Open, Interoperable Advanced Metering.

PRIME PLCNETWORK BUSINESS

Control Systems and Telecommunications

April 2015

Page 2: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

2

• PRIME:

Key Enabler of Telecommunications in the Last Mile

• Telecommunications

For the Backbone

• End-to-end Management (of)

Telecommunications for the Smart Grid

Table of Contents

Page 3: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

3

Index

PRIME

Telecomms in

the Last Mile

Page 4: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

4

The 3 Cornerstones of PRIME

OPEN

INTEROPERABLE

READY

Page 5: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

5

• Open Meter & Others R&D

• PRIME Alliance. 66 members.

• Standardization.

The 3 Cornerstones of PRIME

Page 6: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

6

The 3 Cornerstones of PRIME

Page 7: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

7

• Open Meter & Others R&D

• PRIME Alliance. 66 members.

• Standardization.

The 3 Cornerstones of PRIME

Page 8: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

8

The 3 Cornerstones of PRIME

Page 9: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

• Open Meter & Others R&D

• PRIME Alliance. 66 members.

• Standardization.

The 3 Cornerstones of PRIME

9

Page 10: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

The 3 Cornerstones of PRIME

10

Page 11: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

• Interoperability since Inception.

• Interoperability by Certification.

• Interoperability by Testing.

The 3 Cornerstones of PRIME

11

Page 12: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

12

PHY MAC

PRIME PLC DC at SSPRIME meters

System level

INTEROPERABILITYBy Default

The 3 Cornerstones of PRIME

Page 13: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

13

• Interoperability since Inception.

• Interoperability by Certification.

• Interoperability by Testing.

The 3 Cornerstones of PRIME

Page 14: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

14

INTEROPERABILITYCertification

The 3 Cornerstones of PRIME

Page 15: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

15

• Interoperability since Inception.

• Interoperability by Certification.

• Interoperability by Testing.

The 3 Cornerstones of PRIME

Page 16: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

16

INTEROPERABILITYTesting

99,00%

99,20%

99,40%

99,60%

99,80%

100,00%

1-3

-7-A

ven

ida

ALC

OR

A 8

9

1-3

-7-A

ven

ida

ALC

OR

A 8

9

1-3

-7-A

ven

ida

ALC

OR

A 8

9

1-3

-7-A

ven

ida

ALC

OR

A 8

9

1-3

-7-A

ven

ida

ALC

OR

A 8

9

1-3

-7-A

ven

ida

ALC

OR

A 8

9

1-3

-7-A

ven

ida

ALC

OR

A 8

9

1-3

-7-A

ven

ida

ALC

OR

A 8

9

1-3

-7-A

ven

ida

ALC

OR

A 8

9

1-3

-7-A

ven

ida

ALC

OR

A 8

9

1-3

-7-A

ven

ida

ALC

OR

A 8

9

1-3

-7-A

ven

ida

ALC

OR

A 8

9

1-3

-7-A

ven

ida

ALC

OR

A 8

9

1-3

-7-A

ven

ida

ALC

OR

A 8

9

1-3

-7-A

ven

ida

ALC

OR

A 8

9

1-3

-30

-Ave

nid

a A

LCO

RA

91

1-3

-30

-Ave

nid

a A

LCO

RA

91

1-3

-30

-Ave

nid

a A

LCO

RA

91

1-3

-30

-Ave

nid

a A

LCO

RA

91

1-3

-30

-Ave

nid

a A

LCO

RA

91

1-3

-30

-Ave

nid

a A

LCO

RA

91

1-3

-30

-Ave

nid

a A

LCO

RA

91

1-4

-31

-Cal

le C

UA

DR

A S

ALE

RA

3

1-4

-31

-Cal

le C

UA

DR

A S

ALE

RA

3

1-4

-31

-Cal

le C

UA

DR

A S

ALE

RA

3

1-4

-31

-Cal

le C

UA

DR

A S

ALE

RA

3

1-4

-31

-Cal

le C

UA

DR

A S

ALE

RA

3

1-4

-40

-Cal

le M

AD

RO

ÑO

6

1-4

-43

-Cal

le C

UA

DR

A S

ALE

RA

5

1-4

-43

-Cal

le C

UA

DR

A S

ALE

RA

5

1-4

-43

-Cal

le C

UA

DR

A S

ALE

RA

5

1-4

-43

-Cal

le C

UA

DR

A S

ALE

RA

5

1-4

-43

-Cal

le C

UA

DR

A S

ALE

RA

5

1-4

-43

-Cal

le C

UA

DR

A S

ALE

RA

5

1-4

-43

-Cal

le C

UA

DR

A S

ALE

RA

5

1-4

-46

-Cal

le C

UA

DR

A S

ALE

RA

7

1-4

-46

-Cal

le C

UA

DR

A S

ALE

RA

7

1-4

-46

-Cal

le C

UA

DR

A S

ALE

RA

7

1-4

-56

-Cal

le M

AD

RO

ÑO

8

1-4

-62

-Cal

le L

A H

IGU

ERA

(C

UA

DR

A S

ALE

RA

) 7

1-4

-67

-Cal

le M

AD

RO

ÑO

10

1-4

-78

-Cal

le M

AD

RO

ÑO

12

1-4

-87

-Cal

le S

AB

INA

10

1-4

-90

-Cal

le S

AB

INA

12

1-4

-95

-Cal

le S

AB

INA

14

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-64

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

2

1-8

-78

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

3

1-8

-78

-Cal

le A

ZUEB

AR

(G

PO

. SA

NTI

AG

O)

