Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009...

22
Operational Overview Nolan Robertson

Transcript of Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009...

Page 1: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Operational OverviewNolan Robertson

Page 2: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Composite Weather VariablesFrom 01-December-2009 to 10-January-2010

-4

-2

0

2

4

6

8

1001

/12/

09

03/1

2/09

05/1

2/09

07/1

2/09

09/1

2/09

11/1

2/09

13/1

2/09

15/1

2/09

17/1

2/09

19/1

2/09

21/1

2/09

23/1

2/09

25/1

2/09

27/1

2/09

29/1

2/09

31/1

2/09

02/0

1/10

04/0

1/10

06/0

1/10

08/0

1/10

10/0

1/10

cwv

Actual CWV Actual CWV 08 Normal CWV Cold CWV Warm CWV

Page 3: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Composite Weather VariablesFrom 01-January-2010 to 10-January-2010

-4

-2

0

2

4

6

801

/01/

10

02/0

1/10

03/0

1/10

04/0

1/10

05/0

1/10

06/0

1/10

07/0

1/10

08/0

1/10

09/0

1/10

10/0

1/10

cwv

Normal CWV Cold CWV Warm CWV Actual CWV

Page 4: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Gas Demand BreakdownFrom 01-December-2009 to 09-January-2010

0

100

200

300

400

500

01/1

2/09

03/1

2/09

05/1

2/09

07/1

2/09

09/1

2/09

11/1

2/09

13/1

2/09

15/1

2/09

17/1

2/09

19/1

2/09

21/1

2/09

23/1

2/09

25/1

2/09

27/1

2/09

29/1

2/09

31/1

2/09

02/0

1/10

04/0

1/10

06/0

1/10

08/0

1/10

mcm

NDM* DM (excl. interconnectors)* Storage Injection Interconnectors Export SND Cold demand Warm demand

*Actual from Energy@CV39mj/m3

Page 5: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Gas Demand BreakdownFrom 01-January-2010 to 09-January-2010

0

100

200

300

400

500

01/0

1/10

02/0

1/10

03/0

1/10

04/0

1/10

05/0

1/10

06/0

1/10

07/0

1/10

08/0

1/10

09/0

1/10

mcm

NDM* DM (excl. interconnectors)* Storage Injection Interconnectors Export SND Cold demand Warm demand

447.03453.9

462.8

Page 6: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Actual CWVs vs LDZ Offtake DemandFrom 01-January-2010 to 10-January-2010

0

50

100

150

200

250

300

350

40001

/01/

10

03/0

1/10

05/0

1/10

07/0

1/10

09/0

1/10

mcm

-2.5

-2

-1.5

-1

-0.5

0

0.5

1

1.5

cwv

LDZ Offtakes Actual CWV

Page 7: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Gas Consumption for Power Generation

0

20

40

60

80

100

120

14001

-Oct

08-O

ct

15-O

ct

22-O

ct

29-O

ct

05-N

ov

12-N

ov

19-N

ov

26-N

ov

03-D

ec

10-D

ec

17-D

ec

24-D

ec

31-D

ec

07-J

an

14-J

an

21-J

an

28-J

an

04-F

eb

11-F

eb

18-F

eb

25-F

eb

04-M

ar

11-M

ar

18-M

ar

25-M

ar

mcm

/d

Low Base Case High Actual Power Generation

Fig. 11

Page 8: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Gas Supply BreakdownFrom 01-December-2009 to 09-January-2010

0

100

200

300

400

500

01/1

2/09

03/1

2/09

05/1

2/09

07/1

2/09

09/1

2/09

11/1

2/09

13/1

2/09

15/1

2/09

17/1

2/09

19/1

2/09

21/1

2/09

23/1

2/09

25/1

2/09

27/1

2/09

29/1

2/09

31/1

2/09

02/0

1/10

04/0

1/10

06/0

1/10

08/0

1/10

mcm

/d

UKCS Norway (est) LNG Imports BBL IUK LRS MRS SRS

Page 9: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Gas Supply BreakdownFrom 01-January-2010 to 09-January-2010

0

100

200

300

400

500

01/0

1/10

03/0

1/10

05/0

1/10

07/0

1/10

09/0

1/10

mcm

/d

UKCS Norway (est) LNG Imports BBL IUK LRS MRS SRS

Page 10: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Storage Stocks - UKFrom 01-October-2009 to 30-November-2010

LRS Stocks

05

1015202530354045

Oct

Nov

Dec Ja

n

Feb

Mar Ap

r

May

Jun

Jul

Aug

Sep

GW

h

Stock Level 2009 / 10 Stock Level 2008 / 09

MRS Stocks

0

1

2

3

45

6

7

8

9

10

Oct

Nov

Dec Ja

n

Feb

Mar

Apr

May Ju

n

Jul

Aug

Sep

GW

h

St ock Level 2008 / 09 St ock Level 2008 / 09

SR S St o cks

0

0.5

1

1.5

2

2.5

Stock Level 2009 / 10 Stock Level 2008 / 09

• The Cold weather has coincided with withdrawals at all Storage types, all types of storage stocks are now at similar levels to last year.

