    DIVISION OF ENVIRONMENTAL HEALTH

    SOLID WASTE PROGRAM Telephone: (907) 451-2134

    610 UNIVERSITY AVENUE Fax: (907) 451-2187

    FAIRBANKS, AK 99709-3643

    http://www.state.ak.us/dec/home.htm File number: 100.15.002August 31, 2001

    CERTIFIED MAIL - RETURN RECEIPT REQUESTED 7099 3400 0015 5441 4879

    The Honorable Rhonda Boyles, Mayor

    Fairbanks North Star Borough

    P.O. Box 71267

    Fairbanks, Alaska 99707-1267

    Re: Fairbanks North Star Borough, South Cushman Landfill and Expansion, Solid Waste

    Permit #0131-BA004, Renewal of Permits #9831-BA013 and #9631-BA017

    Dear Mayor Boyles:

    The Department of Environmental Conservation has reviewed and approved your request for a

    renewal of the Class I Municipal Solid Waste Landfill Permit for the Fairbanks North Star Borough

    South Cushman Landfill and South Cushman Expansion, located at 455 Sanduri Road, Fairbanks,

    Alaska, in E 1/2, NW 1/4, & NE 1/4, SW 1/4 of Section 26, T.1S., R.1W., and in Tax Lot 2600,

    Section 26, T.1S., R.1W.; Tax Lot 2502, Section 25, T.1S., R.1W., Fairbanks Meridian, and isissuing the permit in accordance with AS 46, 18 AAC 15, and 18 AAC 60. This permit renewal

    combines the previous permits for the South Cushman Landfill and the South Cushman Expansion.

    Please review the conditions and stipulations in the permit and ensure they are all understood. This

    permit is effective upon issuance and expires August 1, 2006.

    Any person who disagrees with this decision may appeal the decision by requesting an adjudicatory

    hearing, using the procedures contained in 18 AAC 15.200-310. Hearing requests must be delivered to

    the Commissioner of the Department of Environmental Conservation, 410 Willoughby Avenue, Juneau,

    Alaska 99801-1795, within 30 days of receipt of this letter. If a hearing is not requested within 30

    days, the right to appeal is waived. Even if an adjudicatory hearing has been requested and granted, all

    permit conditions remain in full force and effect. Please also send a copy of the request to the

    undersigned.

    Sincerely,

    Nancy B. Sonafrank

    For Heather Stockard

    Solid Waste Program Manager

    SKM\ XD (EH/SW/FBKS - G:\EH\SW\2001\0131-BA004 FNSB.doc)

    Enclosure: Permit#0131-BA004

    cc w/encl: Bob Jordan FNSB Landfill

    Trustees for Alaska/Anchorage

  • 8/7/2019 operating plan sample

    2/28

    ALASKA DEPARTMENT

    OF

    ENVIRONMENTAL CONSERVATION

    DIVISION OF ENVIRONMENTAL HEALTH

    610 UNIVERSITY AVENUE

    FAIRBANKS, ALASKA 99709-3643

    SOLID WASTE DISPOSAL PERMIT

    Permit: 0031-BA004 Date: August 31, 2001

    This Solid Waste Disposal Permit is issued to Fairbanks North Star Borough (FNSB), P.O. Box 71267,

    Fairbanks, Alaska 99707-1267, for the operation and maintenance of a Class I municipal solid waste

    landfill at 455 Sanduri Road, Fairbanks, Alaska, located in the E 2, NW 1/4, and NE 1/4, SW 1/4 of

    Section 26, T.1S., R.1W., and in Tax Lot 2600, Section 26, T.1S., R.1W.; Tax Lot 2502, Section 25,

    T.1S., R.1W.,Fairbanks Meridian. This permit is subject to the conditions and stipulations contained in

    the following Appendices:

    APPENDIX A - SITE DEVELOPMENT & OPERATIONS........................................................... 2

    APPENDIX B - MONITORING AND CORRECTIVE ACTION.................................................. 3

    APPENDIX C - SITE CLOSURE................................................................................................... 7

    APPENDIX D -GENERAL PERMIT CONDITIONS..................................................................... 9

    APPENDIX E -ASBESTOS DISPOSAL CONDITIONS............................................................. 11

    APPENDIX F - ALASKA GOLD CONTAMINATED SOILS CELL.......................................... 14

    APPENDIX G - HOUSEHOLD HAZARDOUS WASTE TRANSFER FACILITY...................... 16

    APPENDIX H - N-VIRO TEMPORARY STORAGE CONDITIONS23

    This permit is issued under the provisions of Alaska Statute 46.03, and the Alaska Administrative Code,as amended or revised, and other applicable state laws and regulations.

    This permit is effective upon issuance and expires August 1, 2006. It may be terminated or modified in

    accordance with AS 46.03.120.

    Nancy B. Sonafrank

    For Heather Stockard

    Solid Waste Program Manager

  • 8/7/2019 operating plan sample

    3/28

    APPENDIX A - SITE DEVELOPMENT & OPERATIONS

    I. SITE DEVELOPMENT

    The permit holder shall:

    A. Comply with the designs and plans in the permit renewal application dated April 2001which includes the following documents: Storm Water Pollution Prevention Plan;

    Operations & Maintenance Manual; Closure/Post Closure Plan; Household Hazardous

    Waste Facility Operating Plan and the Hydrogeological Report and Sampling Plan

    (included by reference). The permit renewal application includes by reference the

    Fairbanks North Star Borough Solid Waste Management Plan, dated July 1994. The

    permittee must comply with the following permit conditions. Additional modifications to

    this permit may be requested by the permittee, but must be authorized by a permit

    amendment before that modification is effective.

