Open Pit Mining
www.MineralsEd.ca
-
8/12/2019 OpenPitMining ME
2/11
Openpitminingisusedtoextractoreinrockbodiesthatareatorclosetothesurfaceof
theEarth. Largescaleequipmentdrills,shovels,andtrucksareusedtomakeoperations
efficient
and
economical.
When
they
move
in,
the
ore
is
dug
up
and
sent
to
a
mill
for
processingandreclamationproceduresareinitiated.
-
8/12/2019 OpenPitMining ME
3/11
1 Inanopenpitoperationa
rotarydrillisusedtodrill
holesthatare~30cmin
diameterand~15mdeep.
Theholes
are
commonly
filledwithANFO(short
forammoniumnitratefuel
oil)explosives.
-
8/12/2019 OpenPitMining ME
4/11
2 Theblastpattern drillholelocationandspacingandlocationdependsonthe
type
of
rock
mined
and
overall
mine
plan.
The
depth
of
the
hole
will
determine
theheightofthe benchinthepit,generally1213m.
-
8/12/2019 OpenPitMining ME
5/11
3 Blasting!Explosivesinthedrillholearedetonated,breakinguptherockintosmaller
piecesthatcanbetransportedforfurtherprocessing.Dependingonthesizeofthe
mine,availability
of
equipment,
and
capacity
of
the
mill,
blasting
may
be
scheduled
everydayorevery23days.
-
8/12/2019 OpenPitMining ME
6/11
4 Largeelectricorhydraulicshovelsscoopupblastedrockandloadintohaultrucks.
Todaytrucks
are
very
large,
carrying
80
200+
tonnes per
load.
It
may
take
only
23shovelsfulltoloadahaultruck,thenanemptyoneisreadytotake
itsplace.
-
8/12/2019 OpenPitMining ME
7/11
5
Haultrucks
loaded
with
ore
transport
it
to
aprimary
crusher
which
crushes
the
oretopieceslessthan30cm.
-
8/12/2019 OpenPitMining ME
8/11
6Therearedifferentstylesofprimarycrushers(e.g.jaw,gyratory,cone)
which
all
use
heavy
steel
parts
that
move
together
to
break
up
the
rock.
Crushedore mustbehauledbytruckorconveyedtoamillforfurther
processing.
-
8/12/2019 OpenPitMining ME
9/11
7
Haultrucks
also
transport
waste
rock
from
ablast
out
of
the
pit
to
a
wasterockdump.
-
8/12/2019 OpenPitMining ME
10/11
8 Thelocationofwasterockdumpsisdeterminedintheoriginalminedesign.They
aregenerally
located
on
the
margins
of
an
active
pit,
but
later
on
can
be
situated
in
aninactivepit,asshownhere.
-
8/12/2019 OpenPitMining ME
11/11
9 Wasterockdumpsarebuiltuptospecificdimensions.Whenreachedthatsizeand
shape,they
must
be
reclaimed
(hyperlink
to
Mine
site
reclamation),
re
sloped
ifnecessaryandrevegetated.