Operate Canberra Tennelec Series 5 XLB Automatic ......Operate Canberra Tennelec Series 5 XLB...

15
Operate Canberra Tennelec Series 5 XLB Automatic Proportional Counting System Type REFERENCE Document No. TF-RC-005 Rev/Mod D-4 Release Date 05/11/2017 Page 1 of 15 Tank Farm Plant Operating Procedure RADCON USQ # N/A-4 CHANGE HISTORY ( LAST 5 REV-MODS ) Rev-Mod Release Date Justification: Summary of Changes D-4 05/10/2017 RadCon Request Modified Section 2.1 to include additional terms and definitions applied throughout procedure in addition to minor changes. D-3 09/01/2016 PER Updated Records section to current standard. D-2 06/23/2016 Inconsequential Change Restored old record section per Radcon request. D-1 06/09/2016 Inconsequential Change Changed Record Section to meet Standard D-0 10/19/2015 Periodic Review Add NIST and OJT to 2.1. Remove sections 3.1 3.6. Add Special Instruction to 5.1. Remove CAUTION from 5.1. Remove “as necessary” form step 5.4.6.2. Remove NOTE for 5.5.1. Add Step 5.5.1. Table of Contents Page 1.0 PURPOSE AND SCOPE ................................................................................................................ 2 1.1 Purpose................................................................................................................................ 2 1.2 Scope ................................................................................................................................... 2 2.0 INFORMATION............................................................................................................................. 2 2.1 Terms and Definitions......................................................................................................... 2 3.0 PRECAUTIONS AND LIMITATIONS......................................................................................... 2 3.1 Radiation and Contamination Control ................................................................................ 2 4.0 PREREQUISITES .......................................................................................................................... 3 4.1 Special Tools, Equipment and Supplies.............................................................................. 3 4.2 Performance Documents ..................................................................................................... 3 4.3 Field Preparation ................................................................................................................. 3 5.0 PROCEDURE ................................................................................................................................. 4 5.1 System Power and Gas Supply ........................................................................................... 4 5.2 Monthly Background Check ............................................................................................... 5 5.3 Daily Operational Check..................................................................................................... 7 5.4 Sample Counting............................................................................................................... 11 5.5 Powering Down the System .............................................................................................. 14 5.6 Records ............................................................................................................................. 15

Transcript of Operate Canberra Tennelec Series 5 XLB Automatic ......Operate Canberra Tennelec Series 5 XLB...

Operate Canberra Tennelec Series 5 XLB

Automatic Proportional Counting System

Type

REFERENCE Document No.

TF-RC-005 Rev/Mod

D-4 Release Date

05/11/2017 Page

1 of 15

Tank Farm Plant Operating Procedure RADCON

USQ # N/A-4

CHANGE HISTORY ( LAST 5 REV-MODS )

Rev-Mod Release Date Justification: Summary of Changes

D-4 05/10/2017 RadCon Request Modified Section 2.1 to include additional terms and definitions

applied throughout procedure in addition to minor changes.

D-3 09/01/2016 PER Updated Records section to current standard.

D-2 06/23/2016 Inconsequential Change Restored old record section per Radcon request.

D-1 06/09/2016 Inconsequential Change Changed Record Section to meet Standard

D-0 10/19/2015 Periodic Review

Add NIST and OJT to 2.1. Remove sections 3.1 – 3.6. Add

Special Instruction to 5.1. Remove CAUTION from 5.1.

Remove “as necessary” form step 5.4.6.2. Remove NOTE for

5.5.1. Add Step 5.5.1.

Table of Contents Page

1.0 PURPOSE AND SCOPE ................................................................................................................ 2

1.1 Purpose ................................................................................................................................ 2

1.2 Scope ................................................................................................................................... 2

2.0 INFORMATION............................................................................................................................. 2

2.1 Terms and Definitions......................................................................................................... 2

3.0 PRECAUTIONS AND LIMITATIONS......................................................................................... 2

3.1 Radiation and Contamination Control ................................................................................ 2

4.0 PREREQUISITES .......................................................................................................................... 3

4.1 Special Tools, Equipment and Supplies.............................................................................. 3

4.2 Performance Documents ..................................................................................................... 3

4.3 Field Preparation ................................................................................................................. 3

5.0 PROCEDURE ................................................................................................................................. 4

5.1 System Power and Gas Supply ........................................................................................... 4

5.2 Monthly Background Check ............................................................................................... 5

5.3 Daily Operational Check..................................................................................................... 7

5.4 Sample Counting ............................................................................................................... 11

5.5 Powering Down the System .............................................................................................. 14

5.6 Records ............................................................................................................................. 15

Operate Canberra Tennelec Series 5 XLB

Automatic Proportional Counting System

Type

REFERENCE Document No.