    B. Ensure that all operations will accommodate the waste volume and are done in a mannerthat will facilitate close out upon closure.

    C. Maintain fencing and a locking gate at the site entrance to control public access to the

    site. Route all landfill users through the existing Sanduri Road scale facilities. A

    secondary access through the levee road may only be used for hauling cover material and

    for facility construction, not for hauling waste to the facility.

    D. Maintain permanent markers, such as surveying bench marks, from which the exact

    location of the facility and each closed portion can be determined.

    E. Maintain a minimum separation distance of 50 feet between the active placement of solid

    waste and the facility boundary. In the Expansion area, maintain a minimum separation

    distance of 100 feet between the area of active placement of solid waste and the northern

    facility boundary.

    F. Implement the stormwater control plan as described in the Storm Water Pollution

    Prevention Plan, dated April 2001.

    G. Erect and maintain the following signs:

    1. Erect and maintain a readily visible sign at the facility with the following

    information legibly printed:

    Facility Identification

    Owner/Operator Name

    Hours of Operation

    Conditions for Use

    Emergency Phone Numbers

  • 8/7/2019 operating plan sample

    4/28

    I. SITE DEVELOPMENT (cont.)

    Erect and maintain the following signs: (cont.)

    2. Erect and maintain readily visible signs in the facility which will easily direct the

    public to specific waste handling areas, and identify items which are not to be

    disposed of such as septage sludge, acids, corrosives, solvents, oily waste,

    explosives, radioactive waste, pathogenic waste, hazardous waste, etc.

    3. Erect and maintain a sign at the landfill entrance, which informs the public thatwaste loads are required to be covered or secured in accordance with AS

    46.06.080.

    H. Install and maintain a composite liner system and leachate collection system in the

    Expansion Cells as described in Sections 2 through 4 the Conceptual Design Report

    dated June, 1996 and Amendment No. 1 to the Conceptual Design Report in the permit

    renewal application.

    1. Ensure liner and leachate collection system construction that occur in areas ofpermafrost have sufficient excavation and backfill with gravel to reduce the

    potential for differential settlement. Liners and leachate systems placed in

    permafrost areas shall be inspected and given approval by a geotechnical

    engineer, as a part of the quality assurance/quality control plan for facility

    construction, to ensure adequate site thaw stability will be maintained.

    2. Ensure the standards for geosynthetic clay liners described in the FNSB letter

    dated September 10, 1996 are met for the clay liner portion of the composite

    liner system for the site. An alternative liner system consisting of a geosynthetic

    clay liner with a maximum permeability of 1 x 10-9

    cm/sec, with a scrim reinforcedpolypropylene geomembrane liner of a minimum 45-mil thickness is approved for

    this facility. Leachate collection areas shall have double polypropylene

    geomembrane liner systems as described in Section 4 of the Conceptual Design

    Report.

    3. Implement the landfill cell phasing/usage system shown in Figure 1-2 and outlinedin Table 1.2 of the permit renewal application to minimize impacts on neighboring

    properties for as long as possible.

    4. Implement an adequate visual inspection program of the subgrade material priorto geosynthetic clay liner material placement to ensure no irregularities are present

    or there are no objects there which might damage the material.

    5. Inspect each roll of geomembrane for damage prior to installation. Ensure all

    seams are field-tested and any damages noted during the liner installation process

    are repaired.

  • 8/7/2019 operating plan sample

    5/28

    I. SITE DEVELOPMENT (cont.)

    6. Implement a quality assurance/quality control program as described in Section 3

    of the Conceptual Design Report dated June 1996 during the construction of

    liners and leachate systems. The plan should include daily inspection reports and

    photographs during construction. Should failures or problems occur with the linerinstallation, the problems areas shall be corrected and retested, with a note

    regarding the problem retained in the construction record for the facility.

    7. As a part of the Quality Assurance/Quality Control for the liner installation,

    employ the services of a company that can perform an electrical leak location

    inspection of the liner when it is in place and had the drainage material placed on

    top. Areas where potential holes are located in the geomembrane shall be

    repaired prior to placement of wastes.

    I. Construct the landfill gas collection system as described in Section 6.2 of the ConceptualDesign Report dated June 1996. If odors from the passive system become a nuisance to

    neighboring properties, install an active collection system and gas flare or other approved

    device to provide control of landfill gas odor.

    II. GENERAL OPERATING PROCEDURES

    The permit holder shall:

    A. Ensure that only domestic refuse, commercial refuse, inert construction and demolitiondebris, scrap metal, asbestos, coal ash from known and tested sources, and GHU WaterTreatment Plant filter cake sludges are disposed of at the facility.

    B. Ensure that municipal solid waste (MSW) is disposed of in the Expansion Cells. SomeMSW may be disposed of in the unlined landfill as necessary. MSW disposed in the

    unlined landfill must be covered by the end of the operating day.

    C. Ensure that public access to the facility is controlled to reduce risks to health and to

    reduce safety hazards. Maintain on-site roads to assure easy user access to the facility at

    all times during open hours.

    D. Ensure that refuse is deposited in approved locations only. Dumping in unauthorized

    areas violates conditions of this permit and Alaska Administrative Codes.