3

#N

/A

#N

/A

#N

/A

Availability

%

Avail

The 3 Cornerstones of PRIME

Page 17: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

17

• PRIME developed & tested since 2009 on field.

• Iberdrola, GNF, EDP, Energa, …

The 3 Cornerstones of PRIME

Page 18: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

18

READY&FUTURE-PROOFEvolution

SiteRegion

Country

From: Smart Meteringto: LV Grid Management

The 3 Cornerstones of PRIME

Page 19: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

19

• PRIME developed & tested since 2009 on field.

• Iberdrola, GNF, EDP, Energa, …

The 3 Cornerstones of PRIME

Page 20: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

20

READY&FUTURE-PROOFExpanding

The 3 Cornerstones of PRIME

6M+ metersdeployed

Page 21: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

• PRIME is an Open Telecommunications Protocol

• PRIME is an Interoperable Telecommunications Technology

• PRIME is a fully Ready & Future-Looking Technology

and it is the key enabler of LV GRID CONTROL with the extension to the 500 kHz band

The 3 Cornerstones of PRIME

21

Page 22: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

22

Index

Telecomms

in the

Backbone

Page 23: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

23

Telecommunications Network

Secondary SubstationLVPRIME

-Millions

ACCESS NETWORK- Thousands

BACKBONE- Hundreds

Page 24: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

24

Public and Private Telecommunications Networks

Head End

Private, Fixed / Mobile

Network

S

S

PLC: PRIME

PLC: MV (BPL)

PUBLIC NETWORK

Public Network

Public Network

Public Network

Fixed/Mobile Public Network

PLC: PRIME

PLC: PRIME

SS

SS

SS

Private, Fixed / Mobile

Network

MPLS/SDH/FO

√ Efficiency (€) is key when selecting the proper solution

Page 25: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

MV

BPL

GPRS/3G

Telecommunications Network

Access Telecommunications Technologies

ACCESS

NETWORK

25

Page 26: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

26

Page 27: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

27

Access Technology Comparison

• Example. BPL vs. GPRS (2G) “experience” comparison:

• Performance example:– Firmware Update (FW). Data Concentrator:

FW image = 1,5 MB; Minimum throughput GPRS = 20 min; BPL = 2 min

Maximum throughput GPRS = 10 min; BPL = 6 s

– Data Concentrator web page:

Web page = 0,05 MB; Minimum throughput GPRS = 40 s; BPL = 4 s

– Telecontrol status update (with data) :

Minimum throughput / Maximum Latency GPRS = 4,88 s; BPL = 0,81 s

Maximum throughput / Minimum Latency GPRS = 2,64 s; BPL = 0,33 s

GPRS BPL

Throughput 10 kbps – 20 kbps 100 kbps – 2 000 kbps

Latency 400 – 700 ms 80 – 150 ms

(x 10, x 100)

Page 28: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

FECHA FIN Fallidos Timeouts > 30s Media (ms) Aceptacion

05/04/2012 4.35% 0.05% 67 1063.29 NOK12/04/2012 3.00% 0.00% 1 923.82 NOK19/04/2012 3.55% 0.00% 39 969.24 NOK23/04/2012 2.98% 0.00% 4 957.31 NOK30/04/2012 4,54% 0,00% 25 951,79 NOK02/05/2012 3,91% 0,00% 27 949,09 NOK21/05/2012 3.92% 0.00% 57 1232.23 NOK

Failure

• Secondary substations in Urban environment. Underground scenarios are bad for GPRS.

• Real Example

Minimum threshold 1%

Are 2G/3G Technologies Ready?

28

Page 29: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

• Public telecommunications networks do not prioritize the traffic of the utilities.

Do we get the resources we require?

29

Page 30: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

30

Through the Smart Metering …

MVGrid

LVGrid

SecondarySubstation

PrimarySubstation

Smart meters

MV & LV Smart Grid: Infraestructure

And Utilities said, “Let there be Metering,” and there was Smart Metering ...

Smart

Metering

Page 31: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

31

… to the Smart Grid

MV & LV Smart Grid: Infraestructure

And Utilities saw that the Metering was good. And Utilities considered the evolution towards the Smart Grid ...