TF-RC-005 Rev/Mod

D-4 Release Date

05/11/2017 Page

2 of 15

1.0 PURPOSE AND SCOPE

1.1 Purpose

This procedure provides quality control and operational instructions to Radiological

Count Room personnel for Tennelec Series 5 XLB using Eclipse software.

1.2 Scope

This procedure involves Daily Operational Checks, Monthly Quality Controls, Sample

Counting and Powering down the Canberra Tennelec Series 5 XLB Automatic

Proportional Counting System.

2.0 INFORMATION

2.1 Terms and Definitions

CRFLM - Count Room First Line Manager

cf/min - cubic feet per minute

dpm - disintegrations per minute

LHPT - Lead Health Physics Technician

NIST - National Institute of Standards and Technology

OJT - On Job Training

SAIMS – Sample Analysis Information System

3.0 PRECAUTIONS AND LIMITATIONS

3.1 Radiation and Contamination Control

3.1.1 Radioactive samples shall be stored and disposed of as radioactive material.

3.1.2 Comply with applicable RWP.

Operate Canberra Tennelec Series 5 XLB

Automatic Proportional Counting System

Type

REFERENCE Document No.

TF-RC-005 Rev/Mod

D-4 Release Date

05/11/2017 Page

3 of 15

4.0 PREREQUISITES

4.1 Special Tools, Equipment and Supplies

The following supplies may be needed to perform this procedure:

P-10 gas supply, prime standard grade (ultra pure)

NOTE - Radioactive sources used for establishing efficiency calibrations and control

chart limits shall be explicitly traceable to the NIST.

239Pu and 90Sr/Y, 47mm disc sources

2 inch x 1/8 inch stainless steel sample carrier inserts

Group and sample carrier plates

Other tools, equipment and supplies as identified by CRFLM.

4.2 Performance Documents

The following documents may be needed to perform this procedure:

SAIMS Quality Control Log

SAIMS Sample Log

Canberra S550 Eclipse LB User’s Manual

TFC-ESHQ-RP_INS-P-05, ESHQ Radiation Protection Instrumentation Program.

4.3 Field Preparation

4.3.1 CONFIRM calibration sticker is current.

4.3.2 CONFIRM OJT to operate Tennelec is complete.

4.3.3 ENSURE ECLIPSE program is running.

Operate Canberra Tennelec Series 5 XLB

Automatic Proportional Counting System

Type

REFERENCE Document No.

TF-RC-005 Rev/Mod

D-4 Release Date

05/11/2017 Page

4 of 15

5.0 PROCEDURE

NOTE - Sections 5.1 through 5.5 in this procedure may be performed and/or re-performed in

any logical order or not at all as directed by CRFLM.

- The Tennelec Series 5 XLB system shall be used only to measure and report alpha and

beta radiations for samples in accordance with approved procedures and system

calibration.

- At various points in this procedure the technician is directed to enter a Sample Log

Number into the computer and/or analysis report. For the purpose of sample tracking,

it is necessary to use the Sample Log Number rather than the sequential file number

provided by the software.

5.1 System Power and Gas Supply

Special Instruction

Do not operate Tennelec if P-10 gas pressure supply is less than 200 psig.

Do not use the Tennelec Series 5 XLB counting system to analyze samples with greater

than 50,000 dpm beta/gamma or greater than 6,000 dpm alpha activity as measured with

portable instruments, without concurrence from the CRFLM.

5.1.1 CONFIRM P-10 gas supply pressure is greater than 200 psig.

5.1.1.1 IF pressure is less than 200 psig, CONTACT maintenance for

bottle change out.

5.1.2 ENSURE output regulator is adjusted to 10 ± 1 psig.

5.1.3 IF gas supply was turned off, ALLOW detector to purge for 4 hours.

5.1.4 ENSURE power switch, at rear of sample changer, is in ON position.

Operate Canberra Tennelec Series 5 XLB

Automatic Proportional Counting System

Type

REFERENCE Document No.