    E. Ensure that dust, odor, noise, traffic, and other effects from the operation of the facility do

    not become a nuisance or hazard to the health, safety, or property of persons outside the

    property boundary.

  • 8/7/2019 operating plan sample

    6/28

    II. GENERAL OPERATING PROCEDURES (cont.)

    F. Manage the facility so that disease vectors, wildlife, and domestic animals do not

    endanger public health or safety, become harmed by contact with the waste, or become a

    nuisance.

    G. Ensure that landfill personnel conduct random hazardous waste inspections of incoming

    loads to check for prohibited wastes. Ensure that landfill personnel receive adequate

    training in the identification of hazardous waste and prohibited waste. Maintain a

    hazardous waste inspection log which will be available to the Department during facility

    inspections.

    H. Institute vector control measures as needed, (for flies, birds, rodents, animals, etc.) to

    ensure such organisms do not become a nuisance or a hazard to health. Bury all animal

    carcasses with one foot of soil immediately after disposal at the facility.

    I. Report all spills or discharges of hazardous substances, which occur at the landfill facility

    as described in 18 AAC 75, Article 3, or as revised or amended.

    J. Ensure pathological wastes or infectious wastes disposed of at the facility have been

    disinfected, sterilized, or incinerated in a pathological waste incinerator or by other

    equivalent method.

    K. Ensure that adequate leachate collection and storage capacity is provided to prevent an

    unauthorized discharge. Ensure that odors from leachate storage or treatment do not

    become a nuisance to neighboring properties.

    L. Maintain less than 12 inches of leachate head over the liner system during all times of

    facility operations.

    III. BURIAL

    The permit holder shall:

    A. Cover & Working Face Requirements

    1. Compact, consolidate, and cover all deposited municipal waste with a minimumof six (6) inches of soil or approved alternate cover materials by the end of each

    operating day. Increase covers frequency if necessary to accommodate disposal

    volume increases or to control disease vectors, odors, fire, wildlife attraction,

    scavenging problems or blowing litter.

  • 8/7/2019 operating plan sample

    7/28

    III. BURIAL (cont.)A. Cover & Working Face Requirements (cont.)

    2. Tarps may be used as an alternative daily cover for municipal waste in theExpansion Cells. Tarps must be of sufficient size to cover all exposed waste and

    be anchored to prevent winds from blowing tarps off the working face. Tires are

    acceptable for anchoring tarps. Tarps must prevent bird access to the waste, and

    be repaired or replaced immediately if damaged. If a mass of flies is present

    under the tarp upon removal at daily start-up, then

    normal soil cover must be used as daily cover. Other alternative daily cover

    materials may be used, but must be approved by the Department prior to use.

    3. Cover all deposited construction and demolition (C&D) waste with a minimum ofsix (6) inches of soil when a lift is completed. Cover the fill when the cell iscomplete, or if the fill area has been inactive for at least seven days, whichever

    comes first. Increase covers frequency if necessary to accommodate disposal

    volume increases or to control fire, wildlife attraction, scavenging problems or

    blowing litter.

    4. Deposit the waste in lifts as described in the Operations Manual and compact in

    approximately two foot increments when using the compactor. Ensure that the

    working face area is kept as small as possible to reduce litter problems and

    minimize the volume of daily soil cover material needed. At no time shall the

    working face exceed 200 feet in width. Erect and maintain an adequate numberof portable litter fences of a sufficient height to catch blowing litter and install them

    as close to the working face as possible.

    4. Ensure that when the temperature is at or below -10 degrees F at noon, theplacement of daily cover will not be delayed for more than 3 days because of the

    impracticality and difficulties of working in very cold weather.

    5. Ensure that an intermediate cover of at least 12 inches of soil is placed andgraded to ensure surface runoff on any area of the landfill which will not receive

    waste for 90 days or more.

    B. Ensure that solid wastes are not placed in surface waters.

    C. Ensure that all-nonsalvageable drum are empty of fluids prior to crushing and burying.

    Remove all fluids from drums prior to the drums disposal and properly dispose of in

    accordance with all applicable State and Federal laws, including but not limited to,

    RCRA, the Clean Water Act, the Clean Air Act, Title 46 of Alaska Statutes and 18

    AAC 60. Ensure that all large containers (e.g., cleaned barrels or drums) are crushed

  • 8/7/2019 operating plan sample

    8/28

    and flattened to prevent voids in the fill.

    III. BURIAL (cont.)

    D. Ensure that all containers for disposal which exceed 25 gallons in size are open and

    empty of fluids prior to acceptance at the facility to ensure that no oil or hazardous waste

    liquids are deposited in the landfill. Prohibit disposal of free liquids in the landfill unless acontainer holds one gallon of liquid or less.

    E. Ensure that if scrapped vehicles and equipment are accepted at the facility, they aredrained of all oil and petroleum products and lead-acid batteries removed prior to

    disposal.

    IV. BURNING

    The permit holder shall:

    A. Prohibit all open burning within the active portion of the facility.

    B. Notify the Department of Environmental Conservation, Solid Waste Program, Fairbanks

    Office at 451-2108, as soon as possible if any fires occur at the landfill. Ensure that

    appropriate and immediate actions are taken to extinguish any fires that occur.

    V. LITTER

    The permit holder shall:

    A. Keep the facility and surrounding adjacent area free of litter by collecting all the litter and

    returning it to the working face for burial as needed during the winter months. Litter shall

    be cleaned up at least once a month during the months of May through August, or more

    often if necessary.