Telecommunications

Network over the LV Grid

MVGrid

LVGrid

SecondarySubstation

PrimarySubstation

Smart meters

MV RTU’s

Metering

&

Control

BPL (Broadband PLC)

BPL & PLC = Enablers

Page 32: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

32

… to the Smart Grid

MV & LV Smart Grid: Infraestructure

And there was a “before” and there was “an after” ...

MVGrid

LVGrid

SecondarySubstation

PrimarySubstation

Smart meters

MV RTU’s

LV RTU’sConnectivity

Smart

Grid

+ End-to-end telecommunications network

+ Mix of private and commercial networks € Efficiency

+ Wired (PLC) and wireless (licensed radio) technologies

+ BPL and PLC as enablers under utility control

Smart meters

LV RTU’s

MV RTU’s

Telecommunications Network

Page 33: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

33

Index

End-to-end

Management

Page 34: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

34

• Smart Metering is just the first “app” of PRIME.

• Need to map the LV assets: obliged to improve SAIDI (System Average Interruption Duration Index).

Smart Grid. Application Number 2: LV Feeder Mapping

34

• Key facts:

– LV grid mapping is generally notknown.

– PRIME Control messages are used to retrieve LV feeder and phase mapping of Smart Meters.

– No extra resources needed in the telecom network.

Page 35: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

35

• Need to remotely access RTU’s in the LV Grid: remote control of feeder switches, control of renewables connection, …

Smart Grid . Application Number 3: Remote Control and Automation

35

20%

10%

• Key facts:

– There is extra bandwidth available. IP based.

– There are resources in the technical specification:

Base Node control.

Direct connections.

Contention Free Period (CFP).

Page 36: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

Meter MAC

Termin

al Switch

Unavai

lable

Availabl

e

Total

Time

Short

Cycles

Failur

es

Short

Cycles

Succe

sses

Short

Cycles

Numb

er

%

Availabi

lity

Short

Long

Cycles

Failures

Long

Cycles

Success

es

Long

Cycles

Number

%

Availabi

lity Long

Cycles

34625882 40:40:22:10:59:5a 0,59% 99,41% 0,00% 100,00% 597462 0 170 170 100,00% 0 46 46 100,00%

34625824 40:40:22:10:59:20 98,89% 1,11% 0,00% 100,00% 598268 0 170 170 100,00% 0 46 46 100,00%

35005985 40:40:22:16:26:21 99,82% 0,18% 0,00% 100,00% 597487 170 0 170 0,00% 46 0 46 0,00%

34625879 40:40:22:10:59:57 79,92% 20,08% 0,00% 100,00% 597519 0 170 170 100,00% 0 46 46 100,00%

34625895 40:40:22:10:59:67 90,33% 9,67% 0,00% 100,00% 596758 0 170 170 100,00% 0 46 46 100,00%

34625899 40:40:22:10:59:6b 99,79% 0,20% 0,00% 100,00% 597510 0 170 170 100,00% 0 46 46 100,00%

34625168 40:40:22:10:56:90 99,87% 0,09% 0,04% 99,96% 597029 0 170 170 100,00% 1 45 46 97,83%

34625831 40:40:22:10:59:27 99,57% 0,36% 0,07% 99,93% 597486 0 170 170 100,00% 0 46 46 100,00%

34625875 40:40:22:10:59:53 99,90% 0,03% 0,07% 99,93% 597621 0 170 170 100,00% 0 46 46 100,00%

35005984 40:40:22:16:26:20 99,66% 0,18% 0,16% 99,84% 598314 1 169 170 99,41% 0 46 46 100,00%

Availability?

Management of Adavanced Metering Infraestructure

36

Page 37: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

Management of Supporting Telecommunications. PRIME

MAC Traces

Channel Occup.

Weekly Traffic

37

Page 38: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

Management of Supporting Telecommunications. Core&Access

MPLS

Interfaces

Traffic

SNMP

BPL

38

Page 39: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

IT become an essential part of the smart grid, key to deploy, operate

the network and to get the value from the investment

Management of the Overall System

39

Page 40: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

Distribution company

• More automated processes• Savings and additional revenue• Improved quality of processes• Availability of new valuable information

Retailers

• Immediate and more effective operations• Claims reduction• Better customer knowledge and bid optimization• Precise and accurate energy settlement with hybrid combined

cycle power plants

Consumers

• Invoices with actual readings and with fewer errors • Immediate response to requests• Web access with information to enable a pricing optimization

40

Realization of the Benefits

40

Page 41: Open, Interoperable Advanced Metering. - EPRI · Open, Interoperable Advanced Metering. PRIME PLC NETWORK BUSINESS Control Systems and Telecommunications April 2015. 2 • PRIME:

• PRIME is the most widely deployed and mature PLC,Plug&Play, Telecommunications Solution to Enable the SmartGrid in the last mile.

• BPL (Broadband PLC) technology is a proven and widelydeployed (10,000+ layer 2 devices) AccessTelecommunications technology, solving the shortcomings ofwireless technologies.

• End-to-end Network Vision and Management is key to face the challenges of Smart Grids.

Conclusions

41