Page 11: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Storage Stocks - EU

Total EU Weekly Storage Levels Oct to Sep 2008_09 and 2009_10

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,00001

-Oct

01-N

ov

01-D

ec

01-J

an

01-F

eb

01-M

ar

01-A

pr

01-M

ay

01-J

un

01-J

ul

01-A

ug

01-S

ep

mcm

2008_09 2009_10

Page 12: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Transporter Energy Traded on the OCMBuys and Sells by DayFrom 01-December-2009 to 10-January-2010

-150,000,000

-100,000,000

-50,000,000

0

50,000,000

100,000,000

150,000,000

200,000,000

01/1

2/09

03/1

2/09

05/1

2/09

07/1

2/09

09/1

2/09

11/1

2/09

13/1

2/09

15/1

2/09

17/1

2/09

19/1

2/09

21/1

2/09

23/1

2/09

25/1

2/09

27/1

2/09

29/1

2/09

31/1

2/09

02/0

1/10

04/0

1/10

06/0

1/10

08/0

1/10

10/0

1/10

kWh

-150,000,000

-100,000,000

-50,000,000

0

50,000,000

100,000,000

150,000,000

200,000,000

kWh

Buy Sell Last Year Buy Last Year Sell

Page 13: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Days of Default SMP PricesFrom 01-December-2009 to 31-December-2009

Da y s Of De f a ul t S M PFr om J a nua r y 2 0 0 9 t o De c e mbe r 2 0 0 9

0 . 0 0

10 . 0 0

2 0 . 0 0

3 0 . 0 0

4 0 . 0 0

5 0 . 0 0

6 0 . 0 0

7 0 . 0 0

8 0 . 0 0

9 0 . 0 0

Both

Percentage of Days of Default SMP

58.6%74.2%82.8%BothSMP SellSMP Buy

Page 14: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Transporter Actions on OCM Mechanism Revenues / CostsFrom 01-October-2009 to 30-November-2009

-£15.00

-£10.00

-£5.00

£0.00

£5.00

£10.00

Nov

-08

Dec

-08

Jan-

09

Feb-

09

Mar

-09

Apr-09

May

-09

Jun-

09

Jul-0

9

Aug-

09

Sep-

09

Oct-0

9

Nov

-09

£m

System Cost - Buy System Cost - Sell

-£5.0123.540.7967-0.629System Sell

£3.7027.510.93910.394System Buy

Cost (£m)Average

Price (p/therm)

Average Price

(p/KWh)

Quantity (TWh)

Net Position -0.235 Sell -£1.31

Page 15: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Imbalance Gas Revenues / CostsFrom 01-October-2009 to 30-November-2009

-£13.8525.500.8703-1.59System Sell

£14.9023.670.80801.84System Buy

Cost £mAverage

Price (p/therm)

Average Price

(p/KWh)Quantity (TWh)System

Net Position 0.25 Buy £1.05

-£20.00

-£15.00

-£10.00

-£5.00

£0.00

£5.00

£10.00

£15.00

£20.00

£25.00

£30.00

£35.00

Nov

-08

Dec

-08

Jan-09

Feb-09

Mar-09

Apr-09

May

-09

Jun-09

Jul-0

9

Aug-09

Sep-09

Oct-09

Nov

-09

£ m

System Cost - Buy System Cost - Sell

Page 16: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Scheduling RevenuesFrom 01-October-2009 to 30-November-2009

-£0.12Output

-£0.18Input

Cost £m

Total -£0.30

-£0.70

-£0.60

-£0.50

-£0.40

-£0.30

-£0.20

-£0.10

£0.00

Nov-08

Dec-08

Jan-09

Feb-09

Mar-09

Apr-09

May-09

Jun-09

Jul-0

9

Aug-09

Sep-09

Oct-09

Nov-09

£ m

Input Output

Page 17: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Balancing CostsFrom 01-October-2009 to 30-November-2009

-£15.00

-£10.00

-£5.00

£0.00

£5.00

£10.00

£15.00

OCM Imbalance Sched

-0.15Scheduling

1.06Imbalance Gas

-1.31OCM/Flex Gas

£m

Balancing Cost -0.40

(0.0003p/KWh or 0.0084p/Therm of Throughput)

Page 18: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Capacity Neutrality – Revenues From DSEC & DAIFrom 01 April 2009 to 30 November 2009

£35,529.99Other

£493,023.93TOTAL

£122,741.03Bacton

£127,527.94Easington

£17,449.81Theddlethorpe

£4,501.50Barrow

£4,342.32Teesside

£180,931.34St Fergus

RevenueASEP

Page 19: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Capacity Neutrality – Prompt Buy BacksFrom 01 April 2009 to 30 November 2009

00£0TOTAL

00£0Bacton

00£0Easington

00£0Theddlethorpe

00£0Barrow

00£0Teesside

00£0St Fergus

Volume

(kWh)

No.of daysCostASEP

Page 20: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Capacity Neutrality – Revenues From OverrunsFrom 01 April 2009 to 30 November 2009

-£94,389.80November 2009-£1,181.58October 2009-£2,992.58September 2009

-£176,913.79August 2009-£345,143.81July 2009

-£810,361.05Total

-£4,201.89June 2009-£154, 266.59May 2009-£31,271.01April 2009

RevenueMonth

Page 21: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Capacity Neutrality – Capacity Management Agreement (including RMTTSEC)From 01 April 2009 to 30 November 2009

£0.00November 2009£0.00October 2009£0.00September 2009

£0.00July 2009£0.00August 2009

£47,031.17Total

£35,442.00June 2009£0.00May 2009

£11,589.17April 2009CostMonth

Page 22: Operational Overview - National Grid Group · From 01 April 2009 to 30 November 2009 November 2009 £0.00 October 2009 £0.00 September 2009 £0.00 July 2009 £0.00 August 2009 £0.00

Capacity Neutrality – Net Cost/RevenueFrom 01 April 2009 to 30 November 2009

-£1,256,353.98Net Revenue

-£810,361.05Overrun Revenue

+£47,031.17Capacity Management Agreement

+£0.00Buy back costs

-£493,023.93DSEC/DAI Revenue