)/10=1050)

Page 38: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 38

Question Bowl

When trying to implement Lean system a

“stabilized schedule” includes which of the

following?

a. Demand pull

b. Backflush

c. Fail-safe methods

d. All of the above

e. None of the above

Answer: e. None of the above (These include: level schedule, underutilization capacity, and establish freeze windows.)

Page 39: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 39

8b. Synchronous Manufacturing and

Theory of Constraints

Page 40: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

• Goldratt’s Rules

• Goldratt’s Goal of the Firm

• Performance Measurement

• Capacity and Flow issues

• Synchronous Manufacturing

OBJECTIVES

Page 41: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Goldratt’s Rules of Production Scheduling

• Do not balance capacity balance the flow• The level utilization of a nonbottleneck

resource is not determined by its own potential but by some other constraint in the system

• Utilization and activation of a resource are not the same

• An hour lost at a bottleneck is an hour lost for the entire system

• An hour saved at a nonbottleneck is a mirage

Page 42: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Goldratt’s Rules of Production Scheduling (Continued)

• Bottlenecks govern both throughput and inventory in the system

• Transfer batch may not and many times should not be equal to the process batch

• A process batch should be variable both along its route and in time

• Priorities can be set only by examining the system’s constraints and lead time is a derivative of the schedule

Page 43: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Goldratt’s Theory of Constraints (TOC)

• Identify the system constraints• Decide how to exploit the system

constraints• Subordinate everything else to that

decision• Elevate the system constraints• If, in the previous steps, the constraints

have been broken, go back to Step 1, but do not let inertia become the system constraint

Page 44: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Goldratt’s Goal of the Firm

The goal of a firm is to make money

Page 45: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Performance Measurement:Financial

• Net profit– an absolute measurement in dollars

• Return on investment– a relative measure based on investment

• Cash flow– a survival measurement

Page 46: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Performance Measurement:Operational

• 1. Throughput– the rate at which money is generated by the

system through sales

• 2. Inventory– all the money that the system has invested in

purchasing things it intends to sell

• 3. Operating expenses– all the money that the system spends to turn

inventory into throughput

Page 47: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Productivity

• Does not guarantee profitability– Has throughput increased?– Has inventory decreased?– Have operational expenses

decreased?

Page 48: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Unbalanced Capacity

• In earlier chapters, we discussed balancing assembly lines– The goal was a constant cycle time

across all stations

• Synchronous manufacturing views constant workstation capacity as a bad decision

Page 49: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

The Statistics of Dependent Events

• Rather than balancing capacities, the flow of product through the system should be balanced

Process Time (B)Process Time (A)

106 8 10 12 14

Process Time (B) Process Time (A)

10 6 8 10 12 14

(Constant)

(Constant)(Variable)

(Variable)

When one process takes longer than the average, the time can not be made up

Page 50: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Capacity Related Terminology

• Capacity is the available time for production

• Bottleneck is what happens if capacity is less than demand placed on resource

• Nonbottleneck is what happens when capacity is greater than demand placed on resource

• Capacity-constrained resource (CCR) is a resource where the capacity is close to demand placed on the resource

Page 51: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Capacity Example Situation 1

X Y Market

Case A

X YBottleneck Nonbottleneck

Demand/month 200 units 200 unitsProcess time/unit 1 hour 45 minsAvail. time/month 200 hours 200 hours

There is some idle production in this set up. How much?There is some idle production in this set up. How much?

25% in Y25% in Y

Page 52: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Capacity Example Situation 2

Y X Market

Case B

X YBottleneck Nonbottleneck

Demand/month 200 units 200 unitsProcess time/unit 1 hour 45 minsAvail. time/month 200 hours 200 hours

Is there is going to be a build up of unnecessary production in Y?

Is there is going to be a build up of unnecessary production in Y?

Yes, 25% in YYes, 25% in Y

Page 53: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Capacity Example Situation 3

X Y

Assembly

Market

Case C

X YBottleneck Nonbottleneck

Demand/month 200 units 200 unitsProcess time/unit 1 hour 45 minsAvail. time/month 200 hours 200 hours

Is there going to be a build up in unnecessary production in Y?

Is there going to be a build up in unnecessary production in Y?

Yes, 25% in YYes, 25% in Y

Page 54: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Capacity Example Situation 4

X Y

Market Market

Case D

X YBottleneck Nonbottleneck

Demand/month 200 units 200 unitsProcess time/unit 1 hour 45 minsAvail. time/month 200 hours 200 hours

If we run both X and Y for the same time, will we produce any unneeded production?

If we run both X and Y for the same time, will we produce any unneeded production?

Yes, 25% in YYes, 25% in Y

Page 55: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Time Components of Production Cycle

• Setup time is the time that a part spends waiting for a resource to be set up to work on this same part

• Process time is the time that the part is being processed

• Queue time is the time that a part waits for a resource while the resource is busy with something else

Page 56: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Time Components of Production Cycle (Continued)

• Wait time is the time that a part waits not for a resource but for another part so that they can be assembled together

• Idle time is the unused time that represents the cycle time less the sum of the setup time, processing time, queue time, and wait time

Page 57: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Saving Time

Bottleneck Nonbottleneck

What are the consequences of saving time at each process?