    B. Install and maintain litter control fencing as necessary, to contain wind blown litter.

    C. Place litter fences or other screening devices at the drainage base of snow storage areasto collect litter and prevent it from discharging into the stormwater collection system.

  • 8/7/2019 operating plan sample

    9/28

    VI. PROHIBITIONS AND SPECIAL RESTRICTIONS

    The permit holder shall:

    A. Prohibit discharge of firearms at the facility.

    B. Prohibit uncontrolled scavenging and salvaging by the public.

    C. Prohibit disposal of hazardous wastes in the landfill, as defined by 40 CFR Part 261.

    D. Prohibit the disposal of raw sewage, radioactive material, oil, solvents, strong acids,

    untreated sewage sludge, septage and pathogenic waste, and other waste defined as

    hazardous under 18 AAC 60.910(28) at the facility unless specifically exempted in this

    permit.

    E. Prohibit disposal of lead-acid vehicle batteries in the landfill. Temporary storage in a

    designated area in leak-proof containers prior to transport to an acceptable recycle or

    disposal site is permitted at the household hazardous waste collection facility.

    F. Prohibit the disposal of polluted soil as defined by 18 AAC 60.025 & 330. Disposal of

    polluted soils will be considered a change in operations and will require an amendment to

    this permit in accordance with 18 AAC 15.100.

    VII. RESOURCE CONSERVATION AND RECOVERY

    The permit holder shall:

    A. Establish separate recyclable goods areas for items such as scrap metals and vehicle

    batteries. Recyclable goods shall be stored in a safe and sanitary way that prevents a

    litter violation under AS 46.06.080 and prevents a health hazard.

  • 8/7/2019 operating plan sample

    10/28

    APPENDIX B - MONITORING AND CORRECTIVE ACTION

    I. VISUAL MONITORING & GENERAL MONITORING REQUIREMENTS

    The permit holder shall:

    A. Visually monitor the site each month for signs of damage or potential damage from settlement,

    ponding, erosion, or operations at the site. Record the inspection results and maintain them in the

    facility's operating record for review by Department staff during inspections.

    B. Maintain a set of site development and use plans and submit an updated copy to the Department of

    Environmental Conservation, Solid Waste Program, Fairbanks Office, Solid Waste Program, 610

    University Avenue, Fairbanks, AK 99709 showing current status by December 15 of each year.

    C. Install and maintain locking caps on all monitoring wells to prevent or detect tampering. Each well

    shall be labeled with a permanent identification mark which corresponds to the mark indicated onthe map included in the monitoring report.

    D. Submit all groundwater, surface water, and gas monitoring data results to the Department of

    Environmental Conservation, Solid Waste Program, 610 University Avenue, Fairbanks, AK

    99709 within 120 days after the collection of required samples or data, but not later than the next

    sampling event.

    E. Ensure inspections of the leachate collection system are done in accordance with the plans outlinedin Section 3 of the Operation and Maintenance Manual dated April 2001 unless otherwise

    approved by the Department in writing.

    F. Submit an annual leachate generation report to the Department by January 31 for each calendaryear with monthly gallons of leachate recycled, disposed to the wastewater treatment system, and

    total leachate generated. Monthly average leachate pH and BOD must also be reported, and

    whether or not amendments such as phosphates were added to the leachate lagoons.

    II. GROUND AND SURFACE WATER MONITORING REQUIREMENTS

    The permit holder shall:

    A. Develop and implement a groundwater monitoring system that consists of a sufficient number of

    wells, installed at appropriate locations and depths, to yield representative groundwater samples

    from the aquifer in accordance with 18 AAC 60.825, 18 AAC 60.830, 18 AAC 60.840, and 40

    C.F.R. 258.51 - 55.

  • 8/7/2019 operating plan sample

    11/28

    II. GROUND AND SURFACE WATER MONITORING REQUIREMENTS (cont.)

    B. Develop and implement a surface waters monitoring system in accordance with 18 AAC 60.810 &

    18 AAC 60.815. Base the surface water monitoring on points of compliance selected by the

    permittee and approved by the Department. Points of compliance must be chosen so that highestconcentrations of hazardous constituents migrating off the facility will be detected.

    C. For the Expansion Area, determine if there is a statistically significant increase over background

    concentrations for one or more of the constituents monitored at any of the point of compliance

    monitoring wells or surface water sampling points. If a statistically significant increase over

    background has been detected for one or more of the constituents listed in Appendix I (40 C.F.R.

    258), develop and implement an assessment monitoring program and corrective action program in

    accordance with 40 CFR 258.55- 40 CFR 258.58, as amended through December 6, 1995.

    D. Update the appropriate groundwater monitoring plans to meet site conditions and changingknowledge about the site, as needed. Submit updated plans to the Solid Waste Program,

    Fairbanks Office for review and approval at least 30 days before changes in monitoring are to

    begin. Any plans shall be based on the site information contained in the Hydrogeological Report

    and Sampling Plan, dated August 1996.

    E. Conduct all groundwater sampling activities in accordance with a Department approved QualityAssurance Program Plan and a Department approved Sampling Plan.

    F. Determine the lateral and vertical extent of the contaminant plume that exists at the westernboundary of the South Cushman Landfill. Submit a plan to delineate the contaminant plume to theDepartment by October 31, 2001. The plan should include provisions for additional monitoring

    wells located between MW-24 and MW-7 along the landfill property boundary. The plan should

    be developed in accordance with 40 CFR 258.55.