TF-RC-005 Rev/Mod

D-4 Release Date

05/11/2017 Page

5 of 15

5.2 Monthly Background Check

5.2.1 PERFORM an alpha only and simultaneous background monthly counts to

establish new fixed mean values.

5.2.2 IF daily values do not fall within +/- limits of < 0.5 cpm alpha and < 3.0 cpm

beta, PERFORM further system evaluations.

5.2.3 PLACE the following into right side of sample changer:

GROUP plate

An empty planchet

END plate.

5.2.4 LOG count into SAIMS Quality Control Log using next sequential number

AND

COMPLETE log entry using sequence number format QCYY-XXXXX,

where:

QC is Quality Control designator

YY is last two digits of year

XXXXX is sequential sample number for year.

5.2.5 CLICK GO button in Control Toolbar

OR

SELECT Count/Go from Eclipse Menu.

5.2.5.1 CONFIRM Start-A-Count window appears.

Operate Canberra Tennelec Series 5 XLB

Automatic Proportional Counting System

Type

REFERENCE Document No.

TF-RC-005 Rev/Mod

D-4 Release Date

05/11/2017 Page

6 of 15

5.2 Monthly Background Check (Cont.)

5.2.6 SELECT appropriate procedure as follows:

AB BKG MONTHLY for monthly background of simultaneous

alpha/beta counting

AO BKG MONTHLY for monthly background of alpha only

counting.

5.2.6.1 SELECT appropriate Group.

NOTE - Background verification results are automatically saved to the

database at the end of the run and a background report will

automatically print.

5.2.6.2 CLICK on OK button to continue AND

CONFIRM following occurs:

Count View window appears

Sample changer loads samples

Counting sequence commences.

5.2.7 AFTER count completion, COMPLETE paperwork as follows:

5.2.7.1 REVIEW report for accuracy.

5.2.7.2 CONFIRM monthly background values fall within limits of <

0.5 cpm alpha and < 3.0 cpm beta.

5.2.7.3 RECORD log number obtained in step 5.2.4.

5.2.7.4 COMPLETE blanks at bottom of report.

5.2.7.5 SUBMIT report to CRFLM for review.

5.2.8 CLOSE Count View window.

Operate Canberra Tennelec Series 5 XLB

Automatic Proportional Counting System

Type

REFERENCE Document No.

TF-RC-005 Rev/Mod

D-4 Release Date

05/11/2017 Page

7 of 15

5.3 Daily Operational Check

NOTE - Selection of sources in reference to selected counting procedure sequence is

critical to ensure accuracy and valid quality control data.

5.3.1 PRIOR to use, PERFORM (each day) the following checks:

An alpha only and simultaneous background to verify acceptable

background levels. are < 0.5 cpm alpha and < 3.0 cpm beta

Operational checks to verify measured efficiencies fall within + 3

sigma of the fixed mean value established during the calibration. (The

source used to perform the daily source check must be listed by serial

number in the Database Utilities; preferably a source other than the

calibration source should be used.)

The chi-square test is used to test if a sample of data came from a

population with a specific distribution. If the instrument is

functioning properly and correct counting methodology is used, then

expected error can be estimated. Additional error could be the result

of equipment malfunction, improper equipment set-up or operation,

improper source handling or changes in the counting environment

such as background, temperature, power supply, etc.

Operate Canberra Tennelec Series 5 XLB

Automatic Proportional Counting System

Type

REFERENCE Document No.

TF-RC-005 Rev/Mod

D-4 Release Date

05/11/2017 Page

8 of 15

5.3 Daily Operational Check (Cont.)

5.3.2 PLACE the following into right side of sample changer: (See diagram below

for clarity.)

END PLATE

CARRIER 3 (beta source)

CARRIER 2 (alpha source)

CARRIER 1 (clean planchet)

QC Group PLATE

CARRIER 4 (An empty carrier)

GROUP A plate (if Dummy Sample is necessary)

END PLATE TOP

BETA SOURCE CARRIER 3

ALPHA SOURCE CARRIER 2

CLEAN PLANCHET CARRIER 1

QC PLATE

BLANK CARRIER ≥4

GROUP A PLATE BOTTOM

5.3.3 CLICK GO button in Control Toolbar

5.3.3.1 CONFIRM Start-A-Count window appears.

5.3.4 SELECT appropriate “Dummy” sample to ensure that QC procedures will be

performed after midnight of the day in use.