What are the consequences of saving time at each process?

Rule: Bottlenecks govern both throughput and inventory in the system. Rule: An hour lost at a bottleneck is an hour lost for the entire system. Rule: An hour saved at a nonbottleneck is a mirage.

Rule: Bottlenecks govern both throughput and inventory in the system. Rule: An hour lost at a bottleneck is an hour lost for the entire system. Rule: An hour saved at a nonbottleneck is a mirage.

Page 58: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Drum, Buffer, Rope

A B C D E F

Bottleneck (Drum)

Inventorybuffer

(time buffer)Communication

(rope)

Market

Exhibit 18.9Exhibit 18.9

Page 59: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Quality Implications

• More tolerant than JIT systems– Excess capacity throughout system

• Except for the bottleneck– Quality control needed before

bottleneck

Page 60: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Batch Sizes

• What is the batch size?

• One?

• Infinity?

Page 61: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Bottlenecks and CCRs:Flow-Control Situations

• A bottleneck – (1) with no setup required when changing from

one product to another– (2) with setup times required to change from

one product to another

• A capacity constrained resource (CCR)– (3) with no setup required to change from one

product to another– (4) with setup time required when changing

from one product to another

Page 62: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Inventory Cost Measurement:Dollar Days

• Dollar Days is a measurement of the value of inventory and the time it stays within an area

department a withindays of Number

inventory of Value Days Dollar

Page 63: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Benefits from Dollar Day Measurement

• Marketing– Discourages holding large amounts of

finished goods inventory

• Purchasing– Discourages placing large purchase orders

that on the surface appear to take advantage of quantity discounts

• Manufacturing– Discourage large work in process and

producing earlier than needed

Page 64: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Comparing Synchronous Manufacturing to MRP

• MRP uses backward scheduling

• Synchronous manufacturing uses forward scheduling

Page 65: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Comparing Synchronous Manufacturing to JIT

• JIT is limited to repetitive manufacturing

• JIT requires a stable production level

• JIT does not allow very much flexibility in the products produced

Page 66: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Comparing Synchronous Manufacturing to JIT (Continued)

• JIT still requires work in process when used with kanban so that there is “something to pull”

• Vendors need to be located nearby because the system depends on smaller, more frequent deliveries

Page 67: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC

Relationship with Other Functional Areas

• Accounting’s influence

• Marketing and production

Page 68: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 68

Question Bowl

Which of the following are examples of Goldratt’s Rules of Production Scheduling?

a. Balance flow, not capacityb. Utilization and activation are the samec. Nonbottlenecks govern throughputd. All of the abovee. None of the aboveAnswer: a. Balance flow, not capacity

(There are eight other rules.)

Page 69: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 69

Question Bowl

Which of the following are examples of Goldratt’s Theory of Constraints?

a. Identify the system constraintsb. Decide how to exploit the system

constraintsc. Elevate the system constraintsd. All of the abovee. None of the aboveAnswer: d. All of the above

Page 70: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 70

Question Bowl

Which of the following is Goldratt’s “Goal of the Firm”?

a. Reduce costsb. Increase jobsc. Increase market shared. All of the abovee. None of the aboveAnswer: e. None of the above (The Goal

of the Firm is to “make money”.)

Page 71: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 71

Question Bowl

Which of the following are Goldratt’s Financial Measurements used to measure a firm’s ability to make money?

a. Net profitb. Return on investmentc. Cash flowd. All of the abovee. None of the aboveAnswer: d. All of the above

Page 72: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 72

Question Bowl

Which of the following are Goldratt’s Operational Measurements used to measure a firm’s ability to make money?

a. Throughputb. Inventoryc. Operating expensesd. All of the abovee. None of the aboveAnswer: d. All of the above

Page 73: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 73

Question Bowl

According to Goldratt, any resource whose capacity is less than the demand placed on it, is considered which of the following?

a. Nonbottleneck resourceb. Bottleneck resourcec. Capacity-constrained resourced. A buffer resourcee. None of the aboveAnswer: b. Bottleneck resource

Page 74: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 74

Question Bowl

Which of the following kinds of time make up a “cycle time”?

a. Setup b. Processingc. Queued. Waite. All of the aboveAnswer: e. All of the above (The correct

answer can also include Idle Time.)

Page 75: Operations Management Japenese (Lean) Production system

Compiled by Ramesh Adavi

8. MoM - Lean Production & ToC 75

Question Bowl

When comparing JIT to synchronous manufacturing, synchronous manufacturing has which of the following drawbacks?

a. Limited to repetitive manufacturingb. Requires stable production levelc. Does not allow much flexibility in the

products producedd. All of the abovee. None of the aboveAnswer: e. None of the above (These are

drawbacks of JIT, not synchronous manufacturing.)