    G. Upon Department approval, execute the plume delineation plan and provide a report of findings tothe Department by April 30, 2002.

    H. Based on results of the plume delineation, perform an assessment of corrective measures inaccordance with 40 CFR 258.56, and provide a report of the assessment to the Department by

    June 30, 2002. Schedule and conduct a public hearing to discuss the results of the correctivemeasure assessment.

    I. Select a remedy based on the results of the corrective measure assessment in accordance with 40CFR 258.57 and submit a timetable for implementation of the remedy to the Department by

    September 30, 2002.

  • 8/7/2019 operating plan sample

    12/28

    III. EXPLOSIVE GAS MONITORING & CONTROL

    The permit holder shall:

    A. Implement a gas monitoring and control plan as described in 18 AAC 60.350 to ensure that theconcentration of methane gas generated by the facility does not exceed

    1. Twenty-five percent of the lower explosive limit for methane in facility structures; and

    2. The lower explosive limit for methane at the facility property boundary.

    B. Conduct gas monitoring at least quarterly and conduct monitoring based on soil conditions,

    hydrogeologic conditions, hydraulic conditions, and the location of facility structures and property

    boundaries. Conduct gas monitoring at outdoor sampling points when wind speeds are less than 5

    miles per hour and barometric pressure is steady or falling. Record wind speed and barometricpressure on a sampling form along with the observed methane concentrations.

    C. Construct and develop gas vents, as necessary to control gases, so that explosive concentrations

    do not become a health or safety hazard.

    IV. RECORD KEEPING REQUIREMENTS

    The permit holder shall:

    A. Maintain a copy of the following records listed in Table A in the facilitys operating record. The

    records shall be made available to Department staff for review during facility inspections.

    Table A. Record Keeping Requirements

    RECORD KEEPING

    REQUIREMENTS

    REGULATION CITATION:

    Permit application or permit 18 AAC 60.210

    Solid Waste Management Plan 18 AAC 60.205

    Gas monitoring & any related

    corrective action records

    18 AAC 60.380(a)(2)

    AK Gold Contaminated Soils Cell

    visual & analytical monitoring records

    Permit #0131-BA004

    Appendix F (II.A) & (II.C)

    Surface water monitoring records 18.AAC 60.225

  • 8/7/2019 operating plan sample

    13/28

    RECORD KEEPING

    REQUIREMENTS

    REGULATION CITATION:

    Groundwater monitoring records &

    any related corrective action records

    18 AAC 60.235, 830(f), 820-860

    Operations & Maintenance Manual 18 AAC 60.210(b)(9)

    On-site sewage solids disposal

    records (if applicable)

    18 AAC 60.365

    Visual Inspections Records 18 AAC 60.210(b)(13)

    Financial Responsibility

    Documentation

    18 AAC 60.265

    Hazardous wastes/PCB detection

    program records

    18 AAC 60.240

    Closure & post-closure plans & post-

    closure notation to deed (if applicable)

    18 AAC 60.245 & 395(c)

    Staff training & operator certification

    records for Class I operators (i.e.

    landfill operations, safety, etc.)

    18 AAC.60.335

    Airport distance, floodplain, and other

    location restriction demonstrations

    18 AAC 305-320

    Current site plan & cross sectional

    drawings of the landfill

    18 AAC 60.210(b)(6)

    Leachate generation report Permit # 0131-BA004

    Appendix B (I.F)

    Household Hazardous Waste report Permit # 0131-BA004

    Appendix B (II.B.)

  • 8/7/2019 operating plan sample

    14/28

    APPENDIX C - SITE CLOSURE

    I. CLOSURE REQUIREMENTS

    The permit holder shall:

    A. Notify the Department's appropriate regional office at least 30 days before the site is to

    be permanently closed and the equipment withdrawn.

    B. Ensure that closure activities are conducted in accordance with the phased closureapproach described in the permittees Closure/Post Closure Plan dated April 2001, or as

    otherwise approved by the Department in writing. Any changes to the closure plan must

    be submitted to the Department at least 30 days prior to when work is scheduled to

    begin.

    C. Ensure that an intermediate cover of 6 to 12 inches of additional soil cover is applied overthe existing 6 inch daily cover resulting in soil cover of 12 to 18 inches in inactive areas of

    the landfill that are at closure grade but have not received final cover. Grade and

    revegetate these areas and maintain the temporary closure in a manner that protects

    public health and the environment.

    D. Ensure that closure activities begin no later than 30 days after the last date on which thelandfill facility stops accepting waste. For the unlined South Cushman Landfill, placement

    of final cover must begin no later than 30 days after final waste placement in that area.

    Complete closure activities within 180 days after beginning closure or on a schedule

    otherwise approved by the Department. Install a final cover system designed to minimizeinfiltration and erosion and meet all the applicable requirements of 18 AAC 60.395. For

    the Existing South Cushman Landfill, an alternative final cover design utilizing N-Viro

    biosolids may be utilized.

    E. For the Expansion Cells, ensure the final cover design uses a flexible geomembrane linerthat provides an equivalent or greater permeability than the geomembrane landfill liner

    present in the base of the disposal cell.

    F. Develop and implement a vegetative cover plan for completed areas within the firstgrowing season using plant species recommended by the Alaska Plant Material Center(907) 745-4469.