5.3.5 SELECT automatic QC sequence “Daily” AND

CLICK OK to start.

Operate Canberra Tennelec Series 5 XLB

Automatic Proportional Counting System

Type

REFERENCE Document No.

TF-RC-005 Rev/Mod

D-4 Release Date

05/11/2017 Page

9 of 15

5.3 Daily Operational Check (Cont.)

5.3.6 LOG count into SAIMS Quality Control Log using next sequential number

AND

COMPLETE log entry using sequence number format QCYY-XXXXX,

where:

QC is Quality Control designator

YY is last two digits of year

XXXXX is sequential sample number for year.

5.3.7 AFTER QC count completion, REVIEW control chart by performing the

following:

5.3.7.1 CLICK QC in Control Toolbar.

5.3.7.2 SELECT Create Control Chart AND

CLICK OK.

5.3.7.3 SELECT a Date Range that includes at a minimum the last thirty

days.

5.3.7.4 SELECT appropriate QC Profiles for daily background and

source counts.

5.3.7.5 SELECT Show Chart AND

REVIEW each chart for the following:

The daily source check efficiency values are within + three

sigma of mean.

Background values are within limits.

5.3.7.6 REVIEW reports for accuracy

5.3.7.7 VERIFY Chi-Square test results are between 8.94 and 32.89

5.3.7.8 RECORD SAIMS log numbers obtained in step 5.3.6.

5.3.7.9 COMPLETE blanks at bottom of report

5.3.7.10 SUBMIT report to CRFLM for review.

Operate Canberra Tennelec Series 5 XLB

Automatic Proportional Counting System

Type

REFERENCE Document No.

TF-RC-005 Rev/Mod

D-4 Release Date

05/11/2017 Page

10 of 15

5.3 Daily Operational Check (Cont.)

5.3.8 IF any daily operational checks fall outside 3 Sigma of mean, the

Chi-Square test is outside limits, or any background levels are above limits,

RE-PERFORM these checks individually using the following steps:

5.3.8.1 PLACE GROUP PLATE, Carrier Plate, clean Planchet, or alpha

or beta source (as applicable for the checks to be re-performed),

and END plate into right side of sample changer.

5.3.8.2 CLICK GO button in on Control Toolbar.

5.3.8.3 IN “START A COUNT” window, SELECT the appropriate

procedure for checks to be re-performed.

5.3.8.4 SELECT appropriate group AND

CLICK OK.

5.3.9 IF any daily operational check or daily background fails a second time TAG

instrument out of service AND

CONTACT CRFLM.

Operate Canberra Tennelec Series 5 XLB

Automatic Proportional Counting System

Type

REFERENCE Document No.

TF-RC-005 Rev/Mod

D-4 Release Date

05/11/2017 Page

11 of 15

5.4 Sample Counting

5.4.1 ENSURE successful completion of daily background and source checks for

type of counting to be performed.

5.4.1.1 IF unable to verify successful completion of daily background

and source checks, CONTACT CRFLM.

5.4.2 PRIOR to initiating sample counting RECORD the sample data for each

sample in the SAIMS Room Sample Log using the next sequential number..

5.4.3 COMPLETE log entry using sequence number format CRYY-XXXX,

where:

CR is facility code

YY is last two digits of year

XXXXX is sequential sample number for year.

5.4.4 WRITE sample log number on sample envelope, outer ring of sample media,

or on bottom of planchet as applicable.

5.4.5 LOAD samples into sample carriers as follows:

5.4.5.1 IF sample filter will not lay flat during counting USE a small

amount of adhesive between planchet and sample media backing

to maintain the filter flat.

5.4.5.2 PLACE each sample into a 2 inch X 1/8 inch stainless steel

planchet .

5.4.5.3 PLACE planchets into sample carriers.

NOTE - As many group plates as needed may be used provided that each

group is counted in same count mode

5.4.5.4 PLACE GROUP plate, sample carriers containing samples

counted in same count mode, and END plate into right side of

sample changer.

Operate Canberra Tennelec Series 5 XLB

Automatic Proportional Counting System

Type

REFERENCE Document No.

TF-RC-005 Rev/Mod

D-4 Release Date

05/11/2017 Page

12 of 15

5.4 Sample Counting (Cont.)

NOTE - The sample results are automatically saved to the database at the end of the

run, and a report is automatically printed.