    G. Correct any water or air quality violations or decomposition gas hazards caused by thedeposited wastes or their interaction with the environment.

    H. Prepare and submit to the Department a survey as-built or record drawing of the facilitywithin 90 days of completion of closure activities. Show the location, types, and volume

    of waste deposited at the facility.

  • 8/7/2019 operating plan sample

    15/28

    I. CLOSURE REQUIREMENTS (cont.)

    I. Record the survey as-built or updated facility record drawings at the State RecordersOffice (or other appropriate land records office approved by the Department) along with

    a plat note or other file notation informing future property owners that

    1. the land was used as a municipal solid waste landfill; and

    2. post-closure use of the property may not disturb the integrity of the final cover, orany other component of the containment system, or the function of the monitoring

    systems, unless approved, in writing, by the ADEC Solid Waste Program.

    J. Submit a copy of the plat note or file notation and proof of filing with the Recordersoffice to this Department within 90 days of completion of closure activities.

    K. Ensure landfill final cover systems, surface water control systems, leachate collectionsystems, groundwater monitoring systems, and landfill gas collection systems are

    maintained for 30 years after site closure. The length of the post-closure care period may

    be decreased if it is demonstrated that the time period is sufficient to protect human health

    and the environment, or it may be increased to a longer period if the Department finds it is

    necessary. Implement the post-closure inspection and maintenance plan as described in

    the Closure/Post Closure Plan dated April 2001.

  • 8/7/2019 operating plan sample

    16/28

    APPENDIX D -GENERAL PERMIT CONDITIONS

    I. ACCESS AND INSPECTION

    The permit holder shall:

    The permittee shall allow the Commissioner or her/his representative access to the permitted

    facilities at reasonable times to conduct scheduled or unscheduled inspections or tests to

    determine compliance with this permit, State laws, and regulations.

    II. INFORMATION ACCESS

    The permit holder shall:

    Except for information relating to confidential processes or methods of manufacture, all records

    and reports submitted in accordance with the terms of this permit shall be available for publicinspection at the State of Alaska Department of Environmental Conservation, Fairbanks Office,

    610 University Avenue, Fairbanks, Alaska 99709-3643.

    III. CIVIL AND CRIMINAL LIABILITY

    The permit holder shall:

    Nothing in this permit shall relieve the permittee from civil or criminal penalties for

    noncompliance, whether or not such noncompliance is due to factors beyond his control

    including, but not limited to, accidents, equipment breakdowns, or labor disputes.

    IV. AVAILABILITY

    The permit holder shall:

    The permittee shall post or maintain a copy of this permit available to the public at the disposal

    facility.

    V. ADVERSE IMPACT

    The permit holder shall:

    The permittee shall take all necessary means to minimize any adverse impacts to the receiving

    waters or lands resulting from noncompliance with any limitation specified in this permit, including

    any additional monitoring needed to determine the nature and impact of the noncomplying

    activity. The permittee shall cleanup and restore all areas adversely impacted by the

    noncompliance.

  • 8/7/2019 operating plan sample

    17/28

  • 8/7/2019 operating plan sample

    18/28

    APPENDIX E -ASBESTOS DISPOSAL CONDITIONS

    I. SITE PREPARATION

    The permit holder shall:

    A. Designate and maintain a separate area within the Existing South Cushman permitted

    landfill for regulated asbestos containing material (RACM) waste disposal.

    B. Ensure the waste management area used for disposal of RACM waste is located on

    undisturbed earth or stable fill. It must not be located in an area that would preclude

    future closeout or remedial action at the facility.

    C. Install fencing, berms, trenches, or other barriers appropriate to the location of the landfill

    to control access to the designated asbestos disposal area.

    D. Post signs at the asbestos site entrance and at 100 foot intervals or less along the

    asbestos site boundary that state in one-inch or taller lettering:

    ASBESTOS WASTE DISPOSAL SITE

    DO NOT CREATE DUST

    BREATHING ASBESTOS

    IS HAZARDOUS TO YOUR HEALTH

    Signs may be removed after the final cover has been applied, however, a permanent

    monument indicating that asbestos is buried below must be maintained.

    II. RECEIVING ASBESTOS WASTE

    The permit holder shall:

    A. Ensure the permittee or designated representative is present at the site to supervise the

    disposal. The landfill operator must maintain a log of the source and quantity of asbestos

    delivered. Landfill operators may require the driver to sign in or sign over a chain-of-

    custody or waste manifest form. Shipping manifests and all other records pertaining to

    the asbestos waste must be maintained by the facility owner.

    B. Inspect loads verify to that RACM waste is properly contained in leak-tight containers

    and labeled appropriately. The loads shall be accompanied by a complete and accurate

    shipment record. The operator should contact the Alaska Department of Environmental

    Conservation (907- 451-2108) and the U.S. Environmental Protection Agency (206)

    553-1757 or (907- 269-4954) if the waste is improperly packaged.

  • 8/7/2019 operating plan sample

    19/28

    II. RECEIVING ASBESTOS WASTE (cont.)

    C. Ensure RACM asbestos waste is thoroughly wetted and placed in a leak-tight container

    before burial. Containers may be barrels, drums, or double six-mil or thicker plasticbags.