5.4.6 SELECT “Sample Manager” icon from Eclipse toolbar.

5.4.7 SELECT “Show Batches (uncounted) Only” in Sample Manage Window

5.4.8 HIGHLIGHT

AND

CLICK Ok.

5.4.9 ENTER sample data into screen as follows:

NOTE - The operator selected name entered into the Batch ID will later be

selected as the procedure used to start a sample count.

- It is important to select the procedures and groups in the order the

samples are sequenced in the sample changer.

5.4.9.1 ENTER operator selected Batch ID.

5.4.9.2 SELECT procedure appropriate for sample counting protocol.

5.4.9.3 ENTER appropriate information in the Sample Comments.

(e.g., Initial Count, 2 day decay, 3 day decay)

5.4.9.4 ENTER Lab ID from Count Room Sample Log.

5.4.9.5 SELECT Sample Type.

5.4.9.6 SELECT Sample State as follows:

Solid for smear and lapel samples

Air for air filter media.

5.4.9.7 ENTER following for air filters:

Start and End Flow

cf/min

On and Off Date and Time

Calculate.

Operate Canberra Tennelec Series 5 XLB

Automatic Proportional Counting System

Type

REFERENCE Document No.

TF-RC-005 Rev/Mod

D-4 Release Date

05/11/2017 Page

13 of 15

5.4 Sample Counting (Cont.)

5.4.10 CLICK Update Sample.

5.4.11 CLICK Save.

5.4.12 REPEAT Steps 5.4.6 through 5.4.11 for each sample within a group.

5.4.13 EXIT Sample Manager.

5.4.14 CLICK GO in Control Toolbar.

5.4.15 SELECT Batch ID created in Step 5.4.9.1 in Start a Count Window.

5.4.16 SELECT appropriate device (Unit 1 or Unit 2).

5.4.17 SELECT appropriate Group.

5.4.18 CLICK OK to start count.

5.4.19 REPEAT Steps 5.4.14 through 5.4.18 for each Batch ID created in

Step 5.4.9.1.

5.4.20 COMPLETE documentation as follows:

5.4.20.1 REVIEW report for accuracy.

5.4.20.2 COMPLETE blanks at bottom of report.

5.4.20.3 SUBMIT report to CRFLM for review.

5.4.21 REMOVE samples from instrument.

5.4.22 RETURN samples to their envelopes.

5.4.23 RETURN sample envelopes to sample storage location

OR

DISPOSE of as Radioactive Waste as appropriate.

5.4.24 CLOSE Count View window.

Operate Canberra Tennelec Series 5 XLB

Automatic Proportional Counting System

Type

REFERENCE Document No.

TF-RC-005 Rev/Mod

D-4 Release Date

05/11/2017 Page

14 of 15

5.5 Powering Down the System

5.5.1 IF directed by CRFLM, SHUT DOWN P-10 gas supply system.

5.5.2 ENSURE all samples and sources are removed from system.

5.5.3 CLOSE all open programs on computer.

5.5.4 IF directed by CRFLM, SHUT DOWN computer.

5.5.5 IF directed by CRFLM, PLACE power switch on right rear of sample

changer to OFF position.

Operate Canberra Tennelec Series 5 XLB

Automatic Proportional Counting System

Type

REFERENCE Document No.

TF-RC-005 Rev/Mod

D-4 Release Date

05/11/2017 Page

15 of 15

5.6 Records

5.6.1 PERFORM the following for records identified within this procedure.

5.6.1.1 On the Records Submittal Checklist, RECORD the number of

pages that were completed

OR

PLACE a check mark () in the N/A column.

5.6.1.2 ATTACH the completed records to the Records Submittal

Checklist AND

SIGN Records Submittal Checklist indicating the package is

complete.

5.6.1.3 SUBMIT the completed records to an approved RadCon Record

Storage Area for retention.

The record custodian identified in the Company Level Records Inventory

and Disposition Schedule (RIDS), is responsible for record retention in

accordance with TFC-BSM-IRM_DC-C-02.

Records Submittal Checklist

Number

of pages

completed

N/A

()

Radiological Count Room Sample Results

Monthly Control Charts and Records

Daily Control Charts and Records.

/ /

Signature Print (First and Last Name) Date

First Line Manager (or designee)