    D. Ensure all RACM containers shall have a warning label attached that states:

    CAUTION

    CONTAINS ASBESTOS

    AVOID OPENING OR BREAKING CONTAINER

    BREATHING ASBESTOS IS HAZARDOUS TO YOUR HEALTH

    or:

    CAUTIONCONTAINS ASBESTOS

    AVOID OPENING OR BREAKING CONTAINER

    BREATHING ASBESTOS DUST

    MAY CAUSE SERIOUS BODILY HARM

    III. WASTE DEPOSITION AND COVERING

    The permit holder shall:

    A. Ensure non-regulated asbestos containing material waste (non-RACM waste) is buried ina manner that does not result in the release of asbestos fibers to the air or surface water.

    Non-RACM waste must be covered with six inches of clean soil within 24 hours after

    its placement in the disposal area. Regulations do not require non-RACM waste to be

    packaged or labeled, but in some cases, packaging may be appropriate to prevent the

    release of asbestos dust. The generation of asbestos dust from non-friable (non-RACM)

    asbestos in a violation of NESHAP. The disposal of non-RACM waste may occur only

    in permitted landfills which have had no fires occurring in them for more than one year.

    B. Place RACM waste into the disposal cell carefully to avoid breaking the material or

    containers. Particular care must be taken with plastic bags since they may break underpressure and emit asbestos particles.

    C. Cover the waste and container with at least six inches of non-asbestos containing soil

    material by the end of each day of waste deposition.

  • 8/7/2019 operating plan sample

    20/28

    IV. SITE CLOSURE

    The permit holder shall:

    A. Construct permanent survey markers at the site.

    B. Ensure final cover of at least thirty (30) inches is applied within 90 days of the last

    deposition to areas that will not receive more waste within one year. Additional cover

    may be required in areas subject to excessive soil erosion or frost action.

    C. Maintain the integrity of the soil cover, slopes, vegetation, and drainage structures of

    closed asbestos waste disposal sites.

    D. Mark the limits of the asbestos disposal area on property survey records.

    E. Record that asbestos disposal has occurred at the site on the property deed, with a

    written warning about health and safety hazards related to disturbing the site. Provide

    proof to the Department that this record had been placed on the property deed.

    V. REPORTING

    The permit holder shall:

    A. Retain all records regarding RACM waste accepted at the site for at least five years after

    site closure. Records shall be furnished to the Department upon request.

    B. Maintain an exact description of the location (maps or diagrams) with reference to a

    permanent marker or survey post, showing the depth of the waste area, and the amount,

    in cubic yards of RACM waste accepted. This information shall be kept in the facility

    operating record.

    C. Prepare and annually update as-built or record drawing showing the location and volume

    of waste deposited at the asbestos waste disposal site and file those drawings with the

    Department when the site is closed.

    D. Record a plat note or file notation at the State Recorders Office (or other appropriate

    land records office approved by the Department) stating that asbestos waste has been

    buried on the property, that it would be hazardous to attempt to excavate that area, and

    any disturbance of the site must be approved by ADEC. The location of the asbestos

    deposit and permanent markers should be conveyed in the as-built drawings attached to

    the file notation.

  • 8/7/2019 operating plan sample

    21/28

    APPENDIX F - ALASKA GOLD CONTAMINATED SOILS CELL

    I. SITE DEVELOPMENT

    The permit holder shall:

    A. Maintain readily visible signs at the four corners of the disposal cell, with the following information

    legibly printed in letters at least two inches in height:

    Caution: Buried Soils Contaminated With

    Arsenic as Arsenopyrite (FeAsS) and Elemental Mercury Present

    In Concentrations Higher Than Background Levels

    Emergency Phone Numbers

    When additional solid waste is placed on top of the north end of the cell, the signs will still be

    maintained in the areas where additional wastes are not deposited at the south end of the cell.

    II. LEACHATE DETECTION SYSTEM

    The permit holder shall:

    A. Monitor for the presence of leachate in the leachate collection and leachate detection system

    annually. If sufficient amounts of leachate are present to sample, collect samples from the leachate

    collection/detection system on an annual basis during the operational life of the FNSB landfill.

    Leachate detection system monitoring will continue as a part of the post-closure care and

    monitoring requirement when the FNSB landfill closes. If no liquid is found, then further analysesare not required. If a sufficient volume of liquid for analysis is collected, then the leachate shall be

    analyzed for the metals listed below, and results of analytical data submitted within 30 days after

    collection.

    1. Analyze leachate samples for the following metals:

    Arsenic (As) EPA Method 206.2

    Cadmium (Cd) EPA Method 213.2

    Lead (Pb) EPA Method 239.2

    Mercury (Hg) EPA Method 245.1

    B. Collect, treat, and dispose of any liquids found in the leachate detection system, in excess of one

    foot in height, in accordance with state regulations. Liquids may be disposed of in a permitted

    wastewater treatment plant if it is shown that they do not exceed standards set in State Drinking

    Water Regulations 18 AAC 80 or State Water Quality Regulations set out in 18 AAC 70.

  • 8/7/2019 operating plan sample

    22/28

    II. LEACHATE DETECTION SYSTEM, (cont.)

    C. Notify the Department in writing, within 10 days of discovery that leachate is collecting within the

    liner system. Additional monitoring, sampling, or repair of the top cover liner may be required at

    that time.

    D. Submit a plan for approval by the Department, if leachate is found collecting in the system, which

    provides for the final disposal and treatment of the leachate.

    III. CELL INTEGRITY MONITORING

    The permit holder shall:

    A. Visually inspect the disposal cell area on an annual basis for signs of settlement, ponding, erosion

    of materials and place the results of visual monitoring in the operational record of the facility.Visual monitoring of the disposal cell area for evidence of subsidence, erosion, or vegetative stress

    shall continue annually throughout the active life of the landfill, and through the post-closure

    monitoring period of the facility after its closure. Retain visual monitoring results in the operating

    record for the facility.

    B. Ensure signs required in I.A. of this section are in place and are legible each time the site is visually

    monitored.

    IV. REPORTING AND RECORDS

    The permit holder shall:

    A. Prepare survey as-built or record drawings showing the location and volume of contaminated soils

    waste deposited in the disposal cell within the FNSB landfill, and file those records with the Solid

    Waste Program, Fairbanks Office within 60 days of the final closure of the landfill.

    B. Submit all results of any leachate analytical monitoring data within 30 days after collection of the

    samples and data.

    V. CELL CLOSURE REQUIREMENTS

    The permit holder shall:

    A. Monitor the disposal cell as required in Section II of this Appendix to ensure compliance with 18

    AAC 60, Article 4 (Closure), or as amended. Take remedial actions necessary to correct

    violations of Drinking Water Standards (18 AAC 80) or Water Quality Standards (18 AAC 70)

    resulting from operations at the site.

  • 8/7/2019 operating plan sample

    23/28

    APPENDIX G - HOUSEHOLD HAZARDOUS WASTE TRANSFER FACILITY

    I. OPERATIONS & SITE RESTRICTIONS

    The permittee shall:

    A. Maintain and operate the collection facility to prevent the possibility of fire, explosion, or

    any release of hazardous waste or hazardous waste constituents to air, soil, or surface

    water which could threaten human health or the environment.

    B. Restrict collection to the receipt of household hazardous waste and conditionally exempt

    small quantity generators hazardous wastes. Collect solid wastes, which exhibit a

    hazardous waste characteristic of ignitability, corrosivity, reactivity, or toxicity, or are

    defined by 18 AAC 62.020 as being hazardous waste. In conjunction with the receipt of

    the above named type of wastes, collect hazardous materials and recyclable material,

    such as used oil to be burned for energy recovery or antifreeze to be recycled or leadacid batteries to be recycled.

    C. Operate the facility as a collection point for household hazardous waste and conditionally

    exempt small quantity generators hazardous wastes only. The treatment and disposal of

    hazardous waste at the collection facility is prohibited.

    D. Erect and maintain the following signs:

    1. HAZARDOUS WASTE COLLECTION FACILITY . This sign must be

    posted at each gate or entrance to the active portion of the facility.

    2. DANGER -- UNAUTHORIZED PERSONNEL KEEP OUT. This sign must

    also be posted at each gate or entrance to the active portion of the facility. This sign

    shall also be used to distinguish restricted areas within the facility which are not

    intended for general public access.

    3. NO SMOKING. This sign is to be placed wherever there may be a hazard from

    ignitable or reactive waste.

    4. A sign at the main gate shall identify the nature and operation of the facility. The signshall state the following:

    Facility Identification

    Hours of Operation

    Emergency Phone Numbers

    E. Ensure that putrescible waste is not collected, treated, or stored at the collection facility.

  • 8/7/2019 operating plan sample

    24/28

    Manage the facility to discourage the attraction of animals.

  • 8/7/2019 operating plan sample

    25/28

    I. OPERATIONS & SITE RESTRICTIONS (cont.)

    F. Control the run-on and run-off of surface water at the collection facility. No run-off of

    surface waters shall cause a violation of the State of Alaska Water Quality Standards.

    G. Be prepared to carry out the appropriate actions immediately if there is a fire, explosion,or release of hazardous waste or hazardous waste constituents which could threaten

    human health or the environment.

    H. Ensure that the facility is equipped with a telephone, or a hand-held two-way radio, fire

    extinguishers, fire control equipment, spill control equipment, over-pack drums, and

    decontamination equipment. Maintain a water supply with adequate volume and

    pressure to supply waste hose streams, or foam producing equipment, water spray

    systems, or emergency eye wash or showers.

    I. Ensure that all personnel at the collection facility maintain a working knowledge of thevisual identification, location, and operation of all emergency equipment at the facility.

    J. Ensure that the facility is controlled and secure at all times to prevent unauthorized entry

    or activities.

    II. MONITORING, RECORDS, & REPORTING

    The permit holder shall:

    A. Conduct a visual inspection at the collection facility at least once a day while hazardouswaste is being collected or stored on-site. Inspect all areas where containers are stored

    and loading/unloading areas for leaks, deterioration, and corrosion, or any situation

    which may cause the release of hazardous materials.

    B. Submit an annual report by July 31 of each year to the Department for waste

    management operations during the previous 12 months (July through June). The report

    shall identify the quantity of each category of hazardous waste received at the collection

    facility. Identify the status of the hazardous waste collected, i.e. remains in storage, or

    has been sent to a recycling or treatment or disposal facility. The report must include the

    EPA identification number (if the permittee has one), name and address of the collectionfacility and the calendar year covered by the report.

  • 8/7/2019 operating plan sample

    26/28

    III. CLOSURE

    The permit holder shall:

    A. Remove all hazardous wastes from the collection facility within 90 days after receivingthe final volume of hazardous wastes.

    B. Within 60 days of completion of closure activities, submit to the Department, byregistered mail, a signed certification certifying that the hazardous waste collection facility